This is a Request for Proposal (RFP) for a military construction project to replace a radio antenna platform at Osan Air Base in the Republic of Korea. The solicitation (W90VN625RA017) is issued by the Department of the Army Materiel Command Army Contracting Command and is limited to existing Multiple Award Task Order Contract (MATOC) work plan contractors in Area III. The project, designated SMYU 26-1029, has an estimated value between $250,000 and $500,000.
Key details include a mandatory site visit scheduled for 11 June 2025 at Building #1039 at Osan AB, with a maximum of two attendees per offeror. Proposals must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module by 1300 hours on the closing date, with additional email submissions required. The contract requires completion within 120 calendar days after receiving notice to proceed, with contractors performing at least 50% of the work on-site. Award will be made to the responsible offeror submitting the lowest-priced offer that meets all evaluation criteria, which include design data submittal, pricing proposal, and tax exemption documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3. Submittal Register (SMYU 26-1029).pdf | ||
| 1. Statement of Work (SMYU 26-1029).pdf | ||
| 2. Drawings (SMYU 26-1029).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section A - Solicitation/Contract Form
SMYU 26-1029 REPLACE RADIO ANTENNA PLATFORM HILL 180 OSAN AB, ROK
Product Service Code: Z1AZ
W90VN625RA017
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
SMYU 26-1029 REPLACE RADIO ANTENNA
PLATFORM HILL 180
Product Service Code: Z1AZ Pricing Arrangement: Firm Fixed Price
1 Job
Section C - Description/Specifications/Statement of Work
See attachment - 1. Statement of Work (SMYU 26-1029)
Requirements
SMYU 26-1029, REPLACE RADIO ANTENNA PLATFORM HILL 180
Magnitude of Project value: Between $250,000 and $500,000.
Section E - Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Inspection and Acceptance will conduct on destination
DoDAAC: F3J3CE CountryCode: USA
51 CES
AF BPN NO MILSBILLS PROCESSES, UNIT 2129 BLDG 449 OSAN AB
APO, AP 96278-2129
UNITED STATES
Choe, Hangsok Email: hangsok.choe.kr@us.af.mil Telephone: 784-5706
Section F - Deliveries or Performance
Overall Contract Delivery Period
From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
From date of lead time event to completion of performance 120 Calendar Days Date of Notice to Proceed Receipt
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to completion of performance 120 Calendar Days Date of Notice to Proceed Receipt
1 Job Service Performance Site DoDAAC: F3J3CE CountryCode: USA
51 CES
AF BPN NO MILSBILLS PROCESSES, UNIT 2129
BLDG 449 OSAN AB
APO, AP 96278-2129
UNITED STATES
Choe, Hangsok Email: hangsok.choe.kr@us.af.mil Telephone: 784-5706
Section G - Contract Administration Data
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
See attachment - 3. Submittal Register (SMYU 26-1029)
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.204-27 Prohibition on a ByteDance Covered Application. Jun 2023 52.222-50 Combating Trafficking in Persons. Nov 2021
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.225-7993 Prohibition on Providing Funds to the Enemy. (DEVIATION 2024-O0003) Dec 2023 Deviation 2024-O0003 Dec 2023
FAR Clauses Incorporated by Full Text
52.211-10 Commencement, Prosecution, and Completion of Work. (Apr 1984)
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor receives the notice to 10 proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than calendar days.* The time stated for 120 completion shall include final cleanup of the premises.
(End of clause)
52.236-1 Performance of Work by the Contractor. (Apr 1984)
Performance of Work by the Contractor (Apr 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least percent of the total amount of work to be 50 performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of clause)
DFARS Clauses Incorporated by Full Text
252.225-7043 Antiterrorism/Force Protection for Defense Contractors Outside the United States. (Jun 2015)
ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS OUTSIDE THE UNITED STATES (JUN 2015)
(a) . " United States ," as used in this clause, means, the 50 States, the District of Columbia , and outlying areas. Definition
(b) Except as provided in paragraph (c) of this clause, the Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall-
(1) Affiliate with the Overseas Security Advisory Council, if the Contractor or subcontractor is a U.S. entity;
(2) Ensure that Contractor and subcontractor personnel who are U.S. nationals and are in-country on a non-transitory basis, register with the U.S. Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality;
(3) Provide, to Contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States; and
(4) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel.
(c) The requirements of this clause do not apply to any subcontractor that is -
(1) A foreign government;
(2) A representative of a foreign government; or
(3) A foreign corporation wholly owned by a foreign government.
(d) Information and guidance pertaining to DoD antiterrorism/force protection can be obtained from (DAMO-ODC) ODCSOP, Telephone DSN;
225-8491 or Commercial; (703) 695-8491 for Army.
(End of clause)
Section J - List of Attachments
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
1. Statement of Work (SMYU 26- 1029)
Statement of Work 01 Jun
Attachment No
2. Drawings
(SMYU 26-1029)
Drawings 01 Jun
Attachment No
3. Submittal Register (SMYU 26-1029)
Supporting Technical Documentation 01 Jun
Attachment No
Section K - Representations, Certification, & Other Statements
ATTACHMENT: CONTRACTOR'S TAX EXEMPTIONDECLARATION
(1) References:
(i) Contract clause, "FAR 52.229-06 Taxes--Foreign Fixed-Price Contracts (Jan 1991)."
(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.
(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.
(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July1977), as amended.
(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July1977), as amended.
(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.
(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
This item will be imported specifically for this contract? Yes _________ No ________
(ii) Special Excise Tax:
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
Name of item manufacturer
(iii) Value Added Tax (VAT):
Input VAT on materials purchased for this contract. _________
Input VAT on transportation leased/rented for this contract. _________
Input VAT on equipment leased/rented for this contract. _________
Input VAT on services purchased for this contract. _________
Output VAT on total contract amount. _________
(iv) Special Excise (Petroleum) Tax:
No. of Unit Price Total Tax
Liters w/o Tax Tax/Unit Amount
Regular Gasoline __________(L) _________ ________ _________
Premium Gasoline __________(L) _________ ________ _________
Diesel __________ (L) _________ ________ _________
Other __________ (L) _________ ________ _________
(3) Name of Oil Company Refinery from which POL products will be purchased:
Oil Company: _________________________________________ (Name only)
(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except for ROK MND-funded contracts and delivery orders), and Special Excise Tax.
Contractor's Signature
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
52.236-27 SITE VISIT(CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- Date & Time: 1100 Hours, 11 JUN 2025 (Wednesday)
(c) Participants will meet at--
Place: Bldg #1039 at Osan AB.
(d) Escort: Any Contractor who needs escort shall bring Korea identification card, passport or driver license
- Escort POC: Mr. Choe, HangSok/ 784-5706/ 0505-784-5706 (Email Address: hangsok.choe.kr@us.af.mil)
(e) NOTE: Any offeror(s) who are interested in participation of the site visit shall be provide a list of attendant's information (Company Name and Name(s)of attendees) to the POC via email No Later Than 10 Jun 2025 (Monday) by 11:00 am for the installation access process. A maximum of two (2)individuals per offeror will be allowed to attend the briefing at Building #1039, Osan AB.
INSTRUCTION TO OFFEROR
1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL
a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).
b. Offeror(s)may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.
2. SUBMISSION REQUIREMENTS
a. TECHNICAL PROPOSAL: Offeror's Design Data Submittal shall have the drawing(s) which meet" Minimum Requirement for Work Plan", design data, and other documents indicating offeror's ability to satisfactorily accomplish the Government design intent and achieves the desired quality end- products. As part of the Design Data Submittal, offeror shall provide drawings and data analysis in accordance with Work Plan SOW.
b. PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices.
c. DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work.
d. SECTION K - Representations, Certifications and Other Statements of Offerors
e. SECTION K-TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.
f. SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.
g. COMPLIANCEWITH SOLICITATION: Failure to submit the above requirements under SECTION L maybe grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's proposal will be ineligible for award.
Non-compliance will only be cured if the government holds discussions as detailed in SECTION L.
3. SUBMISSION OF PROPOSAL
a. Procurement Integrated Enterprise Environment(PIEE) Solicitation Module
The offeror shall submit its proposal/offer/bid electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module prior to the due date and time identified on the first page of this solicitation. Instructions for submissions in PIEE can be found under Solicitation- Web Based Training at https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml.This is the only acceptable means of submission. Failure to submit through the PIEE Solicitation Module will render the submission late, non-responsive and ineligible for award.
The offeror has the responsibility to monitor the PIEE Solicitation Module for any updates and amendments. To ensure that notifications of amendments are received, the offeror must select the option box "Please notify me of amendments to this solicitation" at the top of the subject solicitation page after logging into the PIEE Solicitation Module and viewing the solicitation.
If the PIEE system is not operational, experiences technical difficulties, or is otherwise inaccessible or unusable, the Contractor shall immediately notify the Contracting Officer for further instructions. This notification must occur prior to the solicitation response due date and shall be in writing via email.
b. The offeror shall email offer for each project to the contract specialist, SSG KIM, Jeong-Tae at jeong-tae.kim.mil@army.mil by the Korea local closing time and date which can be found in and Mr. Hwang, Pyong Ha at payongha.hwang.ln@army.mil
Block 13 on page1 of this solicitation. After submission of the offer, the offeror shall send an additional email shall to the contract specialist to verify if offer is received. It is the offeror responsibility to verify receipt of offer from contract specialist before the Korea local closing time and date. All questions should be emailed to jeong-tae.kim.mil@army.mil within seven (7) calendar days after the solicitation is issued.
c. CLOSING DATE: The electronic offer shall be submitted by 1300 hours on the closing date of RFP.
Section M - Evaluation Factors for Award
Electronic offers submitted by 1300 hours on the closing date of RFP shall be considered timely.
1. EVALUATION CRITERIA
a. Offeror's Design Data Submittal shall be evaluated to determine whether an offeror's proposal demonstrates a clear and adequate understanding of the work to be performed under the contract and to identify any performance risks associated with an offeror's proposal.
Design Data Submittal shall have the drawing(s) which meet "Minimum Requirement for Work Plan", design data, and other documents indicating offeror's ability to satisfactorily accomplish the Government design intent and achieves the desired quality end-products. As part of the Design Data Submittal, Offeror shall provide drawings and data analysis in accordance with Work Plan SOW.
b. The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.
c. The detailed offer breakdown will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A detailed offer breakdown may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.
d. SECTION K - Representations, Certifications and Other Statements of Offerors
e. SECTION K-TAXES will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.
f. SECTION K-OTHER will be evaluated to determine whether it is complete. A complete SECTION K-OTHER will be deemed acceptable.
2. BASIS FOR AWARD : Award shall be made to the responsible offeror submitting the lowest price doffer that is evaluated as acceptable for all evaluation criteria.
| topmostSubform[0]: |
| Page1[0]: |
| SolicitationNo[0]: W90VN625RA017 |
| ContractNo[0]: |
| IssuedBy[0]: 0906 AQ CO CONTRACTING BAT |
KO DIRECTORATE OF CONTRACTING, UNIT 15273
APO, AP 96202-0000
UNITED STATES
JEONG-TAE KIM, EMAIL: JEONG-TAE.KIM.MIL@ARMY.MIL TELEPHONE: 315-757-6003
WorkDescribed[0]: PROJECT TITLE: SMYU 26-1029 REPLACE RADIO ANTENNA PLATFORM HILL 180
PROJECT LOCATION: OSAN AB, ROK
REPLACE RADIO ANTENNA PLATFORM HILL 180 OSAN AB, SEE SOW AND DRAWINGS IN DETAILS.
1. THIS IS A REQUEST OF PROPOSAL (RFP) ISSUED TO EXISTING MATOC WORK PLAN CONTRACTORS ONLY OF AREA III, OSAN AND SUWON AB AS FOLLOWS: W91QVN-24-D-0023, -0024, -0025, -0026, -0027, -0028, -0030, -0031, -0033, -0035, -0036, -0038, -0080, -0083 & -0109.
2. SITE VISIT: OFFERORS WHO INTEND TO PROPOSE ON THIS SOLICITATION ARE STRONGLY ENCOURAGED TO ATTEND THE SITE VISIT. SEE SITE VISIT CLAUSE IN SECTION L FOR THE SCHEDULE.
3. SUBMISSION OF PROPOSAL
(1) PROPOSALS PACKET: IT SHALL BE SUBMITTED BY 1300 HOURS ON THE CLOSING DATE OF RFP VIA EMAIL.
(2) PRICING AND TECHNICAL PROPOSAL
A. PRICING PROPOSAL
B. COST BREAKDOWN
C. DESIGN DATA
D. COMPLETION OF SECTION K (CONTRACTOR'S TAX EXEMPTION DECLARATION)
4. IF THE CONTRACTOR IS UNABLE TO SUBMIT THE PROPOSAL IN RESPONSE TO THE RFP, THE CONTRACTOR SHALL SUBMIT A "NO OFFER LETTER" BY THE DATE AND TIME SPECIFIED IN THIS SOLICITATION.
| AddressOfferTo[0]: |
| PurchaseRequestNo[0]: |
| Code[0]: W90VN6 |
| Name9a[0]: JEONG-TAE KIM |
| PhoneNo[0]: 315-757-6003 |
| ProjectNo[0]: SMYU 26-1029 |
| Page[0]: 1 |
| Pages[0]: 18 |
| Sealed[0]: Off |
| Negotiated[0]: 1 |
| DateIssued[0]: 01 JUN 2025 |
| DateDue[0]: 07 JUL 2025 |
| Award[0]: Off |
| Yes[0]: Off |
| Is[0]: Off |
| IsNot[0]: 1 |
| No[0]: 1 |
| Proceed[0]: 1 |
| Mandatory[0]: 1 |
| Negotiable[0]: Off |
| CalendarDaysStart[0]: 10 |
| NumberofCopies[0]: |
| LessCalendarDays[0]: 120 |
| Hour[0]: 01:00 PM |
| By[0]: |
| CalendarDaysComplete[0]: 120 |
| CalendarDays[0]: |
| See[0]: FAR 52.211-10 |
| Page2[0]: |
| NameofOfferor[0]: |
| TelephoneNo\: |
| [0]: |
| CodeField[0]: |
| AmendmentNo1[0]: |
| NameandTitle[0]: |
| AccountingData[0]: |
| NameTitleSign[0]: |
| Item[0]: |
| USC10[0]: |
| USC41[0]: |
| AdministeredByCode[0]: |
| Copies28[0]: |
| AdministeredBy[0]: |
| PaymentMadeBy[0]: |
| ItemsAccepted[0]: |
| AmendmentDate2[0]: |
| AmendmentNo2[0]: |
| AmendmentDate3[0]: |
| AmendmentNo4[0]: |
| AmendmentDate5[0]: |
| AmendmentNo5[0]: |
| AmendmentDate6[0]: |
| AmendmentNo6[0]: |
| AmendmentDate7[0]: |
| AmendmentNo7[0]: |
| AmendmentDate8[0]: |
| AmendmentNo8[0]: |
| AmendmentDate9[0]: |
| AmendmentNo9[0]: |
| AmendmentDate10[0]: |
| OfferDate[0]: |
| Date30c[0]: |
| NameContractingOfficer[0]: |
| Date31c[0]: |
| AmendmentNo10[0]: |
| AmendmentDate4[0]: |
| AmendmentNo3[0]: |
| CalendarDays2[0]: |
| FacilityCode[0]: |
| RemittanceAddress[0]: |
| Amounts[0]: |
| AmendmentDate1[0]: |
| Amount[0]: |
| CheckBox1[0]: Off |
| CheckBox28[0]: Off |
| CheckBox29[0]: Off |
| CheckBox2[0]: Off |
File details come from the government source that posted it. Updated .