This is a Request for Quote (RFQ) W50S8J25QA018 for a Storm Pipe Repair project at the 109th Airlift Wing/Stratton Air National Guard Base in Scotia, NY. The solicitation is a 100% small business set-aside with a total small business size standard of $45.0 million. The base contract involves storm pipe replacement and manhole repairs, with an optional line item for island removal. The contract is a firm fixed-price construction contract with a 14-day mobilization period and 90-day total performance period.

Key details include a site visit scheduled for August 22, 2025 at 2:00 PM, with quotes due via email by August 28, 2025 at 10:00 AM. The government will evaluate quotes using Simplified Acquisition Procedures, considering price and non-price factors such as past performance and performance schedule. Construction wage rates are set by General Decision Number NY20250002, with a minimum wage of $17.75 per hour. The project will be funded through the National Guard, with funds anticipated to become available prior to contract award. A payment bond is required, but a performance bond is not.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Section A - Solicitation/Contract Form

VBDZ252107 Storm Pipe Repair

W50S8J25QA018

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Base: Storm pipe replacement and manhole repairs. The contractor shall provide all materials, labor, supervision and expertise necessary for the storm pipe replacement and manhole repairs in accordance with the attached statement of work

(SOW).

Product Service Code: Z1NZ Signal Code: A Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Option: Island Removal. The contractor shall provide all materials, labor, supervision and expertise necessary for the island removal in accordance with the attached statement of work (SOW).

Product Service Code: Z1NZ Signal Code: A Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

Requirements Storm pipe replacement and manhole cover repairs.

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-12 Inspection of Construction. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: Inspections may be conducted throughout the project and acceptance shall take place upon completion of all work.

DoDAAC: F9S3S3 CountryCode: USA

CE

AF BPN NO MILSBILLS PROCESSES, 1 AIR NATIONAL GUARD RD

STRATTON ANGB, NY 12302-9752

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: Inspections may be conducted throughout the project and acceptance shall take place upon completion of all work.

DoDAAC: F9S3S3 CountryCode: USA

CE

AF BPN NO MILSBILLS PROCESSES, 1 AIR NATIONAL GUARD RD

STRATTON ANGB, NY 12302-9752

UNITED STATES

Section F - Deliveries or Performance

Overall Contract Delivery Period

From date of lead time event to completion of performance 90 Calendar Days Date of Notice to Proceed Receipt

From date of lead time event to beginning of performance 14 Calendar Days Date of Notice to Proceed Receipt

Line Item Delivery Schedule Quantity Address and POC

Delivery Schedule From date of lead time event to completion of performance 90 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F9S3S3 CountryCode: USA

CE

AF BPN NO MILSBILLS PROCESSES, 1 AIR

NATIONAL GUARD RD

STRATTON ANGB, NY 12302-9752

UNITED STATES

Option Line Item

Delivery Schedule From date of lead time event to completion of performance 90 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F9S3S3 CountryCode: USA

CE

AF BPN NO MILSBILLS PROCESSES, 1 AIR

NATIONAL GUARD RD

STRATTON ANGB, NY 12302-9752

UNITED STATES

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.247-34 F.o.b. Destination. Jan 1991

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

N/A

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Construction and Facilities Management Invoice

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC W50S8J Admin DoDAAC W50S8J Inspect By DoDAAC N/A Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) F9S3S3 Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

N/A

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

"General Decision Number: NY20250002 08/08/2025

Superseded General Decision Number: NY20240002

State: New York

Construction Types: Building, Heavy and Highway

Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington

Counties in New York.

BUILDING CONSTRUCTION PROJECTS (For all counties except

COLUMBIA, FULTON, GREENE & MONTGOMERY) (does not include single family homes and apartments up to a including 4 stories), HEAVY

AND HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 |

|into on or after January 30, | generally applies to the |

|2022, or the contract is | contract. |

|renewed or extended (e.g., an |. The contractor must pay |

|option is exercised) on or | all covered workers at |

|after January 30, 2022: | least $17.75 per hour (or |

| | the applicable wage rate |

| | listed on this wage |

| | determination, if it is |

| | higher) for all hours |

| | spent performing on the |

| | contract in 2025. |

|If the contract was awarded on|. Executive Order 13658 |

|or between January 1, 2015 and| generally applies to the |

|January 29, 2022, and the | contract. |

|contract is not renewed or |. The contractor must pay all|

|extended on or after January | covered workers at least |

|30, 2022: | $13.30 per hour (or the |

| | applicable wage rate listed|

| | on this wage determination,|

| | if it is higher) for all |

| | hours spent performing on |

| | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the

Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2025

1 02/07/2025

2 02/28/2025

3 03/07/2025

4 03/14/2025

5 05/16/2025

6 05/23/2025

7 06/06/2025

8 06/13/2025

9 06/20/2025

10 07/04/2025

11 07/25/2025

12 08/08/2025

ASBE0040-002 05/01/2025

Rates Fringes

Asbestos/Insulator Worker

SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 41.74 27.58

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation wetting;

stripping; removal;

scrapping; vacuuming;

bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 41.74 27.58

BOIL0197-002 01/01/2025

Rates Fringes

BOILERMAKER......................$ 43.34 27.66

BRNY0002-019 07/01/2024

Rates Fringes

BRICKLAYER

BRICKLAYERS, STONE MASONS,

CEMENT MASONS, PLASTERERS,

POINTERS, CAULKERS &

CLEANERS....................$ 36.19 20.48

HEAVY & HIGHWAY

CONSTRUCTION

CEMENT MASONS..............$ 37.23 19.51

MARBLE, TILE & TERRAZZO

FINISHERS...................$ 29.38 19.16

MARBLE, TILE & TERRAZZO

WORKERS.....................$ 34.66 19.58

CARP0279-006 07/01/2025

Rates Fringes

Carpenters:

HEAVY AND HIGHWAY

CONSTRUCTION (COLUMBIA AND

GREENE COUNTIES)

Carpenters, Millwrights, Pile Drivers...............$ 44.72 31.23

CARP0291-005 07/01/2025

Rates Fringes

Carpenters:

SARATOGA COUNTY

BUILDING....................$ 36.38 24.65

WASHINGTON COUNTY

BUILDING....................$ 36.38 24.65

PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.

CARP0291-008 07/01/2025

ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND

SCHOHARIE COUNTIES

Rates Fringes

Carpenters:

BUILDING CONSTRUCTION

(Excluding Montgomery

County)

Carpenters & Soft Floor

Layers.....................$ 36.38 24.65

Piledriver.................$ 31.68 20.60

HEAVY & HIGHWAY

CONSTRUCTION

Carpenters.................$ 44.28 24.50

CARP0291-010 07/01/2024

Rates Fringes

Carpenters:

CARPENTERS..................$ 44.28 24.50

DIVER TENDERS...............$ 34.02 21.10

DIVERS (Dry Day)............$ 45.28 24.50

DIVERS......................$ 69.28 24.50

PILEDRIVERS.................$ 33.02 21.10

ELEC0236-001 06/01/2024

ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);

MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;

WASHINGTON

Rates Fringes

ELECTRICIAN......................$ 48.00 32.09

ELEC0363-004 04/01/2024

GREENE COUNTY (Portion of)

Rates Fringes

ELECTRICIAN......................$ 46.50 3%+39.17+a

FOOTNOTE:

a. Paid Holidays: New Year's Day, President's Day, Memorial

Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day

ELEC1249-003 05/05/2025

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal

Systems, Traffic Monitoring systems and Road Weather information systems)

Flagman.....................$ 31.72 7%+27.65

Groundman (Truck Driver)....$ 42.29 7%+27.70

Groundman Truck Driver

(tractor trailer unit)......$ 47.57 7%+27.70

Lineman & Technician........$ 52.86 7%+31.90

Mechanic....................$ 42.29 7%+27.70

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/05/2025

Rates Fringes

ELECTRICIAN (Line

Construction)

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 35.34 7%+27.65

Groundman digging machine operator...................$ 55.40 7%+27.90

Groundman truck driver

(tractor trailer unit).....$ 49.25 7%+27.70

Groundman Truck driver.....$ 49.25 7%+27.70

Lineman and Technician.....$ 61.56 7%+31.90

Mechanic...................$ 49.25 7%+27.70

Substation:

Cable Splicer..............$ 63.14 7%+29.40

Flagman....................$ 35.34 7%+27.65

Ground man truck driver....$ 49.25 7%+27.70

Groundman digging machine operator...................$ 55.40 7%+27.90

Groundman truck driver

(tractor trailer unit).....$ 49.25 7%+27.70

Lineman & Technician.......$ 61.56 7%+31.90

Mechanic...................$ 49.25 7%+27.70

Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation

Cable Splicer..............$ 64.59 7%+38.40

Flagman....................$ 35.34 7%+27.65

Groundman Digging Machine

Operator...................$ 55.40 7%+27.90

Groundman Truck Driver

(tractor-trailer unit).....$ 49.25 7%+27.70

Groundman Truck Driver.....$ 49.25 7%+27.70

Lineman & Technician.......$ 61.56 7%+31.90

Mechanic...................$ 49.25 7%+27.70

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial

Day, Good Friday, Independence Day, Labor Day, Thanksgiving

Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New

York State, provided the employee works two days before or two days after the holiday.

ELEC1249-007 05/05/2025

COLUMBIA COUNTY

Rates Fringes

ELECTRICIAN (LIGHTING AND

TRAFFIC SIGNAL INCLUDING ANY

AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC

SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD

WEATHER INFORMATION SYSTEMS)

Flagman.....................$ 32.51 7%+27.65

Groundman Digging Machine

Operator....................$ 48.77 7%+27.90

Groundman Truck Driver

(Tractor-trailer unit)......$ 43.53 7%+27.70

Groundman Truck Driver......$ 49.25 7%+27.70

Lineman and Technician......$ 54.19 7%+31.90

Mechanic....................$ 43.35 7%+27.70

PAID HOLIDAYS:

a. Memorial Day, New Year's Day, President's Day, Good

Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the

President of the United States and Election Day for the

Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/01/2025

Rates Fringes

ELECTRICIAN (Line

Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 40.81 3%+5.77

Groundman..................$ 20.53 3%+5.77

Installer Repairman-

Teledata

Lineman/Technician-

Equipment Operator.........$ 38.73 3%+5.77

Tree Trimmer................$ 31.45 3%+10.48

a. New Year's Day, President's Day, Good Friday, Decoration

Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0035-001 01/01/2025

ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of

Durham, Greenville, New Baltimore, Coxcsackie and Athens);

MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND

WASHINGTON COUNTIES

Rates Fringes

Elevator Constructor.............$ 57.73 38.435+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ELEV0138-004 01/01/2025

COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,

GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY

(THE TOWNS OF HUNTER AND CATSKILL)

Rates Fringes

ELEVATOR MECHANIC................$ 73.07 38.435+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0158-008 07/01/2025

BUILDING

EXCLUDING MONTGOMERY COUNTY

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP A(1)..................$ 55.42 33.20

GROUP A.....................$ 54.93 33.20

1..........................$ 49.06 30.74

2..........................$ 50.06 30.74

GROUP B.....................$ 53.91 33.20

GROUP C.....................$ 51.01 33.20

Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.

FOOTNOTE:

a. Paid Holidays: New Years Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING):

GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)

GROUP A(1): Crane Premiums:

1 over 150'- $1.00

2 over 200'- $2.00

GROUP A: Shovel, All Excavators (including rubber tire full swing), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under), maintenance engineer, self contained crawler, drill-hydraulic rock drill.

GROUP B: Backhoe, (rubber-tired backhoe/loader combination), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model CHB

Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller

GROUP C: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4"" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack

(belcrete system), seeding, and mulching machines, pumps

ENGI0158-026 07/01/2024

HEAVY & HIGHWAY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 54.90 32.45

GROUP 2.....................$ 53.99 32.45

GROUP 3.....................$ 51.42 32.45

GROUP 4.....................$ 60.90 32.45

GROUP 5.....................$ 59.40 32.45

GROUP 6.....................$ 57.90 32.45

GROUP 7.....................$ 57.01 32.45

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY):

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine

Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop

Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb

Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual

Drum Paver, Excavator (All Purpose Hydraulically Operated)

(Gradall or Similar), Front End Loader ( 4 cu. yd. and

Over), Head Tower (Sauerman or Equal), Hoist (Two or Three

Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump

(jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or

Trailer Mounted Log , Chipper (Self Feeder), Tug Operator

(Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber

Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary

Drill (Truck or Tractor Mounted), Boring Machine, Cage

Hoist, Central Mix Plant (NonAutomated) and All Concrete

Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication

Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One

Drum), Hydro-Axe, Kolman Plant Loader and Similar Type

Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant

Engineer, Profiler (105 H.P. and under), Grinder, Post Hole

Digger and Post Driver, Power Broom (towed), Power

Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam

Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant

Refrigeration Equipment (for soil stabilization)Road

Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type

Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy

Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Fork Lift, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw

(self-propelled), Conveyor, Deck Hand, Directional Drill

Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie

Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day

IRON0012-011 07/01/2024

ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY

(Amsterdam, Charleston, Florida, Glen, Mohawk and Root);

RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON

COUNTIES:

Rates Fringes

Ironworkers:

Sheeter, Bucker-up..........$ 38.75 25.48

Sheeter.....................$ 38.75 25.48

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone

Derrickmen..................$ 38.50 25.48

IRON0440-007 07/01/2025

FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);

MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.

Johnsville):

IRONWORKER

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone

Derrickman..................$ 35.50 31.39

LABO0017-001 07/01/2019

COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

Rates Fringes

LABORER

COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson)

(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY

GROUP 1:...................$ 38.90 27.15+a

GROUP 2:...................$ 43.15 27.15+a

GREENE COUNTY (Township of

Catskill) HEAVY & HIGHWAY:

GROUP 1:...................$ 34.15 27.15+a

GROUP 2:...................$ 38.90 27.15+a

GROUP 3:...................$ 43.15 27.15+a

GROUP 4:...................$ 48.00 27.15+a

TUNNEL, SHAFT & CAISSON

WORK

GROUP 1....................$ 48.05 29.50+a

For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY

(Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

HEAVY & HIGHWAY CLASSIFICATIONS

GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required

GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required

For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY

(Township of Catskill)

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial

Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas

Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.

GROUP 1: Flagperson, gateperson

GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.

Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.

Ground man on milling machine

GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman

GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman

For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial

Day, Independence Day, Labor Day, Election Day, Veterans

Day, Thanksgiving Day, Christmas Day

GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and

Powderman;

Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air

LABO0035-001 07/01/2017

FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND

ST. JOHNSVILLE)

Rates Fringes

Laborers Building Construction

Asbestos Removal............$ 24.00 20.64+a

Blasters, Form Setters, MotorBuggy Operator (Rider

Type)......................$ 23.00 20.64+a

Hazardous Waste Removal

Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 24.00 20.64+a

HEAVY & HIGHWAY:

GROUP 1:...................$ 28.05 23.74+a

GROUP 2:...................$ 28.25 23.74+a

GROUP 3:...................$ 28.45 23.74+a

GROUP 4:...................$ 28.65 23.74+a

Laborers....................$ 22.50 20.64+a

Pipelayers, Motor Mixers, Motor Buggy Operator

(Walk Behind) Power Lift

(Walk Behind)...............$ 22.65 20.64+a

Wagon Drill Operator........$ 22.90 20.64+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day and Christmas Day.

GROUP 1: Common Laborers, Flagman, Outboard and Hand boats

GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw

Operator on asphalt paver, Water pump operator (1 1/2"" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman

GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters

LABO0157-001 07/01/2023

FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton

Park); SCHENECTADY and SCHOHARIE COUNTIES.

Rates Fringes

LABORER

BUILDING:

GROUP 1....................$ 28.74 20.14+a

GROUP 2....................$ 30.09 20.14+a

HEAVY & HIGHWAY:

GROUP 1:...................$ 39.19 26.75

GROUP 2:...................$ 39.39 26.75

GROUP 3:...................$ 39.59 26.75

GROUP 4:...................$ 39.79 26.75

GROUP 5:...................$ 41.69 26.75

LABORER CLASSIFICATIONS

Group 1: Common Laborers

Group 2: Asbestos and Toxic Materials

Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day

LABORER CLASSIFICATIONS

GROUP 1: Common laborers, flagman, outboard & hand boats

GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2"") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking laborers

GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb setters

GROUP 5: Hazardous waste removal

LABO0190-001 07/01/2024

ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA

COUNTY (Townships of Stillwater, Halfmoon, Saratoga)

Rates Fringes

Laborers:

BUILDING:

GROUP 1....................$ 36.16 26.68

GROUP 2....................$ 37.51 26.68

LABORERS CLASSIFICATIONS

GROUP 1: Common Laborers

GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at

$100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply

LABO0190-002 07/01/2024

ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).

GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO

COUNTY (Townships of Stillwater, Halfmoon Saratoga)

Rates Fringes

Laborers:

HEAVY & HIGHWAY:

GROUP 1:...................$ 41.69 27.65

GROUP 2:...................$ 41.89 27.65

GROUP 3:...................$ 42.09 27.65

GROUP 4:...................$ 42.29 27.65

GROUP 5:...................$ 44.19 27.65

FOOTNOTE:

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

LABORERS CLASSIFICATIONS

GROUP 1: Common laborers, flagmen, outboard and hand boats

GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2"" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking laborers

GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb setters

GROUP 5: Hazardous waste removal

LABO0235-006 05/01/2023

COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):

Rates Fringes

Laborers:

HEAVY & HIGHWAY

GROUP 1....................$ 36.45 27.80+a

GROUP 2....................$ 42.80 27.80+a

GROUP 3....................$ 43.90 27.80+a

LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;

tool rooms

GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;

Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;

wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2"" or under; Nipper; Chucker;

Asphalt Workers

GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);

Laser Beam Operator; Form Setter/Aligners; Blasters

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and

Christmas Day

PAIN0009-013 05/01/2025

Rates Fringes

GLAZIER..........................$ 37.25 33.54

PAIN0155-002 05/01/2021

COLUMBIA AND GREENE COUNTIES

Rates Fringes

Painters:

Drywall Finisher............$ 35.94 24.66

Lead Abatement Work.........$ 35.94 24.66

Painter/Paperhanger.........$ 35.94 24.66

Spray Rate..................$ 36.94 24.66

PAIN0201-001 05/01/2025

Rates Fringes

Painters:

Lead Abatement Workers, Structural Steel

Zone 1.....................$ 34.50 21.69

Zone 2.....................$ 34.50 21.69

Painters, Drywall

Finishers, Spray

Zone 1.....................$ 33.50 21.69

Zone 2.....................$ 33.50 21.69

Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

ZONE #2 All of WASHINGTON County

PAIN0806-002 10/01/2024

ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,

SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON

Rates Fringes

Painters:

Structural Steel and Bridge.$ 56.25 55.14

PLUM0007-001 05/01/2025

ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;

SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway, Halfmoon, Milton, Stillwater and Waterford)

Rates Fringes

PLUMBER/PIPEFITTER...............$ 55.26 29.12

PLUM0112-019 05/01/2023

Townships of Canajoharie and Minden

Rates Fringes

PLUMBER (Including

Steamfitting)

Northern Zone...............$ 31.40 31.70

PLUM0773-002 05/01/2025

SARATOGA (Remainder of County); WASHINGTON COUNTY:

Rates Fringes

PLUMBER/PIPEFITTER...............$ 44.88 33.60

ROOF0203-003 06/01/2023

SCHOHARIE COUNTY:

Rates Fringes

ROOFER...........................$ 30.50 19.84

ROOF0241-001 06/01/2024

Rates Fringes

ROOFER...........................$ 37.05 23.52

SFNY0669-001 04/01/2025

Rates Fringes

SPRINKLER FITTER.................$ 45.06 29.41

SHEE0083-001 06/01/2019

Rates Fringes

Sheet metal worker...............$ 33.73 33.04+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day. If any of these holidays fall on a Saturday or Sunday, either the preceding Friday or following Monday will be observed as the holiday.

TEAM0294-003 07/01/2024

Truck drivers:

HEAVY & HIGHWAY

GROUP 1....................$ 39.20 30.52+a

GROUP 2....................$ 39.26 30.52+a

GROUP 3....................$ 39.35 30.52+a

GROUP 4....................$ 39.48 30.52+a

GROUP 5....................$ 39.64 30.52+a

TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Pick-ups, panel trucks, flatboy material trucks

(straight jobs), single axle dump trucks, dumpsters, receivers, greasers, truck tireman

GROUP 2: Tandems, batch trucks, mechanics

GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck

GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded, straddle (ross) carrier, self-contained concrete unit

GROUP 5: Off-highway tandem back dump, twin engine equipment and double hitched equipment where not self-loaded

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday.

* TEAM0294-004 07/01/2025

BUILDING CONSTRUCTION

EXCLUDING MONTGOMERY COUNTY

Rates Fringes

Truck drivers:

GROUP 1.....................$ 33.65 30.79+a

GROUP 2.....................$ 33.95 30.79+a

FOOTNOTES:

a. One week vacation after 1 year; 2 weeks vacation after 5 years.

TRUCK DRIVERS BUILDING CLASSIFICATIONS

GROUP 1: Straight, winch, transit mix on job site, road oilers, dump, panel, pick-up, water and fuel trucks on site

(including nozzle)

GROUP 2: Euclid or similar equipment, lowboy or lowboy trailers

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than

""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.