This document is a Request for Proposal (RFP) for the repair of Fire Station, Building No. 277 at Warrior Base, Korea. The RFP is issued to existing General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MATOC) contract holders. The project has an estimated value between $1,000,000 and $5,000,000. Key scope of work includes replacement of flooring, walls, ceilings, roofing, plumbing, HVAC, electrical, fire protection, and miscellaneous architectural and structural items. The contractor must be a Korean entity to be eligible for award. Proposals are due by June 27, 2024, and the performance period is 240 calendar days after award. No U.S. funds will be obligated, as this is a Republic of Korea (ROK) Ministry of National Defense (MND) funded contract.

View the file

Other files

File Type Posted
Drawing files 184001 Civil AMENDMENT.pdf PDF
Amendment of Solicitation W90VN824R0046_0001.pdf PDF
184001_DWG.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0012101879

a. This is a Request for Proposal (RFP) issued to existing General Construction Multiple Aw ard Indefinite Delivery Indef inite Quantity (IDIQ) holding contract number(s) listed below ;

Contract Numbers W91QVN-24-D-0059, 0060, 0061, 0062, 0063, 0064, 0065, 0066, 0067, 0068, 0069, 0070, 0071, 0072, 0073, 0074, 0075, 0076, 0077, 0078, 0084, 0085, 0098, 0102 and 0106.

b. Site Visit: Above MATOC contractors w ho intend to propose on this solicitation are strongly recommended to attend the Site Visit. See Section L for the schedule.

c. If the contractor is unable to submit the proposal in response to this solicitation, the Contractor shall submit the "NO OFFER LETTER" by date and time specif ied in this solicitation.

d. CONSTRUCTION PRICE RANGE Pursuant to FAR 36.204 the estimated price range is betw een $1,000,000 and $5,000,000.

***Fund are not presently available for this project. No aw ard w ill be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date.***

MR. KIM, CHONG NAK 315-722-1384

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

04-Jun-2024

(RFP)

(IFB)

X

CALL:

Repair Fire Station, Bldg #277, Warrior Base

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________240 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________27 Jun 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______190 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO CASEY

UNIT#15289

APO AP 96224-6224

UNITED STATES

W90VN8

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

11:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

184001

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W90VN824R0046 36

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W90VN824R0046

Section A - Solicitation/Contract Form

ELIGIBILITY FOR AWARD ROK MND

ELIGIBILITY FOR AWARD OF ROK MND CONTRACTS

(a) This solicitation is conducted under the LCS program and will result in a contract between the Government of the Republic of Korea (ROK) and the contractor. ROK will directly pay the contractor. No appropriated funds of the United States (US) shall be obligated for payment due under a contract resulting from this solicitation.

(b) In accordance with the International Agreement between the US and ROK, titled “Implementation Arrangement for the Special Measures Agreement” (hereinafter “International Agreement”), signed by the parties in 2019:

The parties hereby agree that all LCS work must be accomplished in the ROK or its territorial waters and that all equipment and supplies that are to be acquired with ROK Government funds shall be manufactured in the ROK, and all LCS service work shall be carried out by Korean contractor(s), the Korea Railroad Corporation, or the ROK military.

The term ‘Korean contractor” in implementing the LCS program in Section V, Paragraph 3 (of the 2019 SMA IA) is defined as follows:

1. An entity, that, including its parent, is a domestic corporation under the Korean Corporation Tax Act and whose domestic status is recorded in the Certified Copy of Register or its successor document. A parent is defined as an entity that holds more than 50/100 of the total issued and outstanding shares in another company, as reflected in the Stock Change Certificate; or

2. An individual who has Korean nationality.

(c) In order to establish eligibility for a LCS contract, the offeror shall submit the documents listed below with their proposal prior to the closing date/time established in the solicitation. The contracting officer will determine the offeror’s eligibility status as a Korean contractor solely on the basis of these documents.

(1) Prime Contractor Registration: The offeror shall submit its Certified Copy of Register (등기부 등본

(유효사항)), as certified and submitted to the ROK Supreme Court (대법원). In order to qualify as a

Korean Contractor, the fourth block of the offeror's Certified Copy of Register [등기부 등본 (유효사항)] must state an address that is physically located in the Republic of Korea.

(2) Prime Contractor Stock Change Certification: The offeror shall submit its most recent Stock Change

Certificate (주식 변동 상황 명세서), as certified and submitted to the ROK Local Tax Office (국세청). The prime contractor’s tock Change Certificate (주식 변동 상황 명세서) will be evaluated to determine if the prime contractor has ap Parent (as defined in the International Agreement extract above).

(3) If the Prime Contractor has a Parent, the offeror shall submit the Parent’s Certified Copy of Register

(등기부등본 (유효사항)) as certified and submitted to the ROK Supreme Court (대법원). In order for the

Prime Contractor to qualify as a Korean Contractor, the fourth block of the offeror’s Parent’s Certified

Copy of Register (등기부 등본 (유효사항)) must state an address that is physically located in the Republic of Korea.

(4) To validate if an individual is “Korean nationality”, the following documents shall be submitted:

? Business Registration (사업자 등록증)

? Basic Certificate (기본 증명서)

? Certificate of Business Fact (사업사실증명서)

(Issued by National Tax Service showing partnership/owners, shares, and date when the business was jointly owned)

(d) To summarize the requirements stated above:

(1) An offeror that does not have a “Parent” will submit 2 documents to establish that the offeror is a Korean Contractor: 1) Offeror's Certified Copy of Register, and 2) Offeror's Stock Change Certificate.

(2) An offeror that does have a “Parent” will submit 3 documents to establish that the offeror is a Korean Contractor: 1) Offeror's Certified Copy of Register, 2) Offeror's Stock Change Certificate, and 3) Parent's Certified Copy of Register.

(3) An Offeror that does not have Stock Change Certificate will submit: 1) Business Registration, 2) Basic Certificate, and 3) Certificate of Business Fact.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

K WORK

FFP

K WORK

FOB: Destination

PURCHASE REQUEST NUMBER: 0012101879

PSC CD: 5680

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

L WORK

FFP

L WORK

FOB: Destination

PURCHASE REQUEST NUMBER: 0012101879

PSC CD: 5680

NET AMT

Section C - Descriptions and Specifications

DESCRIPTIONS AND SPECIFICATION

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

184001 Repair fire station, building No. 277 Warrior Base

1. DESCRIPTION: The work to be performed to repair fire station, building No. 277 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project.

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Architectural Work

2.1.1.1. Floor work

2.1.1.1.1. Replace existing floor tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) as shown on new floor plans and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall be corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.

2.1.1.1.2. Replace existing rubber tiles including rubber tile base as shown on floor plans and interior finish schedule

2.1.1.1.3. Replace existing conc stoops as shown on floor plan, existing/removal plan, floor plan, section, and interior finish schedule.

2.1.1.1.4. Apply hardener and epoxy coating with non-slip grits as shown on floor plan and interior finish schedule.

TP I-1

2.1.1.1.5. Replace existing Ceramic Floor Tile (CFT) with new including cement bond coat, waterproof membrane, and mortar bed as shown on floor plans and detail drawings.

2.1.1.2. Interior and exterior wall work

2.1.1.2.1. Replace existing all Gypsum Wall Board (GWB) wall board walls with new GWB wall (Normal, water resistant or 'X' type) including metal studs as shown on floor plans, sections and detail drawings.

2.1.1.2.2. Paint all interior/exterior wall surfaces including other components (Steel guardrail, guard post, fuel tank, and conc dike) as shown on interior finish schedule, elevations, and sections.

2.1.1.2.3. Replace existing Glazed Ceramic Wall Tile (GCWT) with new including cement bond coats, waterproof membrane, and plastering with metal lath as shown on floor plans and sections.

2.1.1.2.4. Replace existing pipe chases/pipe cover with waterproof or ‘X’ type of GWB for mechanical piping system and duct as per floor plans, sections, and detail drawings.

2.1.1.2.5. Replace/block up existing protected wall siding including insulations with vapor barrier and paint on existing protected metal wall liner as shown on floor plans, elevations, sections and detail drawings.

2.1.1.3. Interior and exterior ceiling and roof work

2.1.1.3.1. Replace existing ceiling with new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.

2.1.1.3.2. Replace existing ceiling with new GWB (Normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.

2.1.1.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and sections.

2.1.1.3.4. Replace existing rain gutters and downspouts with new including conc splash blocks as shown on floor plans and elevations.

2.1.1.3.5. Replace existing standing seam metal canopies with new including rain gutter as shown on roof plan, elevation, and detail.

2.1.1.4. Miscellaneous work

2.1.1.4.1. Replace existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule.

2.1.1.4.2. Replace existing windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations, and window schedule.

2.1.1.4.3. Replace existing window horizontal mini blinds with new, fireproof type.

TP I-2

2.1.1.4.4. Replace existing exterior steel stair with new including guardrail, handrail, and rubber safety corner guards as shown on floor plan, elevation, section, picture, and structure drawings.

2.1.1.4.5. Replace existing aluminum louver with new as shown on floor plans and louver schedule.

2.1.1.4.6. Replace existing Fire Extinguisher Cabinets (FEC) and Fire Extinguisher Brackets (FEB) with new as shown on floor plans and detail drawing.

2.1.1.4.7. Replace existing all toilet accessories and shower benches with new as shown on floor plans and detail drawings.

2.1.1.4.8. Replace interior and exterior signages with new as shown on floor plans, elevations, and signage schedule.

2.1.1.4.9. Replace existing metal shelf with mop rack with new.

2.1.1.4.10. Replace existing roll up doors including manual hand chain and wire remote controller as shown on floor plans and door schedule.

2.1.1.4.11. Replace existing Stainless Steel (SST) laundry shelf as shown on floor plans, elevations, and detail drawing.

2.1.1.4.12. Replace existing access doors on wall and ceiling as required.

2.1.1.4.13. Replace existing counter table as shown on floor plan, elevation, and detail drawing.

2.1.1.4.14. Replace existing kitchenette including base cabinet and upper cabinet as shown on floor plan, elevation, and detail drawings.

2.1.1.4.15. Replace existing bulletin boards as shown on floor plans and detail drawings.

2.1.1.4.16. Block up duct chase hall on concrete slab with concrete including re-bar, metal deck, and support steel structure as shown on floor plan.

2.1.2. Mechanical Work

2.1.2.1. Replace heating and cooling system with new Variable Refrigerant Flow (VRF) duct-free split heat pump indoor and outdoor units, hot water boiler, hot water circulation pump, electric wall mounted heaters, electric ceiling heater, electric unit heater, unit heaters, air separator, expansion tank, air compressor, ducts, pipes, valves, insulations, controls, access doors, equipment support (concrete pad), and all associated accessories for Heating, Ventilating, and Air Conditioning (HVAC) system as shown on drawings.

2.1.2.2. Replace ventilation system with new exhaust fans, range hood, energy recovery ventilators, sliding balancer track system for removal disel exhaust, heat destratification fan, CO2 sensor, controls, diffusers, grilles, louvers, dampers, ducts, insulations, access doors, equipment support (concrete pad), and all associated accessories for HVAC system as shown on drawings.

2.1.2.3. Perform Duct Air Leakage Test (DALT) and Testing, Adjusting, and Balancing (T.A.B) after construction to verify that the HVAC system works properly.

TP I-3

2.1.2.4. Replace plumbing system with new domestic cold and hot water piping system, sewer and vent piping system including plumbing fixtures, washer box, domestic hot water heater, domestic hot water recirculation pump, valves, water hammer arresters, emergency eyewash and shower station, control, access doors, and all associated accessories as shown on drawings.

2.1.2.5. Replace sprinkler system with new automatic fire protection wet sprinkler system, spare sprinkler head cabinet with spare sprinkler head (6ea), and fire suppression system (for range hood) as shown on drawings.

2.1.2.6. The contractor shall inspect and test the fire protection system. The work inspection and test shall be performed by the Fire Protection Professional Engineer (FPE).

2.1.3. Electrical Work

2.1.3.1. Replace existing lighting fixtures, exit lights, exterior lights, emergency alarm lights, toggle switches, 3-way switches, photocell, lighting contactor, remote roll-up doors and emergency alarm lights controller, wires and conduits with new.

2.1.3.2. Replace panelboards, receptacles and cover plates, and wires and conduits with new.

2.1.3.3. Replace existing safety switches, combination motor starters, magnetic motor starters, junction boxes, control system, wires and conduits for HVAC system with new.

2.1.3.4. Replace existing fire alarm control system with new addressable fire alarm control and mass notification system panel, building transmitter, antenna, lighting arrester, manual pull stations, smoke detectors and relay modules, visual signal strobes, microphone, speaker devices, and associated wiring and conduit.

2.1.3.5. Replace existing Telephone Terminal Board (TTB), equipment rack, telephone/data outlets, and associated wire and conduit with new.

2.1.3.6. Replace existing cable TV distribution system, CATV outlets and associated wiring and conduit with new.

2.1.3.7. Replace existing Public Address (PA) system, speakers, and associated wiring and conduit with new.

2.1.3.8. Replace existing lightning protection system with new.

2.1.3.9. Replace existing underground exterior telecommunication line with new.

2.1.3.10. Remove and reinstall existing communication devices and cables, radio antenna.

2.1.3.11. Replace existing underground exterior power distribution system including pad mounted transformer and manholes with new.

2.1.3.12. Replace existing emergency backup generator sets and Automatic Transfer Switch (ATS) with associated wiring and conduit with new.

TP I-4

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

2.2.1. Civil Work

2.2.1.1. Install 150mm diameter Polyvinyl Chloride (PVC) fire water line with two (2) 150mm gate valve.

2.2.1.2. Install 80mm diameter PVC service water line with one (1) 80mm gate valve.

2.2.1.3. Replace 2.0m width concrete step with handrail and concrete stoop.

2.2.1.4. Restore Portland Cement Concrete (PCC) pavement.

2.2.1.5. Replace all necessary fuel tank parts including 20mm two (2) supply and 20mm one (1) return double wall pipes, except fuel tank and concrete pad with cleaning the fuel tank.

2.2.1.6. Restore solid sodding.

2.2.1.7. Construct trash bin.

2.2.1.8. Construct one (1) oil water separator and three (3) sewer manhole, and connect to existing sewer manhole with 150mm diameter PVC pipe.

2.2.1.9. Construct concrete encasement.

2.2.1.10. Connect to existing 20mm diameter supply and return fuel line with flexible double wall pipes.

2.2.1.11. Reroute 200mm diameter PVC water line with one (1) air vacuum valve.

2.2.1.12. Construct one (1) hydrant with 150mm diameter gate valve.

2.2.1.13. Install 100mm diameter service water line with 100mm diameter gate valve.

2.2.1.14. Install 150mm diameter fire water line with 150mm diameter gate valve.

2.2.1.15. Construct eight (8) bollards around generator and transformer.

2.2.2. Architectural Work

2.2.2.1. Floor work

2.2.2.1.1. Install Vinyl Composition Tile (VCT) including VCB as shown on floor plan and interior finish schedule.

2.2.2.1.2. Install rubber tiles including rubber tile base as shown on floor plans and interior finish schedule

2.2.2.1.3. Install concrete slab and stoops as shown on floor plans, sections, and structure drawings.

2.2.2.1.4. Apply epoxy coating with non-slip grits as shown on floor plan and interior finish schedule.

2.2.2.1.5. Install CFT with new including cement bond coat, water proof membrane, and mortar bed as shown on floor plans and detail drawings.

2.2.2.1.6. Install trenches including trench covers in apparatus as shown on floor plans, sections, and detail drawings.

TP I-5

2.2.2.2. Interior and exterior wall work

2.2.2.2.1. Install all GWB walls including metal studs and insulation as shown on floor plans, sections, and detail drawings.

2.2.2.2.2. Paint all interior/exterior wall surfaces including other components (Guard post and trash bin) as shown on interior finish schedule, elevations and sections.

2.2.2.2.3. Install Glazed Ceramic Wall Tile (GCWT, full height) including cement bond coats, waterproof membrane, and plastering with metal lath as shown on floor plans and sections.

2.2.2.2.4. Install pipe chases/pipe cover waterproof or ‘X’ type of GWB for mechanical piping system and duct as per floor plans, sections, and detail drawings.

2.2.2.2.5. Install protected metal wall siding and protected metal wall liner panel including insulations with vapor barriers as shown on floor plans, elevations, sections, and detail drawings.

2.2.2.3. Interior and exterior ceiling and roof work

2.2.2.3.1. Install ceiling acoustical ceiling tile including metal suspension systems as shown on floor plan and interior finish schedule.

2.2.2.3.2. Install ceiling GWB (Normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.

2.2.2.3.3. Paint all interior ceiling surfaces as shown on floor plans, sections, interior finish schedule, and section.

2.2.2.3.4. Paint all exterior exposed metal, woods, fascia, soffit, and metal flashing as shown on floor plan and elevations.

2.2.2.3.5. Install standing seam metal roof and protected metal roof liner panels including insulations with vapor barriers as shown on floorplans, elevations, sections, and detail drawings.

2.2.2.3.6. Install metal canopies including rain gutters and downspouts as shown on floor plans, elevations, and detail drawings.

2.2.2.3.7. Install protected metal rain gutters and downspouts including concrete splash blocks as shown on floor plans and elevations.

2.2.2.4. Miscellaneous work

2.2.2.4.1. Install doors and door frames including new hardware sets as shown on new floor plan and door schedule.

2.2.2.4.2. Install windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations, and window schedule.

2.2.2.4.3. Install aluminum louver as shown on floor plans and louver schedule.

2.2.2.4.4. Install metal shelf with mop rack in janitor room as shown on floor plans and detail drawing.

TP I-6

2.2.2.4.5. Install window horizontal mini blinds, fireproof type.

2.2.2.4.6. Install FECs and FEBs as shown on new floor plans and detail drawing.

2.2.2.4.7. Install all toilet accessories and wooden shower benches as shown on floor plans and detail drawings.

2.2.2.4.8. Install storage shelves with plastic laminates as shown on floor plan, elevation, and detail drawings.

2.2.2.4.9. Install interior and exterior signages with new for all rooms as shown on floor plan, elevations, and signage schedule.

2.2.2.4.10. Install roll up doors including manual hand chain and wire remote controller as shown on floor plans and door schedule.

2.2.2.4.11. Install SST laundry shelves room as shown on floor plan and detail drawing.

2.2.2.4.12. Install access doors on wall and ceiling as required.

2.2.2.4.13. Install guard posts as shown on floor plans and detail drawing.

2.2.2.4.14. Install bulletin boards as shown on floor plans and detail drawings.

2.2.3. Mechanical Work

2.2.3.1. Install new VRF duct-free split heat pump indoor and outdoor units, hot water boiler, hot water circulation pump, electric wall mounted heaters, electric ceiling heater, electric unit heater, unit heaters, air separator, expansion tank, air compressor, ducts, pipes, valves, insulations, controls, access doors, equipment support (concrete pad), and all associated accessories for the heating and cooling system as shown on drawings.

2.2.3.2. Install new exhaust fans, energy recovery ventilators, sliding balancer track system for removal disel exhaust, heat destratification fan, CO2 sensor, controls, diffusers, grilles, louvers, dampers, ducts, insulations, access doors, equipment support (concrete pad), and all associated accessories for the ventilation system as shown on drawings.

2.2.3.3. Perform DALT and T.A.B after construction to verify that the HVAC system works properly.

2.2.3.4. Install new domestic cold and hot water piping system, sewer and vent piping system including plumbing fixtures, washer box, domestic hot water heater, domestic hot water recirculation pump, valves, water hammer arresters, emergency eyewash and shower station, electric water cooler, control, access doors, and all associated accessories for the plumbing system as shown on drawings.

2.2.3.5. Install new automatic fire protection wet sprinkler system, spare sprinkler head cabinet with spare sprinkler head (6ea), and all associated accessories for the sprinkler system as shown on drawings.

2.2.3.6. The contractor shall inspect and test the fire protection system. The work inspection and test shall be performed by the FPE (Fire Protection Professional Engineer).

TP I-7

2.2.4. Electrical Work

2.2.4.1. Install new lighting fixtures, exit lights, exterior lights, emergency alarm lights, toggle switches, 3-way switches, photocell, lighting contactor, remote roll-up doors and emergency alarm lights controller, wires and conduits.

2.2.4.2. Install new watt hour meter, Current Transformers (CT), panelboards, receptacles and cover plates, and wires and conduits.

2.2.4.3. Install new safety switches, combination motor starters, magnetic motor starters, junction boxes, control system, wires and conduits for HVAC system.

2.2.4.4. Replace existing fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull stations, smoke detectors and relay modules, visual signal strobes, microphone, speaker devices, and associated wiring and conduit.

2.2.4.5. Install new Telephone Terminal Board (TTB), equipment rack, telephone/data outlets, and associated wire and conduit.

2.2.4.6. Install new cable TV distribution system, CATV outlets, and associated wiring and conduit.

2.2.4.7. Install new Public Address (PA) speakers and connect to new PA system with associated wiring and conduit.

2.2.4.8. Install new underground exterior telecommunication line including manhole.

2.2.4.9. Replace existing lightning protection system with new.

2.2.5. Structural Work

2.2.5.1. Construct concrete slab.

2.2.5.2. Construct concrete stoop with step.

2.2.5.3. Construct 200mm thickness concrete stem and foundation.

2.2.5.4. Construct roof with steel column, beam, and standing seam metal roofing.

2.2.5.5. Construct interior/exterior stairs.

2.2.5.6. Construct 250mm thickness concrete ramp.

2.2.5.7. Submit structure design analysis and shop drawing.

TP I-8

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

The Standard Technical Detail Specifications:

The work shall conform to the most current version of the listed standards/specifications below.

DIVISION 01 – GENERAL REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00.00 10 QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED

MATERIAL

02 65 00 UNDERGROUND STORAGE TANK REMOVAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS

MATERIALS

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

TP II-1

02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET

HOUSING & CHILD OCCUPIED FACILITIES

DIVISION 03 – CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 12 00 STRUCTURAL STEEL

05 21 23 STEEL JOIST GIRDER FRAMING

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 22 00 ROOF AND DECK INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 41 13 METAL ROOF PANELS

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 23 OVERHEAD COILING DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

TP II-2

08 81 00 GLAZING

08 87 16 FRAGMENT RETENTION FILM FOR GLASS

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 – FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 LATH

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

DIVISION 12 – FURNISHINGS

12 21 00 WINDOW BLINDS

12 32 00 MANUFACTURED WOOD CASEWORK

12 36 00 COUNTERTOPS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

TP II-3

23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 – ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE

28 31 49 CARBON MONOXIDE DETECTORS

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 – EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS

32 11 16 SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR PERVIOUS

PAVEMENT

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 11 BITUMINOUS SURFACE TREATMENT

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

TP II-4

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 17 24.00 10 PAVEMENT MARKINGS

32 92 23 SODDING

DIVISION 33 – UTILITIES

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

TP II-5

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

1. Material Approval Submittal:

(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 14 days after receipt of NTP.

(2) The Contractor shall process submittals in accordance with Section 013300 – SUBMITTAL

PROCEDURES.

2. Extended warranty - FAR 52.246-21

2.1. Extended warranty list

2.2. Contractor shall submit to COR the Warranty Certification with 4025 for the listed items.

2.3. Contractor shall submit to COR Warranty management plan and approve it before 30 days of pre-warranty conference. (OMA Sec 01 78 00)

2.4. Contractor shall have the Pre-Warranty Conference before Contract Close Date. (OMA Sec 01 78)

L/N Warranty Item Description Warranty

Period (Yrs) Certification

(Yes / No) Warranty Tag

(Yes / No) Repair Time after call

1 Metal roof panel Installer 10 N N 24hrs

2 Acrylic fluid-applied proofing. Installer 2 N N 24hrs

3 Leak Detection Module panel TMS-2000 Installer 10

4 Float Level S/W Assm'y MP 450 Installer 10

5 Leak Sensor Installer 10

6 Leak Detection Module panel progrem Fee Installer 10

7 Oil Water Separator Installer 10

8 VRF Heat Pump, Outdoor Unit Product 3 Y Y 24 Hrs

9 VRF Heat Pump, Indoor Unit Product 3 Y Y 24 Hrs

10 Energy Recovery Ventilator Product 3 Y Y 24 Hrs

11 Split Type Heat Pump, Indoor & Outdoor Unit Product 3 Y Y 24 Hrs

12 LED Light Product 10 Y Y 7 Days

2.5. Warranty Information and Data

TP III-1

2.5.1. Contractor shall submit Warranty tag design, COR shall review and approve it for the listed and shall install it for the listed items. (OMA Sec 01 78 00)

2.5.2. Submit the O&M Manual with Manufacture’s instruction for DPW training. (OMA Sec 01 78 00)

3. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)

4. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

TP III-2

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.

Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

TP III-3

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

5. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW

COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I training. This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil

B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.

Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to

TP III-4

watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

D. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section I - Contract Clauses

5152.232-4028 – Funding of ROK MND Funded Contracts

FUNDING OF ROK MND FUNDED CONTRACTS

(a) Funding advisement: This contract, any modifications (including exercise of option(s)) thereto, and any delivery or task orders thereunder, shall be paid with ROK funds and shall cite “MOA Contract

- funded by ROK MND” (in lieu of citing appropriations and accounting data). No U.S. funds, appropriated or other, are or will be obligated under this contract.

(b) Limitation of US liability: The U.S. Government shall incur no liability, and no appropriated or other funds of the United States shall be obligated, for payment for services, supplies, claims, or other costs arising out of or under this contracts, delivery or service orders, exercises of options, or other modifications.

(c) Identification of invoices: Contractor shall state clearly “MOA Contract - funded by ROK MND” on all invoices for performance under contracts, delivery or service orders that are designated as “MOA Contract - funded by ROK

MND.”

(d) Funding carry-over:

(1) The Contractor will make every reasonable effort to obtain completion of all performance under the contract and to obtain, approve, and forward Contractor’s invoices under the contract before the end of the calendar year of the contract. In the event that any work initiated under the contract cannot be completed by the end of the calendar year, the Contractor shall furnish the Contracting Officer and USFK, ATTN: FKJ4-P-G, not later than 30 November, the following information:

(i) A list of work that apparently will not be completed and invoiced by, and apparently will require payments after, the end of the calendar year;

(ii) Estimated price of work that apparently will be carried beyond the calendar year; and

(iii) Date of anticipated completion of the work.

(2) The ROK MND shall seek mutually agreeable procedures for payment for work carried over to the next calendar year.

(e) Availability of ROK Funds for the Next Calendar Year:

(1) This contract is funded with calendar year ROK MND funds, from date of award through 31 December of the year in which the contract is awarded and/or into which the contract is extended. ROK MND funds are not available for performance, under this contract, beyond 31 December of the current contract’s calendar year period. Any obligation and/or legal liability on the part of ROK MND for the next calendar year’s performance, including exercise of any option to extend the services/contract, is contingent upon the Contracting Officer’s explicit notification to the Contractor of availability of that new calendar year’s ROK MND funds, from which contractual payment(s) can be made.

(2) Unavailability of ROK MND funds until a few months into the new calendar year may necessitate a break in performance of the contract until those funds become available. In the event of a break in performance because of unavailability of the new calendar year’s ROK MND funds for obligation under the contract, that break in performance shall not be deemed a breach or default of the contract.

5152.233-4008 – Choice of Law and Disputes under ROK MND Funded Contracts

CHOICE OF LAW AND DISPUTES, ROK MND FUNDED CONTRACTS

(a) This contract shall be construed and interpreted in accordance with the substantive laws of the United States of America. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with U.S.

law.

(b) All disputes arising under, or relating to, this contract shall be resolved under this clause.

(c) “Claim,” as used in this clause, means a written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract terms, or other relief arising under or relating to this contract. A claim arising under a contract, unlike a claim relating to that contract, is a claim that can be resolved under a contract clause that provides for the relief sought by the claimant; however, a written demand or written assertion by the Contractor seeking the payment of money exceeding $100,000 is not a claim under the clause until certified as required by subparagraph (d)(2) below. A voucher, invoice, or other routine request for payment that is not in dispute when submitted is not a claim under the clause. The submission may be converted to a claim under the clause, by complying with the submission and certification requirements of this clause, if it is disputed either as to liability or amount or is not acted upon in a reasonable time.

(d) The contractor shall have the right to submit to the Contracting Officer, disputes, demands, and/or claims, relating to or arising under this contract, only on the issue of whether the Government should and will certify performance, for payment by the ROK Government. The contractor shall not submit to the U.S. Government, nor will the Contracting Officer accept, any disputes, demands, or claims for compensation for work, which the U.S.

Government has certified as completed.

(e) Procedures

(1) A claim by the contractor shall be made in writing and submitted to the Contracting Officer for a written decision. A claim by the Government against the Contractor shall be subject to a decision by the Contracting Officer.

(2) For contractor’s claims exceeding $100,000, the contractor shall submit with the claim a certification that –

(i) The claim is made in good faith;