SOLICITATION W911KF-21-Q-0011.pdf

PDF 1 MB Posted

Attached to
Electron Beam Welding Systems - Preventive Maintenance, Calibration and Emergency Repairs
Solicitation number
W911KF-21-Q-0011
Issued by

About this file

This is a solicitation for electron beam welding system maintenance services. The solicitation requires preventative maintenance, calibration, and emergency repairs for two electron beam welding systems located at Anniston Army Depot. Services include four quarterly preventative maintenance checks and calibrations for one system, and two semi-annual preventative maintenance checks and calibrations for the other system. Emergency repairs are also required on an as-needed basis to restore systems to 100% performance. The sole-source awardee will be PTR-Precision Technologies of Enfield, Connecticut. The base period of performance is one year from award with four one-year option periods. The solicitation closes on January 15, 2021 and includes pricing schedules, product and service codes, delivery locations, and terms. The contracting agency is the Department of the Army Contracting Command at Detroit Arsenal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911KF21Q0011 16-Dec-2020

b. TELEPHONE NUMBER

256-240-3541

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 15 Jan 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911KF9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

SONJA L. FREEMAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SEE SCHEDULE

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-ANAD

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W31G1Y 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ANNISTON ARMY DEPOT (DPM)

7 FRANKFORD AVENUE, BLDG 362

ANNISTON AL 36201

TEL: FAX:

256 235-6353FAX:

TEL: 256 235-6231 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

333992

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF70

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911KF21Q0011

Section SF 1449 - CONTINUATION SHEET

NARRATIVES

Narratives Narrative 1:

Narrative 2: ATTACHMENTS. The following documents are incorporated as a part of this solicitation:

1. Statement of work

2. Evidence of Authority

3. Wage Determination

4. Sioan Form 380-2 Personnel Data Questionnaire

Narrative 3: ANAD Hours of Operation:

WORK HOURS RECEIVING HOURS DAY(S) OF WEEK

7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturdays, Sundays, and Federal Holidays

(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.

(2) Shutdown Periods. The Government may choose to shut down for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.

4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*

*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand-Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The Contractor’s services may not be required during these periods. In such cases, the Contractor will be notified in writing by the Government. These interruptions will be at no cost to the Government.

(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written

This procurement is sole sourced to PTR-Precision Technologies, Enfield, CT 06082.

“ANY ORGANIZATION WHICH BELIEVES ITSELF TO BE IN POSSESSION OF THESE

CAPABILITIES CAN PROVIDE WRITTEN EVIDENCE TO THIS EFFECT TO THE

CONTRACTING OFFICER AND MAY BE CONSIDERED FOR FUTURE PROCUREMENT

ACTIONS."

notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.

(4) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.

Narrative 4: SYSTEM FOR AWARD MANAGEMENT (SAM). Contractors must be registered in the System for Award Management (SAM) database before an award will be issued and shall complete the electronic annual representations and certifications within SAM. After award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.

Narrative 5: ELECTRONIC SUBMISSION OF OFFERORS. All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses will not be accepted. All solicitation responses must be submitted by email to: sonja.l.freeman.civ@mail.mil.

It is the responsibility of the offeror to confirm receipt and insure its offer, in its entirety, reaches the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), before the time set for closing of the solicitation. Attachments may be rejected once scanned by our email system and the Contract Specialist does not receive a notification.

Offers submitted using any other means will not be accepted, unless stated otherwise in the solicitation.

Beta.SAM provides industry with a single point of access to all U.S. Army contracting opportunities. The Contracting Opportunities Search feature allows vendors to easily locate opportunities. Vendors must be registered before being able to respond to a solicitation. Before registering, a Data Universal Numbering System (DUNS) Number is required and registration in the SAMS System (www.sam.gov) is required. Offeror must insure its offer, in its entirety, reaches the Army Contracting Command-Warren, Anniston Army Depot (ANAD), before the time set for opening or closing of the solicitation.

Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission as stated in the paragraph above.

Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:

a. The SF33/SF1449/SF18/SF1442 filled out and signed.

b. All applicable fill-in provisions from the solicitation must be completed.

c. Any other information required by the solicitation.

It is your responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you will be determined non-responsive.

If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.

Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as “unreadable.”

See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.

Any bid bond required by this solicitation must be submitted with the offer. Also, the properly completed original bid bond must be furnished to the Army Contracting Command-Warren, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.

Narrative 6: PAYMENT. Contractor must accept Government Smart Pay Credit Card or provide their electronic funds transfer address. Contractors must be registered in the System for Award Management (SAM) database before an award will be issued. Companies should verify their SAM registration to ensure it is valid and current. COMPLETE THE

FOLLOWING INFORMATION AND INCLUDE WITH ANY OFFER.

Accept MasterCard? Yes_____ No_____

If no, EFT address: _____________________________

Federal Tax Identification Number: _____________________ Dun & Bradstreet Number (DUNS): _____________________ CAGE Code: _____________________ System for Award Management (SAM) Registration: Yes____ No____ Expiration Date:______ Vendor Contact Information: POC: __________________________ Telephone: _____________________

FAX: __________________________

Email: _________________________

Narrative 7: WAWF PROCEDURES. If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://piee.eb.mil/piee-landing/.

Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. SAM is accessible at www.sam.gov. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.

If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.

Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment.

Go to DFAS on the web at: www/dfas.mil/money/vendor. THE FOLLOWING CODES

WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL EMAILS

CORRECTLY THROUGH WAWF:

WAWF

Data/CODES needed for

Invoice

SUPPLIES/

MATERIALS

(PRs that start with W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/

MATERIALS

(PRs DO NOT that start with W31G1Y)

CONSTRUCTION

CAGE CODE

SAM Cage code listed in Contractor/

Offeror field of contract

SAM Cage code listed in Contractor/

Offeror field of contract

SAM Cage code listed in

Contractor/ Offeror field of contract

SAM Cage code listed in

Contractor/Offeror field of contract

ISSUE/ADMIN BY

DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY

DODAAC (If needed)

W31G1Y (Must have inspector code)

W911KF

W911KF

(Unless

Inspected by

DCMA)

W911KF

SHIP TO

(Supplies/Material s

Only)

W911KF

NOT

AVAILABLE

W911KF W911KF

ACCEPTOR

(Services/Equipment

Only)

NOT

AVAILABLE

W911KF

NOT

AVAILABLE

NOT AVAILABLE

Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION

Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

CONTRACT NUMBER:

DELIVERY ORDER NUMBER (IF APPLICABLE):

EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)

CONTRACT

ADMINISTRATOR:

CONTRACTING OFFICER:

USER AND/OR INSPECTOR:

Narrative 8: AUTOMATED INSTALLATION ENTRY (AIE) BADGE. Contractors accessing Anniston Army Depot will be required to obtain an AIE badge. To do so, contractors must submit a completed SIOAN 380-2 (sent to contractor at time of award) to the Contract Specialist with all required signatures to the badge office. A background check will be completed and approved/disapproved within 7-10 days. Once approved, the contractor can schedule an appointment for an AIE badge to be issued.

Narrative 9: WAGE DETERMINATION

(a) U. S. Department of Labor Wage Determination Number(s) _2015-4587 Rev No 9_dated _12/26/2018_ is/are attached and made a part of this Solicitation. The Wage Determination(s) will be made a part of any resulting contract. However, if this solicitation includes the FAR Clause 52.222-48 entitled EXEMPTION FROM APPLICATION OF THE SERVICE

CONTRACT LABOR STANDARDS TO CONTRACTS FOR MAINTENANCE,

CALIBRATION, OR REPAIR OF CERTAIN EQUIPMENT-CERTIFICATION (MAY 2014),

and the contractor provides an affirmative certification therein, the Wage Determination(s) will not be made a part of any resulting contract.

(b) Any class of service employees which is not listed therein, but which is to be employed under this contract, shall be classified by the Contractor so as to provide a reasonable relationship between such classifications and those listed in the attachment, and shall be paid such monetary wages and furnished such fringe benefits as are determined by agreement of the interested parties, who shall be deemed to be the contracting agency, the Contractor, and the employees who will perform on the contract or their representatives. If the interested parties do not agree on a classification or reclassification which is, in fact, conformable, the contracting officer shall submit the question, together with his recommendation, to the Office of Government Contract Wage Standards, Wage and Hour Division, ESA, of the Department of Labor for final determination. Failure to pay such employees the compensation agreed upon by the interested parties or finally determined by the Administrator or his authorized representative shall be a violation of this contract. No employees engaged in performing work on this contract shall in any event be paid less than the minimum wage specified shall be in Section b (a)(1) of the Fair Labor Standards Act of 1938, as amended.

Narrative 10: DISCLOSURE OF UNIT PRICE INFORMATION. This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.

Narrative 11: OPTION YEARS: Contractor shall be notified at least sixty (60) days prior to expiration date of the contract if the Government intends to exercise its option to extend the contract for an additional year. In the event the Government fails to notify the contractor within the said sixty (60) days, but at a time less than sixty (60) days prior to the expiration date does notify the contractor that it intends to exercise the option to extend the contract for an additional year, the contractor will have the right to waive the sixty (60) days’ notice requirement and to perform under the option contract.

Narrative 12: It is the Government’s intent to award ONLY one contract from this solicitation.

However, the Government reserves the right to make multiple awards if there is a cost savings that would be advantageous to the Government.

Narrative 13: COVID-19

COVID-19 is an infectious disease that has caused sickness and death around the world and in the United States of America. This disease is in the form of a virus and is primarily spread by person-to-person transmission. This narrative mandates actions to reduce the risk of spreading this virus.

Contract employees must comply with Federal (Center for Disease Control (CDC)) and State (Alabama Department of Public Health (ADPH)) guidelines related to, but not limited to, protective measure, reporting for duty, quarantine, and returning to work.

Social distancing and covering the face, specifically, the mouth and nose to prevent the spread of viral aerosols, are avenues to limit the spread of the virus. In order to mitigate the spread of COVID-19 and to protect all personnel, ANAD has directed that all contractor personnel comply with the practices that have been recommended by the CDC, including, but not limited to washing your hands, not touching your face, and social distancing.

Absent a medical condition that prevents the wearing of a face covering or safety considerations based on a contractor’s assigned duties, ANAD contractors shall wear face coverings where they cannot maintain six (6) feet of separation from other persons within the work area. A face mask covering the mouth and nose must be worn at all times while in duty status, to include lunch and breaks, when the six (6) feet of separation cannot be maintained.

If a contract employee is infected by COVID-19 and has performed work or delivered supplies to ANAD, the contractor shall notify the Contracting Officer immediately. Infected contractor employees may not return to ANAD until they are cleared to return to work by medical personnel in accordance with (IAW) ANAD COVID-19 Pandemic policy regarding the return to work of infected individuals.

Contractors must continue to remain informed and comply with all current and future Commander directives and policies related to COVID-19 to ensure the most safe, effective, and efficient workforce conditions.

Narrative 14: IDENTIFICATION BADGES. The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.

(1) Contractors are required to secure, and wear at all times, employee identification badges for all employees who must enter the Anniston Army Depot (ANAD) to engage in contract work.

Badges must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance.

Emergency badges will be issued on a case-by-case basis. Badges may be obtained from the Badge Office (BO), Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:

a. - State driver's license

b. - State identification card

c. - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description

NOTE: A social security card is not a photo identification and will not be accepted as proper identification. Employee identification cards issued by the Contractor will not be accepted. The Directorate of Emergency Services (DES) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.

(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.

(3) Ten working days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check.

SIOAN Forms 380-2 may only be submitted for persons who are current employees of the

Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the Badge Office (BO), Building 367, located at the main entrance to ANAD. NO

PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY

ANNISTON ARMY DEPOT. The prime contractor is responsible for checking with the Badge Office (BO), Building 367, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.

(4) Also, at least ten working days before the Contractor expects to begin work on the installation, prime Contractor shall submit, on company letterhead, the name, social security number, date/place of birth, and citizenship of all persons entering ANAD to perform contract work for the prime and any subcontractors. Letter shall be submitted through the Contracting Officer to the Badge Office (BO).

(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.

(6) See clause entitled Identification of Contractor Employees for Contractor employees working on Anniston Army Depot.

Narrative 15: TRAFFIC. The Contractor will be required to conform to Depot regulations concerning:

(1) Designated routes

(2) Parking regulations

(3) Insurance--See clause entitled "Insurance Requirements." The Contractor will also insure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.

(4) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.

Narrative 16: TEMPORARY STRUCTURES. The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.

Narrative 17: FIRE PROVENTION AND PROTECTION. The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.

Narrative 18: UTILITIES. Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.

Narrative 19: CELLULAR TELEPHONE USE. Use of any cellular telephone camera is prohibited on this installation. If a cellular telephone is illegally used on this installation, that cellular telephone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both. Use of cameras without ANAD-issued permit is strictly prohibited. Non-permitted cameras are subject to confiscation.

Narrative 20: ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001. The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746. The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.

Narrative 21: SAFETY AND ACCIDENT PREVENTION. Contractors shall adhere to all safety rules and regulation of corrective actions, which will be taken into consideration:

General:

Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.

Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.

National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).

Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company will comply with the basic requirements of the standard.

For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.

In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed

Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.

The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death. Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. Contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The Contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors.

Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.

Contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well-being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear and hearing protection shall be used and provided by contractor.

The Government reserves the right to conduct unannounced safety inspection at any time, all OSHA required records to include OSHA form 300 and 300A will be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors.

Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation within 1 day of receipt of documentation.

If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.

The contractor must have a Drug Free Workplace plan that includes post-accident testing. This shall be part of their Safety Plan.

Narrative 22: CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION PLANS. For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted. This plan is specific for the current project, and must address the particular hazards which will be inherent in the project and how they will control them. This plan must be submitted to the ANAD Safety Office not more than 10 days after contract award. Contractor must have approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed above.

(1.) SIGNATURE SHEET. Title, signature, and phone number of the following:

a. Plan preparer

b. Plan approval, e.g., owner, company president, etc.

c. Plan concurrence (concurrence of other applicable corporate and project personnel

(contractor) such as their safety officer, project manager, or superintendent) (2.) BACKGROUND INFORMATION. List the following:

a. Contractor

b. Contract number

c. Project name

d. Brief description of the work to be performed and location

e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)

f. Listing of phases of work and hazardous activities requiring activity hazards analyses.

(3.) STATEMENT OF SAFETY AND HEALTH POLICY.

(4.) RESPONSIBILITIES AND LINES OF AUTHORITIES.

a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.

b. Lines of authority.

(5.) SUBCONTRACTORS AND SUPPLIERS.

a. Identification of subcontractors and suppliers (if known).

b. Means for controlling and coordinating subcontractors and suppliers.

c. Safety responsibilities of subcontractors and suppliers.

(6.) TRAINING.

a. List subjects to be discussed with employees in safety indoctrination.

b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).

c. Identify requirements for emergency response training.

d. Outline requirements (who attends, when given, who will conduct etc.) for supervisory and employee safety meetings.

(7.) SAFETY AND HEALTH INSPECTIONS. Provide details on:

a. Who will conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)

b. Any external inspections/certifications that may be required.

(8.) SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND

COMPLIANCE.

a. The company's written safety program goals, objectives, and accident experience.

b. A brief description of the company's safety incentive programs (if any)

c. Policies and procedures for holding managers and supervisors accountable for safety.

(9.) ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:

a. Exposure data (man hours worked)

b. Accident investigations, reports and logs

c. Immediate notification of accidents

(10.) PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE

CONDUCTED. This list is not all-inclusive, nor will all topics apply to all contractors.

a. Hazard communication

b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)

c. Layout plans

d. Respiratory protection plan

e. Health hazard control program

f. Lead abatement plan

g. Asbestos abatement plan

h. Abrasive blasting

i. Confined space

j. Hazardous energy control plan

k. Critical lift procedures

l. Contingency plan for severe weather

m. Access and haul road plan

n. Demolition plan (engineering and asbestos survey)

o. Material handling equipment licensing

p. Plan for prevention of alcohol and drug abuse

q. Fall protection

(11.) Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.

Narrative 23: SEXUAL ASSUALT AND HARASSMENT IN THE WORKPLACE.

Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their will, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR will provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.

As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD. Contract performance requirements will not be adjusted for reasons related to an incident involving an offense by contractor employees.

In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises:

If you believe you are a victim of sexual harassment:

It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.

Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.

Tell someone; do not keep it to yourself. There are things that other people can do to help you Document the incident. Write down dates, places, names of witnesses and what happened.

Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.

Report harassment to your supervisor, director, EEO staff, Victim Advocate, or union representative.

Follow whatever complaint procedures apply with your employer

If you witness sexual harassment or it is reported to you:

Report it to your supervisor

Report it to the Depot Sexual Harassment/Assault Response and Prevention (SHARP) Coordinator, Mrs. Wendy Suttles, at (256) 240-3447.

Cooperate with any investigative agencies.

Narrative 24: GOVERNMENT OWNED PROPERTY. When contractors bring in equipment onto Anniston Army Depot for use in performing contracted work to repair, replace or install, all contractor-owned equipment must have ‘company name’ stenciled, laser marked, or marked in some other permanent way on the equipment.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot

ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

EBW S/N 670. Four preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. Base Year Period -12 months from date of award FOB: Destination

NSN: AASSVC0307017Y

MILSTRIP: W31G1Y0287018F

PURCHASE REQUEST NUMBER: W31G1Y0287018F

PSC CD: J036

NET AMT

0002 1 Lot

ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

Serial Number: 918. Two preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. Base Year Period -12 months from date of award FOB: Destination

NSN: AASSVC03070184

MILSTRIP: W31G1Y0307017Y

PURCHASE REQUEST NUMBER: W31G1Y0307017Y

0003 1 Lot

ELECTRON BEAM WELDER

FFP

EMERGENCY REPAIRS - Contractor shall perform emergency repairs in accordance with the Statement of Work for two Electron Beam Welders - EBW S/N 670 and EBW S/N 918. Emergency repairs shall restore equipment to 100% performance level. Only new Original Equipment Manufacturer (OEM) repair parts or certified replacements shall be used to repair the welders. Base Year Period - 12 months from date of award Principle period of maintenance, Monday through Friday:

$_______________ per hour Outside principle period:

$_______________ per hour FOB: Destination

NSN: AASSVC0287018F

MILSTRIP: W31G1Y03070184

PURCHASE REQUEST NUMBER: W31G1Y03070184

1001 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

EBW S/N 670. Four preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. Period of Performance: 1st Option Period - 12 months after base year expires FOB: Destination

NSN: AASSVC0307017Y

MILSTRIP: W31G1Y0287018F

1002 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

Serial Number: 918. Two preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. Period of Performance: 1st Option Year - 12 months after base year expires FOB: Destination

NSN: AASSVC03070184

MILSTRIP: W31G1Y0307017Y

1003 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

EMERGENCY REPAIRS - Contractor shall perform emergency repairs in accordance with the Statement of Work for two Electron Beam Welders - EBW S/N 670 and EBW S/N 918. Emergency repairs shall restore equipment to 100% performance level. Only new Original Equipment Manufacturer (OEM) repair parts or certified replacements shall be used to repair the welders. Period of Performance: 1st Option Period - 12 months after base year expires Principle period of maintenance, Monday through Friday:

$_______________ per hour Outside principle period:

$_______________ per hour FOB: Destination

NSN: AASSVC0287018F

MILSTRIP: W31G1Y03070184

2001 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

EBW S/N 670. Four preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. 2nd Option Period - 12 months after 1st option year expires FOB: Destination

NSN: AASSVC0307017Y

2002 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

Serial Number: 918. Two preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. 2nd Option Period -12 months after 1st option year expires FOB: Destination

NSN: AASSVC03070184

2003 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

EMERGENCY REPAIRS - Contractor shall perform emergency repairs in accordance with the Statement of Work for two Electron Beam Welders - EBW S/N 670 and EBW S/N 918. Emergency repairs shall restore equipment to 100% performance level. Only new Original Equipment Manufacturer (OEM) repair parts or certified replacements shall be used to repair the welders. Period of Performance: 2nd Option Period - 12 months after 1st option year expires Principle period of maintenance, Monday through Friday:

$_______________ per hour Outside principle period:

$_______________ per hour FOB: Destination

NSN: AASSVC0287018F

3001 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

EBW S/N 670. Four preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. 3rd Option Period - 12 months after 2nd option year expires FOB: Destination

NSN: AASSVC0307017Y

3002 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

Serial Number: 918. Two preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. 3rd Option Period - 12 months after 2nd option year expires FOB: Destination

NSN: AASSVC03070184

3003 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

EMERGENCY REPAIRS - Contractor shall perform emergency repairs in accordance with the Statement of Work for two Electron Beam Welders - EBW S/N 670 and EBW S/N 918. Emergency repairs shall restore equipment to 100% performance level. Only new Original Equipment Manufacturer (OEM) repair parts or certified replacements shall be used to repair the welders. 3rd Option Period - 12 months after 2nd option year expires Principle period of maintenance, Monday through Friday:

$_______________ per hour Outside principle period:

$_______________ per hour FOB: Destination

NSN: AASSVC0287018F

4001 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

EBW S/N 670. Four preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. 4th Optioin Period - 12 months after 3rd option year expires FOB: Destination

NSN: AASSVC0307017Y

4002 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

PREVENTIVE MAINTENANCE AND CALIBRATION - Electron Beam Welder.

Serial Number: 918. Two preventive maintenance service checks and calibration services to be performed in accordance with the Statement of Work. Period of Performance: 4th Option Period - 12 months after 3rd option year expires FOB: Destination

NSN: AASSVC03070184

4003 1 Lot

OPTION ELECTRON BEAM WELDER

FFP

EMERGENCY REPAIRS - Contractor shall perform emergency repairs in accordance with the Statement of Work for two Electron Beam Welders - EBW S/N 670 and EBW S/N 918. Emergency repairs shall restore equipment to 100% performance level. Only new Original Equipment Manufacturer (OEM) repair parts or certified replacements shall be used to repair the welders. 4th Option Period - 12 months after 3rd option year expires Principle period of maintenance, Monday through Friday:

$_______________ per hour Outside principle period:

$_______________ per hour FOB: Destination

NSN: AASSVC0287018F

CLAUSES INCORPORATED BY REFERENCE

52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-18 Prohibition on Contracting With Entities That Require Certain

Internal Confidentiality Agreements or Statements-- Representation

JAN 2017

52.204-7 System for Award Management OCT 2018 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

JUN 2020

52.217-5 Evaluation Of Options JUL 1990 52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

MAR 2020

52.222-54 Employment Eligibility Verification OCT 2015 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

JUN 2020

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.229-12 Tax on Certain Foreign Procurements JUN 2020 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

DEC 2013

52.237-2 Protection Of Government Buildings, Equipment, And Vegetation

APR 1984

52.245-1 Government Property JAN 2017 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7006 Billing Instructions OCT 2005 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013

252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .