This is a Women-Owned Small Business (WOSB) Solicitation for commercial products and services (Standard Form 1449) issued by the Department of the Army Corps of Engineers, New York District for shipyard repair services on the U.S. Drift Collection Vessel "GELBERMAN."

The solicitation (W912DS26RA020) encompasses comprehensive hull and machinery repairs for an 85-foot welded steel vessel, with work to be performed within a 45-calendar-day contract duration following vessel delivery to the contractor's yard on or before June 30, 2026. The work scope includes drydocking the vessel, exterior and interior hull cleaning and painting, removal and reinstallation of five keel coolers, hull anode replacement, rudder and propeller inspections, sea chest maintenance, and fuel tank cleaning. Definite work items are organized under Hull Repairs and Machinery Repairs categories, while indefinite items—such as additional steelwork (15,000 lbs.), welding seams (1,200 linear feet), bilge water disposal (1,000 gallons), compartment gas-freeing (12 compartments), audio gauging (1,000 shots), and docking plug replacement (2 each)—require unit pricing for bid comparison purposes. The contractor must possess a certified drydock or marine railway capable of handling a 213-ton vessel and submit documentation including drydock certification, welder certifications, a project schedule, a contractor safety plan, and five references for similar ship repair work completed within the past eight years. Liquidated damages are set at $4,100 per calendar day of delay. The contractor is responsible for all vessel movement, berthing, mooring, wharfage, utilities (208VAC 3-phase 60Hz shore power, compressed air, potable water, heating), security, waste disposal, and 24-hour watchman service. Work must comply with American Bureau of Shipping (ABS) Rules, U.S. Coast Guard regulations (46 CFR), OSHA standards (29 CFR), and Corps of Engineers safety requirements (EM 385-1-1). The contractor must enter into a Mastership Agreement for Repair and Alteration of Vessels and cooperate fully with USCG and ABS inspections at the contractor's expense. An interport cost differential applies for work performance locations beyond specified project boundaries in New York Harbor, using formulas based on round-trip nautical mileage.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price

Amount

0001 Hull Repairs

0001AA TP 1.01 - Drydocking Pricing Arrangement: Firm Fixed Price

1 Job

0001AB TP 1.02 - Gas Freeing Compartments Pricing Arrangement: Firm Fixed Price

1 Job

0001AC TP 1.03 - Docking Plugs & Hull Guard Fills and Drains Pricing Arrangement: Firm Fixed Price

1 Job

0001AD TP 1.04 - Exterior Cleaning and Painting Pricing Arrangement: Firm Fixed Price

1 Job

0001AE TP 1.05 - Interior Cleaning and Painting Pricing Arrangement: Firm Fixed Price

1 Job

0001AF TP 1.06 - Remove, Clean, and Re-install Keel Coolers Pricing Arrangement: Firm Fixed Price

1 Job

0001AG TP 1.07 - Bow Capstan Foundation Inspection

1 Job

W912DS26RA020

Pricing Arrangement: Firm Fixed Price

0001AH TP 1.08 - Sea Chest Pricing Arrangement: Firm Fixed Price

1 Job

0001AJ TP 1.09 - Hull Anodes Pricing Arrangement: Firm Fixed Price

1 Job

0001AK TP 1.10 - Cleaning of Fuel Tanks Pricing Arrangement: Firm Fixed Price

1 Job

0001AL TP 1.11 - Indefinite- Steelwork Pricing Arrangement: Firm Fixed Price

15,000 Pound

0001AM TP 1.12 - Indefinite- Welding Seams Pricing Arrangement: Firm Fixed Price

1,200 Feet and Decimal

0001AN TP 1.13 - Indefinite- Bilge Water Disposal Pricing Arrangement: Firm Fixed Price

1,000 Gallon

0001AP TP 1.14 - Indefinite- Additional Gas- Freeing Compartments Pricing Arrangement: Firm Fixed Price

12 Each

0001AQ TP 1.15 -Indefinite- Additional Audio gauging Pricing Arrangement: Firm Fixed Price

1,000 Each

0001AR 2 Each

TP 1.16 - Indefinite- Replacement of Docking Plugs Pricing Arrangement: Firm Fixed Price

0001AS TP 1.17 - Indefinite-CO2 Bottle Removal Pricing Arrangement: Firm Fixed Price

1 Job

0001AT TP 1.18 - Indefinite-Fresh Water Tank Cleaning Pricing Arrangement: Firm Fixed Price

1 Job

0001AU TP 1.19 - Indefinite- Blast and Paint Forepeak Tank Pricing Arrangement: Firm Fixed Price

1 Job

0001AV TP 1.20 - Indefinite- Blast and Paint Compartment 2 Pricing Arrangement: Firm Fixed Price

1 Job

0001AW TP 1.21 - Indefinite- Blast and Paint Compartment #3 Pricing Arrangement: Firm Fixed Price

1 Job

0001AX TP 1.22 - Indefinite- Blast and Paint Compartment #4 Pricing Arrangement: Firm Fixed Price

1 Job

0001AY TP 1.23 - Indefinite- Blast and Paint Compartment #6 Pricing Arrangement: Firm Fixed Price

1 Job

0001AZ TP 1.24 - Indefinite- Blast and Paint Compartment #7 Pricing Arrangement: Firm Fixed Price

1 Job

0001BA TP 1.25 - Indefinite- Blast and Paint Aft Ballast Tank Pricing Arrangement: Firm Fixed Price

1 Job

0001BB TP 1.26 - Indefinite- Engine Room Painting Pricing Arrangement: Firm Fixed Price

1 Job

0001BC SW-1-SC-19

Pricing Arrangement: Firm Fixed Price

1 Job

0002 Machinery Repairs

0002AA TP 2.01 - Rudders Pricing Arrangement: Firm Fixed Price

1 Job

0002AB TP 2.02 - Rudder Stock Bearings Pricing Arrangement: Firm Fixed Price

1 Job

0002AC TP 2.03 - Propeller Shaft Bearing Clearances and Shaft Runout Readings Pricing Arrangement: Firm Fixed Price

1 Job

0002AD TP 2.04 - Sea Valves Pricing Arrangement: Firm Fixed Price

1 Job

0002AE TP 2.05 - Deck Vents

Price

1 Job

0002AF TP 2.06 - Propellers Pricing Arrangement: Firm Fixed Price

1 Job

0002AG TP 2.07 - Bearing Ring Guards Pricing Arrangement: Firm Fixed Price

1 Job

0002AH TP 2.08 - Indefinite- Propeller Shafts Pricing Arrangement: Firm Fixed Price

1 Job

0002AJ TP 2.09 - Indefinite-Switchboard Cleaning Pricing Arrangement: Firm Fixed Price

1 Job

0002AK TP 2.10 - Indefinite- Propeller Shaft Seal Replacements Pricing Arrangement: Firm Fixed Price

1 Job

0002AL TP 2.11 - Indefinite- Propeller Shaft Bearings Pricing Arrangement: Firm Fixed Price

1 Job

0002AM TP 2.12 - Indefinite- Epoxy Propeller Shaft Bearing Liners Pricing Arrangement: Firm Fixed Price

1 Job

0002AN TP 2.13 - Indefinite-Propulsion System Alignment

1 Job

0002AP TP 2.14 - Indefinite- Renewal of Deck Vent Stems Pricing Arrangement: Firm Fixed Price

3 Each

0002AQ TP 2.15 - Indefinite- Renewal of Deck Vents Pricing Arrangement: Firm Fixed Price

6 Each

0002AR TP 2.16 - Indefinite- Additional Sea Valves Pricing Arrangement: Firm Fixed Price

8 Each

0002AS TP 2.17 - Indefinite- Sea Valves Replacement Pricing Arrangement: Firm Fixed Price

2 Each

0002AT TP 2.18 - Indefinite- Add 2,500 Gallons of Fuel Pricing Arrangement: Firm Fixed Price

2,500 Gallon

0002AU TP 2.19 - Indefinite- Bearing Rudder Stocks Pricing Arrangement: Firm Fixed Price

2 Each

0002AV TP 2.18 - Indefinite-Rudder Stocks Pricing Arrangement: Firm Fixed Price

2 Each

0003 TP 3.01 3,500 Each

Continuation of Description

SPECIFICATIONS FOR 2026 REPAIRS TO DCV "GELBERMAN"

STATEMENT OF WORK

SW-1 Description of Work

a. The work consists of furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc., and performing all work on U.S. Drift Collection Vessel "GELBERMAN" specified herein. The principal dimensions and physical data for the vessel are shown below:

GENERAL DESCRIPTION

Length Overall 85' 0" Breadth, Molded 26' 0" Depth, Molded 10'-0" Material All Welded Steel Displacement, light 213 short tons Propellers (2) 64"Dx52"P, 4 blade Draft, loaded, aft 8'-6" Hull Form Monohull/Keel Coolers ABS I.D. No 8004533

b. The major work scope includes drydocking the vessel, cleaning and painting the hull, assisting with ABS and USCG required inspections, and miscellaneous modifications and repairs in accordance with these specifications.

c. The work scope also includes various items required to satisfy the requirements of Annual Hull and Machinery Surveys. The Contractor shall be responsible for the costs associated with providing the inspection services of ABS.

d. Wherever the term "Plant" is used in these specifications, it is understood to refer to the items of floating plant named in this paragraph, together with their normal appurtenances, equipment, and supplies.

e. General vessel arrangements and details are included in the attached file named "Reference Drawings". The accuracy of these drawings has not been verified. Therefore, the Contractor shall template all work from the vessel.

f. The Contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in his or her possession.

g. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled by the Contractor at his/her expense. Any damage from removal or relocation of parts, equipment, etc. shall be repaired or replaced at the Contractor's expense.

h. The Contractor's work shall comply with ABS "Rules for Building and Classing Steel Vessels" and USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR).

SW-2 Indefinite Scope of Work

a. The Contractor shall notify the Contracting Officer (KO) or the Contracting Officer's Representative (COR) when any of the indefinite work items approach 75% of the bid quantity for the respective items noted in the Contract. The Contractor is not authorized to exceed the quantity specified for each indefinite item in this Contract without written authorization from the KO.

b. The Contractor shall perform all definite work items in sufficient time for the KO to direct such indefinite work items as may be revealed to be necessary by the performance of the definite work items.

c. The direction of any indefinite work items by the KO or COR will be prompt so as to allow for completion of the indefinite work items within the Contract duration.

Note - Before any work can be performed under the indefinite items, the KO must first issue a Notice to Proceed (NTP) for each item. After the NTP has been issued, the COR may direct work under that indefinite item up to the quantity that is allowed for in the Contract.

SW-3 Condition Found Reports

The Contractor shall notify the KO or the COR of any additional work or abnormal condition found requiring attention by the Contractor by means of filing a Condition Found Report (CFR).

The Contractor's CFRs shall be submitted to the KO within 3 business days of the discovery of additional work and shall include a work scope, cost estimate to include labor, materials, and any schedule impacts the work would have on the contract delivery date.

SW-4 Mastership Agreement

Prior to the award of this Contract, the Contractor shall enter into a "Mastership Agreement for Repair and Alteration of Vessels". If the Contractor has entered such an agreement prior to this Contract, that agreement may be utilized. For more information, see DFARS Subpart 252.217-71, Master Agreement for Repair and Alteration of Vessels.

SW-5 Contract Duration

The Contract duration is forty-five (45) calendar days after delivery of the vessel to Contractor's yard. The Contractor is responsible for completing all definite and indefinite work items within the forty-five (45) calendar day Contract duration. See Paragraph SC-1 for additional details.

SW-6 Distance Restriction From Caven Point Terminal

Contract work shall be performed within the project boundary limits established in SC-19 Interport Cost Differential.

SW-7 Pre-bid Vessel Inspections

Pre-bid inspections may be held to allow all prospective Bidders to inspect the vessel. The pre-bid inspections can be held by appointment in Jersey City, NJ. Representatives of prospective Bidders wishing to attend should contact William Lyness at (908) 902-4234 for the specifics of the exact location and time.

During the pre-bid inspections, Bidders will be allowed unencumbered access throughout the entire vessel. Representatives of the Government will be available, but only to the extent necessary to escort Bidders and assist with access. Government Representatives on the vessel will not discuss the scope of the work or make any technical clarifications or interpretations.

After each inspection, Offerors shall submit any questions to the Contracting Officer, Matthew Lubiak, or the Contract Specialist Monica Coniglio via email matthew.e.lubiak@usace.army.mil and monica.n.coniglio@usace.army.mil. The Government will prepare answers to all questions and forward a copy of both the questions and answers to all prospective vendors through a Solicitation Amendment

SPECIAL CONDITIONS

SC-1 Pre-Award Survey, Delivery, Commencement, Completion of Work and Return of Plant

a. A Pre-Award Survey may be requested prior to award in accordance with FAR 9.106 to verify that the Contractor is able to comply with the required performance schedule, taking into consideration all existing commercial and government business commitments and has the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

b. To minimize the vessel's time out of service and to allow for flexibility in scheduling, the Government will deliver the plant to the nearest slip at the Contractor's facility on a date mutually agreed on by the Government and Contractor, on or before 30 June 2026.

c. The Government will accept return of the plant in open water, clear of the Contractor's yard or any other berthing facility used in connection with Contract work upon completion of the Contract.

d. The Contractor shall commence the work under the Contract immediately after delivery of the vessel to the Contractor's facility and shall execute the work within the time stated in the Contract.

The Contract duration shall be computed from and including the first calendar day after delivery of the vessel to the Contractor.

e. The time for completion shall be computed to the hour at which the plant is accepted by the COR in open water clear of the Contractor's yard. The date of completion shall be considered as half a day if the plant is accepted by the COR before 12:00 o'clock Noon and as a whole if accepted after 12:00 o'clock Noon. The work cannot be considered complete until the COR has agreed all activated and contracted work is satisfactory.

SC-2 Berthing, Drydocking and Services

The Government will deliver the vessel to the Contractor at the agreed upon date. Upon receipt of the vessel by the Contractor, Contracting Officer will issue the Notice to Proceed at which time the period of performance for the Contractor will begin. The Contractor shall drydock the vessel for such time that will be necessary to complete all underwater work included in these specifications.

Following completion of underwater work, the Contractor shall be prepared to drydock the vessel in case of unforeseen circumstances. Contract delays resulting from unavailability of a dry dock shall be the Contractors responsibility.

The drydock that the Contractor plans to use shall be certified for docking the vessel, based on the dimensions and weight identified in paragraph SW-1, by one of the following:

(a) US Navy, Naval Sea Systems Command

(b) American Bureau of Shipping (ABS)

(c) An independent registered Professional Engineer specialized in drydocks, who shall cover the inspection requirements of item (a) or (b) above.

A copy of the drydock certification shall be submitted with the Offeror's bid.

The Inspection Certificate shall be within three (3) years if the age of the dock is less than ten (10) years old and within two (2) years if the age of the dock is over ten (10) years old.

Floating drydocks shall be one integral unit. The Government will allow the coupling of two rated docks to meet the load requirements of the vessel, provided that the lifting plan used shall include provisions for ensuring integrity of the coupling in the event of foul weather. Linked drydocks shall be certified as an entity.

SC-3 Contractor Quote Submittals

The Contractor shall provide ethe following as part of their bid submittal:

Drydock/Travel Lift certification in accordance with SC-2

Welder certification in accordance with SC-9

A project schedule in accordance with SC-18

Contractor safety plan in accordance with SC-6

Past Performance to include five (5) contracts from the past eight (8) years for similar work scope of ship repair and associated mechanical, structural, hydraulic, and electrical maintenance requirements comparable to those described in this solicitation.

Failure to provide all of these items will be considered an incomplete submittal and bid will not be considered.

SC-4 Liquidated Damages

a. In the case of failure on the part of the Contractor to complete the work within the time frame in the Contract or any extensions thereof, the Contractor shall pay the Government as liquidated damages, the sum of $4,100.00 for each calendar day of delay until the work is completed or accepted.

b. The Contractor shall not be charged with liquidated damages when the delay in delivery or performance arises out of causes beyond the control and without the fault or negligence of the Contractor as defined in the Default Clause of the Mastership Agreement for Repairs and Alterations of Vessels (DFARS Clause 252.217-7009 - Default).

SC-5 Contractor's Custody of Plant

a. On entering and leaving dry dock, or marine railway, the Contractor shall have charge of, and be responsible for a vessel not operating under its own power. If tug or pilot service is required during delivery or return of the plant or at any time during Contractor's custody for maneuvering the plant between open water and dry dock, slip or berth at the Contractor's yard or other facility, or for moving the plant for any reason during the course of Contract work, such service shall be promptly furnished by the Contractor at his/her expense. This shall not exclude the right of the Government to move its plant around the Contractor's premises using the Government's personnel and facilities if the Government representative considers such movement of the plant to be in the interests of safety of the plant, or otherwise in the Government's interests.

b. The Government shall have the right to access the vessel while in the Contractor's custody with Government owned or hired floating plant or personnel for the purpose of delivering equipment, materials or personnel to the plant in the Contractor's custody.

c. The Contractor shall not permit the plant to go aground or bear upon the bottom of any waterway or any submerged object while in his/her possession. The Contractor shall not perform any Contract work on the plant if it should accidentally go aground or bear upon any submerged object but shall notify the Government representative and immediately take the necessary steps to refloat the plant. The sole exception to this shall be that the plant shall be allowed to rest or bear upon a drydock which is properly prepared, in accordance with the plant's drydocking plan.

d. If the Contractor anchors the plant offshore for the purpose of performing Contract work on the plant, the Contractor shall convey Government inspectors, crew and hired personnel to and from the plant at the convenience of the Government at the Contractor's expense. While at such anchorage, the plant shall be considered in the custody of the Contractor and subject to any pertaining provision of these conditions.

SC-6 Accident Prevention

The Contractor shall provide a fire protection plan, flood prevention plan, and safety plan to the COR. All plans shall be in compliance with all federal, state, and local regulations as well as USCG, ABS, and USACE regulations. This information shall be submitted no later than seven (7) days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.

The items listed below refer to specific areas of accident prevention, however this in no way limits the Contractor's responsibility to perform all work under this Contract in strict accordance with their fire protection, flood prevention, and safety plans as well as all federal (ex. 29 CFR), state, local, USCG, ABS, and USACE regulations (EM 385-1-1).

a. The Contractor shall take all necessary precautions for the protection of the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this Contract. The Contractor shall comply with all pertinent provisions of the Mastership Agreement for Repair and Alteration of Vessels and the Corps of Engineers Safety Manual EM 385 1 1, dated 15 March 2024 entitled "Safety and Health Requirements Manual" as amended and shall also take or cause to be taken such additional measures as the COR may determine to be reasonably necessary for the purpose. The Contractor shall also comply with OSHA Safety and Health Standards 29 CFR. The Contractor shall designate the entire area of work as a hardhat area.

b. A qualified employee shall be designated by the Contractor to be directly responsible for full and immediate compliance with all applicable safety and fire protection requirements. The COR will make a safety inspection of shipyard facilities within 48 hours of the vessel's arrival at the Contractor's yard. At such time the Contractor's safety program will be reviewed with the Contractor's safety representative.

c. When the specifications require work in areas fitted with the fixed CO2 systems (i.e. machinery spaces), the COR shall be notified prior to commencing work. All work in these areas shall be in strict accordance with 29 CFR 1915.506 and substitute fire protection equipment shall be furnished by the Contractor during the test or repair period.

d. Fire watches shall be posted wherever hot work is performed. Fire watches shall also be posted on the opposite side of all adjacent bulkheads, decks, and overheads where the hot work is performed. All fire watches shall remain on site until 30 minutes after the hot work is completed.

For additional requirements, see 29 CFR 1915. It should be noted that 29 CFR 1915.52 (b)(3) only requires additional fire watches for specific conditions, however the Contractor shall provide fire watches for all hot work as mentioned above.

e. The Contractor is responsible for compliance with USCG regulations for handling of inflammable and combustible liquids. Whenever hot work is to be performed, a certified marine chemist's gas free certificate shall be furnished to the Government representative at the Contractor's expense prior to commencing work. Additionally, a copy of the most recent gas-free certificate shall be posted near the vicinity of the work and at each gangway for the vessel. The Contractor shall have the marine chemist recertify the vessel for all ongoing hot work permits in the event of any vessel movement or change in ballasted condition or in the case of any combustible liquid spillage.

Following any of these events, inspection for recertification by a Competent Person is unacceptable. NOTE - See TP 1.14 for additional details and requirements.

f. All work in confined areas or enclosed spaces shall be performed in accordance with Sections 06.I and 19.A.08 of EM 385 1 1, "Safety and Health Requirements Manual", dated 15 March 2024 as amended. In such areas or spaces, the Contractor shall test for the concentration of oxygen and have immediately available a sufficient number of respirators for everyone working in such areas or spaces. An attendant shall be stationed outside every confined space while work is being performed therein and a rescuer equipped with respirators and retrieval lines shall be immediately available in case of an emergency.

g. The Contractor shall furnish a gangway, conforming to EM 385-1-1, most recent revision, of suitable strength and construction for safe and convenient boarding of the vessel at all times. The gangway shall be installed at an angle of less than 40 degrees and shall have 39-inch high guardrails at both sides. Hatches and openings that present a falling hazard shall be provided with suitable and substantial guards.

h. All exits and passageways shall be kept free of obstructions and shall be kept well lighted at all times.

i. The Contractor shall maintain an accurate record of, and shall report to the COR, in the manner and on the forms prescribed by the COR, exposure data and all accidents, resulting in death, traumatic injury, occupational disease, and/or damage to property, materials, supplies and equipment incident to work performed under this Contract.

j. The COR will notify the Contractor of any non compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor.

k. Compliance with the requirements of this provision (SC-6) by any subcontractors shall be the responsibility of the Contractor.

SC-7 Performance of Work by the Government

The Government reserves the right to quarter and subsist the crew on the vessel and to perform certain work while the plant is in the Contractor's possession. Government personnel, as well as materials, equipment, and tools, shall be permitted to access the vessel while in the Contractor's possession and to perform the work mentioned above.

SC-8 Labor Reports

The Contractor shall keep and maintain complete payroll records for the duration of time covering the work under this Contract for a period of three (3) years from the end of such periods, and such records shall be made available for Government inspection upon request.

SC-9 Workmanship

a. General

1. All labor shall be especially skilled for each kind of work, thorough and first class in every respect, and under competent direction.

2. Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause of Contractor's replacement at no additional cost to the Government.

3. All parts of the work intended to join or bear upon others shall have complete and solid surface contact and fit together neatly without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit. Stopwaters shall be used only in seams or landings passing through or attached to watertight members.

4. All watertight staples and collars shall be malleable castings or forged from angles close fitting and with solid bearing over the entire faying surface. They may be riveted and caulked or welded watertight.

5. Ends of outstanding flanges shall be cropped.

6. Lightening holes may be punched or burned and all edges shall have burrs removed.

7. All hull castings shall be machined or ground to bear solidly against the connecting structure and all holes drilled. Holes in members having sharp curvature shall be avoided whenever practicable.

8. Limber and air holes in adequate size shall be cut in floors and elsewhere to provide free drainage and passage of air. Limber holes shall be located at the level of any cement waterways.

9. All new and disturbed iron and/or steel work shall have its finish restored in kind, or as otherwise indicated by specification.

b. Cutting

1. All edges and corners of plates and shapes shall be smooth and free of burrs. The use of a cutting torch is permissible for cutting plates and shapes to size but burning of bolt or rivet holes shall not be permitted. New hull or bulkhead plates installed under this Contract shall have 2" minimum radius corners unless otherwise directed by the COR.

c. Welders and Welding

1. All welding performed under this Contract shall be accomplished only by welders who have successfully passed the qualification tests of ABS, the American Welding Society and/or the ASME for the type of welding to be performed by each welder. Copies of the certifications of each welder the Contractor wishes to use for Contract work shall be provided to the COR by the Contractor prior to the beginning of Contract work.

2. The Contractor shall bear the expense of conducting these tests and shall certify by name to the COR, welders who have successfully passed the prescribed test. The Contractor shall require any welder to repeat these tests when, in the opinion of the COR, the work of the welder indicated a reasonable doubt of his/her efficiency. In such cases, the welder shall be re-certified as above if he /she successfully passes the re test.

3. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld. Electrodes shall be received on the job in unbroken packages bearing the manufacturer's label or be otherwise marked. Certified statements shall accompany each shipment of electrodes to the effect that sample pieces, representatives of each kind and size in each shipment, have satisfactorily passed the tests required by ABS.

4. All welding procedures shall conform to American Bureau of Shipping standards where applicable.

5. Welding procedures, as to direction, length, number and sequence of beads, shall be carefully planned so as to minimize locked up stresses, shrinkage and distortion.

d. Standard Parts

1. All articles, fittings, equipment, machinery and supplies used in the work covered by these specifications shall, as far as possible, be the manufacturer's standard articles, of reliable make, the manufacturer's current product, for which spare parts are readily available.

2. All materials, equipment, and machinery installed in or delivered with the vessel shall be new and of the quality specified herein.

SC-10 Coating Systems and Painting

a. All paint specified to be applied under this Contract shall be furnished by the Contractor unless stated otherwise.

b. Surface preparation, painting, staining, and varnishing of new and old construction shall be in compliance with "Painting: New Construction and Maintenance", EM 1110 2 3400, 30 April 1995.

All paint in use shall be thoroughly mixed at frequent intervals. Any materials not specified shall be the best of their kind suitable for marine work and subject to the approval of the COR.

c. During all exterior sandblasting and painting operations, the Contractor shall ensure that all areas of the drydock that are open to the atmosphere are covered (i.e. curtained) to prevent the dust cloud from spreading to other areas, specifically outside of the drydock. Similarly, if a marine railway is used for removing the vessel from the water, the Contractor shall ensure that all areas surrounding the vessel are covered to prevent the dust cloud from spreading to other areas.

d. Following the completion of all sandblasting, the Contractor shall remove and properly dispose of all sandblasting grit. All sandblasting grit in interior spaces shall be removed either through the existing tank access openings or through access cuts in the hull or the main deck made by the Contractor. Should the contractor choose to make access cuts for this purpose or for ventilation, dehumidification, or hose passage, the Contractor is responsible for furnishing all labor and materials to renew the steel and coatings in each area. All areas shall be renewed by replacing the removed steel area with a new steel insert of equivalent material properties and plate thickness.

After the steel has been renewed, the space shall be air tested in the presence of ABS, USCG, and the COR.

e. Hydroblasting may be utilized in conjunction with or in lieu of sandblasting, provided all surfaces shall receive the required surface profile.

f. Paint shall not be applied when atmospheric conditions will affect its application or durability.

g. Each coat of paint should adhere firmly and uniformly to the surface to which it is applied.

Sufficient drying time shall be allowed between coats.

h. In general, if paint is sprayed, each coat of paint shall consist of a double spray coat in which the surface or section of a surface to be coated is sprayed in a series of half lapped passes over the surface or section of the surface, and then sprayed again at right angles to the first spraying direction in half lapped passes.

i. Following completion of all coatings, the Contractor shall provide a report from the coatings manufacturer's representative. The report shall document all coatings, environmental parameters during the application of coatings, and all coating thickness readings. The report shall include a statement from the manufacturer's representative certifying that the application of all coatings has been performed in accordance with their requirements.

SC-11 Standard Hull Materials

All structural hull material shall be in accordance with the current rules of ABS, or with the following specifications:

Standard Specifications for Structural Steel: ASTM A131/A131M Rev A;

Standard Specifications for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels:

ASTM A372/A372M;

Standard Specifications for Steel Castings, Carbon, for General Application: ASTM A27/A27M;

Standard Specifications for Steel Castings, High Strength, for Structural Purposes: ASTM A148 /A148M

Standard Specifications for Gray Iron Castings: ASTM A48/A48M.

SC-12 Electric Power, Water, Compressed Air, and Heating

The Contractor shall furnish all necessary compressed air, and electric power for lighting and heating, and for the operations of necessary deck and auxiliary machinery of the plant while it is in his/her possession. The Contractor shall provide potable water for use on the vessel.

The Contractor shall provide 208VAC 3 Phase 60 hz at 100 amps shore power for the duration that the vessel is in the Contractor's custody.

The Contractor shall provide an external diesel fuel source plumbed into the ships heating boiler to provide hot water for the ships heating system.

The Contractor is responsible for providing all labor, hoses, electrical cable, and any other equipment or material needed to make up the connections for the services identified above. The Contractor is also responsible for disconnecting the services at the completion of the Contract.

SC-13 Wharfage, Dockage, Garbage Disposal, Etc.

While the plant is in their possession, the Contractor shall be responsible for any, and pay all expenses of wharfage, dunnage, dockage, mooring lines, garbage disposal, security, etc. The Contractor, after making repairs, shall move the boat to a convenient berth for the purpose of testing machinery and taking on supplies. Fresh water for the use of the plant shall be provided by the Contractor at their expense while the plant is in their possession, and all freshwater tanks shall be properly filled on completion of the work and return of the plant to the Government. Upon vessel arrival any liquid in the bilges shall be disposed by the Contractor in accordance with all Federal, State and Local regulations. The Contractor shall be responsible for the emptying of the 150-gallon marine sanitary holding tank as necessary.

For the period of time in which the ships sanitary system in out of service, the Contractor shall provide suitable head facilities for the ship's crew.

SC-14 Tests and Trials

For all operational testing of equipment on the vessel, the Army Corps of Engineers personnel will operate the vessel's machinery plant.

The Contractor shall perform an operational pre-test of all items or shipboard devices that are to be disturbed, used, repaired, or altered, to determine operational condition in the presence of COR and Chief Engineer. Contractor shall record pre-test results on a CFR and submit to the COR.

All machinery or other equipment disturbed, used, furnished, altered, installed, repaired or worked on by the Contractor shall be tested upon completion of all work to demonstrate proper installation and operation to the COR. This shall include all removals for access and/or interference (See Contract Clause SW-1-g. for details).

The Contractor shall conduct dock trials and sea trials as necessary to test the work performed.

Including but not limited to operations tests or inspections of all machinery and equipment removed, moved, distributed, or damaged by the Contractor in accomplishing the work outlined in this specification package.

The underway sea trials shall continue for a duration that is satisfactory to the COR, not to exceed 8 hours.

Rework on any such equipment, or subsequent sea trials to demonstrate proper installation and operation shall be performed at the expense of the Contractor.

SC-15 Contractor Cooperation with the U.S. Coast Guard, the American Bureau of Shipping and the Contracting Officer's Representative

The Government is requesting ABS Drydocking Credit upon completion of the work in this work scope to coincide with the USCG Drydocking due date.

The Contractor shall cooperate with the COR in the recertification and/or inspection of the vessel by the U.S. Coast Guard (USCG), ABS and the COR. All costs associated with the Contractor's cooperation shall be the responsibility of the Contractor. The Contractor's cooperation during or in connection with such investigations may include, but not be limited to, the following:

a. Dye penetrant, water hose, air lance, and/or vacuum box testing of any welds performed under this Contract.

b. Flooding of areas of decks, small voids, small tanks and small spaces for testing of watertight integrity whether worked on under this Contract or not.

c. Hydrostatic pressure testing of all new piping and all piping that has been worked upon by the Contractor.

d. Manual movement of any unattached objects or any objects which can be easily dismounted or opened and moved anywhere on the vessel.

e. The Contractor shall provide the services of a marine surveyor to audio gauge various locations throughout the vessel. The Contractor is responsible for all coordination to ensure that the marine surveyor and their equipment are acceptable to ABS and USCG prior to the start of any audio gauging work. For the purposes of bidding, the Contractor shall assume that two hundred (200) audio gauge "shots" are required. The Contractor shall be responsible for having the marine surveyor provide a detailed report of the audio gauge readings within 10 days of sandblasting the hull. Any delays in providing this report beyond the 10-day requirement to the Government shall be the responsibility of the shipyard. As part of this work, the Contractor is also responsible for providing all labor and power tools for cleaning locations where audio gauging is required.

Note - Any additional suspect areas throughout the vessel that are noted by the attending Surveyor shall be audio gauged. This audio gauge work shall be covered by the additional audio gauging work identified under TP 1.15.

The Contractor is also responsible for having an ABS recognized marine surveyor provide a detailed report of the audio gauge readings. As part of this work, the Contractor is also responsible for providing all labor and equipment for removal of paint in way of a reading and repairing paint, including non-skid where applicable.

f. Minor interruptions of work for purposes of inspection not to exceed eight (8) man hours of such interruptions.

g. Scheduling of work to accommodate inspections of sea valves, sea chests, tanks, hull sections and spaces, machinery and electrical items.

For the purpose of monitoring the quantity of man-hours used for items e. and f. above, the Contractor shall maintain a log sheet to document the number of man-hours worked throughout the Contract completion. The Contractor shall request approval and signature of the Government Representative on site for each entry on the log sheet to verify the information.

SC-16 Watch Service Requirements

The Contractor shall provide a 24-hour watch service to respond to any emergencies/alarms on the vessel while in the Contractor's possession. The watchman will be given a key to the GELBERMAN for use at night, on weekends and on holidays. The Contractor shall provide the name and qualifications of the watchman in writing to the COR. This information shall be submitted no later than 10 days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.

SC-17 Vessel Security

The Contractor is responsible for security while the vessel is in the Contractor's possession.

Physical means of preventing unauthorized access (i.e. gated access) to the vessel shall be provided in accordance with Federal Acquisition Regulation (FAR) Clause 252.217-7016 - Plant Protection.

SC-18 Project Schedule

The Contractor shall submit to the Government a project schedule with their initial proposal.

Following award, the Contractor shall update the schedule and submit it to the Government on a weekly basis. The schedule shall identify the intended start and end date for work under each work item as well as percentage completed for each work item.

SC-19 Interport Cost Differential

The Work Performance Location shall be limited to the area within the Project Boundary labeled "Limit of Drift Removal Project," as shown on the project map "New York Harbor NY and NJ Collection and Removal of Drift," dated 30 September 1986, plus extended locations outside of this Project Boundary, deemed safely navigable to reach by DCV Gelberman as follows:

No further than a 500 nautical mile (round trip) voyage via navigable waters beginning and ending at the South Project Boundary in the Atlantic Ocean (Atlantic Highlands). Any coastwise Atlantic Ocean transit shall not extend past the entrance to Delaware Bay. Any transit route past this point must be via the Delaware River, C&D Canal, or Chesapeake Bay.

No further than a 200 nautical mile (round trip) voyage via navigable waters beginning and ending at the East Project Boundary in Long Island Sound (Port Chester).

No further than a 140 nautical mile (round trip) voyage via navigable waters beginning and ending at the North Project Boundary in the Hudson River (Tappan Zee).

An Interport Cost Differential shall be applied for voyage travel distances beyond the East Project Boundary in Long Island Sound (Port Chester) or beyond the North Project Boundary in the Hudson River (Tappan Zee) or beyond the South Project Boundary in the Atlantic Ocean (Atlantic Highlands). This differential shall be calculated using the following two formulas.

Interport Cost Differential = (Round Trip Voyage Travel Distance Beyond Boundary in Nautical Miles x $92.00 per Nautical Mile) + $64,454.24 (For Voyage Between 0-250 Nautical Miles)

Interport Cost Differential = (Round Trip Voyage Travel Distance Beyond Boundary in Nautical Miles x $92.00 per Nautical Mile) + $74,473.87 (For Voyage Between 250-500 Nautical Miles)

Distance, in nautical miles, shall be measured starting from the point where the most direct navigable channel intersects the Project Boundary and ending at the Contractor's facility.

Measurement shall be based on the shortest safe navigational path, avoiding all known navigations hazards, depth limitations, and overhead restrictions.

This Interport Cost Differential shall be applied to any proposals where the Work Performance Location is outside of the Project Boundary when determining final cost for comparison. THIS

COST IS NOT TO BE INCLUDED IN CONTRACTOR BID, IT WILL BE APPLIED BY THE

GOVERNMENT DURING EVALUATION OF BIDS SOLELY TO DETERMINE THE APPARENT

LOW BIDDER.

Reference Attachment I of Project Map: New York Harbor NY and NJ Collection and Removal of Drift

Technical Provisions

Hull Repairs Definite Items

TP 1.01 Drydocking

Drydocking, as used below, is defined as the Contractor's responsibility to furnish all labor, material, equipment, and services to remove the vessel from the water in order to perform the work required by these specifications. The Contractor shall use either a drydock, marine railway, or travel lift to remove the vessel from the water. All requirements below shall apply regardless of which method of removal is used.

Notice to Proceed for the Contract will not be provided by the Contracting Officer until the Government has reviewed and approved the Contractor's structural calculations for using a travel lift, if used.

a. The vessel shall be drydocked within five (5) calendar days after delivery of the vessel to Contractor's yard. See Paragraph SC-1 for additional details on vessel delivery. The vessel shall be drydocked for such time as may be necessary to complete the work required by this Contract.

In particular, but not limited to the following, the vessel shall be drydocked for any exterior hull cleaning and painting below the waterline and for any interior or exterior hull plating, cutting, welding, plate replacement or structural repair or replacement within or upon the hull including hull anodes, rudders, shafts and propellers.

b. Irrespective of whether the vessel is in drydock, the Contractor is responsible for ensuring that there is a suitable drydock available for the plant for the entire contract duration in the event that an emergency drydocking of the plant should be necessary for any reason.

c. The COR may allow exceptions at his/her discretion to the necessity for drydocking for various items of work on a case-by-case basis only when informed by the Contractor and allowed to render a decision prior to any work being performed on the requested exception.

d. The drawings listed below are included with the contract package for the Contractor's use with drydocking the vessel. The Contractor is responsible for determining the actual drydock blocking arrangement. The Contractor shall use the reference drawings listed below to determine the drydock block size and arrangement.

Drawing No. 91-100-G6 - Docking Plan Drawing No. 1738-01-2 - Lines Plan

Drawing No. 91-102-53 - Transverse Framing Details

e. Drydocking blocks and other drydocking supports shall not obstruct access to remove, work upon, or replace: docking plugs, discharge openings, sea chests, anodes, shafts, struts, stern tubes, propellers, rudders, keel coolers or any other hull fittings. The Contractor shall remove and relocate drydocking blocks and/or supports, or refloat and re-drydock the plant, as needed at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein. Prior to doing so, the Contractor shall notify the COR of their plan to relocate the blocks to adequately support the vessel.

f. The Contractor shall install temporary grounding straps from the vessel's hull to the dry dock's steel structure. The Contractor shall ensure that the straps will adequately protect the vessel from any stray currents that may be present from shore side power source.

g. The Contractor shall disconnect the electronic control module (ECM) on the crane engine prior to any welding being conducted on the vessel.

h. Any direction by the COR for work required under these specifications including the direction of indefinite work items which extends drydocking time within the overall Contract duration shall not result in any additional cost to the Government.

i. Prior to undocking the vessel, the Contractor shall notify the COR and the master of the vessel.

Notification shall be provided a minimum of twenty-four (24) hours prior to undocking.

j. When undocking the vessel, all interior spaces and systems affected by work performed under this Contract shall be inspected for leakage, watertight integrity and/or seaworthiness by the Contractor and witnessed by COR or designated Government Representatives onsite.

TP 1.02 Gas-Freeing Compartments

a. Within three (3) calendar days after drydocking the vessel, the Contractor shall furnish all labor, material, equipment, and services to gas-free all hull compartments and make each space safe for entry and hot work. The Contractor shall use forced air if needed to gas free the hull compartments.

b. The hull compartments to be gas-freed, tested, and certified are listed below (11 total):

Forepeak Compartment #2 Compartment #3 Compartment #4 Potable Water Tank Engine Room

Fuel Tanks (P/S) Compartment #6 Aft Ballast Tank Compartment #7

c. The Contractor shall provide a licensed marine chemist's gas-free certificates for each space and shall then maintain the chemist's gas-free conditions for entry and hot work throughout the vessel modifications, including all definite and indefinite work, until all work has been verified as complete by the COR, ABS, and USCG.

d. Tanks shall be protected from weather while maintaining the gas free certification. The Contractor shall be responsible for any additional cleaning or gas freeing required if the tanks are not protected while opened. The Contractor shall keep all tanks open for access until cleared by USCG, ABS, and COR.

e. If the gas-free conditions are violated at any point during the performance of this work, the contractor shall bear the full expense of gas-freeing the space and providing an updated marine chemist's gas-free certificate.

f. The contractor shall strictly comply with the requirements of EM 385-1-1 "Safety and Health Requirements Manual" as stated above in SC-6"Accident Prevention" regarding gas freeing all spaces requiring hot work.

g. At the end of contract work, the Contractor shall reinstall all hatches…