Solicitation - W912NW26QA048.pdf
PDF 3 MB Posted
- Attached to
- Engine test cell PLC upgrade
- Solicitation number
- W912NW26QA048
About this file
This is a Solicitation for a Women-Owned Small Business (WOSB) contract issued by the U.S. Army. The solicitation number is W912NW26QA048, issued on August 12, 2026, for the procurement of an Engine Test Cell #4 PLC (Programmable Logic Controller) upgrade at Corpus Christi Army Depot in Texas. The contract is a firm fixed-price service contract with a single line item valued for the installation and upgrade of the PLC system. The period of performance is 60 calendar days, with work to be performed between September 21, 2026, and December 31, 2026, during standard business hours (0700-1700 Monday-Friday) at the Corpus Christi Army Depot facility.
The primary objective is to remove the obsolete GE Fanuc 90-30 PLC and install a new Allen-Bradley CompactLogix 1769 Series PLC system in Engine Test Cell 4. The contractor must transpose existing PLC ladder logic into RSLogix5000/Studio 5000 software, create CAD drawings in PDF and DWG formats showing all wiring configurations, remove the old PLC, install and configure the new system, and conduct operational verification of all PLC-related controls. If an alternative PLC brand is selected, the contractor must provide a perpetual software license, programming cables, spare parts, and training at no additional cost. The contract is subject to the Service Contract Act, with wage determination 2015-5225 (Texas Counties of Aransas, Nueces, and San Patricio) requiring health and welfare benefits of $5.55 per hour and applicable prevailing wages based on occupation. The solicitation incorporates FAR and DFARS clauses by reference, includes security requirements mandating base pass credentials, training in Anti-Terrorism, OPSEC, CUI, and cyber awareness, and requires compliance with all applicable federal and safety regulations including OSHA standards and electrical codes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ETC4_GERemotePLC.JPG | JPG image | |
| ETC4_GEMasterPLC.JPG | JPG image | |
| ETC 4 PLC Drawings.pdf | ||
| ETC 4 10 Slot PLC 1989.pdf | ||
| Responses to questions.pdf | ||
| DNLoader Readme.Txt | TXT text file | |
| DNLoader Flow Chart.pdf | ||
| ETC4_PLCs.JPG | JPG image | |
| ETC4_PLCCabinet.JPG | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
calls)
Section A - Solicitation/Contract Form
Engine test cell #4 PLC upgradeInstrument Name:
Product Service Code : J036
W912NW26QA048
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0001 Install PLC upgrade for engine test cell #4 as per PWS
Product Service Code: J036
Pricing Arrangement: Firm Fixed Price
1 Each
Section C - Description/Specifications/Statement of Work
PERFORMANCE WORK STATEMENT (PWS)
FOR
Engine Test Cell 4 PLC Upgrade
PART 1
GENERAL INFORMATION
1.0 General: This is a non-personal service contract to Upgrade the GE Fanuc 90-30 PLC in Engine Test Cell 4 to a new Allen-Bradley CompactLogix 1769 Series PLC. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Scope: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, quality control, and other items and non-personal services necessary to complete the following project objectives. Project will include onsite integration of the new Allen- Bradley Compact Logix 1769 Series PLC system in Engine Test Cell 4. The contractor shall provide newly created drawings showing all wiring from terminal strip to module edge connectors in PDF and DWG format.
1.2 Background: The GE Fanuc 90-30 PLC is obsolete and unsupportable. If the PLC were to fail, Engine Test Cell 4 would be down indefinitely.
1.3 Description of Services: The Contractor shall provide the following project objectives:
1.3.1. Contractor shall transpose existing PLC ladder logic into RSLogix5000/Studio 5000 to ensure the upgraded control system mimics the current operational functionality. This program shall be provided to CCAD.
1.3.2. Contractor shall create CAD drawings reflecting Allen-Bradley CompactLogix installation including all wiring from the terminal strip to the module edge connectors. The drawings shall be provided in PDF and DWG formats.
1.3.3. The Contractor shall remove the existing GE Fanuc 90-30 PLC.
1.3.4. The contractor shall install the new Allen-Bradley CompactLogix 1769 Series PLC utilizing existing wiring where possible and adding additional wiring, terminals, breakers, fuses, labels, and panel building materials as needed.
1.3.5. The contractor shall conduct operational checks to verify functionality of all PLC related controls.
1.3.6. If an alternative PLC is used, the contractor shall provide a full perpetual software license to include all applicable source coding, cables to connect to a laptop, spare parts, and training on PLC programming.
1.3.6.1 In addition, the new PLC will require commissioning and tie-in to existing equipment which shall not constitute a change order or additional funds soley due to changing of equipment brand-name.
1.4 Period of Performance (POP): The period of performance shall be for sixty (60) calendar days.
1.5 General Information:
1.5.1 Quality Control (QC): The Contractor shall develop and maintain an effective QC Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the Contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary.
1.5.2 Quality Assurance (QA): The Government will evaluate the Contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The Government will evaluate the Contractor's performance under this contract in accordance with the Performance Requirements Summary, See Part 7.1; attachment 1.
1.5.3 Recognized Holidays: The following are recognized US holidays. The Contractor shall not perform services on these days:
New Year's Day Labor Day
Martin Luther King Jr.'s Birthday Columbus Day
President's Day Veteran's Day
Memorial Day Thanksgiving Day
Juneteenth National Independence Day Christmas Day
Independence Day
1.5.4 Hours of Operation: The Contractor shall provide services between the hours of 0700 - 1700 hours Monday thru Friday, except on US Holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. For other than firm fixed price contracts, the Contractor shall not be reimbursed when the Government facility is closed for the above reasons. The Contractor shall always maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed. Extended hours may be worked when approved by the government and at no additional cost to the government.
1.5.5 Place of Performance: Performance for work under this contract shall be at Corpus Christi Army Depot, 308 Crecy Street, Corpus Christi, Texas.
1.5.6 Security Requirements: See Part 7.3; attachment 3.
1.6 Safety Requirements:
1.6.1 The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991).
1.6.2. The Contractor shall conduct all work in a safe manner and in compliance with Federal, State, Local, Department of Defense, Army, and Depot regulations and national consensus standards.
1.6.3 The Contractor shall provide a Site-Specific Safety and Occupational Health Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA).
1.6.3.1 Site-Specific Safety and Occupation Health Accident Prevention Plan (APP). The Contractor shall develop, promulgate, and enforce a written site-specific safety and occupational health accident prevention plan (Herein referred to as safety plan). The safety plan shall identify protocols and procedures to ensure a safe and healthful workplace. The safety plan shall be reviewed and deemed acceptable by the COR before beginning any on-site activities.
1.6.3.2 Activity Hazard Analysis (AHA). The Contractor shall identify in sequence the activities being performed, the specific anticipated hazard, equipment, materials, and the control measures to implemented to eliminate or minimize each hazard to an acceptable level of risk. The contractor shall use the more stringent standard when standards are different. The names of the competent and qualified person required for a particular activity (e.g., excavation, scaffolding, fall protection, or other activities as specified by OSHA) shall be identified and included in the activity hazard analysis, as well as proof of their competency and qualification. The analysis shall be reviewed and deemed acceptable by the COR before beginning any on-site activities.
1.6.4 Service Condition. No part of the services covered by the McNamara-O'Hara Service Contract Act of 1965 will be performed in buildings or surroundings or under working conditions, provided by or under the control or supervision of the Contractor or any Subcontractor, which are unsanitary or hazardous or dangerous to the health or safety of service employees engaged to furnish the services.
PART 2
DEFINITIONS & ACRONYMS
2.0 DEFINITIONS AND ACRONYMS:
2.1 Definitions:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government.
Note: The only individual who can legally bind the Government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.
Government designated by the KO to monitor Contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.3.1 TECHNICAL OFFICER'S REPRESENTATIVE (COTR). An employee of the U.S.
Government assisting the COR in technical matters outside his expertise such as functional checks regarding water and air volume flows at various speeds, proper fill material installation and structural support, engineering drawings review, component shop submittals etc.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the PWS.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured items such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to the acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
AR Army Regulation
AQL Acceptable Quality Level
CAD Computer Aided Design
CCAD Corpus Christi Army Depot
CFR Code of Federal Regulations
COR Contracting Officer's Representative
DA Department of the Army
DD250 Department of Defense Form 250 Receiving Report
DD254 Department of Defense Form 254 Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DMWR Depot Maintenance Work Requirement
DOD Department of Defense
FAR Federal Acquisition Regulation
IAW In Accordance With
JTR Joint Travel Regulation
KO Contracting Officer
NA Not Applicable
NFPA National Fire Protection Association
PDF Portable Document Format
PIPO Phase In/Phase Out
PLC Programable Logic Controller
POC Point of Contact
POP Period of Performance
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
TE Technical Exhibit
TEEB Test Equipment Engineering Branch
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES
3.0 GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Facilities: The Government will provide access to and the necessary workspace to perform the tasks as outlined in the PWS.
3.2 Equipment: The Government will provide access to Engine Test Cell 4 as needed to complete PWS. As Engine Test Cell 4 is an active test cell, access will need to be coordinated with CCAD production.
3.3 Materials: Not Applicable.
3.4 Services: The Government will provide COR/Project engineer to be available during the project to coordinate, perform, verify, and accept the requirements of the PWS.
3.5 Utilities: The Government will provide all utilities available in the facility for the Contractor's use in the performance of this contract. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: Except for those items specifically stated to be Government-Furnished in paragraph 3.0, the Contractor shall furnish everything required to perform project objectives as indicated in paragraph 1.1.
4.2 Secret Facility Clearance: Not Applicable.
4.3 Materials/Equipment: The contractor shall furnish all required materials, supplies, equipment, and tools of the trade to perform the project as defined in this PWS.
4.4 Standard Warranty: No warranty.
PART 5
SPECIFIC TASKS
5.0 REQUIREMENTS:
5.1 Basic Services: The Contractor shall furnish all labor, parts, material, and equipment to successfully upgrade the PLC in Engine Test Cell 4.
5.2 Task/Requirement:
5.2.1 Contractor shall remove GE Fanuc 90-30 PLC.
5.2.2 Contractor shall install new Allen-Bradley CompactLogix 1769 Series PLC system.
5.2.3 Contractor shall program the new Allen-Bradley CompactLogix 1769 Series PLC system to function like removed system.
5.2.4 Contractor shall verify functionality of all PLC related controls.
5.2.5. If an alternative PLC is used, the contractor shall provide a perpetual software license, cables to connect to a laptop, spare parts, and training on PLC programming.
PART 6
APPLICABLE PUBLICATIONS
6.0 APPLICABLE PUBLICATIONS
6.1 The Contractor shall abide by all applicable regulations, publications, manuals, and local policies and procedures listed below
Line Item Publication Mandatory (M) or Advisory (A) Website
1 Occupational Safety and Health Administration (OHSA) Part 1910 Occupational Safety and Health Standards M https://www.osha.gov/
2 NFPA 70 National Electrical Code M http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=70
3 EM 385-1-1, Safety and Health Requirements Manual, 2014 version M https://usace.contentdm.
oclc.org/digital/collection/p16021coll9/id/51/rec/248
4 Occupational Safety and Health Administration (OHSA) Part 1926 Safety and Health
Regulations For Construction M https://www.osha.gov/
5 NFPA 70E Standard for Electrical Safety in the Workplace M http://catalog.nfpa.org/NFPA-70E- Standard-for-Electrical-Safety-in-the-Workplace-2015-Edition-P1197.aspx?icid=D482
6 Unified Facilities Criteria (UFC) 3-561-01 Electrical Safety, O & M M Copy available from COR
7 Security Requirements M Attachment 3
8 CCAD Reg. 385.30 CCAD Safety Program M Copy available from COR
PART 7
ATTACHMENTS/TECHNICAL EXHIBITS
7.0 Attachment/Technical Exhibit List: (List all attachments and technical exhibits that will be useful for the Contractor to submit an appropriate proposal).
7.1 Attachment 1 / Technical Exhibit 1: Performance Requirements Summary
7.2 Attachment 2 / Technical Exhibit 2: Deliverables Schedule
7.3 Attachment 3 / Technical Exhibit 3: Security Requirements
ATTACHMENT 1 / TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine Contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PWS Paragraph Task Performance Standard Acceptable Quality
Levels (AQL) Surveillance Method /
By Whom
5.2.1 Remove GE Fanuc 90-30 PLC. Install and Test 100% Inspection by COR or TEEB representative.
On time inspection.
5.2.2 Install Allen-Bradley CompactLogix 1769 Series PLC system. Install and Test 100% Inspection by COR or TEEB representative.
On time inspection.
5.2.3 Program Allen-Bradley CompactLogix 1769 Series PLC system to function like removed system. Install and Test 100% Inspection by COR or TEEB representative.
On time inspection.
5.2.4 Verify functionality of all PLC related controls. Install and Test 100% Inspection by COR or TEEB representative.
On time inspection.
ATTACHMENT 2 / TECHNICAL EXHIBIT 2
Deliverables Schedule
Deliverable Frequency Number of Copies Medium/Format Submit To
Allen-Bradley CompactLogix 1769 Series Main Rack and Expansion Rack Within 40 days of contract award 1 Physical Item COR/TEEB Representative
CAD Drawings End of Contract 1 CD-ROM/ Digital on Computer COR/TEEB Representative
PLC Program End of Contract 1 CD-ROM/ Digital on Computer COR/TEEB Representative
Perpetual Software License (If alternative PLC is used) End of Contract 1 CD-ROM/ Digital on Computer COR/TEEB Representative
Cables to Connect to Laptop (If alternative PLC is used) End of Contract 1 Physical Item COR /TEEB Representative
Spare Parts (If alternative PLC is used) End of Contract 1 Physical Items COR/TEEB Representative
Training on Programming (If alternative PLC is used) End of Contract 1 In Person COR/TEEB Representative
Individual Termination or Expiration of employment (para. 7.3) Within 3-working days N/A Access passes COR or issuing office
Contract Termination or cancellation (para 7.4) Within 3-working days N/A Access passes COR or issuing office
Controlled Unclassified Information (CUI) Training (para. 7.8.5) Within 30-calendar days and annually thereafter 1 Hard copy or electronic) COR
Part 7.3 ATTACHMENT 3: Security Requirements
7.1. Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information /data and obtain required documentation or background investigations will be grounds for denying access to U.S. installations, buildings, and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm's failure to comply with Installation Access Control processing requirements.
The Contractor shall return installation and CCAD passes to the issuing Security office when the contract is completed or when a Contractor employee no longer requires access.
The Contractor shall obtain a Base Pass through Navy Pass & Tag not to exceed contract expiration. The government Contracting Officer Representative (COR) will coordinate badging and briefing with Security. CCAD personnel will escort Contractor at all times if building access is required unless approved in advanced by CCAD Security. Contractors are not authorized to escort anyone on the installation or CCAD.
7.2. Installation Pass Log: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within three (3) calendar days after contract award. The log must at a minimum contain the following information Full Legal Name, type of access (e.g. DBIDS, base pass) and working hours. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log.
7.3. Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within three (3) working days.
7.4. Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within three (3) working days.
7.5. Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).
7.6. Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.
7.7 Safeguarding Covered Defense Information: Contractors and subcontractors are required to safeguard covered defense information that resides in or transits through covered contractor information systems by applying specified network security requirements and reporting of cyber incidents in accordance with 48 CFR 204.73.
7.8 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
7.9 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government.
These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
7.10 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
7.11 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil /resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
7.12 Required Training: The following provides information on training requirements.
7.8.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar days as required on the AT/OPSEC Cover Sheet after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within five business days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil, (course JS-US007). Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within five business days after completion of the training.
7.8.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 calendar days of employment under this contract. Verification of the training shall be provided to the COR within five business days after completion of the training.
OPSEC Level I training is available at https://securityawareness.usalearning.gov. Contractor personnel must complete refresher training every twelve months. Verification of the training shall be provided to the COR within five business days after completion of the training.
7.8.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days after the contract is awarded and within five business days after new employees commence contract performance, with the results reported to the COR within five business days after the contract is awarded and within 30 calendar days} after new employees commence contract performance. Verification of the training shall be provided to the COR within five business days after completion of the training.
7.8.4 DoD Cyber Awareness Training All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the DoD IA Cyber Awareness Training within 30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel.
Verification of the training can be provided to the COR upon request after completion of the training.
7.8.5 Controlled Unclassified Information (CUI): Contractor employees, including subcontractors, performing services under this contract with access to CUI shall complete DOD Mandatory Controlled Unclassified Information (CUI) Training within 30 calendar days of employment and annual refresher training in accordance with DoDI 5200.48.The Contractor shall provide the COR a copy of the training certificates for its employees no later than five (5) days after completion.
Training is available at https://securityawareness.usalearning.gov.
7.9 Omitted
7.10 APPLICABLE SECURITY PUBLICATIONS
7.10.1 Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
7.10.1.1 Executive Order 13556, Controlled Unclassified Information
7.10.1.2 National Institute of Standards and Technology Special Publication 800-171, Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations
7.10.1.3 32 Code of Federal Regulation (CFR) Part 2002, Controlled Unclassified Information
7.10.1.4 32 Code of Federal Regulation (CFR) Part 117 National Industrial Security Program Operating Manual (NISPOM)
7.10.1.5 Federal Acquisition Regulation Subpart 24.1 CFR Part 24 and Part 39.105
7.10.1.6 Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
7.10.1.7 Defense Acquisition Regulation 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls
7.10.1.8 Defense Acquisition Regulation 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
7.10.1.9 DoDI 1000.13, Identification (ID) Cards for Members of the Uniformed Services, Their Dependents, and other Eligible Individuals
7.10.1.10 DoDM 5200.02 Procedures for the DoD Personnel Security Program
7.10.1.11 DoDM 1000.13, Volume 1, DoD Identification (ID) Cards: ID Card Life-Cycle DoDI
5200.02 DoD Personnel Security Program
7.10.1.12 DoDI 5200.02 DoD Personnel Security Program
7.10.1.13 DoDI 5200.48, Controlled Unclassified Information
7.10.1.14 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS UNIFIED
FACILITIES CRITERIA (UFC)
7.10.1.15 DoDI 1000.13, Identification (ID) Cards for Members of the Uniformed Services, Their Dependents, and other Eligible Individuals
7.10.1.16 DoD 5220.22-M National Industrial Security Program Operating Manual DoD Directives
7.10.1.17 DoDD 5230.25, Withholding of Unclassified Technical Data from Public Disclosure
7.10.1.18 DoDD 5240.06 Counterintelligence Awareness and Reporting (CAIR)
7.10.1.19 DoDD 5400.11, Department of Defense Privacy Program, October 29, 2014
7.10.1.20 DoD 5400.11-R, Department of Defense Privacy Program UFC 4-010-01 9 February 2012 Change 1, 1
October 2013
7.10.1.21 DoD 8570-M Information Assurance Workforce Improvement Program
7.10.1.22 AR 25-1 Army Information Technology
7.10.1.23 AR 25-2 Army Cybersecurity
7.10.1.24 AR 25-55, The Department of the Army Freedom of Information Act
7.10.1.25 AR 70-31, Standards for Technical Reporting
7.10.1.26 AR 190-13 The Army Physical Security Program
7.10.1.27 AR 360-1, The Army Public Affairs Program
7.10.1.28 AR 380-5, Army Information Security Program
7.10.1.29 AR 380-10, Foreign Disclosure and Contact with Foreign Representatives
7.10.1.30 AR 380-49, Industrial Security Program
7.10.1.31 AR 380-67, Personnel Security
7.10.1.32 AR 530-1, Operations Security
7.10.1.33 AR 735-5 Property Accountability Policies
7.10.1.34 EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
7.10.1.35 530-CCAD-001 CCAD Operations Security Plan (OPSEC)
7.10.1.36 CCAD Physical Security Plan
7.10.1.37 Army Directive 2014-05 (or its successor) Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
7.10.1.38 AMC-R 525-13, AMC Force Protection Program
7.10.1.39 5230.24, Distribution Statements on Technical Documents
*** END OF NARRATIVE ***
Requirements Procurement of Engine Test Cell PLC (Programmable Logic Controllers)Upgrade.
Section F - Deliveries or Performance
0001 1 EachQuantity
Address and POC
Period of Performance From 21 Sep 2026 To 31 Dec 2026
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process Electronic invoicing.
vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF WAWF training.
Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web WAWF methods of document submission.
entry, Electronic Data Interchange, or File Transfer Protocol.
(f) The Contractor shall use the following information when WAWF payment instructions.
submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following Document type.
document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
DESTINATION / ACCEPT AT: DESTINATION
INVOICE AND RECEIVING REPORT (COMBO) INSPECT AT:
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2in1
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Document routing.
Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC
HQ0303
Issue By DoDAAC
W912NW
Admin DoDAAC
W912NW
Inspect By DoDAAC W45N7V
Ship To Code
W912NW
N/A
Ship From Code
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC W45N7V
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) The Contractor shall ensure a payment request includes Payment request.
documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the Receiving report.
requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TBD
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-19 Child Labor-Cooperation with Authorities and Remedies.
(Deviation 2026-O0038)
2026-03
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.225-3 Buy American-Free Trade Agreements-Israeli Trade Act.
(Deviation 2026-O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-
2026-02
O0038)
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7001 Buy American and Balance of Payments Program.
2024-02
252.225-7002 Qualifying Country Sources as Subcontractors.
2022-03
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.232-7010 Levies on Contract Payments. 2006-12
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.
2023-01
252.246-7008 Sources of Electronic Parts. 2023-01
252.247-7023 Transportation of Supplies by Sea.
2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services. Alternate
II (DEVIATION 2025-O0003)
2025-03 Alternate
II
Deviation 2025- O0003
2025-03
Alternate II (MAR 2025) (DEVIATION 2025-O0003).
(d)(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8 G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials shall have access to and right to-
(i) Examine any of the Contractor's or any subcontractors' records that pertain to, and involve transactions relating to, this contract; and
(ii) Interview any officer or employee regarding such transactions.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), and (c), of this clause, the Contractor is not required to flow down any FAR clause in a subcontract for commercial products or commercial services, other than-
(i) Paragraph (d) of this clause. This paragraph flows down to all subcontracts, except the authority of the Inspector General under paragraph (d)(1)(ii) does not flow down; and
(ii) Those clauses listed in this paragraph (e)(1). Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(A) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509).
(B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5).
(C) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) (41 U.S.C. 4712).
(D) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(E) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(F) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).
(G)[ ]( 1) 52.204-30, Federal Acquisition Supply Chain Security Act Orders- Prohibition. (Dec 2023) (Pub. L. 115-390, title II).
[ ](2) Alternate I (Dec 2023) 52.204-30.
(H) 52.219-8, Utilization of Small Business Concerns (Jan 2025) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(I) [Reserved]
(J) [Reserved]
(K) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
(L) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
(M) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222- 40.
(N) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(O) [ ] (1) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.
O 13627).
[ ] (2) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(P) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(Q) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(R) 52.222-54, Employment Eligibility Verification (Jan 2025) (Executive Order 12989).
(S) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).
(T) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
(U)[ ] (1) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
[ ] (2) Alternate I (Jan 2017) of 52.224-3.
(V) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
(W) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Jun 2020) (42 U.S.
C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(X) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph (c) of 52.232-40.
(Y) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub.
L. 118-31, 41 U.S.C. 3901 note prec.).
(Z) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46 U.
S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
Section J - List of Attachments
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5225
Daniel W. Simms Division of | Revision No.: 30
Director Wage Determinations| Date Of Last Revision: 5/13/2026
State: Texas
Area: Texas Counties of Aransas, Nueces and San Patricio
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations
01011 - Accounting Clerk I 17.06
01012 - Accounting Clerk II 19.15
01013 - Accounting Clerk III 21.42
01020 - Administrative Assistant 30.46
01035 - Court Reporter 20.36
01041 - Customer Service Representative I 15.32
01042 - Customer Service Representative II 16.72
01043 - Customer Service Representative III 18.77
01051 - Data Entry Operator I 14.86
01052 - Data Entry Operator II 16.22
01060 - Dispatcher, Motor Vehicle 21.76
01070 - Document Preparation Clerk 17.62
01090 - Duplicating Machine Operator 17.62
01111 - General Clerk I 15.67
01112 - General Clerk II 17.10
01113 - General Clerk III 19.19
01120 - Housing Referral Assistant 22.70
01141 - Messenger Courier 16.83
01191 - Order Clerk I 15.24
01192 - Order Clerk II 16.63
01261 - Personnel Assistant (Employment) I 18.35
01262 - Personnel Assistant (Employment) II 20.53
01263 - Personnel Assistant (Employment) III 22.89
01270 - Production Control Clerk 30.58
01290 - Rental Clerk 15.48
01300 - Scheduler, Maintenance 18.20
01311 - Secretary I 18.20
01312 - Secretary II 20.36
01313 - Secretary III 22.70
01320 - Service Order Dispatcher 19.45
01410 - Supply Technician 30.46
01420 - Survey Worker 18.26
01460 - Switchboard Operator/Receptionist 14.91
01531 - Travel Clerk I 15.37
01532 - Travel Clerk II 16.89
01533 - Travel Clerk III 19.83
01611 - Word Processor I 16.22
01612 - Word Processor II 18.20
01613 - Word Processor III 20.36
05000 - Automotive Service Occupations
05005 - Automobile Body Repairer, Fiberglass 22.98
05010 - Automotive Electrician 21.43
05040 - Automotive Glass Installer 20.38
05070 - Automotive Worker 20.38
05110 - Mobile Equipment Servicer 18.21
05130 - Motor Equipment Metal Mechanic 22.40
05160 - Motor Equipment Metal Worker 20.38
05190 - Motor Vehicle Mechanic 22.40
05220 - Motor Vehicle Mechanic Helper 17.06
05250 - Motor Vehicle Upholstery Worker 19.27
05280 - Motor Vehicle Wrecker 20.38
05310 - Painter, Automotive 21.43
05340 - Radiator Repair Specialist 20.38
05370 - Tire Repairer 16.68
05400 - Transmission Repair Specialist 22.40
07000 - Food Preparation And Service Occupations
07010 - Baker 14.53
07041 - Cook I 14.23
07042 - Cook II 15.91
07070 - Dishwasher 12.99
07130 - Food Service Worker 13.55
07210 - Meat Cutter 18.88
07260 - Waiter/Waitress 11.99
09000 - Furniture Maintenance And Repair Occupations
09010 - Electrostatic Spray Painter 22.40
09040 - Furniture Handler 14.93
09080 - Furniture Refinisher 22.40
09090 - Furniture Refinisher Helper 17.83
09110 - Furniture Repairer, Minor 20.15
09130 - Upholsterer 22.40
11000 - General Services And Support Occupations
11030 - Cleaner, Vehicles 13.48
11060 - Elevator Operator…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .