Solicitation - W912PP25QA017.pdf
PDF 3 MB Posted
- Attached to
- Potable Water Tanks Inspection at Conchas Dam
- Solicitation number
- W912PP25QA017
About this file
This is a Request for Quote (RFQ) solicitation for potable water tank inspection services at Conchas Dam, New Mexico. The U.S. Army Corps of Engineers Albuquerque District (W912PP) is seeking a contractor to perform a comprehensive inspection of three potable water storage tanks: one 30,000-gallon raw potable water tank located in the maintenance area and two 3,000-gallon portable storage tanks located in the administrative building. The contract is a firm fixed-price service contract with a period of performance of 180 days after award.
The solicitation is set aside for Women-Owned Small Business (WOSB) with a NAICS code of 221310 and a size standard of $41,000,000. Offerors must submit their quote via email to Harry Rivera by 3:00 PM on 25 Jul 2025. The contractor will be responsible for furnishing all labor, management, equipment, supplies, and materials needed for the tank inspection, in strict accordance with the attached Performance Work Statement and U.S. Department of Labor Wage Determination. Pricing will include all applicable federal, state, and local taxes, with the point of contact for the project being Santiago M. Gallegos.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
calls)
Created On:
15 Jul 2025, 11:05 AM Central Daylight Time
Solicitation/Contract Form Continuation
Conchas Tank Inspection
Submission Instructions
Please submit offers to Harry Rivera via e-mail at harry.j.riverareyes@usace.army.mil.
The Government intends to award a Firm Fixed Price service contract, resulting from this solicitation to the responsible Offeror with the lowest acceptable price.
****************Note to Offeror****************
The System for Award Management (SAM) registration (formerly CCR) should be completed prior to award of any resultant contract from the RFQ.
Failure to have this registration completed could cause delay of award or rejection of offer. To complete or update a SAM registration, go to www.
sam.gov.Please provide the following information with quote:
UEI Number: ______________________
Federal Tax ID Number: ______________________
CAGE Code: ______________________
W912PP25QA017
Continuation of Supplies or Services and Prices/Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
Contractor shall furnish all labor, management, equipment, supplies, and materials needed for Potable water tank Inspection at Conchas Dam, NM, in strict accordance with the attached Performance Work Statement and US Department of Labor Wage Determination. Price includes all applicable Federal, State, and Local taxes. Point of contact for this project is Santiago M Gallegos, 505-441-8469.
Product Service Code: H346 Pricing Arrangement: Firm Fixed Price
1 Each
Continuation of Description
See Performance Work Statement attached
Requirements This is a non-personal services contract to provide potable water tank inspections of the three (3) potable water storage tanks located at Conchas Dam, NM. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary contractor who, in turn is responsible to the Government.
Continuation of Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
Party to receive Certified Inspection Report
Other
DoDAAC: 968384 CountryCode: USA
US ARMY CORPS OF ENGINEERS
CONCHAS PROJECT OFFICE, 287 BELL RANCH ROAD
CONCHAS DAM, NM 88416
UNITED STATES
Christine D Green Email: Christine.D.Green@usace.army.mil Telephone: 5758682221
Continuation of Deliveries or Performance
Party to Pay Transportation Cost: Contractor Point
Type: FoB Point
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule 180 Days After Award
1 Each Service Performance Site DoDAAC: 968384 CountryCode: USA
US ARMY CORPS OF ENGINEERS
CONCHAS PROJECT OFFICE, 287 BELL RANCH
ROAD
CONCHAS DAM, NM 88416
UNITED STATES
Christine D Green Email: Christine.D.Green@usace.army.mil Telephone: 5758682221
1-1
PERFORMANCE WORK STATEMENT (PWS)
Potable Water Tank Inspection at
Conchas Dam
PART 1
GENERAL INFORMATION
1.0 General: This is a non-personal services contract to provide potable water tank inspections of the three (3) potable water storage tanks located at Conchas Dam, NM. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform raw potable water tank inspections as defined in this Performance Work Statement
(PWS) except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background Routine potable water inspections should be performed on all potable water storage tanks at minimum 3 to 5 years depending on existing conditions. The inspection shall be conducted by a qualified inspector or engineer.
1.3 Objectives: The objective is to provide inspection services to the three (3) potable water storage tanks located at Conchas Dam. The inspection items will include one (1) 30,000-gallon raw potable water storage tank located in the maintenance area, northwest of the project office; and two (2) 3,000-gallon portable storage tanks located in the administrative building next to the filtration system.
1.4 Scope: Routine inspections shall be performed on the three (3) active potable water storage tanks.
The inspection shall be conducted by a qualified inspector using the dry method when the tanks are completely drained. All discharge water and sediment released from the tanks may be released onto the ground. All discharge water does not require dichlorination. The tanks shall be evaluated from several locations to provide an accurate evaluation of its condition. Individuals entering the tank sh all comply with the Occupational Safety and Health Administration (OSHA), state, and/or other applicable regulations
1-2 concerning entry into confined spaces. The Contractor shall inspect the following specific tasks in section
5.1 Inspection Requirements.
1.5 Period of Performance: The period of performance is 180 days after award.
1.6 General Information:
1.6.1 Place of Performance: The work to be performed under this contract will be performed at
Conchas Dam located 32 miles northwest of Tucumcari, New Mexico and 77 miles south of Las Vegas, New Mexico.
1.6.2 Type of Contract: The Government will award a Firm, Fixed-Price Contract.
1.6.3 Hours of Operation: The Contractor is responsible for conducting business between the hours of
0730 and 1600 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
For other than firm fixed price contracts, the contractor will not be reimbursed when the Government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.4 Recognized Holidays: The following holidays are recognized as Federal holidays and
Government offices will not be open
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Juneteenth Christmas Day
Independence Day
1.6.5 Quality Control The contractor shall develop and maintain an effective Quality Control Program
(QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract. The QCP shall be delivered within 30 days after contract award. Three copies of a comprehensive written QCP shall be submitted to the KO and COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.6.6 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in a ccordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum satisfactory performance thresholds.
1.6.7 Security Requirements: Contractor personnel performing work under this contract must have a
1.6.7.1 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1-3
1.6.7.2 General Security Requirements and Guidance
The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated
Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity
(RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of
Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the da te new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the
Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition
(FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and
Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the
Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site -specific requirements identified in local policies or procedures.
1.6.7.2.1 Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security
Office using the National Crime Information Center-Interstate Identification Index
(commonly referred to as “NCIC-III”) and Terrorist Screening Da tabase (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures.
Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed.
Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
1.6.7.2.2 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or
See Something, Say Something) All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
1-4
1.6.7.2.3 Pre-screen Candidates Using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility
Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under
United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
1.6.7.3 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The
Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the
Contracting Officer.
1.6.7.3.1 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks;
however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.
1.6.7.3.2 The contractor shall prohibit the use of Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.6.7.4 Lock Combinations: The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the contractor’s Quality
Control Plan.
1.6.8 Special Qualifications: The Contractor is responsible for ensuring that all employees possess the required certifications, safety equipment, etc.
1.6.9 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with
Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s
Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise
1-5 the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.10 Contracting Officer’s Representative (COR): A COR may be identified by separate letter. The
COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance ;
maintain written and oral communications with the contractor concerning technical aspects of the contract;
issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor contractor's performance and notifies both the Contracting Officer and contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.6.11 Key Personnel: The follow personnel are considered key personnel by the Government: Santiago
Gallegos, Project Manager, Santiago.M.Gallegos@usace.army.mil , Office: (505) 441-8469; Dante Padilla, Government Representative, Dante.G.Padilla@usace.army.mil, Office: (505) 850-9310. The contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Contract Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The Contract Manager or alternate shall be available between 0730 and 1600 Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.
1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering
Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the min ds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contract personnel will not be required to obtain and/or wear badges during the performance of the work outlined in this PWS.
1.6.13 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the
Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.14 Organizational Conflict of Interest Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, spec ifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent
Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the
Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such
OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he file://///155.83.170.200/cespa/User/CT/Simplified%20Purchases/FY25%20Purchase%20Orders/W912PP25QA017%20-%20CN%20Potable%20Water%20Tank%20Inspection/Pre-Award/,%20Santiago.M.Gallegos@usace.army.mil%20 file://///155.83.170.200/cespa/User/CT/Simplified%20Purchases/FY25%20Purchase%20Orders/W912PP25QA017%20-%20CN%20Potable%20Water%20Tank%20Inspection/Pre-Award/Dante.G.Padilla@usace.army.mil
1-6 or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.15 Safety:
1.6.15.1 U.S. Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385-1-1 and
OSHA Requirements: The Contractor will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385 -1-1 in effect on the date of the contract award. EM 385-1-1 and its changes are available at https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/. The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.
1.6.15.2 Zero Accident Goal: The Albuquerque District, in its continual pursuit of excellence in safety has established a goal of zero accidents. To attain this goal, it will be necessary for contractor management to set the expectation that worker injury is unacceptable and to create a culture where employees at all levels accept ownership of their safety performance.
1.6.15.3 Contractor Accident Prevention Plan: The Contractor shall develop a contract- or site- specific
Accident Prevention Plan (APP) to address the specific work, work processes, equipment to be used, and hazards pertaining to the contract. The APP shall contain appropriate hazard -specific plans as needed for the work being performed. The Contractor shall provide (1) Electronic in PDF Format and (1) Hard Copy
15-Days after award for Review and Acceptance by the COR https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/
2-1
DEFINITIONS & ACRONYMS
2.0 Definitions and Acronyms:
2.1 Definitions
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the
Government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance (QA): The Government procedures to verify that services being performed by the contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control (QC): All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 Work Day: The number of hours per day the contractor provides services in accordance with the contract.
2.1.12 Work Week: Monday through Friday, unless specified otherwise.
2-2
2.2 Acronyms:
ACOR Alternate Contracting Officer's Representative
AFARS Army Federal Acquisition Regulation Supplement
AR Army Regulation
CCE Contracting Center of Excellence
CFR Code of Federal Regulations
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative
COTR Contracting Officer's Technical Representative
COTS Commercial-Off-the-Shelf
DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DMDC Defense Manpower Data Center
DOD Department of Defense
FAR Federal Acquisition Regulation
HIPAA Health Insurance Portability and Accountability Act of 1996
KO Contracting Officer
OCI Organizational Conflict of Interest
OCONUS Outside Continental United States (includes Alaska and Hawaii)
ODC Other Direct Costs
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
TE Technical Exhibit
USACE U.S. Army Corps of Engineers
3-1
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.0 Government Furnished Items and Services:
3.1 Services: The Government will provide a site visit, if requested by the Contractor. The
Government will also provide guidance and progress meetings, as necessary.
3.2 Facilities: The Government will provide the Contractor with any necessary keys or combinations to locks to access Conchas Dam Project areas in which the Contractor will require access upon the
Contractor’s arrival for the performance of services and check in at the Visitor Center. Keys and lock combinations must be returned to the POC/COR upon completion of the work described in this PWS.
3.3 Utilities: The Government will provide the use of utilities and water for tasks outlined in this
PWS. If utilities are furnished, the following is required: The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
3.4 Equipment: The government will not provide any equipment for performance of this contract.
3.5 Materials: None
4-1
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 Contractor Furnished Items and Responsibilities:
4.1 General: The contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance: A Security Facility Clearance is not necessary for this contract.
4.3 Materials: The contractor shall furnish all personnel, equipment, supplies, services, transportation, tools, materials, supervision, and other items (personal and non -personal) for services required to meet the requirements in this PWS.
4.4 Equipment: The contractor shall provide all necessary equipment to meet the requirements in this
PWS.
4.5 Government Safety Requirements: The contractor shall submit their written Accident
Prevention Program to the Contracting Officer for evaluation and acceptance. The plan must be submitted and approved before any on-site work begins.
4.6 Service Contract Reporting (SCR): The contractor shall report ALL contractor labor hours
(including subcontractor labor hours) required for performance of services provided under this contract for
USACE via a secure data collection site. See clause 52.204-14. The contractor is required to completely fill in all required data fields using the following web address www.sam.gov
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each ca lendar year. Contractors may direct questions to the help desk at: www.fsd.gov. Contractor User Guide is available at www.sam.gov
Click on the “Help” tab.
http://www.sam.gov/ http://www.fsd.gov/ http://www.sam.gov/
5-1
PART 5
SPECIFIC TASKS
5.0 Specific Tasks: The contractor shall furnish all personnel, equipment, supplies, services, transportation, tools, materials, supervision, and other items (personal and non -personal) for services required to meet the requirements in this PWS.
5.1 Basic Services: The contractor shall provide a thorough inspection on the three (3) potable water storage tanks located at Conchas Dam and provide insight on the contractor’s findings via electronic file.
The inspection shall be conducted by a qualified inspector using the dry method when the tanks are completely drained. The tanks shall be evaluated from several locations to provide an accurate evaluation of its overall condition. The contractor shall ensure all features of the tanks mentioned in Section 5.1 are captured in their inspection results. Individuals entering the tank should comply with Occupational Safety and Health Administration (OSHA), state, and other applicable regulations concerning entry into confined spaces.
5.2 Optional Services: Exercise of options is at the Government’s discretion. The contractor shall not perform these optional services unless the Contracting Officer has executed a formal contract modification exercising the option.
5.3 Inspection Requirements:
5.3.1 Foundation: The foundation should be checked for visible concrete deterioration, settlement, and hollow-sounding areas
5.3.2 Supporting tower: The diagonal and riser rods shall be inspected for any rust or metal loss that may reduce their strength. They shall also be checked for proper tension. All the connections (clevises, wing plates, turnbuckles, and strut-to- column connections) shall be checked for structural integrity. The bolts and welds at these connections shall be inspected for metal loss and deterioration.
5.3.3 Container: The interior and exterior of the tank shall be inspected for deteriorating or worsening conditions that may include rust, mineral buildup, and loss of material, and to determine the remaining membrane thickness. The exterior must be marked “POTABLE WATER
ONLY”. Rivets and bolts shall be examined for tightness and metal loss. Pits shall be measured with a pit-depth gauge to determine the extent of the pitting. The steel around the pit shall be measured with an ultrasonic thickness gauge to determine the th ickness of the steel surrounding the pit.
5.3.4 Container Interior (Stainless Steel and Aluminum): Inspect the interior of the tank to determine existing conditions and to ensure that the tank is in good operable condition and is in no need of repair, that there are no rusting elements, material degradation, damage to the paint coating, no cracking or surficial damage is observed, and that the polyurethane is not exposed.
5.3.5 Container Interior (Fiberglass): Inspect the interior of the tank to determine existing conditions and to ensure that the tank is in good operable condition and is in no need of repair, that
5-2 cracks and chips are less than 10%, the fiberglass is not exposed, and that there is no damage to the paint coating.
5.3.6 Manhole Covers: Inspect the rubber gasket, insulation, and other physical components to ensure that these items are intact and are not displaced. Operate the locking mechanism and pressure relief valve to ensure the operation and functionality of these components.
5.3.7 Coating: Inspect the interior and exterior coating for rust, peeling, chalking, and/or graffiti.
5.3.8 Sanitary Conditions: Inspect the tank piping (including drain and overflow) for possible cross-connections. All the manholes, hatches, vents, and openings shall be inspected for compliance with AWWA standards and local, state, and federal regulations.
5.3.9 Vent and Overflow: The Contractor shall inspect for missing, damaged, rusted, or warped screens and ensure that the screen sizes can prevent birds and insects from entering the tank. The Contractor shall inspect the vent and overflow for proper sizing if there has been a significant increase in water usage and a corresponding increase in the fill/withdraw rates of the tank.
5.3.10 Access Hatches: The Contractor shall inspect that the access hatches to ensure that they are properly installed, fit snug, can easily be secured, and have a 4-inch curb or neck and 2-inch downward overlap or are tightly gasketed, bolted, and sealed.
5.3.11 Finial Balls: Inspect that the finial balls are effectively screened.
5.3.12 Roof: Inspect the roof for any physical damage such as holes, missing components, and/or interior or exterior damage. Inspect roof for any indications of settlement such as depressions, heaves, or displacement.
5.3.13 Cathodic Protection: Operate and inspect the system to ensure operability and that there is no physical damage.
5.3.14 Accessories: Level gauges, access lighting, obstruction lighting, and antennas, ladders, safety railings, platforms, and other safety-related items shall be inspected for deterioration and to ensure that they meet all applicable regulations.
5.3.15 Environment: The tank inspection shall include an evaluation of the tank’s environment and operating conditions.
6-1
PART 6
APPLICABLE PUBLICATIONS
6.0 Applicable Publications (Current Editions) Contractor shall be accordance with applicable ANSI/AWWA standards, Federal, local and State Codes.
6.1 The contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures in Part IV – Army – Chapter 16 129-131.
7-1
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7.0 Attachment/Technical Exhibit List:
7.1 Attachment 1/Technical Exhibit 1 – As built detail for 30,000-gallon portable water tank..
7.2 Attachment 2/Technical Exhibit 2: As-built detail for the two, 3,000-gallon potable water tanks.
7-2
7-3
7.3 Attachment 3/Technical Exhibit 3: As-built detail of the two, 3,000-gallon potable water tanks.
7-4
7.4 Attachment 4/Technical Exhibit 4: Aerial view of the tank locations with respect to the Conchas
Dam Project Office.
TE1-1
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum satisfactory levels of service required for each requirement. These thresholds are critical to mission success.
Performance
Objective Standard
Performance
Threshold
Method of
Surveillance
Task # 1.
The Contractor shall schedule and attend a
Pre-Construction
Meeting after award and prior to performing the requirements of this
PWS, pursuant to Part 5 of this PWS.
The Contractor scheduled and attended a Pre-Construction
Meeting prior to performing the requirements of this
PWS, pursuant to
Section 5.1.1.
Zero deviation from standard.
The COR/POC shall provide a detailed report after the Pre-
Construction Meeting identifying the attendees of the meeting, discussions, issues, resolutions, etc.
Task # 2
The Contractor shall complete 100 percent inspection in accordance with Part 5 of this PWS and in accordance with applicable
ANSI/AWWA
standards, Federal, local and State codes.
The Contractor submitted an electronic file displaying and discussing their findings during the inspection.
Zero deviation from standard.
The COR/POC received the electronic file that covers the findings during the inspection.
TE2-1
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Inspection Report to include a written report and digital report capturing all findings during the inspection.
30 days after inspection is complete
One copy Via Email Santiago.M.Gallegos@usace.army.mil;
Dante.G.Padilla@usace.army.mil
Quality Control
Plan
30 days after award
One copy Via Email Santiago.M.Gallegos@usace.army.mil;
Dante.G.Padilla@usace.army.mil
Annual
Performance Plan
15 days after award
One copy Via Email Santiago.M.Gallegos@usace.army.mil;
Dante.G.Padilla@usace.army.mil
Provide names of contract personnel trained in
Suspicious Activity
Reporting Training
10 days after award
One copy Via Email Santiago.M.Gallegos@usace.army.mil;
Dante.G.Padilla@usace.army.mil
Provide names of contract personnel pre-screening using
E-Verify
10 days after award
One copy Via Email Santiago.M.Gallegos@usace.army.mil;
Dante.G.Padilla@usace.army.mil mailto:Santiago.M.Gallegos@usace.army.mil mailto:Dante.G.Padilla@usace.army.mil mailto:Santiago.M.Gallegos@usace.army.mil mailto:Dante.G.Padilla@usace.army.mil mailto:Santiago.M.Gallegos@usace.army.mil mailto:Dante.G.Padilla@usace.army.mil mailto:Santiago.M.Gallegos@usace.army.mil mailto:Dante.G.Padilla@usace.army.mil mailto:Santiago.M.Gallegos@usace.army.mil mailto:Dante.G.Padilla@usace.army.mil
Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services. Nov 2023
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023 252.204-7022 Expediting Contract Closeout. May 2021 252.246-7003 Notification of Potential Safety Issues. Jan 2023 252.225-7001 Buy American and Balance of Payments Program. Feb 2024 252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2023
252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7010 Levies on Contract Payments. Dec 2006 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010 252.247-7023 Transportation of Supplies by Sea. Oct 2024
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
2 IN 1
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC ____
Issue By DoDAAC W912PP
Admin DoDAAC W912PP
Inspect By DoDAAC 968384_
Ship To Code 968384_
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) 968384_
Service Acceptor (DoDAAC) 968384_
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
SFC Riverareyes, Harry at harry.j.riverareyes@usace.army.mil
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Contract Terms and Conditions Required To Implement Statutes or Executive Orders — Commercial Products and Commercial Services
FAR Clauses Incorporated by Full Text
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services.
(DEVIATION 2025-O0003 and 2025-O0004)
(Jan 2025) Deviation 2025-O0004 (Mar 2025)
Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services (MAR 2025) (DEVIATION 2025-O0003 and 2025-O0004)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889 (a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .