Solicitation - W911PT26QA073.pdf
PDF 6 MB Posted
- Solicitation number
- W911PT26QA073
About this file
This is a sealed bid solicitation for construction services to replace feed water piping at Building 136, Watervliet Arsenal, located in Watervliet, New York. The solicitation number is W911PT26QA073, issued on June 30, 2026, with a bid opening date of July 15, 2026, at 2:30 PM local time. The project involves removing and replacing approximately 70 linear feet of 4-inch black carbon steel feed water piping, two backflow preventers, valves, fittings, and related components. All newly installed pipe and fittings must be insulated and labeled. The work is firm fixed price with a performance period of 45 calendar days from receipt of the notice to proceed, which must begin within 7 calendar days of award. Both performance and payment bonds at 100% are required. The contracting officer is Maria DeCrescenzo, reachable at 518-266-4641 or maria.d.decrescenzo.civ@army.mil.
The contract is a total small business set-aside with a project magnitude between $25,000 and $100,000. Wage Determination General Decision Number NY2 (latest revision) applies to this construction project. Offerors must meet specific technical requirements including submission of welding procedures and qualified welder certifications per ASME BPVC SEC IX, radiographic inspection of field welds (minimum 10 welds anticipated), and hydrostatic pressure testing in accordance with ASME B31.1. All submittals must be submitted electronically in Microsoft Office 2007 or lower, PDF, or HTML formats to the contract specialist by the bid deadline. A mandatory site visit is scheduled for July 7, 2026, at 1:00 PM, with advance notice required to gain arsenal access. The government requires domestic construction materials per Buy American requirements and all work must conform to the Statement of Work, applicable specifications (UFGS 23 07 00, UFGS 22 00 00, UFGS 23 05 15), and ANSI/ASME A13.1 pipe labeling standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_2701.jpg | JPG image | |
| IMG_2697.jpg | JPG image | |
| IMG_2698.jpg | JPG image | |
| IMG_2696.jpg | JPG image | |
| IMG_2705.jpg | JPG image | |
| IMG_2699.jpg | JPG image | |
| IMG_2706.jpg | JPG image | |
| IMG_2688.jpg | JPG image | |
| IMG_2695.jpg | JPG image | |
| IMG_2690.jpg | JPG image | |
| IMG_2700.jpg | JPG image | |
| IMG_2707.jpg | JPG image | |
| IMG_2703.jpg | JPG image | |
| IMG_2687.jpg | JPG image | |
| IMG_2694.jpg | JPG image | |
| IMG_2704.jpg | JPG image | |
| IMG_2686.jpg | JPG image | |
| IMG_2693.jpg | JPG image | |
| IMG_2689.jpg | JPG image | |
| IMG_2692.jpg | JPG image | |
| IMG_2691.jpg | JPG image | |
| IMG_2702.jpg | JPG image | |
| REPLACE FEED WATER PIPING - RFI RESPONSES.docx | DOCX document | |
| 26PW004 - Install Feed Water Lines Bldg. 136 v4.docx | DOCX document | |
| 26PW004 - Install Feed Water Lines Bldg. 136 v3.docx | DOCX document | |
| M1_26PW004_INSTALL_WATER_LINES.pdf | ||
| 26PW004 - Install Feed Water Lines Bldg. 136 v2.docx | DOCX document | |
| UFGS 22 00 00 Plumbing General Purpose.pdf | ||
| UFGS 23 07 00 Thermal Insulation for Mechanical Systems.pdf | ||
| UFGS 23 05 15 Common Piping for HVAC.pdf |
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section A - Solicitation/Contract Form
REPLACE FEED WATER PIPING AT BUILDING 136 AT WATERVLIET Instrument Name:
ARSENAL
A. NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS
(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:
(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE
REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE
ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.
(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE
DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO
COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION
OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO
EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).
(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS
IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NONCONFORMING
PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.
(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR
CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.
NOTICE: Throughout this document we may use the terms "we" and "you", the term "we" means the government of the United States of America, and the term "you" means the contractor.
(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:
W911PT26QA073
"Watervliet Arsenal Information for Contractors" document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address:
http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available."
POC - CONTRACT SPECIALIST/BUYER: Maria DeCrescenzo
TELEPHONE NUMBER: 518-266-4641
E-MAIL ADDRESS: maria.d.decrescenzo.civ@army.mil
Please provide the following information for your company.
VENDOR NAME: ________________________
VENDOR POC: ________________________
POC PHONE: ________________________
E-MAIL ADDRESS (see note below): ________________________
UNIQUE ENITITY ID: ________________________
CAGE CODE (if known): ________________________
TAX ID NUMBER: ________________________
NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be data faxed.
(c) POSTERS:
(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, "Employee Rights on Government Contracts".
(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, "Employee Rights under the Davis Bacon" and the Office of Federal Contract Compliance poster on "Equal Employment Opportunity is the Law."
(3) These posters can be accessed electronically at http://www.dol.gov .
(4) Hard copies of the posters will be made available upon request to the contracting officer.
(d) PAYMENTS:
Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://piee.eb.mil/ using the "my invoice" system.
You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.
(e) RELEASE OF INFORMATION:
The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the
DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor's responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.
usapa.army.mil/pdffiles/r360_1.pdf
*** END OF NARRATIVE ***
*** END OF NARRATIVE ***
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 TO PROVIDE ALL LABOR, MATERIAL,
PARTS AND EQUIPMENT REQUIRED
FOR THE REMOVAL AND
REPLACEMENT OF FEED WATER
PIPING AT BUILDING 136 PER SOW
PROJECT #26PW004 Bldg 136v2. Wage Determination General Decision Number:
NY2, latest revision applies and is incorporated. Magnitude of this Project is between $25,000 and $100,000 Period of Performance is 45 Calendar Days from receipt of Notice to Proceed. 100% Payment and Performance Bonds (Performance bonds only if quote is over $150k) are required Technical POC is Michael White.
Pricing Arrangement: Firm Fixed Price
1 Lot
Section C - Description/Specifications/Statement of Work
STATEMENT OF WORK (SOW)
FOR
Replace Feed Water Lines
AT
Watervliet Arsenal
Building 136
Project #: 26PW004 Installation Management, Public Works Division
Facilities Engineering (TAWV-IMP-F)
PART 1 GENERAL
1.1 SUMMARY OF WORK
1.1.1 Project Description
a. This Statement of Work (SOW) defines the effort required for replacing two existing backflow preventers with two new government supplied backflow preventers. There will also be removal and replacement of approximately 70 linear feet of 4-inch black carbon steel feed water line and fittings. All newly installed pipe and fittings shall be insulated and labeled.
1.1.2 Location of Work
a. The work is located at 136, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.1.3 Period of Performance
a. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than [45] calendar days after notice to proceed was given. The time stated for completion shall include final cleanup of the premises.
1.1.4 Hours of Operation
a. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on Fridays. Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.
1.2 SUBMITTALS
1.2.1 General Submittal Requirements
a. The contractor shall provide submittal documents via e-mail to the Contracting Officer for review and approval. Provide all physical (non-document) submittals (including but not limited to material swatches, samples, etc.) directly to the Contracting Officer for review and approval. All submittals require government approval unless otherwise explicitly stated.
b. The contractor shall reference APPENDIX A "Consolidated List of Submittals" for the complete list of required submittals.
c. The contractor is required to review the project site and obtain and/or verify all measurements and project data/information required to perform this project work. In addition, the contractor is required to review all contract documents and provide written notice to Contracting Officer of any discrepancies that are found.
d. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for a complete and appropriate execution of the contract documents and requirements of this SOW.
e. The SOW and any Project Drawings and Specifications do not indicate each component, device, fastener, fixture, or similar incidental item necessary for the performance of the Work. The Contractor shall provide, furnish, and install all necessary and appropriate components, devices, fasteners, fixtures, or similar incidental items as necessary and required to provide complete, operable, and functional system to suit the intended purpose
1.2.2 Contractor Safety Plan
a. The contractor shall submit a safety plan which is specific to the work activity being performed under the scope of this project for Government review and approval.
1.2.3 Lockout / Tagout (LOTO) Acknowledgement
a. The Contractor shall sign and submit a "Lockout/Tagout (LOTO) Notification Acknowledgement Record" prior to working on or de-energizing any electrical equipment.
1.2.4 Asbestos Notification Acknowledgement Record
a. The contractor shall sign the "Asbestos Notification Acknowledgement Record" and submit this form to the Project COR prior to starting project work.
1.2.5 Project Schedule
a. The contractor shall create a project schedule and submit for Government review and approval.
b. The project schedule shall detail the phases of work and the overall timeline for the execution of the work. The contractor shall include delivery dates, appropriate milestones, and shall clearly detail any requirements for work performed outside of regular hours of operation.
1.3 GENERAL REQUIREMENTS
1.3.1 Watervliet Arsenal Information for Contractors (WAIC)
a. The contractor shall perform all work in strict conformance with Watervliet Arsenal (WAIC). The contractor shall read and understand this document prior to Instructions for Contractors submitting a proposal. The WAIC is publicly available at:
<http://www.wva.army.mil/Documents/Contracting/WAIC.pdf>
1.3.2 Utility Outage Requests and Utility Connection Requests
a. Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, coordinate schedule with COR. Schedule utility outages and connections to minimize disruptions to the Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.
b. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.
1.3.3 Safety Requirements
a. The contractor is required to provide the proper control of hazardous energy (lockout/tagout) per OSHA 29 CFR 1910.147.
b. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials.
1.4 ON-SITE PERMITS
1.4.1 Excavation (Dig Permit)
a. The clearance of buried utilities will be performed by the Government in advance of the Contractor performing subsurface work, unless otherwise explicitly stated.
b. The Contractor shall obtain a copy of the completed Utility Clearance Permit (WVA Form 420-2- E) from the COR prior to performing subsurface work. Verify existing utility locations indicated on contract drawings, within area of work.
1.4.2 Hot Work and Confined Space
a. Obtain permit for welding, burning, use of flame, or entry into confined space from WVA Fire Department by calling (518)266-5990 each day the permit is to be used.
1.5 APPLICABLE DOCUMENTS
1.5.1 Specifications
a. The following specifications accompany this Statement of Work and are a part thereof.
i. UFGS 23 07 00 Thermal Insulation for Mechanical systems
UFGS 22 00 00 - Plumbing, General Purposeii.
UFGS 23 05 15 - Common Piping for HVACiii.
1.5.2 References
a. The following references accompany this Statement of Work and are a part thereof.
i. Watervliet Arsenal Instructions for Contractors (WAIC).
ii. NFPA 70 - National Electric Code (NEC).
iii. ANSI/ASME A13.1 - Pipe Labeling Requirements
iv. ASME B31.1 Code for Pressure Piping
1.6 CONTRACTOR EQUIPMENT
1.6.1 Equipment Identification
a. The contractor shall create and affix a label to all large equipment, dumpsters, and other mobilized property, which is weather-resistant (laminated, or within a see-thru label hanger), securely affixed to the equipment or visible through a window, and which clearly displays the General Contractor's:
i. Company Name, POC Name (first, last), POC phone number, Project Number.
1.6.2 Waste Dumpster
a. The contractor shall place any waste dumpsters in a manner that does not interfere with thru-traffic.
b. Place waste dumpsters with a minimum of 33' clearance from any building.
The final location shall be coordinated with, and approved by the COR before any dumpsters are mobilized.
c. Cover all waste dumpsters when not in use, and before the end of each work shift. The cover shall be weather-tight.
d. The Contractor shall submit all Bills of Lading and Weight Slips associated with the disposal of all construction and demolition (C&D) debris to the Contracting Officer on a monthly basis. The contractor shall provide this information within ten (10) days of disposal of the waste.
PART 2 PRODUCTS
2.1 GENERAL
All work shall be in strict accordance with product manufacturer's instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.
2.1.1 Hazardous Materials
a. The contractor shall submit Safety Data Sheets (SDS) for all hazardous materials to be used.
2.1.2 Asbestos, Mercury, Lead, PCB
a. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer's original packaging.
2.1.3 DoD Green Procurement Program
a. All construction materials shall meet the applicable requirements of the DoD Green Procurement Program, specifically recycled content products, environmentally preferable products and services, biobased products, energy-and water-efficient products, alternate fuel vehicles and alternative fuels, products using renewable energy, and alternatives to hazardous or toxic chemicals as found at <http://www.acq.
osd.mil/dpap/cpic/cp/docs/USA001967-08-DPAP.pdf>.
2.1.4 Paint
a. To meet the Affirmative Procurement Program (Federal Government's Buy Recycled Requirements) all paint used in the project shall adhere to the below listed requirements of the Comprehensive Procurement Guideline for recovered materials.
This applies only to interior latex paint, only if available at the time of the project.
Reprocessed Latex Paint (White, Off-White, Pastel Colors) shall i.
contain 20% Post consumer content.
Reprocessed Latex Paint (Grey, Brown Earth tones, and Other ii.
Dark Colors) shall contain 50-99% Post consumer content.
Consolidated Latex Paint shall contain 100% Post consumer content.
2.2 PRODUCTS
2.2.1 Pipe
Black carbon steel, schedule 40, grade A, seamless, conforming i.
to ASTM A53.
2.2.2 Pipe Fittings
i. Fittings 2 inches and under 150 psi min. wsp, banded black malleable iron screwed, conforming to ASTM A197and ASME B16.3
ii. Unions 2 inches and under, 250 psi min. wsp, banded black malleable iron screwed, conforming to ASTM A197 and ASME B16.3
iii. Fittings 2 1/2 inches and over, steel butt weld, conforming to ASTM A234 and ASME B16.9 to match pipe wall thickness
iv. Flanges 2 1/2 inches and over, 150 psi forged steel conforming to ASME B 16.5, Weld neck to match pipe wall thickness.
2.2.3 Flange
Flanged fittings including, but not limited to, flanges, bolts, nuts i.
and bolt patterns must be in accordance with ASME B16.5 class 150 and must have the manufacturer's trademark affixed in accordance with MSS SP- 25.
Flange material must conform to ASTM A105.ii.
Bolts must be high strength or intermediate strength with material iii.
conforming to ASTM A193.
2.2.4 Gaskets
i. Non-asbestos material in accordance with ASME B16.21
Flat gaskets, 1/16 inch thick, and contain Aramid fibers bonded ii.
with Styrene Butadiene Rubber (SBR) or Nitro Butadiene Rubber (NBR)
Gaskets must be full face or self-centering flat ring typeiii.
2.2.5 Valves
i. 2-inches and smaller must be bronze with threaded bodies for pipe and solder type connections for tubing.
Valves over 2-inches shall have flanged iron bodies and bronze ii.
trim.
2.2.6 Insulation
i. 1 1/2 inch thick, closed cell, foam or expanded rubber materials containing anti-microbial additive, vapor barrier, complying to ASTM exterior C534, grade 1, type1.
ii. PVC Jacketing, white .02" minimum.
2.2.7 Pipe Label
i. Snap-Around, 360-degree visibility, flow direction arrows.
PART 3 EXECUTION
3.1 ITEMS OF WORK
3.1.1 General Requirements
The contactor shall be responsible for enabling and disabling fire alarms while a.
performing any work that may set off the fire alarms. Fire alarms shall only be operated by a properly trained fire alarm technician.
The contactor shall be responsible for isolating, draining and LOTO of all b.
sources of energy for this project.
If the fire alarms need to be disabled, the contactor shall be responsible for c.
enabling and disabling fire alarms while performing any work that may set off the fire alarms. Fire alarms shall only be operated by a properly trained fire alarm technician.
The fire department shall be alerted prior to disabling or enabling any fire d.
alarms or points in the fire alarm system.
The fire alarm system is a Simplex 4100ES located on the first floor.e.
Any work performed on this project shall be done after heating season, which f.
ends approximately May 15 . All work must be coordinated through project COR.th
3.1.2 Replace Backflow Preventers
The contractor shall remove the two existing backflow preventers and replace a.
with the two government supplied backflow preventers.
Strainers housing from the old backflow shall be removed and reused on the b.
new backflow preventer. The strainer shall be installed in same location on new backflow preventer, after isolation valve and before first check valve. Contractor shall remove old strainers and install new strainers.
All piping, hoses, valves and fittings shall be replaced from both strainers and c.
piped into the backflow drain line.
New Flanges, gaskets and bolts shall be supplied and installed for all new d.
connections at the backflow preventer.
Install new 3-inch, schedule 40 PVC, DWV lines and fittings from backflow e.
preventers down to lower level. Piping on wall shall be cut and coupling installed to connect new and old piping. Approximately thirty linear feet of pipe.
3.1.3 Remove and Replace Piping
a. The contactor shall be responsible for isolating, draining and LOTO of all sources of energy for this project.
The contractor shall remove and replace the existing 4- inch black iron piping, b.
valves, fittings, pipe hangers, supports, threaded rod and insulation. All piping shall be removed and replaced up to and including the first fitting on each of the branch lines.
All piping over 2-inches shall be welded. Piping must be welded in accordance c.
with qualified procedures using performance-qualified welders. Contractor shall submit a copy of qualified procedures and a list of names and identification symbols of qualified welders and welding operators. Procedures and welders must be qualified in accordance with ASME BPVC SEC IX. Welding procedures qualified by others, and welders and welding operators qualified by another employer, may be accepted as permitted by ASME B31.9, unless temperature and pressure limits specified then may be accepted as permitted by ASME B31.
The contractor shall be responsible to supply and replace all necessary fittings d.
on the branch lines to connect the new water line to the branch line. Branch lines connections on 4" supply line shall have olet fittings. Di-electric unions shall be used where copper and steel pipes are connected.
New isolation valves shall be installed within two feet of where the branch line e.
connects to the main. Piping shall be modified as necessary to accommodate the new valve installation.
f. New flanges, gaskets, bolts, unions and shall be replaced up to the point where the new water line connects to existing branch lines.
g. Horizontal pipe supports must be spaced as specified in MSS SP-58 and a support must be installed not over 1 foot from the pipe fitting joint at each change of direction of the piping. Pipe supports must be spaced not over 5 feet apart at valves.
Horizontal pipe runs must include allowances for expansion and contraction
h. The contractor shall remove and replace the six (6) pipe stanchions supporting the pipe at and near the backflow preventer. Stanchions are to be completely removed including removing the bolts from the floor.
i. New pipe stanchions shall be bolted and secured to the floor
j. New four-inch valves, flanges, bolts and gaskets shall be replaced, this is to include:
The 4-inch butterfly valve for the holding tanksi.
The 4-inch OS&Y isolation valve for the water softenersii.
k. The contractor shall be responsible to supply and replace all necessary fittings on the branch lines to connect the new water line to the branch line. Branch lines connections on 4" supply line shall have olet fittings. Di-electric unions shall be used where copper and steel pipes are connected.
l. Install new 3-inch, schedule 40 PVC, DWV lines and fittings from backflow preventers down to lower level. Piping on wall shall be cut and coupling installed to connect new and old piping. Approximately thirty linear feet of pipe.
3.1.4 Radiographic Inspection of Welds
a. The contractor shall furnish all labor, tools, safety equipment, supervision, transportation, insurance, and all other ancillary items/services necessary to perform a random radiographic examination of field welds throughout the replaced water piping.
If any of the welds are deemed unacceptable, they shall be removed, re-welded, and radiographically re-examined at no additional cost to the Government. For bidding purposes, the Contractor shall anticipate performing testing on no less than ten (10) field welds.
b. The project COR shall identify the ten field welds that are to be inspected.
Project COR/Engineer reserves the right to review all inspection records, and if any welds inspected are found unacceptable in accordance with ASME B31.1, the fitting shall be removed, replaced, and reexamined at no additional cost.
c. The Contractor shall submit for review and approval the radiographic examination procedure to be used under this contract. The procedure shall be established to demonstrate that the required sensitivity can be consistently achieved under the most unfavorable conditions (e.g. source to film distance, geometric un-sharpness, thickness, etc.).
i. The radiographic technique and procedure adopted shall conform to the requirements outlined in Article 2 as well as Article 22 of ASME Sec V.
ii. The IQI sensitivity obtained shall be equal to or better than the requirements mentioned in Article 2 of ASME Sec V.
d. The Contractor shall perform radiographic examination in accordance with all applicable codes and safety requirements to include Army Pamphlet 385-24, the Army Radiation Safety Program, and the New York State Department of Health.
i. The Contractor shall obtain an Army Radiation Permit from the WVA Safety Office prior to bringing or using the x-ray equipment on post.
Contractor shall submit a copy of their license and the name of the piece of equipment to the Project COR. The purpose of the name is to verify the amount of radiation the equipment emits.
ii. Contractor shall remove the x-ray equipment from post upon completion of the test (s).
iii. Contractor shall store and utilize the X-ray equipment in a manner so that Government and other personnel are not exposed to the device.
iv. Contractor shall conduct radiation surveys prior to the usage of the equipment and document findings to ensure that ALARA principles and proper standoff distances are in place.
e. The Contractor shall place a radiograph identification mark and two location identification marks on the piping at each radiograph location.
i. A corresponding radiograph identification mark and two location identification marks, all of which shall show on the radiograph, shall be produced by placing lead numbers or letters, or both, over each of the identical identification and location marks made on the steel to provide a means for matching the developed radiograph to the weld.
ii. Information required to show on the radiograph shall include the contract identification, initials of the radiographic inspection company, and initials of the fabricator, the radiographic identification mark, the date, and the weld repair number, if applicable.
f. The Contractor shall process the film to comply with all the manufacturer's recommendations as to required chemicals, processing techniques and times. Particular attention shall be taken on dilution, chemical life, and replenishment.
g. The Contractor shall furnish all radiographs to the Project COR immediately after processing along with the evaluation.
i. All radiographs shall be free from mechanical, chemical, or other blemishes to the extent that they cannot mask or be confused with the image of any discontinuity in the area(s) of interest in the radiograph. Such blemishes include, but are not limited to the following: fogging, processing defects such as streaks/water marks/or chemical stains, scratches, finger marks, dirtiness, static marks, smudges, tears, loss of detail due to poor screen t-to-film contact or false indications due to defective screens or internal faults.
h. The Contractor shall consider successful performance of this work when all the field welds in the carrier piping pass examination. Acceptance level shall be as per relevant project code.
i. Personnel performing the radiographed examination shall be qualified to American Society for Nondestructive Testing (ASNT) Level-II or Level-III. The evaluation (film interpretation) shall be performed at a minimum by a ASNT Level-III radiographer, in line with Article 2 of ASME Sec. V. The film interpreter shall also have a yearly eye examination and the certificate shall be available upon request for verification. The certificate of ASNT/ISNT Level II qualification of the Non-Destructive Testing (NDT) personnel shall be submitted to the Government for verification prior to commencement of the work.
3.1.5 Hydrostatic Test
a. The contractor shall perform a hydrostatic test of the newly installed piping up the first isolation valve on each branch line.
b. Hydrostatic leak test for piping
i. Provide complete hydrostatic testing for leaks of all applicable piping systems in accordance with ," latest revision.ASME B31.1 "Code for Pressure Piping
ii. Test pressure for service piping shall be at least 1.5 the incoming water pressure, but in no less than 100 psig.
iii. Following the application of hydrostatic test pressure for at least 4 hours, examination shall be made for leakage of the piping and at all joints and connections.
No leakage or pressure drop is acceptable.
iv. If leaks are found, they shall be eliminated as appropriate, and the test repeated until no leakage is found.
v. The contractor shall supply all necessary equipment to perform the hydrostatic test including pumps, fittings, gauges and pipe/hose.
vi. Testing must be witnessed and approved by the COR.
3.1.6 Insulate New Piping
a. The contractor shall insulate the new piping and fittings. The city water lines before the backflow preventer and after the OS&Y valves shall have existing insulation removed and be replaced.
b. All insulation shall be closed cell insulation 1.5 - inch thick with an exterior vapor barrier.
c. All insulation shall be installed with tight butt joints. All joints and ends shall be sealed with joint sealant, , mastic, permanent adhesive tape or PVDC adhesive tape.
d. Contractor shall install PVC jacketing over the insulation. All seams on PVC jacketing shall overlap and seams shall be sealed with tape or tacks
e. Pipes shall be labeled in accordance with the most recent version of ANSI Pipe Labeling Requirements. Labels for the water lines shall be placed /ASME A13.1 at intervals of 25 feet and clearly readable from floor. Pipe label shall be snap-around and read "Cold Water" or "Feed Water" and indicate direction of flow. Pipe label must be approved by project COR.
3.2 CLOSEOUT REQUIREMENTS
3.2.1 Construction and Demolition Debris
a. The Contractor shall submit copies of all Bills of Lading and Weight Slips associated with the disposal of construction and demolition (C&D) debris and/or recycled materials, under this scope of work. Submit documentation per Appendix A, "Consolidated List of Submittals".
3.2.2 Cleanup of Work Site
a. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises.
b. The contractor shall remove all debris from any remote holding locations, to include any excavation and concrete equipment chute cleanout debris.
c. The contractor shall remove their equipment from Watervliet Arsenal premises within five (5) working days after completion of project work.
3.2.3 Restoration of Work Site
a. The contractor shall repair any items, building surfaces, equipment or miscellaneous items which were damaged during the execution of this SOW. Items that cannot be repaired to restore original function or aesthetics shall be replaced in kind by the Contractor at no additional charge to the Government.
b. Grass, trees, and other vegetation affected by project work shall be restored to same or better condition as existed prior to the start of project work. The Contractor shall prepare the affected areas to eliminate uneven areas and low spots. Remove foreign materials, weeds, and damaged soil. The Contractor shall scratch the area to a depth of three (3) inches where topsoil is to be placed. Spread topsoil to a uniform, compacted depth of less than five (5) inches over areas to be reseeded. Rake until smooth. The Contractor shall seed, fertilize, and water the area to establish grass.
3.2.4 Warranty
a. The contractor shall provide a [1] year warranty on all new parts installed and craftsmanship from the date of government acceptance.
PART 4 APPENDICES
a. Consolidated List of Submittals
APPENDIX A: Consolidated List of Submittals
Line Item Submitted Submittal Needed By Submittal Reviewed By (Office)
1 Safety Data Sheets for Hazardous Materials
(SDS)
NLT 7 Calendar
Days After Award
Safety Office
2 Signed Contractor Asbestos Notification Form Environmental Office
NLT 7 Calendar
Days After Award
3 Signed Lockout/Tagout (LOTO) Notification
Acknowledgement Record
NLT 7 Calendar
Days After Award
Safety Office
4 Project Schedule NLT 7 Calendar
Days After Award
COR
5 Contractor Safety Plan NLT 7 Calendar
Days After Award
COR
6 Solid Waste Reporting Log, Bills of Lading, Dump Slips for C&D Debris and Recycled
Materials
NLT the 10th Day of the Following Month, and at Project
Completion.
Environmental Office
7 Welding Procedures and Qualified Welders NLT 7 Calendar
Days After Award
COR
8 Pipe, Fittings, Valves, Flanges and Flange
Kits
NLT 7 Calendar
Days After Award
COR
9 Insulation, Jacketing and Pipe Labels
NLT 7 Calendar
Days After Award
COR
10 Radiographic Test Equipment Licenses, Radiographic Technician Certificate
NLT 7 Calendar
Days After Award
COR
11 X-Ray Test Results NLT 1 Calendar Day after Test Completion.
COR
*** END OF NARRATIVE ***
Requirements Replace Feed Water Piping Building 136 at the Watervliet Arsenal, NY 12189.
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP) : W16H1F530800CY Product Service Code : Z1NB Bill to Party: W16H1F
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-12 Inspection of Construction. 1996-08
Overall Contract Inspection/Acceptance Locations
0001 Inspection and Acceptance Location
Both Destination Instructions: INSPECTION AND ACCEPTANCE terms per SOW.
DoDAAC: W911PT CountryCode: USA
W6QK ACC WVA
ACC WATERVLIET ARSENAL, 1 BUFFINGTON ST
WATERVLIET, NY 12189-4050
UNITED STATES
Section F - Deliveries or Performance
0001 Delivery Schedule From date of lead time event to completion of performance 45 Calendar Days
Date of Notice to Proceed Receipt 1 LotQuantity
Address and POC Place of Performance DoDAAC: W911PT CountryCode: USA
W6QK ACC WVA
ACC WATERVLIET ARSENAL, 1 BUFFINGTON ST WATERVLIET, NY 12189-4050
UNITED STATES
Period of Performance From 01 Aug 2026 To 31 Oct 2026
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process Electronic invoicing.
vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF WAWF training.
Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web WAWF methods of document submission.
entry, Electronic Data Interchange, or File Transfer Protocol.
(f) The Contractor shall use the following information when WAWF payment instructions.
submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following Document type.
document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Construction Invoice
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Document routing.
Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC
HQ0303
Issue By DoDAAC
W911PT
Admin DoDAAC
W911PT
Inspect By DoDAAC N/A
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC)
W911PT
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s)
W911PT
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the Receiving report.
requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
N/A
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
H._1_ SERVICES/CONSTRUCTION REQUIREMENTS
(a) SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to "JOB".
(b) WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:
The contractor agrees that each employee working at Watervliet Arsenal will sign the "Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won't be considered an excusable delay to contract performance as defined in the contract clause "Default". Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf
(d) CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE OF WATERVLIET
ARSENAL TECHNOLOGY
(1) The Undersigned, as an employee of (Name of Firm) agrees to the following terms and conditions.
(2) Any knowledge gained, as a result of my being permitted on Watervliet Arsenal's premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company's domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.
(3) Definitions:
(a) CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components. It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.
(b) CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.
(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.
(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used and/or useful in the manufacturing of cannon.
(c) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.
(d) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.
(e) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.
(f) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.
TYPED OR PRINTED NAME SIGNATURE DATE
TYPED OR PRINTED NAME SIGNATURE DATE
TYPED OR PRINTED NAME SIGNATURE DATE
(e) JOB SITE AVAILABILITY:
The work site will be available for performance during normal business hours:
Monday through Thursday Business Hours: 7:00 a.m. EST to 3:00 p.m. EST.
Friday Business Hours: Every other Friday from 7:00a.m. EST to 2:00 p.m. EST.
Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2026 to be closed is January 09, 2026.
Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.
When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business. Work at other than the above hours won't be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.
(f) CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:
Offerors are advised that any employee or representative of their company who is not a U.S.
citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds. Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S.
citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.
Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance. Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause "Default" contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.
(h) CONTRACTOR IDENTIFICATION:
Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.
*** END OF NARRATIVE ***
*** END OF NARRATIVE ***
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation 2026-O0038)
2026-02
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.204-19 Incorporation by Reference of Representations and Certifications.
2014-12
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)
2026-02
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-6 Construction Wage Rate Requirements. (Deviation 2026- O0038)
2026-02
52.222-7 Withholding of Funds. (Deviation 2026-O0038)
2026-02
52.222-8 Payrolls and Basic Records.
(Deviation 2026-O0038)
2026-02
52.222-9 Apprentices and Trainees.
(Deviation 2026-O0038)
2026-02
52.222-10 Compliance with Copeland Act Requirements. (Deviation 2026- O0038)
2026-02
52.222-11 Subcontracts (Labor Standards).
(Deviation 2026-O0038)
2026-02
52.222-12 Contract Termination-Debarment. 2014-05
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
2014-05
52.222-14 Disputes Concerning Labor Standards. (Deviation 2026- O0038)
2026-02
52.222-15 Certification of Eligibility. 2014-05
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .