SOLICITATION W912BU24B0009-Dwgs.pdf
PDF 42 MB Posted
- Solicitation number
- W912BU24B0009
About this file
This document is a Solicitation for the Beach Nourishment Long Beach Island, Ocean County, New Jersey project (Solicitation Number W912BU24B0009). The U.S. Army Corps of Engineers Philadelphia District is issuing this Invitation for Bids (IFB) to award a firm-fixed-price construction contract for the placement of approximately 1,750,000 cubic yards of beachfill to repair the dune and berm system along the Atlantic Ocean coastline of Long Beach Island. The contract work may also include construction or repair of dune crossovers, dune grass planting, sand fencing, and relocation of existing structures. The beachfill material must come from authorized offshore borrow areas. This is a full and open competition under FAR Part 14 Sealed Bidding. Bonding requirements and Liquidated Damages will apply. The contract performance period is 270 calendar days. The magnitude of construction is estimated between $100,000,000 and $250,000,000. This project is subject to a Project Labor Agreement requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract-W912BU24B0009-Long Beach Island-Final.pdf | ||
| Amendment 0003-Specs.pdf | ||
| Amendment 0003-Dwgs.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| SOLICITATION W912BU24B0009-XYZ File.txt | TXT text file | |
| SOLICITATION W912BU24B0009-Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
OF WORK
LOCATION
N
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
SOLICITATION NO:
CONTRACT NO:
ISSUE/SUBMITTAL DATE:
G-001
LO
NG
B
EA
CH
IS
LA
ND
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
BE
AC
H
NO
UR
IS
HM
EN
T
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
CO
VE
R
SH
EE
T
FN
RT
A
- M
AR
CH
W
2B U2
4B
PH
IL
AD
EL
PH
IA
PHILADELPHIA
BARNEGAT INLET TO LITTLE EGG INLET
BEACH NOURISHMENT
OCEAN COUNTY, NEW JERSEY
LONG BEACH ISLAND
RTA - MARCH 2024
W912BU24B0009
SUBMITTED:
APPROVED:
CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
CHIEF, ENGINEERING BRANCH
BARBARA F. MOFFATT P.E
THIS PROJECT WAS DESIGNED BY THE
PHILADELPHIA DISTRICT OF THE U.S.
ARMY CORPS OF ENGINEERS. THE
INITIALS OR SIGNATURES AND
REGISTRATION DESIGNATIONS OF
INDIVIDUALS APPEAR ON THESE
PROJECT DOCUMENTS WITHIN THE
SCOPE OF THEIR EMPLOYMENT AS
REQUIRED BY ER 1110-1-8152. ANDREW J. SCHWAIGER, P.E.
VICINITY MAP
LOCATION
OF PROJECT
N
SCALE: NTS
SCALE: NTS
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
PHILADELPHIA
G-002
LO
NG
B
EA
CH
IS
LA
ND
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
BE
AC
H
NO
UR
IS
HM
EN
T
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
DR
AW
IN
G
IN
DE
X
SH
EE
T
DR
AW
IN
G
IN
DE
X
SH
EE
T.
dw g
RT
A
- M
AR
CH
W
2B U2
4B
PH
IL
AD
EL
PH
IA
SS
P
SS
P
GM
G
DA
N
AS
S
HO
W
N
DRAWING INDEX
SHEET
NUMBER DESCIPTION
GENERAL
G-001 COVER SHEET
G-002 DRAWING INDEX SHEET
CIVIL
C-001 GENERAL INFORMATION SHEET
C-002 SURVEYS - BASELINE AND CONSTRUCTION COORDINATES
C-003 SURVEYS - PRE AND POST PLACEMENT CONDITION SURVEYS
C-004 SURVEYS - PRE AND POST PROJECT SURVEYS
C-005 CONTRACTOR WORK LIMIT COORDINATES
C-101 GENERAL PLAN
C-102 GENERAL PLAN
C-103 PLAN - STA. 932+27 TO STA. 971+97
C-104 PLAN - STA. 895+12 TO STA. 932+27
C-105 PLAN - STA. 857+35 TO STA. 895+12
C-106 PLAN - STA. 820+28 TO STA. 857+35
C-107 PLAN - STA. 783+25 TO STA. 820+28
C-108 PLAN - STA. 746+20 TO STA. 783+25
C-109 PLAN - STA. 709+16 TO STA. 746+20
C-110 PLAN - STA. 672+17 TO STA. 709+16
C-111 PLAN - STA. 635+14 TO STA. 672+17
C-112 PLAN - STA. 598+08 TO STA. 635+14
C-113 PLAN - STA. 561+00 TO STA. 598+08
C-114 PLAN - STA. 524+00 TO STA. 561+00
C-115 PLAN - STA. 487+00 TO STA. 524+00
C-116 PLAN - STA. 449+99 TO STA. 487+00
C-117 PLAN - STA. 412+97 TO STA. 449+99
C-118 PLAN - STA. 375+97 TO STA. 412+97
C-119 PLAN - STA. 338+97 TO STA. 375+97
C-120 PLAN - STA. 301+96 TO STA. 338+97
C-121 PLAN - STA. 264+89 TO STA. 301+96
C-122 PLAN - STA. 227+71 TO STA . 264+89
C-123 PLAN - STA. 190+18 TO STA. 227+71
C-124 PLAN - STA. 152+80 TO STA. 190+18
C-125 PLAN - STA. 115+54 TO STA. 152+80
C-301 TYPICAL SECTIONS - CROSSOVERS
C-302 TYPICAL SECTIONS - BEACHFILL
C-303 CROSS SECTIONS (LBI100 TO LBI210)
C-304 CROSS SECTIONS (LBI220 TO LBI330)
C-305 CROSS SECTIONS (LBI340 TO LBI450)
C-306 CROSS SECTIONS (LBI460 TO LBI570)
C-307 CROSS SECTIONS (LBI580 TO LBI690)
C-308 CROSS SECTIONS (LBI700 TO LBI810)
C-309 CROSS SECTIONS (LBI820 TO LBI930)
C-310 CROSS SECTIONS (LBI940 TO LBI960)
C-401 PLAN - BORROW AREA D-1
C-402 PLAN - PEDESTRIAN CROSSOVERS
C-403 PLAN - PEDESTRIAN CROSSOVERS
C-404 PLAN - PEDESTRIAN CROSSOVERS (BEACH HAVEN)
C-405 PLAN - PEDESTRIAN CROSSOVERS (HARVEY CEDARS)
C-406 PLAN - ADA AND VEHICULAR CROSSOVERS
C-407 PLAN - VEHICULAR CROSSOVERS
C-501 DETAILS - DUNE GRASS PLANTINGS AND SAND FENCE
C-502 DETAILS - ADA POST AND RAIL FENCE
C-503 DETAILS - SPLIT RAIL AND DOWEL RAIL FENCE
X-1011
VIEW NAME
MATCHLINE MATCHLINE
RE: X-XXX RE: X-XXX
X-101
TIDAL REFERENCE (LOCATION)
MLW
NAVD 88
-2 .77
+1 .5
MHW
CLOUD
REVISION & AMENDMENT
CLOUD AND SYMBOL
REVISION SYMBOL
(NUMERIC)
AMENDMENT SYMBOL
(ALPHA)
1 a
SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
BEACHFILL PLAN SYMBOLS LEGEND
VIEW TITLE SYMBOL SECTION CUT SYMBOL
VIEW IDENTIFICATION NUMBER
VIEW NAME
DIRECTION OF VIEW
CALLOUT SYMBOL
CALLOUT AREA VIEW
MATCHLINE SYMBOL
CALLOUT IDENTIFICATION
NUMBER
DETAIL SHEET
REF NUMBER
DRAWING SHEET
MATCHING REFERNECE
NUMBER
DRAWING SHEET SYMBOLS
GRAPHIC BAR SCALE SYMBOLS
PRIMARY
SCALE
EXTENSION
SCALE
X
SECTION IDENTIFICATION NUMBER
DETAIL SHEET
REF NUMBER
X X X X
PRIMARY
SCALE
EXTENSION
SCALE
V: X X X X X
X X X XH: X
SCALE IN FEET/METERS
(SINGLE SCALE, SCALE BAR)
SCALE IN FEET/METERS
(HORIZONTAL/VERTICAL SCALE BAR)
DIRECTION OF MAGNETIC
NORTH NNORTH
PLAN
MAGNETIC
NORTH
PLAN
NORTH
NORTH SYMBOLS
ABBREVIATIONS
ABBRV DESCRIPTION ABBRV DESCRIPTION ABBRV DESCRIPTION
AD AREA DRAIN FDN FOUNDATION PSI POUNDS PER SQUARE INCH
ADDL ADDITIONAL FF FINISHED FLOOR PVI POINT OF VERTICAL INFLECTION
AFF ABOVE FINISHED FLOOR FIN FINISH RAD RADIUS
BD BOARD FL FLOOR REINF REINFORCEMENT
BIT BITUMINOUS FM FORCE MAIN REM REMOVABLE
BL or BASE LINE FT FOOT, FEET ROW RIGHT OF WAY
BLDG BUILDING FTG FOOTING S SOUTH
BM BEAM G GROUND SCH SCHEDULE
BMP BEST MANAGEMENT PRACTICE GOVT GOVERNMENT SECT SECTION
BOT BOTTOM GR GRADE SPEC SPECIFICATION
BVCE BEGINNING OF VERTICAL CURVE ELEVATION HORIZ HORIZONTAL SPRT SUPPORT
BVCS BEGINNING OF VERTICAL CURVE STATION HS HIGH STRENGTH SQ SQUARE
CL or CENTERLINE HT HEIGHT SST STAINLESS STEEL
CMU CONCRETE MASONRY UNIT HVY HEAVY STA STATION
CO CLEAN OUT IN INCH STD STANDARD
COL COLUMN INSUL INSULATION, INSULATED STRUCT STRUCTURAL
CONC CONCRETE IINT INTERIOR SUSP SUSPENDED
CONSTR CONSTRUCTION INV INVERT SYS SYSTEM
CONT CONTINUOUS LL LIVE LOAD TEMP TEMPORARY
CTRL CONTROL LP LOW POINT TD TRENCH DRAIN
CWL CONTRACTOR WORK LIMITS LT LIGHT TDO TRENCH DRAIN OUTLET PIPE
DET DETAIL LVC LENGTH OF VERTICAL CURVE TELE TELEPHONE
DGA DENSE GRADED AGGREGATE JCT JUNCTION TOPO TOPOGRAPHY
DIA DIAMETER MATL MATERIAL TYP TYPICAL
DIM DIMENSION MAX MAXIMUM UD UNDERDRAIN
DL DEAD LOAD MIN MINIMUM UDO UNDERDRAIN OUTLET PIPE
DWG DRAWING MISC MISCELLANEOUS UE UNDERGROUND ELECTRIC
E EAST N NORTH UGND UNDERGROUND
EA EACH NLT NOT LESS THAN UNO UNLESS NOTED OTHERWISE
ECM EROSION CONTROL MAT NTS NOT TO SCALE UOP UNDERDRAIN OUTLET PIPE
EJ EXPANSION JOINT OC ORIGINAL CONSTRUCTION UXO UNEXPLODED ORDINANCE
EL ELEVATION OD OUTSIDE DIAMETER VB VINYL BASE
ELEC ELECTRIC OH OVERHEAD VC VERTICAL CURVE
EOP EDGE OF PAVEMENT OPG OPENING VCT VINYL COMPOSITION TILE
EOS EDGE OF SHOULDER OPP OPPOSITE VOL VOLUME
EQ EQUAL PC POINT OF CURVE VERT VERTICAL
EQUIP EQUIPMENT PD PAVEMENT DRAIN VTR VENT THROUGH ROOF
EXH EXHAUST PI POINT OF INFLECTION W/ WITH
EXIST or (E) EXISTING PIV POST INDICATOR VALVE W WEST
EXP EXPANSION, EXPOSED POT POINT OF TANGENT WL WATER LEVEL
EXP JT EXPANSION JOINT PMP PROBABLE MAXIMUM PRECIPITATION WS WATER SURFACE
EXT EXTERIOR PNL PANEL W/O WITHOUT
FIG FIGURE SINGLE PSF POUNDS PER SQUARE FOOT
CL
BL
DUNE REPAIR AND PLANTINGS AREA
SURVEY BASELINE
CONTRACTOR STAGING AREA
TYPICAL EXISTING VEHICULAR DUNE CROSSOVER
TYPICAL EXISTING PEDESTRIAN DUNE CROSSOVER
TYPICAL EXISTING ADA ACCESSIBLE DUNE CROSSOVER
FILL SLOPE AND BERM LINE
EXISTING STONE/WOOD GROIN
EXISTING STRUCTURE
EXISTING SAND FENCE
EXISTING WOOD WALKWAY
EXISTING DUNE
EXISTING UTILITY PHONE
CONTRACTOR ACCESS
EXISTING MEAN LOW WATER LINE
EL. -2.77' N.A.V.D. 88
EXISTING MEAN HIGH WATER LINE
EL. +1.50' N.A.V.D. 88
STATION AND OFFSET FROM BASELINE
TURNING POINT IN SURVEY BASELINE
CONTRACTOR WORK LIMIT POINT
ELEVATION POINT
CONTRACTOR WORK LIMIT
TYPICAL CROSSOVER REPAIR (ADA)
GENERAL NOTES:
1. ELEVATIONS ARE EXPRESSED IN FEET AND TENTHS AND REFER TO NORTH AMERICAN VERTICAL
DATUM (NAVD 1988).
2. HORIZONTAL CONTROL IS REFERENCED TO THE NEW JERSEY STATE PLANE COORDINATE SYSTEM
(NAD 1983).
3. ALL BEACHFILL MATERIAL SHALL BE OBTAINED FROM BORROW AREA D-1 SHOWN ON SHEET C-401.
4. BEACH CONDITIONS ARE DYNAMIC IN NATURE AND TOPOGRAPHY AND BATHYMETRY MAY DIFFER FROM THAT SHOWN
ON THE CONTRACT DRAWINGS.
5. THE EXISTING BEACH CROSS SECTIONS SHOWN ON SHEETS C-303 TO C-310 ARE A RESULT OF SURVEYS CONDUCTED IN THE FALL OF 2022, AND CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE CONDITIONS OCCURRING AT THAT TIME. EXISTING BEACH SECTIONS LBI943, LBI937, LBI953 AND LBI 957 ARE A RESULT OF SURVEYS CONDUCTED IN THE SPRING OF 2023 BY NJDEP, AND CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE CONDITIONS OCCURRING AT
THAT TIME.
6. SURVEY CONTROL DESCRIPTION SHEETS ARE INCLUDED IN THE SPECIFICATIONS.
7. ANY EXISTING SAND FENCE, WHICH INCLUDES FENCING AND POSTS, THAT REQUIRES DEMOLITION, SHALL BE REMOVED
AND DISPOSED OF OFF-SITE BY THE CONTRACTOR.
8. CONTRACTOR STAGING AND ACCESS LOCATIONS ARE SHOWN ON SHEETS C-103 THROUGH C-125. LOCATIONS THAT ACCESS ARE SHOWN WITHIN OPTION LIMITS MAY BE UTILIZED ONLY IF THOSE OPTIONS ARE AWARDED.
9. IN MANY AREAS THE LANDWARD LIMIT OF EXISTING DUNE TEMPLATE IS RIGHT UP AGAINST THE CONTRACTOR WORK
LIMIT LINE.
10. THE SIZE OF THE STAGING AREAS SHOWN ON THESE DRAWINGS ARE APPROXIMATE. EXACT SIZES WILL BE
DETERMINED BY THE COR IN THE FIELD.
TYPICAL CROSSOVER REPAIR (PEDESTRIAN)
TYPICAL CROSSOVER REPAIR (VEHICULAR)
HISTORIC LOCATION OF SEABEACH
AMARANTH IN 2022
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
PHILADELPHIA
C-001
LO
NG
B
EA
CH
IS
LA
ND
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
BE
AC
H
NO
UR
IS
HM
EN
T
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
GE
NE
RA
L I
NF
OR
MA
TI
ON
S
HE
ET
FN
RT
A
- M
AR
CH
W
2B U2
4B
P
H
IL
A D
E
LP
H
IA
SS
P
SS
P
GM
G
DA
N
AS
S
HO
W
N
STA. 670+79.99
N 278888.50 E 573812.06
STA. 721+78.90
N 274522.26
E 571178.65STA. 771+71.36
N 270058.21 E 568943.28
STA. 819+98.42
N 265791.82 E 566685.31
STA. 861+45.55
N 262329.55 E 564402.46
STA. 873+14.31
N 261551.65 E 563530.18
STA. 912+95.13
N 258387.10 E 561115.11
STA. 962+32.96
N 254507.59 E 558491.52
STA. 1011+86.66
N 250449.54 E 555648.76
STA. 957+65.79
N 254471.66 E 558957.31
650+00 660+00670+00680+00690+00700+00710+00720+00730+00740+00750+00760+00770+00780+00790+00800+00810+00820+00830+00840+00850+00860+00
870+00 880+00
890+00 900+00
910+00920+00930+00940+00950+00
960+00
970+00980+00990+001000+001010+00 1020+00
PRE/POST PLACEMENT CONDITION SURVEY PROFILE LINE (TYP)
(SEE NOTE 2)
STA. 322+95.22
N 309151.21 E 590928.30
STA. 280+21.20
N 312880.41 E 593016.44
STA. 371+02.20
N 304993.34 E 588516.00
STA. 420+49.40
N 300715.71 E 586030.72
STA. 471+30.13
N 296415.49 E 583324.80
STA. 518+99.70
N 292279.57 E 580949.32
STA. 570+08.22
N 287842.88 E 578416.97
STA. 620+10.35
N 283342.39 E 576233.65
280+00 290+00300+00310+00320+00330+00340+00350+00360+00370+00380+00390+00400+00410+00420+00430+00440+00450+00460+00470+00480+00490+00500+00510+00520+00530+00540+00550+00560+00570+00580+00590+00600+00610+00620+00630+00640+00
PRE/POST PLACEMENT CONDITION SURVEY PROFILE LINE (TYP)
(SEE NOTE 2)
STA. 230+47.85
N 317400.92 E 595089.87
STA. 177+57.46
N 322359.40 E 596934.25
STA. 132+14.49
N 326552.73 E 598681.98
STA. 78+60.50
N 331444.78 E 600857.54
STA. 0+0.00
N 338360.29 E 604594.28
PRE/POST PLACEMENT CONDITION SURVEY PROFILE LINE (TYP)
(SEE NOTE 2)
SURVEY BASELINE (TYP)
0+0010+0020+0030+0040+0050+0060+0070+0080+00 90+00
100+00 110+00
120+00 130+00
140+00 150+00
160+00 170+00
180+00 190+00
200+00 210+00
220+00 230+00
240+00 250+00
260+00 270+00
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
AS
S
HO
W
N
DA
N
GM
G
SS
P
JD
PH
IL
AD
EL
PH
IA
-W
2B U2
4B
RT
A
- M
AR
CH
C-
2 S
UR
VE
Y
IN
FO
RM
AT
IO
N.
dw g
SU
RV
EY
S
- B
AS
EL
IN
E
AN
D
CO
NS
TR
UC
TI
ON
C
OO
RD
IN
AT
ES
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
BE
AC
H
NO
UR
IS
HM
EN
T
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
LO
NG
B
EA
CH
IS
LA
ND
C-002
PHILADELPHIA
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
/C
-0
R E:
/C
-0
NORTH
PLAN
1 SURVEY PLAN1 SURVEY PLAN
2 SURVEY PLAN2 SURVEY PLAN
3 SURVEY PLAN3 SURVEY PLAN
NORTH
PLAN
NORTH
PLAN
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
/C
-0
R E:
/C
-0
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
/C
-0
R E:
/C
-0
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
/C
-0
R E:
/C
-0
1. SEE SHEET C-001 FOR GENERAL INFORMATION.
2. SEE SHEET C-003 FOR PRE/POST PLACEMENT
CONDITION SURVEY PROFILE ORIGIN POINTS.
2. SEE SHEET C-004 FOR PRE/POST PROJECT
SURVEY PROFILE ORIGIN POINTS.
NOTES:
PRE/POST PLACEMENT CONDITION SURVEY PROFILE ORIGIN POINTS
PROFILE ID BASELINE STATION EASTING NORTHING AZIMUTH NORTH
LRP054 - 603482.08 335611.74 118.68
LRP055 - 600850.64 331371.72 116.67
LBI100 99+97.21 599989.30 329492.43 113.63
LBI110 109+96.93 599583.07 328578.96 113.60
LBI120 119+96.65 599176.84 327665.50 113.56
LBI130 129+45.46 598791.98 326797.28 113.03
LBI140 139+96.10 598381.29 325831.28 112.32
LBI150 149+95.82 597996.69 324908.50 112.11
LBI160 159+95.54 597612.08 323985.72 112.08
LBI170 169+95.26 597227.48 323062.94 112.63
LBI180 179+94.97 596851.45 322136.79 110.69
LBI190 190+39.70 596487.23 321157.61 109.75
LBI200 199+94.42 596154.38 320262.79 109.72
LBI210 209+94.14 595805.85 319325.79 110.40
LBI220 219+93.86 595457.32 318388.79 110.40
LBI230 230+00.01 595106.55 317445.77 110.40
LBI240 240+00.00 594692.91 316535.47 114.64
LBI250 250+00.00 594276.00 315626.52 114.64
LBI260 260+00.00 593859.10 314717.57 114.64
LBI270 269+99.99 593442.19 313808.63 114.64
LBI280 280+00.00 593025.28 312899.68 114.64
LBI290 290+00.00 592538.23 312026.38 119.25
LBI300 301+09.63 591996.11 311058.20 119.25
LBI310 310+00.00 591561.10 310281.32 119.25
LBI320 320+00.00 591072.53 309408.80 119.25
LBI330 330+00.00 590574.62 308541.60 120.12
LBI340 340+00.00 590072.79 307676.63 120.12
LBI350 350+00.00 589570.95 306811.67 120.12
LBI360 360+00.00 589069.12 305946.71 120.12
LBI370 370+00.00 588567.29 305081.74 120.12
LBI380 380+00.00 588064.98 304217.05 120.16
LBI390 390+00.00 587562.62 303352.39 120.16
LBI400 400+00.00 587060.26 302487.74 120.16
LBI410 410+00.00 586557.90 301623.08 120.16
LBI420 420+00.00 586055.53 300758.42 120.16
LBI430 430+00.00 585524.44 299911.14 122.18
LBI440 440+00.00 584991.86 299064.76 122.18
LBI450 449+99.99 584459.28 298218.39 122.18
LBI460 460+00.00 583926.69 297372.01 122.18
LBI470 470+00.00 583394.11 296525.63 122.18
LBI480 480+00.00 582891.56 295661.19 119.87
LBI490 490+00.00 582393.51 294794.04 119.87
LBI500 500+00.00 581895.46 293926.89 119.87
LBI510 510+00.00 581397.41 293059.74 119.87
LBI520 520+00.00 580899.60 292192.46 119.72
LBI530 530+00.00 580403.89 291323.97 119.72
LBI540 540+00.00 579908.18 290455.48 119.72
LBI550 549+99.99 579412.47 289587.00 119.72
LBI560 560+00.00 578916.76 288718.51 119.72
LBI570 570+00.00 578421.05 287850.02 119.72
LBI580 580+00.00 577984.08 286950.56 115.88
LBI590 590+00.00 577547.60 286050.85 115.88
LBI600 600+00.00 577111.12 285151.13 115.88
LBI610 610+00.00 576674.65 284251.42 115.88
LBI620 620+00.00 576238.17 283351.70 115.88
LBI630 630+00.00 575760.93 282472.94 118.53
PRE/POST PLACEMENT CONDITION SURVEY PROFILE ORIGIN POINTS
PROFILE ID BASELINE STATION EASTING NORTHING AZIMUTH NORTH
LBI640 640+00.00 575283.26 281594.40 118.53
LBI650 650+00.00 574805.60 280715.86 118.53
LBI660 660+00.00 574327.93 279837.32 118.53
LBI670 670+00.00 573850.27 278958.77 118.53
LBI680 680+00.00 573336.91 278100.69 121.10
LBI690 690+00.00 572820.44 277244.38 121.10
LBI700 700+00.00 572303.98 276388.07 121.10
LBI710 710+00.00 571787.51 275531.76 121.10
LBI720 720+00.00 571271.05 274675.45 121.10
LBI730 730+00.00 570811.00 273788.07 116.60
LBI740 740+00.00 570363.25 272893.91 116.60
LBI750 750+00.00 569915.50 271999.75 116.60
LBI760 760+00.00 569467.75 271105.59 116.60
LBI770 770+00.00 569020.01 270211.43 116.60
LBI780 780+00.00 568555.66 269325.82 117.89
LBI790 790+00.00 568087.89 268441.97 117.89
LBI800 800+00.00 567620.12 267558.12 117.89
LBI810 810+00.00 567152.34 266674.27 117.89
LBI820 820+25.00 566670.68 265769.63 123.50
LBI830 830+00.00 566133.97 264955.64 123.40
LBI840 840+00.00 565583.51 264120.78 123.40
LBI850 850+00.00 565033.05 263285.92 123.40
LBI860 860+00.00 564482.58 262451.06 123.40
LBI870 870+00.00 563764.76 261760.85 124.00
LBI880 880+00.00 563114.19 261006.56 124.00
LBI890 890+00.00 562507.51 260211.61 124.00
LBI900 900.00.00 561900.84 259416.66 124.00
LBI910 910+09.36 561284.94 258616.97 124.00
LBI920 920+00.00 560774.90 257769.77 124.00
LBI930 930+00.00 560292.24 256893.96 124.00
LBI933 933+33.79 560131.36 256602.03 118.86
LBI940 940+00.01 559809.58 256018.15 124.00
LBI950 950+00.06 559326.92 255142.35 124.00
LBI953 953+33.33 559166.04 254850.41 118.86
LBI957 956+66.67 559005.15 254558.47 118.86
LBI960 960+00.00 558723.79 254489.67 124.00
LBI963 963+33.34 558433.93 254425.38 125.01
LBI967 966+66.67 558242.68 254152.37 125.01
LBI970 970+00.00 558051.43 253879.36 125.01
LBI980 980+00.00 557477.68 253060.33 124.00
LBI997 - 556521.43 251695.28 125.01
HB0001 - 553075.02 248192.50 119.85
HB0003 - 552131.15 247225.90 119.42
HB0005 - 551334.92 246159.52 119.15
HB0007 - 550605.80 245064.88 118.86
HB0009 - 549639.23 244201.67 119.51
HB0011 - 548810.57 243454.79 131.04
HB0013 - 547682.71 242930.34 143.90
LB0016 - 542041.98 241843.17 60.65
LB0018 - 542840.08 240775.36 61.23
LB0020 - 543247.74 239491.28 59.67
LB0022 - 543682.95 238246.45 61.73
LB0024 - 543854.63 237054.06 71.15
LB0026 - 544430.27 235883.38 80.92
LB0028 - 544977.12 234651.41 82.23
LB0030 - 544367.18 233365.72 89.85
LB0032 - 543966.08 232113.15 104.53
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
AS
S
HO
W
N
DA
N
GM
G
SS
P
JD
PH
IL
AD
EL
PH
IA
-W
2B U2
4B
RT
A
- M
AR
CH
C-
3 P
RE
A
ND
P
OS
T
CO
ND
IT
IO
N
SU
RV
EY
S.
dw g
SU
RV
EY
S
- P
RE
A
ND
P
OS
T
PL
AC
EM
EN
T
CO
ND
IT
IO
N
SU
RV
EY
S
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
BE
AC
H
NO
UR
IS
HM
EN
T
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
LO
NG
B
EA
CH
IS
LA
ND
C-003
PHILADELPHIA
1. SEE SHEET C-001 FOR GENERAL INFORMATION.
2. THE CONTRACTOR SHALL COMPLETE ALL OF THE
PRE/POST PLACEMENT CONDITION SURVEYS AS
SHOWN ON THIS SHEET AND AS DEFINED IN THE
CONTRACT SPECIFICATIONS.
PRE/POST PROJECT SURVEY PROFILE ORIGIN POINTS
PROFILE ID BASELINE STATION EASTING NORTHING AZIMUTH NORTH
LRP054 - 603482.08 335611.74 118.68
LRP055 - 600850.64 331371.72 116.67
LBI100 99+97.21 599989.30 329492.43 113.63
LBI110 109+96.93 599583.07 328578.96 113.60
LBI120 119+96.65 599176.84 327665.50 113.56
LBI130 129+45.46 598791.98 326797.28 113.03
LBI140 139+96.10 598381.29 325831.28 112.32
LBI150 149+95.82 597996.69 324908.50 112.11
LBI160 159+95.54 597612.08 323985.72 112.08
LBI170 169+95.26 597227.48 323062.94 112.63
LBI180 179+94.97 596851.45 322136.79 110.69
LBI190 190+39.70 596487.23 321157.61 109.75
LBI200 199+94.42 596154.38 320262.79 109.72
LBI210 209+94.14 595805.85 319325.79 110.40
LBI220 219+93.86 595457.32 318388.79 110.40
LBI230 230+00.01 595106.55 317445.77 110.40
LBI240 240+00.00 594692.91 316535.47 114.64
LBI250 250+00.00 594276.00 315626.52 114.64
LBI260 260+00.00 593859.10 314717.57 114.64
LBI270 269+99.99 593442.19 313808.63 114.64
LBI280 280+00.00 593025.28 312899.68 114.64
LBI290 290+00.00 592538.23 312026.38 119.25
LBI300 301+09.63 591996.11 311058.20 119.25
LBI310 310+00.00 591561.10 310281.32 119.25
LBI320 320+00.00 591072.53 309408.80 119.25
LBI330 330+00.00 590574.62 308541.60 120.12
LBI340 340+00.00 590072.79 307676.63 120.12
LBI350 350+00.00 589570.95 306811.67 120.12
LBI360 360+00.00 589069.12 305946.71 120.12
LBI370 370+00.00 588567.29 305081.74 120.12
LBI380 380+00.00 588064.98 304217.05 120.16
LBI390 390+00.00 587562.62 303352.39 120.16
LBI400 400+00.00 587060.26 302487.74 120.16
LBI410 410+00.00 586557.90 301623.08 120.16
LBI420 420+00.00 586055.53 300758.42 120.16
LBI430 430+00.00 585524.44 299911.14 122.18
LBI440 440+00.00 584991.86 299064.76 122.18
LBI450 449+99.99 584459.28 298218.39 122.18
LBI460 460+00.00 583926.69 297372.01 122.18
LBI470 470+00.00 583394.11 296525.63 122.18
LBI480 480+00.00 582891.56 295661.19 119.87
LBI490 490+00.00 582393.51 294794.04 119.87
LBI500 500+00.00 581895.46 293926.89 119.87
LBI510 510+00.00 581397.41 293059.74 119.87
LBI520 520+00.00 580899.60 292192.46 119.72
LBI530 530+00.00 580403.89 291323.97 119.72
LBI540 540+00.00 579908.18 290455.48 119.72
LBI550 549+99.99 579412.47 289587.00 119.72
LBI560 560+00.00 578916.76 288718.51 119.72
LBI570 570+00.00 578421.05 287850.02 119.72
LBI580 580+00.00 577984.08 286950.56 115.88
LBI590 590+00.00 577547.60 286050.85 115.88
LBI600 600+00.00 577111.12 285151.13 115.88
LBI610 610+00.00 576674.65 284251.42 115.88
LBI620 620+00.00 576238.17 283351.70 115.88
LBI630 630+00.00 575760.93 282472.94 118.53
PRE/POST PROJECT SURVEY PROFILE ORIGIN POINTS
PROFILE ID BASELINE STATION EASTING NORTHING AZIMUTH NORTH
LBI640 640+00.00 575283.26 281594.40 118.53
LBI650 650+00.00 574805.60 280715.86 118.53
LBI660 660+00.00 574327.93 279837.32 118.53
LBI670 670+00.00 573850.27 278958.77 118.53
LBI680 680+00.00 573336.91 278100.69 121.10
LBI690 690+00.00 572820.44 277244.38 121.10
LBI700 700+00.00 572303.98 276388.07 121.10
LBI710 710+00.00 571787.51 275531.76 121.10
LBI720 720+00.00 571271.05 274675.45 121.10
LBI730 730+00.00 570811.00 273788.07 116.60
LBI740 740+00.00 570363.25 272893.91 116.60
LBI750 750+00.00 569915.50 271999.75 116.60
LBI760 760+00.00 569467.75 271105.59 116.60
LBI770 770+00.00 569020.01 270211.43 116.60
LBI780 780+00.00 568555.66 269325.82 117.89
LBI790 790+00.00 568087.89 268441.97 117.89
LBI800 800+00.00 567620.12 267558.12 117.89
LBI810 810+00.00 567152.34 266674.27 117.89
LBI820 820+25.00 566670.68 265769.63 123.50
LBI830 830+00.00 566133.97 264955.64 123.40
LBI840 840+00.00 565583.51 264120.78 123.40
LBI850 850+00.00 565033.05 263285.92 123.40
LBI860 860+00.00 564482.58 262451.06 123.40
LBI870 870+00.00 563764.76 261760.85 124.00
LBI880 880+00.00 563114.19 261006.56 124.00
LBI890 890+00.00 562507.51 260211.61 124.00
LBI900 900.00.00 561900.84 259416.66 124.00
LBI910 910+09.36 561284.94 258616.97 124.00
LBI920 920+00.00 560774.90 257769.77 124.00
LBI930 930+00.00 560292.24 256893.96 124.00
LBI933 933+33.79 560131.36 256602.03 118.86
LBI940 940+00.01 559809.58 256018.15 124.00
LBI950 950+00.06 559326.92 255142.35 124.00
LBI953 953+33.33 559166.04 254850.41 118.86
LBI957 956+66.67 559005.15 254558.47 118.86
LBI960 960+00.00 558723.79 254489.67 124.00
LBI963 963+33.34 558433.93 254425.38 125.01
LBI967 966+66.67 558242.68 254152.37 125.01
LBI970 970+00.00 558051.43 253879.36 125.01
LBI980 980+00.00 557477.68 253060.33 124.00
LBI997 - 556521.43 251695.28 125.01
HB0001 - 553075.02 248192.50 119.85
HB0003 - 552131.15 247225.90 119.42
HB0005 - 551334.92 246159.52 119.15
HB0007 - 550605.80 245064.88 118.86
HB0009 - 549639.23 244201.67 119.51
HB0011 - 548810.57 243454.79 131.04
HB0013 - 547682.71 242930.34 143.90
LB0016 - 542041.98 241843.17 60.65
LB0018 - 542840.08 240775.36 61.23
LB0020 - 543247.74 239491.28 59.67
LB0022 - 543682.95 238246.45 61.73
LB0024 - 543854.63 237054.06 71.15
LB0026 - 544430.27 235883.38 80.92
LB0028 - 544977.12 234651.41 82.23
LB0030 - 544367.18 233365.72 89.85
LB0032 - 543966.08 232113.15 104.53
SUPPLEMENTAL SURVEYS*
PRE/POST PROJECT SURVEY PROFILE ORIGIN POINTS
PROFILE ID BASELINE STATION EASTING NORTHING AZIMUTH NORTH
LBI117 116+66.67 599310.93 327967.01 113.98
LBI123 123+33.34 599040.03 327357.86 113.98
LBI127 126+66.67 598904.59 327053.29 113.98
LBI133 133+33.33 598636.26 326443.04 112.63
LBI137 136+66.67 598508.02 326135.36 112.63
LBI143 143+33.33 598251.55 325520.00 112.63
LBI147 146+66.67 598123.31 325212.32 112.63
LBI153 153+33.33 597866.84 324596.96 112.63
LBI157 156+66.67 597738.60 324289.28 112.63
LBI163 163+33.34 597482.13 323673.92 112.63
LBI167 166+64.30 597354.81 323368.43 112.63
LBI173 173+33.33 597097.42 322750.89 112.63
LBI177 176+66.67 596969.18 322443.21 112.63
LBI183 183+33.34 596733.49 321819.66 110.40
LBI227 226+66.67 595222.76 317758.19 110.40
LBI233 233+33.34 594970.85 317141.44 114.64
LBI237 236+66.67 594831.88 316838.45 114.64
LBI243 243+33.33 594553.94 316232.49 114.64
LBI247 246+66.66 594414.97 315929.51 114.64
LBI253 253.53.34 594128.7 315305.36 114.64
LBI257 256+66.67 593998.06 315020.56 114.64
LBI263 263+33.33 593720.13 314414.59 114.64
LBI267 266+66.66 593581.16 314111.61 114.64
LBI273 273+33.34 593303.22 313505.64 114.64
LBI277 276+66.67 593164.25 313202.66 114.64
LBI283 283+33.34 592863.94 312608.06 119.25
LBI287 286+66.67 592701.09 312317.22 119.25
LBI293 293+33.33 592375.38 311735.54 119.25
LBI297 296+66.67 592212.52 31144.69 119.25
LBI303 303+33.33 591886.81 310863.01 119.25
LBI307 306+66.67 591723.95 3100572.17 119.25
LBI313 313+33.34 591398.24 309990.48 119.25
LBI363 363+23.20 588906.90 305667.20 120.12
LBI367 366+56.44 588739.70 305378.90 120.12
LBI373 373+22.91 588405.10 304802.50 120.15
LBI377 376+56.16 588237.70 304514.30 120.16
LBI383 383+22.64 587902.90 303938.00 120.16
LBI517 516+52.25 581072.56 292494.14 199.85
LBI523 523+18.74 580741.60 291915.64 119.72
SUPPLEMENTAL SURVEYS*
PRE/POST PROJECT SURVEY PROFILE ORIGIN POINTS
PROFILE ID BASELINE STATION EASTING NORTHING AZIMUTH NORTH
LBI527 526+51.97 580576.41 291626.23 119.72
LBI533 533+43.45 580233.64 291025.69 119.72
LBI537 536+51.69 580080.84 290757.98 119.72
LBI543 543+18.17 579750.46 290179.15 119.72
LBI547 546+51.41 579585.26 289889.74 119.72
LBI553 553+33.33 579251.08 289304.25 119.72
LBI557 556+51.14 579089.69 289021.49 119.72
LBI563 563+17.62 578759.31 288442.66 119.72
LBI567 566+50.85 578594.12 288153.25 119.72
LBI573 573+17.34 578282.05 287564.76 115.88
LBI777 776+66.81 568711.59 269620.43 117.89
LBI783 783+33.34 568399.74 269031.20 117.89
LBI787 786+66.67 568243.81 268736.58 117.89
LBI793 793+33.33 567931.97 268147.35 117.89
LBI797 796+91.68 567764.35 267830.63 117.89
LBI803 803+33.34 567464.19 267263.50 117.89
LBI807 806+66.66 567308.27 266968.89 117.89
LBI813 813+33.36 566996.42 266379.65 117.89
LBI817 816+66.67 566840.49 266085.04 117.89
LBI823 823+33.34 566500.95 265512.21 123.40
LBI827 826+66.67 566317.46 265233.93 123.40
LBI833 833+33.34 565950.49 264677.35 123.40
LBI837 836+66.66 565767.00 264399.07 123.40
LBI843 843+33.33 565400.02 263842.50 123.40
LBI847 846+66.67 565216.53 263564.21 123.40
LBI853 853+33.33 564849.56 263007.64 123.40
LBI857 856+66.67 564666.07 262729.35 123.40
LBI863 864+33.33 564187.68 262138.01 138.27
LBI867 866+66.66 564013.54 261982.71 138.27
LBI873 873+14.31 563530.18 261551.65 127.35
LBI877 876+66.67 563316.41 261271.55 127.35
LBI883 883+33.33 562911.96 260741.58 127.35
LBI887 886+66.51 562709.74 260476.60 127.35
LBI893 893+33.33 562305.29 259946.63 127.35
LBI897 896+66.64 562103.06 259681.65 127.35
LBI903 903+33.34 561698.61 259151.68 127.35
LBI927 926+66.66 560453.13 257185.90 118.86
LBI937 936+66.67 559970.47 256310.09 118.86
LBI943 943+33.33 559648.70 255726.22 118.86
LBI947 946+66.64 559487.81 255434.28 118.86
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
AS
S
HO
W
N
DA
N
GM
G
SS
P
SS
P
PH
IL
AD
EL
PH
IA
-W
2B U2
4B
RT
A
- M
AR
CH
C-
4 P
RE
A
ND
P
OS
T
PR
OJ
EC
T
SU
RV
EY
S.
dw g
SU
RV
EY
S
- P
RE
A
ND
P
OS
T
PR
OJ
EC
T
SU
RV
EY
S
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
BE
AC
H
NO
UR
IS
HM
EN
T
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
LO
NG
B
EA
CH
IS
LA
ND
C-004
PHILADELPHIA
1. SEE SHEET C-001 FOR GENERAL INFORMATION.
2. THE CONTRACTOR SHALL COMPLETE ALL OF THE
PRE/POST PROJECT SURVEYS AS SHOWN ON
THIS SHEET AND AS DEFINED IN THE CONTRACT
SPECIFICATIONS.
NOTES:
* SUPPLEMENTAL SURVEYS LISTED IN THIS TABLE
SHALL ONLY CONSIST OF UPPER BEACH AND
WADING SURVEYS. HYDROGRAPHIC SURVEYS ARE
NOT REQUIRED FOR SUPPLEMENTAL SURVEYS. SEE
CONTRACT SPECIFICATIONS FOR FURTHER
REQUIREMENTS.
* SUPPLEMENTAL SURVEYS LISTED IN THIS TABLE
SHALL ONLY CONSIST OF UPPER BEACH AND
WADING SURVEYS. HYDROGRAPHIC SURVEYS ARE
NOT REQUIRED FOR SUPPLEMENTAL SURVEYS. SEE
CONTRACT SPECIFICATIONS FOR FURTHER
REQUIREMENTS.
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
253518.95
253518.95
254329.13
254215.22
254546.82
254546.82
254606.45
254622.36
254636.79
254579.55
254766.88
254849.79
254874.25
254800.06
254904.47
254904.47
254896.02
254999.62
255089.40
255099.40
255014.59
255030.11
255030.11
255131.36
255217.41
255229.49
255307.66
255307.66
255241.06
255252.14
255252.14
255360.32
255458.96
255524.54
255537.57
255459.37
255583.73
255940.22
255945.48
255970.47
255970.47
256027.72
255969.74
256110.80
256174.20
256188.41
256130.47
256278.24
256337.40
256350.16
256350.16
256433.31
256489.68
256508.40
256451.50
256451.50
256901.34
256914.56
256867.64
256867.64
257210.90
257222.67
257175.28
257472.43
257515.15
257528.92
257483.38
257775.56
257821.29
257835.53
EASTING
558682.40
558682.40
558707.74
558949.43
559127.66
559127.66
559177.48
559151.03
559156.55
559257.00
559411.22
559258.70
559270.25
559408.43
559464.00
559464.00
559479.32
559533.41
559381.61
559386.78
559540.27
559547.37
559547.37
559581.20
559622.93
559637.27
559497.62
559497.62
559651.00
559664.14
559664.14
559675.31
559727.14
559613.39
559620.31
559759.72
559811.33
559984.93
559975.91
559968.85
559968.85
559880.95
559999.36
560068.01
559959.23
559966.42
560077.58
560149.55
560044.04
560049.60
560049.60
560225.06
560125.72
560134.36
560233.92
560233.92
560341.79
560349.28
560437.12
560437.12
560509.88
560516.11
560600.43
560758.22
560669.80
560676.65
560764.03
560919.04
560832.58
560840.42
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
257787.78
257958.93
258006.69
258006.69
258013.99
257966.35
258089.63
258146.10
258097.18
258097.18
258322.20
258383.82
258383.82
258330.12
258334.90
258483.51
258644.95
258644.95
258720.76
258658.29
258658.29
258787.49
258850.47
258800.55
258800.55
259010.57
259010.57
258965.11
258977.34
259102.60
259275.76
259342.75
259349.69
259349.69
259676.25
259762.38
259770.27
259770.27
259802.74
259802.74
259901.08
259816.68
260029.46
260124.78
260134.69
260167.76
260157.01
260265.09
260273.09
260301.98
260291.43
260478.25
260507.15
260511.61
260482.50
260582.19
260675.17
260719.31
260724.46
260696.73
260901.12
260941.89
260948.07
260914.69
261109.16
261135.98
261135.98
261168.16
261323.70
261365.88
EASTING
560925.82
561021.85
560931.74
560931.74
560935.73
561026.13
561095.37
561007.21
561099.73
561099.73
561241.65
561133.92
561133.92
561248.33
561252.37
561342.91
561449.25
561449.25
561343.61
561458.04
561458.04
561543.14
561426.69
561551.69
561551.69
561531.26
561531.26
561660.13
561668.19
561750.69
561872.33
561745.34
561749.94
561749.94
562154.88
562015.63
562020.47
562020.47
562244.40
562244.40
562107.45
562254.35
562404.86
562482.66
562467.24
562489.84
562508.45
562596.09
562581.19
562598.11
562618.09
562778.56
562727.49
562730.07
562782.21
562864.01
562927.87
562888.04
562890.82
562941.96
563076.66
563024.23
563027.49
563085.41
563211.37
563176.78
563176.78
563190.10
563400.02
563341.46
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
261373.47
261373.47
261504.39
261504.39
261552.41
261552.41
261721.85
261786.15
261793.01
261793.01
261906.61
261924.33
261927.80
261911.39
262121.19
262147.95
262167.91
262132.53
262281.99
262326.96
262334.14
262287.92
262398.64
262474.07
262484.42
262550.41
262532.37
262532.37
262526.50
262640.69
262705.77
262757.04
262768.75
262768.75
262829.96
262918.07
262961.18
262967.77
262952.38
262952.38
263126.65
263190.52
263198.34
263140.91
263329.93
263372.02
263378.20
263346.46
263356.66
263558.07
263656.09
263661.12
263565.51
263601.08
263790.06
263805.87
263814.85
263802.38
263992.13
264018.86
264029.97
264007.61
264218.84
264243.69
264252.68
264252.68
264445.03
264457.31
264500.71
264492.97
EASTING
563343.34
563343.34
563562.79
563562.79
563527.72
563527.72
563771.85
563674.01
563679.31
563679.31
563950.70
563920.86
563926.62
563954.57
564208.42
564181.60
564192.08
564222.72
564477.30
564403.12
564406.27
564485.46
564562.09
564610.80
564627.79
564533.44
564577.31
564577.31
564638.56
564709.22
564755.29
564695.38
564701.72
564701.72
564845.46
564932.14
564867.25
564870.75
564905.88
564905.88
565092.90
564992.98
564997.14
565104.17
565278.72
565221.52
565224.85
565294.03
565303.46
565381.01
565238.73
565241.64
565383.88
565397.57
565518.60
565499.44
565506.53
565526.49
565648.01
565620.04
565623.25
565657.74
565790.07
565750.10
565757.83
565757.83
565931.78
565909.40
565937.81
565963.08
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
264683.26
264704.50
264714.49
264695.16
264941.86
264941.86
264977.75
264977.75
265211.08
265215.76
265238.64
265230.03
265416.86
265452.39
265528.02
265496.49
265728.02
265753.65
265779.08
265792.92
265792.92
266025.02
266047.81
266054.36
266054.36
266203.85
266234.10
266254.78
266254.78
266266.26
266420.66
266463.51
266493.00
266522.87
266507.46
266698.91
266720.85
266737.39
266748.03
266748.03
266925.75
266925.75
266948.17
266941.81
267120.99
267139.49
267160.29
267164.31
267164.31
267146.69
267366.29
267393.21
267408.51
267381.96
267514.92
267614.19
267633.61
267640.55
267628.59
267810.98
267830.55
267842.96
267842.96
267982.30
268010.86
268031.58
268045.36
268023.52
268035.06
268229.12
EASTING
566081.04
566052.72
566058.77
566088.50
566243.05
566243.05
566217.26
566217.26
566437.11
566369.82
566374.02
566449.07
566585.14
566519.81
566565.66
566625.64
566713.42
566728.76
566685.65
566694.58
566694.58
566891.16
566866.45
566866.66
566866.66
566988.69
567007.83
566973.63
566973.63
566980.19
567125.87
567145.96
567093.09
567107.08
567147.40
567256.79
567268.68
567238.21
567243.77
567243.77
567379.64
567379.64
567358.90
567388.34
567485.38
567497.83
567462.26
567472.16
567472.16
567502.68
567637.92
567591.10
567600.07
567647.14
567699.31
567752.48
567723.07
567726.73
567760.28
567859.05
567825.09
567831.64
567831.64
567951.83
567967.30
567934.30
567934.19
567974.15
567980.40
568095.38
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
268259.76
268266.67
268266.67
268343.99
268448.37
268448.37
268487.48
268487.48
268661.47
268671.93
268681.73
268702.62
268691.46
268727.19
268888.24
268904.12
268911.39
268930.48
268924.25
269127.86
269151.84
269167.37
269167.37
269353.16
269353.16
269398.91
269384.42
269583.96
269597.67
269617.04
269617.04
269751.36
269817.07
269830.69
269844.54
269832.04
270029.79
270051.42
270065.26
270049.65
270253.61
270269.64
270288.64
270274.19
270274.19
270502.19
270518.58
270500.68
270640.06
270640.06
287103.47
287334.38
287334.38
287536.45
287614.83
287550.71
287594.30
287754.48
287815.90
287826.47
287764.47
287977.63
288040.51
288050.99
288050.99
288206.19
288265.35
288276.24
288214.99
288364.05
EASTING
568050.92
568054.46
568054.46
568163.45
568212.38
568212.38
568201.09
568201.09
568312.27
568319.99
568308.05
568313.07
568334.41
568360.78
568418.58
568426.03
568412.84
568424.40
568435.46
568530.91
568495.35
568504.16
568504.16
568636.53
568636.53
568615.86
568651.18
568744.72
568720.33
568729.49
568729.49
568823.20
568854.01
568827.27
568836.18
568861.72
568964.26
568937.30
568946.32
568974.56
569080.33
569051.51
569057.97
569091.00
569091.00
569160.23
569170.87
569208.44
569280.72
569280.72
578721.50
578321.54
578321.54
578430.79
578324.28
578438.50
578461.93
578548.00
578434.02
578439.70
578555.02
578667.63
578557.45
578563.31
578563.31
578790.17
578682.45
578687.59
578794.88
578874.73
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
288378.22
288433.56
288443.78
288388.62
288405.53
288548.09
288603.88
288614.20
288558.24
288573.37
288712.78
288767.31
288778.06
288723.31
288899.51
288954.80
288965.22
288910.03
289064.21
289119.15
289129.76
289074.74
289245.86
289245.86
289311.57
289256.38
289423.94
289477.78
289488.99
289435.34
289451.89
289593.85
289648.57
289664.72
289609.95
289609.95
289756.98
289812.13
289822.13
289767.14
289930.61
289984.20
289994.70
289940.77
290109.24
290162.82
290172.82
290119.41
290277.32
290277.32
290340.99
290287.48
290287.48
290443.90
290443.90
290509.19
290454.43
290634.35
290687.87
290698.13
290644.88
290798.86
290849.78
290860.38
290809.38
290971.18
291024.25
291034.96
290981.70
291152.47
EASTING
578882.91
578785.95
578792.27
578888.90
578898.65
578988.61
578890.86
578896.82
578995.04
579004.63
579081.20
578985.66
578991.04
579086.97
579183.57
579086.70
579092.65
579189.34
579273.86
579177.62
579183.24
579279.63
579373.45
579373.45
579282.53
579379.22
579471.07
579377.09
579383.68
579477.32
579486.39
579575.78
579479.93
579489.96
579585.91
579585.91
579678.49
579582.24
579588.54
579684.88
579787.81
579693.91
579699.72
579794.21
579900.28
579806.41
579813.11
579906.68
580006.11
580006.11
579918.76
580012.51
580012.51
580110.09
580110.09
580019.90
580115.85
580214.47
580120.71
580126.94
580220.24
580304.66
580211.85
580217.48
580310.43
580399.13
580306.15
580311.59
580404.90
580498.45
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
291204.45
291215.05
291162.96
291309.85
291327.57
291327.57
291393.54
291338.80
291516.79
291571.35
291582.57
291528.02
291701.41
291701.41
291762.27
291712.89
291869.06
291895.94
291951.06
291961.97
291906.60
291910.94
292061.67
292122.40
292133.70
292072.22
292246.67
292282.97
292299.99
292262.36
292334.39
292404.58
292432.83
292440.31
292412.57
292595.40
292177.80
309666.77
309784.11
310414.38
310547.41
310816.14
310988.22
311021.08
311079.11
311095.93
311037.93
311377.82
311681.04
311851.11
311932.71
312035.08
312057.63
312113.04
312126.23
312126.23
312323.16
312367.75
312381.88
312381.88
312576.99
312606.48
312619.63
312619.63
312844.90
312873.59
312885.22
312857.22
313091.51
313123.65
EASTING
580402.44
580408.07
580504.27
580584.79
580591.95
580591.95
580500.56
580596.48
580668.24
580572.65
580577.19
580672.77
580742.68
580742.68
580648.83
580746.50
580816.79
580820.00
580723.50
580728.53
580825.54
580836.08
580906.45
580800.05
580804.47
580911.96
581005.54
580937.98
580946.88
581014.17
581053.74
581092.30
581049.07
581053.36
581096.69
581197.49
581920.79
591620.03
591416.78
591734.43
591802.54
591970.51
592121.94
592139.71
592039.15
592048.02
592148.82
592332.60
592472.14
592566.67
592612.03
592667.24
592679.16
592574.89
592581.35
592581.35
592819.54
592735.21
592741.60
592741.60
592939.75
592878.70
592885.30
592885.30
593074.24
593015.47
593021.37
593080.42
593198.03
593137.65
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
313140.65
313140.65
313378.98
313410.70
313423.84
313392.14
313427.37
313670.04
313704.17
313717.88
313683.86
313931.51
313959.68
313973.21
313944.99
314544.03
314571.69
314611.36
314619.43
314579.36
315002.47
315041.23
315058.29
315019.49
315277.13
315305.72
315319.38
315290.74
315419.37
315553.93
315849.09
315907.21
316091.56
316108.65
316124.14
316137.75
316122.97
316631.35
316644.61
316658.73
316645.63
316878.13
316891.42
316905.49
316891.77
317132.50
317153.45
317167.56
317167.56
317372.54
317394.88
317408.95
317385.87
317566.62
317614.97
317642.84
317657.01
317628.76
317853.67
317879.02
317893.03
317893.03
317878.04
318098.63
318134.21
318148.24
318112.35
318345.73
318345.73
318382.31
EASTING
593146.09
593146.09
593342.33
593280.53
593286.82
593348.94
593366.62
593488.23
593415.13
593421.94
593494.53
593613.95
593553.07
593559.64
593620.57
593921.40
593934.24
593853.22
593857.19
593939.05
594151.62
594076.15
594084.49
594160.02
594281.63
594211.33
594218.13
594288.31
594346.68
594375.13
594511.57
594538.44
594623.65
594633.61
594595.44
594601.79
594638.21
594851.86
594814.34
594819.42
594856.46
594955.11
594919.52
594924.72
594961.49
595053.82
594998.40
595003.48
595003.48
595146.45
595087.66
595092.86
595153.59
595226.50
595246.01
595176.83
595181.79
595251.94
595330.89
595274.72
595280.14
595280.14
595340.18
595439.08
595361.02
595366.38
595445.14
595549.76
595549.76
595506.42
TABLE: CWL COORDINATES
POINT NUMBER
NORTHING
318363.08
318585.00
318585.00
318631.28
318597.28
318597.28
318827.33
318860.52
318860.52
318841.30
319068.93
319068.93
319115.43
319086.55
319321.08
319321.08
319366.75
319366.75
319335.16
319573.26
319580.76
319580.76
319622.51
319595.15
319830.34
319862.08
319876.13
319844.72
319981.07
320120.02
320120.02
321289.48
321524.04
321633.09
322100.49
322216.89
322332.18
322909.52
323089.20
323158.97
323224.63
323224.63
323602.32
323717.78
324428.39
324783.58
325241.49
325584.84
326042.64
326515.52
326537.92
326560.89
326560.89
326697.78
326980.54
326993.11
327000.54
327000.54
327467.93
327748.13
327506.40
EASTING
595557.67
595657.16
595657.16
595591.66
595666.40
595666.40
595765.78
595676.90
595676.90
595771.19
595859.55
595859.55
595783.21
595866.02
595952.13
595952.13
595869.64
595869.64
595957.30
596044.38
596046.89
596046.89
595968.77
596051.15
596121.14
596027.82
596033.15
596125.46
596166.51
596208.31
596208.31
596623.82
596710.31
596757.70
596950.64
596999.17
597047.81
597288.63
597363.58
597206.57
597228.11
597228.11
597577.62
597625.80
597866.51
597986.82
598190.56
598343.32
598547.00
598735.44
598677.82
598683.91
598683.91
598808.07
598918.82
598889.43
598894.51
598894.51
599109.72
599237.13
599780.69
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
AS
S
HO
W
N
DA
N
GM
G
SS
P
SS
P
PH
IL
AD
EL
PH
IA
-W
2B U2
4B
RT
A
- M
AR
CH
CO
NT
RA
CT
OR
W
OR
K
LIM
IT
C
OO
RD
IN
AT
ES
.dw g
CO
NT
RA
CT
OR
W
OR
K
LIM
IT
C
OO
RD
IN
AT
ES
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
BE
AC
H
NO
UR
IS
HM
EN
T
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
LO
NG
B
EA
CH
IS
LA
ND
C-005
PHILADELPHIA
SHEET C-103
SHEET C-104
SHEET C-105
LONG BEACH TOWNSHIP
5.1
4.7
5.1
3.1
4.9
4.4
4.6
4.0
5.4
5.8 5.5
6.2
6.7
4.1
3.3
3.8
3.5
3.6 3.7
4.0
3.7 3.7
4.0
2.7
3.6
4.0
5.0
4.5
4.4 5.0
4.4
4.4
3.5
5.0 5.0
5.7
4.7
3.2
3.0
3.23.13.4 3.6
3.9
3.8
4.04.0
4.0 4.04.7
4.9
4.8
4.6 5.24.9
5.3
5.4
5.4
4.7
4.9
6.4
5.6
3.9
4.4
4.3 4.6
4.4
3.5 4.2
4.3 5.3
3.3
3.9
4.95.0
4.8
3.0
3.5
4.9
3.7
RESTRICTION ZONE ON
DREDGING OPERATIONS
(SEE SPECIFICATIONS)
ATLANTIC OCEAN
BASE BID AND
OPTIONS 8, 9 AND 10
ST
A.
2+
850+00860+00 870+00
880+00 890+00
900+00 910+00920+00930+00940+00950+00
960+00
970+00980+00990+00 1000+001010+00
1020+00 1030+00
1040+00 1050+00
1060+00
1070+00
1080+00
1090+00
1100+00
1105+00
BEACH HAVEN BOROUGH
APPROXIMATE SHORELINE
SURVEY BASELINE
(TYP)
CONTRACTOR WORK LIMIT
(TYP)
SHEET C-106 SHEET C-107 SHEET C-108 SHEET C-109 SHEET C-110 SHEET C-111 SHEET C-112 SHEET C-113 SHEET C-114 SHEET C-115
ST
A.
0+
LONG BEACH TOWNSHIP
ST
A.
0+
OPTIONS 1, 5, 6 AND 7
ST
A.
0+
BEACH HAVEN BOROUGH
Obscured
Obscured
Obscured
Obscured
Obscured
Obscured
Obscured
U.C.
Obscured
Obscured
O bscured
Obscured
Obscured
U.C.
U.C.
U.C.
U.C.
U.C.
U.C.
U.C.
U.C.
U.C.
U.C.U.C.
U.C.
U.C.
U.C.
Obscured
O bscured
Obscured
Obscured
Obscured
Obscured
Obscured
Obscured Obscured
Obscured
Obscured
Obscured
U.C.
U.C.
U.C.
Obscured
O bscured
Obscured
U.C.
RESTRICTION ZONE ON
DREDGING OPERATIONS
(SEE SPECIFICATIONS)
ATLANTIC OCEAN
490+00500+00510+00 520+00530+00540+00
550+00560+00570+00580+00
590+00600+00610+00620+00630+00640+00650+00660+00670+00680+00690+00700+00710+00720+00730+00740+00750+00760+00770+00780+00790+00800+00810+00820+00830+00840+00850+00
OPTIONS 20, 21 AND 22OPTIONS 23, 24 AND 25
ST
A.
5+
BASE BID AND
OPTIONS 8, 9 AND 10
SHEET C-111
OPTIONS 17, 18 AND 19
SHIP BOTTOM BOROUGH
1 GENERAL PLAN - STA 851+00 TO STA. 1105+001 GENERAL PLAN - STA 851+00 TO STA. 1105+00
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
PHILADELPHIA
C-101
LO
NG
B
EA
CH
IS
LA
ND
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
BE
AC
H
NO
UR
IS
HM
EN
T
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
GE
NE
RA
L P
LA
N
C-
1 G
EN
ER
AL
P
LA
N.
dw g
RT
A
- M
AR
CH
W
2B U2
4B
PH
IL
AD
EL
PH
IA
SS
P
SS
P
GM
G
DA
N
AS
S
HO
W
N
2 GENERAL PLAN - STA. 487+00 TO STA. 851+002 GENERAL PLAN - STA. 487+00 TO STA. 851+00
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
/C
-1
R E:
/C
-1
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
/C
-1
R E:
/C
-1
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
/C
-1
R E:
/C
-1
NORTH
PLAN
NORTH
PLAN
1. SEE SHEET C-001 FOR GENERAL INFORMATION.
2. SEE SHEET C-002 FOR SURVEY AND
CONSTRUCTION BASELINE COORDINATES.
SHEET C-116 SHEET C-117
SHEET C-118 SHEET C-119 SHEET C-120
SHEET C-121 SHEET C-122
SHEET C-123
SHEET C-124
SHEET C-125
BORROW AREA D-1
(AVAILABLE FOR USE)
(SEE SHEET C-401)
LONG BEACH TOWNSHIP
ST
A.
0+
LONG BEACH TOWNSHIPSURF CITY BOROUGHSHIP BOTTOM BOROUGH
3.1
3.1
U.C.
3.4
3.5
3.7
3.93.8
U.C.
3.6
3.7
4.4
3.8
4.0
5.2
11.7
U.C.
Obscured
3.2
3.8
U.C.
3.3
3.6
3.2
3.7
3.9
3.4
3.5
3.6
4.1
4.2 3.9
3.6
2.92.7
3.9
3.3
3.3
3.4
3.4
3.3
3.2
3.0
3.5
3.3
2.7
4.6
3.9 3.8
2.9
3.8
4.3
4.0
4.0
4.1
4.8
5.8 4.2
3.9 3.9
2.3
4.0 3.6
3.5
3.6
3.0
7.9 10.8
4.0 3.7
3.3
4.6
4.4
4.4
4.2
3.6
4.0
3.1
4.03.9
3.4
3.6
4.5
3.9
4.0
4.1
4.3
3.7
4.3
4.0
3.9
U.C.
U.C.
3.8
3.9
3.8 3.8
4.5
3.9
4.4
3.9
4.1
U.C.
4.2
U.C.
U.C.
5.0
4.0
3.7
4.3
3.9
4.4
U.C.
3.9
3.2
3.5
4.0
Obscured
3.6 3.1
4.3
Obscured
4.1
4.4
4.7
4.4
4.7
4.4
4.1
5.0
3.9
4.4
3.0
Obscured
O bscured
Obscured
2.7
3.6 3.7
9.6
4.3
4.2
4.1
Obscured
3.9
3.7
4.3
3.1
2.9
3.3
3.6
8.3
7.2
4.2
6.6
8.1
3.6
3.5
4.0
4.3
4.4
4.5 4.3
4.6
4.2
4.5 4.3
3.6
3.7 3.0
3.4
3.8
3.8
3.3
3.3
3.3
3.2
3.0 2.7
3.6 3.5
4.0
4.4
4.1 4.1
3.9
3.5
3.5
4.0
3.6
Obscured
9.4
Fence U.C.
4.1
4.1
4.6
3.9 4.1
3.9 4.2
3.9 4.1
4.3
4.7
3.9
4.1
4.9 4.5
3.6
4.3 4.4
4.4
4.7
4.6
4.6 4.6
5.0 4.7
4.7
4.8
4.7
4.8
4.4
3.9 3.4
Obscured
Obscured
3.6
3.6
3.4
3.5
2.8
3.3
2.9
3.2
3.5
Obscured
3.6 3.3
3.8
Obscured7.2
7.3
7.4 4.24.4
4.2
4.1
4.5
3.9
3.63.7
4.0
3.7
3.7
3.6
4.0
4.0
Obscured Obscured
Obscured
Obscured
Obscured
3.73.9
3.9
ATLANTIC OCEAN
HARVEY CEDARS BOROUGH
BASE BID
AND OPTIONS 2, 3 AND 4
ST
A.
0+
120+00 130+00
140+00 150+00
160+00 170+00
190+00 200+00
210+00 220+00
230+00240+00250+00 260+00
270+00280+00290+00300+00310+00320+00330+00340+00350+00360+00370+00380+00390+00400+00410+00420+00430+00440+00450+00460+00470+00480+00490+00
OPTIONS 11, 12 AND 13OPTIONS 14, 15 AND 16OPTIONS 17, 18 AND 19
ST
A.
7+
ST
A.
3+
ST
A.
7+
EXISTING TRANSATLANTIC CABLE
(TYP)
RESTRICTION ZONE ON
DREDGING OPERATIONS
(SEE SPECIFICATIONS)
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
PHILADELPHIA
C-102
LO
NG
B
EA
CH
IS
LA
ND
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
BE
AC
H
NO
UR
IS
HM
EN
T
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
GE
NE
RA
L P
LA
N
C-
2 G
EN
ER
AL
P
LA
N.
dw g
RT
A
- M
AR
CH
W
2B U2
4B
PH
IL
AD
EL
PH
IA
SS
P
SS
P
GM
G
DA
N
AS
S
HO
W
N
1 GENERAL PLAN - STA. 116+00 TO STA. 487+001 GENERAL PLAN - STA. 116+00 TO STA. 487+00
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
/C
-1
R E:
/C
-1
NORTH
PLAN 1. SEE SHEET C-001 FOR GENERAL INFORMATION.
2. SEE SHEET C-002 FOR SURVEY AND
CONSTRUCTION BASELINE COORDINATES.
ATLANTIC OCEAN
EDWIN B. FORSYTHE
NATIONAL WILDLIFE REFUGE
HOLGATE - LBT
ST
A.
2+
EXISTING VEHICULAR
ACCESSWAY
935+00940+00945+00950+00955+00
960+00
965+00
970+00
CONTRACTOR STAGING
AREA
TAPER BEACHFILL BERM INTO
TERMINAL GROIN AT STATION 962+33
STA. 960+00
388.53 LT ℄ OF DUNE
STA. 953+33.33
279.75 LT
VEHICULAR DUNE
CROSSOVER REPAIR
SEAWARD
EDGE OF BERM
STA. 960+00
763.86 LT
TOE OF SLOPE
CONTRACTOR
ACCESS
BASE CONTRACT FILL LIMIT
PEDESTRIAN DUNE
CROSSOVER REPAIR
STA. 950+00.06
282.37 LT
STA. 956+66.68
195.27 LT
STA. 950+00.06
617.56 LT
STA. 940+00.01
569.31 LT
STA. 946+66.64
261.26 LT STA. 943+33.33
240.63 LT
STA. 939+59.50
247.36 LT
SURVEY BASELINE
6 7
8 9
14 15
23 24 25
27 28
30 31
32 33
34 35
41 42
43 44
45 46
49 50
51 52
53 54
CONTRACTOR WORK
LIMIT (TYP)
STA. 936+66.67
232.64 LT
STA. 933+33.79
207.00 LT
CONSTRUCT SAND FENCE (TYP)
(SEE NOTE 8)
PEDESTRIAN DUNE
CROSSOVER
REPAIR
PEDESTRIAN DUNE
CROSSOVER REPAIR
DEMO AND REMOVE 60 LF
OF EXISTING POST AND
RAIL AND 210 SF OF
EXISTING WOOD DECKING.
PEDESTRIAN DUNE
CROSSOVER
REPAIR
BASE BID AND
OPTIONS 8 THROUGH 10
HOLGATE - LBT
N 253879.22 E 558051.64
DUNE
REPAIR (TYP)
SEE NOTE 12
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
PHILADELPHIA
C-103
LO
NG
B
EA
CH
IS
LA
ND
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
BE
AC
H
NO
UR
IS
HM
EN
T
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
PL
AN
ST
A.
2+
T O
ST
A.
1+
PL
AN
ST
A.
2+
T O
ST
A.
1+
.dw g
RT
A
- M
AR
CH
W
2B U2
4B
PH
IL
AD
EL
PH
IA
SS
P
SS
P
GM
G
DA
N
AS
S
HO
W
N
1 PLAN - STA. 932+27 TO STA. 971+971 PLAN - STA. 932+27 TO STA. 971+97
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
C -1
R
E:
C
-1
NORTH
PLAN
NOTES:
1. SEE SHEET C-001 FOR GENERAL INFORMATION SHEET.
2. SEE SHEET C-002 FOR SURVEY AND CONSTRUCTION BASELINE COORDINATES.
3. SEE SHEET C-005 FOR COORDINATES OF CONTRACTOR WORK LIMIT.
4. SEE SHEET C-301 FOR TYPICAL CROSSOVER SECTIONS.
5. SEE SHEET C-302 FOR TYPICAL BEACHFILL SECTIONS AND SHEETS C-303 THROUGH C-310 FOR BEACHFILL
CROSS SECTIONS.
6. FOR ENLARGED CROSSOVER PLANS, SEE SHEETS C-402 THROUGH C-407.
7. FOR CROSSOVER DETAILS, SAND FENCE AND DUNE GRASS DETAILS, SEE SHEETS C-501 THROUGH C-503.
8. FOR CROSSOVER QUANTITIES, SEE TABLE ON THIS SHEET.
9. SAND FENCE SHALL BE CONSTRUCTED ALONG THE SEAWARD TOE OF DUNE IN ALL REPAIR AREAS
SHOWN.
10. LOCATION AND TEMPLATE OF BEACHFILL WILL BE REVISED BY THE CONTRACTING OFFICER AFTER THE
PRE-PLACEMENT CONDITION SURVEYS ARE RECEIVED FROM THE CONTRACTOR.
11. APPROXIMATELY 300 FEET OF EXISTING SAND FENCE LOCATED NORTH OF WASHINGTON AVENUE
VEHICULAR CROSSOVER SHALL BE REMOVED.
12. HISTORIC LOCATION OF SEABEACH AMARANTH IN 2023 FOUND AT N 253767.99, E 557716.03 WHICH FALLS
OUTSIDE OF THE VIEW OF THIS SHEET. SEE SPECIFICATIONS FOR REQUIREMENTS.
CROSSOVERS - QUANTITIES
CROSSOVER # APPROXIMATE STATION STREET DETAIL # TYPE REPAIR (SF) SPLIT RAIL FENCE (LF) REMARKS
1 956+78 McKINLEY AVE./CLEVELAND AVE.
MID BLOCK 1/C-402 PEDESTRIAN 2005
2 955+00 McKINLEY AVENUE 1/C-402 PEDESTRIAN 1650
DEMO AND REMOVE 60 LF OF EXISTING POST
AND RAIL AND 210 SF OF EXISTING WOOD
DECKING.
3 952+75 WASHINGTON AVENUE 1/C-407 VEHICULAR 5130 575
4 950+25 HARDING AVENUE 2/C-402 PEDESTRIAN 1460
5 947+75 ROOSEVELT AVENUE 1/C-402 PEDESTRIAN 1550
6 945+25 PERSHING AVENUE 1/C-402 PEDESTRIAN 1750
7 939+50 JACQUELINE AVENUE 1/C-402 PEDESTRIAN 1350
8 938+00 CAROLINA AVENUE 1/C-402 PEDESTRIAN 1350
9 936+00 INLET ROAD 1/C-402 PEDESTRIAN 1350
10 934+25 CHATHAM ROAD 1/C-402 PEDESTRIAN 1350
U.C.
U.C.
U.C.
U.C.
U.C.
895+00
900+00
905+00
910+00
915+00920+00925+00930+00
℄ OF DUNE
TAPER BEACHFILL BERM INTO
EXISTING GROUND AT STATION 920+00
EXISTING ADA ACCESSIBLE
DUNE CROSSOVER (TYP)
EXISTING
PEDESTRIAN DUNE
CROSSOVER (TYP)
SURVEY BASELINE
TAPER BEACHFILL BERM INTO
EXISTING GROUND AT STATION 900+00
57 58
59 60
61 62
99 100
102 103
106 107
CONTRACTOR WORK
LIMIT (TYP)
CONTRACTOR WORK
LIMIT (TYP)
PEDESTRIAN DUNE
CROSSOVER REPAIR
67 68
69 70
71 72
73 74
75 76
77 78
79 80 81
82 83
88 89
92 93
94 95
96 97
BASE BID AND
OPTIONS 8 THROUGH 10
HOLGATE - LBT
STA. 930+00
414.12 LT
SEAWARD EDGE
OF BERM (TYP)
TOE OF
SLOPE (TYP)
SEAWARD EDGE
OF BERM (TYP)
TOE OF
SLOPE (TYP)
DUNE REPAIR (TYP)
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
PHILADELPHIA
C-104
LO
NG
B
EA
CH
IS
LA
ND
OC
EA
N
CO
UN
TY
, N
EW
JE
RS
EY
BE
AC
H
NO
UR
IS
HM
EN
T
BA
RN
EG
AT
IN
LE
T
TO
LI
TT
LE
E
GG
IN
LE
T
PL
AN
ST
A.
5+
T O
ST
A.
2+
PL
AN
ST
A.
5+
T O
ST
A.
2+
.dw g
RT
A
- M
AR
CH
W
2B U2
4B
PH
IL
AD
EL
PH
IA
SS
P
SS
P
GM
G
DA
N
AS
S
HO
W
N
1 PLAN - STA. 895+12 TO STA. 932+271 PLAN - STA. 895+12 TO STA. 932+27
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
C -1
R
E:
C
-1
NORTH
PLAN
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
C -1
R
E:
C
-1
NOTES:
1. SEE SHEET C-001 FOR GENERAL INFORMATION SHEET.
2. SEE SHEET C-002 FOR SURVEY AND CONSTRUCTION BASELINE COORDINATES.
3. SEE SHEET C-005 FOR COORDINATES OF CONTRACTOR WORK LIMIT.
4. SEE SHEET C-301 FOR TYPICAL CROSSOVER SECTIONS.
5. SEE SHEET C-302 FOR TYPICAL BEACHFILL SECTIONS AND SHEETS C-303 THROUGH C-310 FOR
BEACHFILL CROSS SECTIONS.
6. FOR ENLARGED CROSSOVER PLANS, SEE SHEETS C-402 THROUGH C-407.
7. FOR CROSSOVER DETAILS, SAND FENCE AND DUNE GRASS DETAILS, SEE SHEETS C-501
THROUGH C-503.
8. FOR CROSSOVER LOCATIONS QUANTITIES, SEE THIS SHEET.
9. LOCATION AND TEMPLATE OF BEACHFILL WILL BE REVISED BY THE CONTRACTING OFFICER
AFTER THE PRE-PLACEMENT CONDITION SURVEYS ARE RECEIVED FROM THE CONTRACTOR.
CROSSOVERS - QUANTITIES
CROSSOVER # APPROXIMATE STATION STREET DETAIL # TYPE REPAIR (SF)
1 930+00 HOLGATE AVE 3/C-402 PEDESTRIAN 300
BEACH HAVENHOLGATE - LBT
860+00
865+00
870+00
875+00
880+00
885+00
890+00
895+00
SEAWARD EDGE
OF BERM (TYP)
STA. 890+00
92.54 LT
℄ OF DUNE
PEDESTRIAN DUNE
CROSSOVER REPAIR
STA. 890+00
268.67 LT
STA. 884+82
164.48 LT
EXISTING
BULKHEAD
SURVEY BASELINE
EXISTING
WOOD WALKWAY
STA. 880+00
257.140 LT STA. 880+00
81.03 LT
STA. 873+14.31
90.00 LT
EXISTING
WOOD
WALKWAY
EXISTING VEHICULAR
DUNE CROSSOVER (TYP)
TOE OF SLOPE
(TYP)
EXISTING PEDESTRIAN
DUNE CROSSOVER (TYP)
CONTRACTOR
ACCESS
CONTRACTOR
STAGING AREA
CONTRACTOR
ACCESS
STA. 876+66.67
85.00 LT
STA. 870+00
80.85 LT
STA. 866+66.66
74.00 LT
STA. 864+33.33
78.00 LT
STA. 861+45.55
160.57 LT
STA. 860+00
132.65 LT
STA. 870+00
255.85 LT
STA. 860+00
318.26 LT
119 120
123 124
130 131
132 133
134 135 136 137
140 141
146 147
148 149
152 153
163 164
CONTRACTOR WORK
LIMIT (TYP)
CONSTRUCT SAND FENCE (TYP)
(SEE NOTE 8) PEDESTRIAN DUNE
CROSSOVER REPAIR
BASE BID…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .