Solicitation - W50S7426QA025.pdf
PDF 6 MB Posted
- Attached to
- Erosion Control for building 2276
- Solicitation number
- W50S74-26-Q-A025
- Issued by
-
Department of the Army National Guard
About this file
This is a Standard Form 1442 Request for Quotations (RFQ) for erosion control construction services at Building 2276, March Air Reserve Base (March ARB), California. The solicitation number is W50S7426QA025, with a project number of PDPG262004, issued on 19 August 2026.
The contractor shall provide all materials, supplies, paint, equipment, tools, labor, personnel, transportation, supervision, and management necessary for erosion control work on a firm fixed-price basis. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The project magnitude ranges from $100,000 to $250,000, with NAICS code 238910 and a small business size standard of $19,000,000. The contract performance period runs from 30 September 2026 to 27 November 2026 (60 calendar days after notice to proceed). A mandatory site visit will be conducted on 3 September 2026 at 10:00 AM PST; contractors must register by 27 August 2026. Sealed bids are due by 11:00 AM local time on 11 September 2026, with a 90-calendar-day acceptance period required. A bid guarantee (SF24 bond) is mandatory and must be mailed to 163 MSG/MSC. Electronic submission is mandatory to david.moreno.34@us.af.mil and jeremy.hebb.2@us.af.mil. Performance and payment bonds are required, due within 10 calendar days of award. Wages are subject to Davis-Bacon requirements per the referenced wage determination. Funds are not presently available; no contract award will be made until appropriated funds are available.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Patrick.Ferguson Line
Patrick.Ferguson Line
Section 00 00 00 - Procurement and Contracting Requirements
CES Erosion ControlInstrument Name:
THIS SOLICITATION IS BEING PURSUED AS A SERVICE-DISABLED Contract Description:
VETERAN OWNED SMALL BUSINESS SET-ASIDE, FOR CONSTRUCTION SERVICES: Erosion Control OR THE 163 ATKW FOR THE CA ANG AT MARCH ARB. NAICS: 238910 PROJECT MAGNITUDE: $100,000.00 to $250,000.00 SITE VISIT WILL BE CONDUCTED ON 3 September
2026 AT 10:00 AM PST. YOU MUST SUBMIT THE VISTORS PASS REQUEST INORDER TO
ATTEND THE SITE VISIT NO LATER THAN 27 August 2026. NAICS CODE SMALL BUSINESS
SIZE STANDARD IS $19,000,000.00. BID GUARANTEE; FAILURE TO FURNISH A BID
GUARANTEE IN THE PROPER FORM AND AMOUNT, BY THE TIME SET FOR OPENING OF
QUOTES, MAY BE CAUSE FOR REJECTION OF THE QUOTE. FUNDS ARE NOT PRESENTLY
AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL
APPROPRIATED FUNDS ARE MADE AVAILABLE
Product Service Code : Y1PZ
W50S7426QA025
Section 00 01 10 - Table of Contents
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
SECTION 00 10 00 - BID SCHEDULE, NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO QUOTERS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 01 00 00 - GENERAL REQUIREMENTS
ATTACHMENT 1 - 08 STATEMENT OF WORK AND DRAWINGS
ATTACHMENT 2 - 08.1 Drawings
ATTACHMENT 3 - 08.2 INFO
SECTION 00 10 00 NOTES
1. Submission of physical bids or transmission of bids by facsimile is not authorized. Electronic submission of quotes is mandatory through email to the organization inbox
163MSG.MSC.Contracting_ORG@us.af.mil.
2. A complete quote package must contain the following:
(a) Volume 1: Standard Form (SF) 1442, Solicitation, Offer, and Award, front and back. Pursuant to Federal Acquisition Regulation 4.102, Contractor's Signature, blocks 20A, 20B, and 20C must be signed by an official having the authority to contractually bind the company. One copy of the SF1442 is required to have an original signature. The completion and submission of the above items of information will constitute your quote and written assent to perform in accordance with the terms of this RFQ.
(b) Reserved
(c) Section 00 10 00, Bid Schedule, all line items must be priced.
(d) A Bid Bond and Power of Attorney must be submitted with the bid and on the due date.
Pursuant to Department of Defense (DOD) Deviation 2020-O0016, electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. The bid bond must be on a SF24, Bid Bond. Rejection of a bid bond shall be handled in accordance with Federal Acquisition Regulation (FAR) 28.101-4, Noncompliance with Bid Guarantee Requirements. Original Bid Bond must be mailed to 163 MSG/MSC so the government can retain a physical copy.
(e) Section 00 45 00, Representations and Certifications, completed. Complete and return only additional certifications that are included in this section but are not included with the quoter's current/complete representations and certifications (within the past year) from the Entity Information module of the SAM website.
(f) Any/all amendments to the solicitation must be acknowledged either collectively using block 19 of the SF1442 (back side), or individually using a copy of each SF30, Amendment of Solicitation /Modification of Contract. See Section 00 21 00, paragraph 5.2, Amendments to the Solicitation.
3. Joint Venture Requirements.
(a) Quoters wishing to submit a quote as a Joint Venture (JV) must also submit (with the pro forma documents) a copy of the JV agreement that is executed in accordance with FAR 4.102(d).
Additionally, each JV partner shall submit evidence that its board of directors has approved its participation in the JV. For an unincorporated entity, submit an instrument of similarly binding character.
(b) JV quoters are reminded that the JV entity must be registered in the Entity Information module of the SAM website. For solicitations that are set-aside, the JV must also meet the applicable size standard. If the JV entity has received a size determination from the Small Business Administration (SBA), submit a copy of that determination with the quote.
(c) Pursuant to FAR 19.302(b), the Contracting Officer may protest the small business representation or representation of a JV entity where one (1) or more of the party/parties appears to not meet the set-aside standard. All questions regarding JVs must be directed to SBA.
(d) Pursuant to FAR 52.204-8(d), Annual Representations and Certifications, and 52.212-3(b), Representations and Certifications--Commercial Products and Commercial Services, small business JV entities must submit the appropriate representations at 52.212-3(c) and 52.219-1(c).
*** END OF NARRATIVE ***
*** END OF NARRATIVE ***
Identifier Document Name
Document Description
Reference Identifier
Date Line Item
Page Numbers
Document Type
Provided Under Separate Cover
0001 08 SOW - E
rosion Con trol 2276 -
PDPG2620
Statement of Work 14 Aug
Attachment No
0002 08.1 DWG -
Erosion C ontrol 227 6
- PDPG26
Drawings 14 Aug
Attachment No
0003 08.2 INFO -
Erosion Control 22
76 - PDPG2
62004
Information 05 May
Attachment No
0004 Wages 14 J uly 26.gov
Wage Determination
Jul
Attachment No
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
Additional Information/Notes
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0001 The contractor shall Provide all materials, supplies, paint, equipment, tools, labor, personnel, transportation, supervision, and management necessary for Erosion Control Building 2276, March ARB, IAW SOW dated 13 Mar 2026.
Product Service Code: Y1PZ
North American Industry Classification System (NAICS):
238910
Pricing Arrangement: Firm Fixed Price
1 Job
Section 00 21 00 - Instructions
SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Description of the Project: The contractor shall Provide all materials, supplies, paint, equipment, tools, labor, personnel, transportation, supervision, and management necessary for Erosion Control Building 2276, March ARB.
2. Instructions to Offerors.
2.1. You are invited to submit a quote in response to Request for Quotations (RFQ)
W50S74-26-Q-A025, "Erosion Control building 2276" (Project Number 262004).
2.2. As a result of this solicitation, the Government intends to award a firm-fixed-price (FFP) purchase order resulting from this solicitation to the responsible offeror whose quote, conforming to the RFQ, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for service-disabled veteran owned small businesses.
3. Notice of Pre-Award Conference and Site Visit.
3.1. A site visit will be conducted on 3 September 2026 at 1000 for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at Building 2276. Interested Contractors are encouraged to attend the Site Visit.
3.2. Due to security conditions, all offerors must register to attend this site visit. Email the attached MARB Contractors Base Pass Request information (in the format stated ) for all attendees to david.
moreno.34@us.af.mil.
3.3. This information must be provided in advance, not later than 27 August 2026, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate attendance. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
3.4. Visitors must pick up their passes at the March Visitors Center Main Entry Gate PRIOR to start of site Visit. You may be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver's License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
3.6. A record of the sign in sheet for the site visit will be made and furnished to all prospective offerors via posting to SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.4. Formal Communications and Explanations to Offerors.
4. Formal Communications and Explanations to Offerors.
4.1. Use of the System for Award Management.
4.1.1. The solicitation and any technical and/or engineering data for this solicitation will be distributed using the Contract Opportunities module of the SAM website. Technical /engineering data may locked/secured and require offerors to request explicit access to this solicitation from the contracting office. Offerors may also request the data via export-controlled access through the Defense Logistics Agency.
4.1.2. Requests to access locked/secure data through the contracting office will require the individual to have a registered account with the SAM website.
4.1.3. When requesting access to locked/secure data, you must provide your firm's name and either Unique Entity Identification (UEID) or Commercial and Government Entity (CAGE) code as part your request. This information is not provided automatically and failure to provide it will result in your request being denied.
4.1.4. Allow two business days for the contracting office to process your access to the locked /secured data.
4.1.5. Complete instructions (to include training) is available through the SAM website. The California National Guard is unable to provide technical assistance with the site.
4.2. Amendments to the Solicitation.
4.2.1. Any changes to the solicitation or contract documents (i.e., drawings, plans, specifications, statements of work, etc.) shall be issued to offerors as a formal amendment and disseminated through Contract Opportunities.
4.2.2. All offerors must acknowledge all amendments either collectively on the SF1442 (block 19, back side), or individually with each amendment's SF30, Amendment of Solicitation/Modification of Contract. All acknowledgements for all amendments must be received by the time set for receipt of quotes.
4.3. Pre-quote Inquiries.
4.3.1. Answers to pre-quote inquiries that clarify or provide interpretations of the solicitation or contract documents will be issued as an amendment and require acknowledgement. All amendments or responses to inquiries will be provided through the Contract Opportunities module.
4.3.2. All pre-quote inquiries pertaining must be submitted to the contracting office no later than 0930, 8 September 2026. This provides adequate time for the Government to answer the question and post its response to Contract Opportunities for the benefit of all offerors. Offerors are strongly encouraged to submit questions early in this process.
4.3.3. Do not contact the architect-engineer or technical personnel directly as this may delay the Government's response.
4.3.4. Please reference the solicitation number as part of the subject line (see block 1 of the SF1442) and include pertinent contact information with your inquiry to: .david.moreno.34@us.af.mil
5. Quote Submission.
5.1. Physical offers will not be accepted. All quotes (and supporting documentation) must be submitted electronically to the submission email address listed below prior to the time established in the solicitation. Please provide the information below with your quote.
5.1.1. Submission Email Address: david.moreno.34@us.af.mil and jeremy.hebb.2@us.af.mil
5.1.2. Subject Line: "Company Name
5.1.3. Company Name
5.1.4. Company Address
5.1.5. Company Phone Number
5.1.6. Company CAGE Code or UEI
- Quote W50S74-26-Q-A025"
6. Wage Determination. Construction Wage Rates are applicable to this project and are incorporated by reference. See the Wage Determination that is referenced in the Table of Contents. The current Wage Determination is also available from the SAM website.
7. Quote Preparation Expenses and Pre-Contract Costs. This RFQ does not commit the Government to pay costs incurred in preparation and submission of offers or for any other costs incurred prior to award of a formal contract.
8. Clauses and Provisions. Clauses and provisions from the RFO FAR, Defense FAR Supplement, and Army FAR Supplement are incorporated with this solicitation by reference and in full text.
Those incorporated by reference have the same force and effect as if they were given in full text.
9. Offerors Qualifications. To establish a offeror's responsibility, the Government may request the apparent low offerors to submit a statement regarding their experience in performing comparable work, business and technical organization, financial and bonding resources, and available plant /equipment to be used in performing the work. The contracting officer may also review other government systems of record (e.g. CPARS, FAPIIS, etc.).
10. This program is intended to encourage interested parties to seek resolution of their concerns with the NG as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and with the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing.
An agency protest may be filed with either the Contracting Officer or the NG Agency's Protest
Decision Authority, but not both, and in accordance with NG protest procedures.
10.1. To be timely, the protests must be filed within the periods specified at RFO FAR 33.104, Protests to the Agency. To file a protest under the NG Agency Protest Program, the protest must request resolution under that program and sent to:
National Guard Bureau
Office of the Director of Acquisitions/Head of Contracting Activity
ATTN: NGB-AQ-O
111 S. George Mason Dr.
Arlington, VA 22204
Emailing: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil
10.2. All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation. See contract clause 52.233-2, Service of Protest.
10.3. NG public-facing, general protest information is found at: https://www.nationalguard.mil /Leadership/Joint-Staff/Special-Staff/Director-of-Acquisitions/
End of Section 00 21 00
*** END OF NARRATIVE ***
FAR Provisions Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.204-7 System for Award Management- Registration. (Deviation 2026- O0038)
2026-02
52.212-1 Instructions to Offerors- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
DFARS Provisions Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.204-7024 Notice on the Use of the Supplier Performance Risk System.
2023-03
Section 00 45 00 - Representations and Certifications
FAR Provisions Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements- Representation.
2017-01
52.240-90 Security Prohibitions and Exclusions Representations and Certifications. (Deviation 2026- O0038)
DFARS Provisions Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7005 Representation Relating to Compensation of Former DoD Officials.
2022-09
252.204-7008 Compliance with Safeguarding Covered Defense Information Controls.
2016-10
252.225-7055 Representation Regarding Business Operations with the Maduro Regime.
2022-05
252.225-7059 Prohibition on Certain 2023-06
Procurements from the Xinjiang Uyghur Autonomous Region- Representation.
DFARS Provisions Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation.
2021-05
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS
EQUIPMENT OR SERVICES-REPRESENTATION (MAY 2021)
The Offeror is not required to complete the representation in this provision if the Offeror has represented in the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument."
(a) Definitions. "Covered defense telecommunications equipment or services," "covered mission," "critical technology," and "substantial or essential component," as used in this provision, have the meanings given in the 252.204-7018 clause, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services, of this solicitation.
(b) Prohibition. Section 1656 of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits agencies from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award
Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.
(d) Representation. If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does" provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument, then the Offeror shall complete the following additional representation:
The Offeror represents that it [ ] will [ ] will not provide covered defense telecommunications equipment or services as a part of its offered products or services to DoD in the performance of any award resulting from this solicitation.
(e) Disclosures. If the Offeror has represented in paragraph (d) of this provision that it "will provide covered defense telecommunications equipment or services," the Offeror shall provide the following information as part of the offer:
(1) A description of all covered defense telecommunications equipment and services offered (include brand or manufacturer; product, such as model number, original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable).
(2) An explanation of the proposed use of covered defense telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition referenced in paragraph (b) of this provision.
(3) For services, the entity providing the covered defense telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known).
(4) For equipment, the entity that produced or provided the covered defense telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).
(End of provision)
Section 00 70 00 - Conditions of the Contract
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.222-3 Convict Labor. (Deviation 2026- O0038)
Section 00 72 00 - General Conditions
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.219-27 Notice of Set-Aside for, or Sole- Source Award to, Service- Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program. (Deviation 2026-O0038)
2026-02
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-27 Prompt Payment for Construction Contracts.
2017-01
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.236-2 Differing Site Conditions.
(Deviation 2026-O0038)
2026-02
52.236-5 Material and Workmanship.
(Deviation 2026-O0038)
2026-02
52.236-7 Permits and Responsibilities.
(Deviation 2026-O0038)
2026-02
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-O0038)
2026-02
52.236-10 Operations and Storage Areas.
(Deviation 2026-O0038)
2026-02
52.236-12 Cleaning Up. (Deviation 2026- O0038)
2026-02
52.236-13 Accident Prevention. (Alternate I) 2026-02 Alternate I 1991-11
52.236-14 Availability and Use of Utility Services. (Deviation 2026-O0038)
2026-02
52.236-17 Layout of Work. (Deviation 2026- O0038)
2026-02
52.236-21 Specifications and Drawings for Construction. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative.
1991-12
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7048 Export-Controlled Items. 2013-06
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.232-7010 Levies on Contract Payments. 2006-12
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
252.247-7023 Transportation of Supplies by Sea.
2024-10
DFARS Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.236-7001 Contract Drawings and Specifications.
2000-08
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall-
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
(End of clause)
Section 00 73 00 - Supplementary Conditions
Overall Contract Inspection/Acceptance Locations
Overall Contract Delivery Period
0001 1 JobQuantity
Address and POC
Period of Performance From 30 Sep 2026 To 27 Nov 2026
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2in1"
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC W50S74
Admin DoDAAC W50S74 Inspect By DoDAAC F7S3E1 Ship To Code ____ Ship From Code ____ Mark For Code F7S3E1 Service Approver (DoDAAC) F7S3E1 Service Acceptor (DoDAAC) F7S3E1 Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section 01 00 00 - General Requirements
1. INSURANCE - MINIMUM AMOUNTS
1.1. Reference Contract Clause titled, "Insurance -Work on a Government Installation (FAR 52.228-5). Kinds and minimum amounts are as follows:
KIND AMOUNTS (FAR 28.307-2)
Workmen's
Compensation
$100,000 (see paragraph 1.2, below)
Workmen's
Compensation
$500,000 per occurrence for bodily injury
Comprehensive
Automobile
Liability
$200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage
(If applicable)
Aircraft Public and Passenger
Liability
200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability and $200,000 per occurrence for property damage;
coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats $200,000 multiplied by the number of seats or passengers, whichever is greater
1.2. Except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
1.3. NOTE: Before commencing work under this contract, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained. The policies referenced in the certification (s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor shall maintain a copy of proofs of required insurance, and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
2. ORDER OF PRECEDENCE (REFERENCE FAR 52.236-21)
Any inconsistency in this solicitation or contract will be resolved by giving precedence in the following order:
1) Representations and other instructions,
2) Contract clauses,
3) Other documents, to include special contract requirements Section 00800, exhibits, and attachments,
4) The specifications
5) The drawings
3. SCHEDULING
3.1. Normal base work hours for the Contractor will be between the hours of 7:00 AM through 4:30 PM, excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer's Representative (COR) five (5) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces. When the COR determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days.
However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.
3.2. The following Federal legal Holidays are observed by this base:
New Year's Day 1 January
Martin Luther King's Birthday Third Monday of January
President's Day Third Monday of February
Memorial Day Last Monday of May
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veteran's Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
3.3. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday;
holidays falling on a Sunday will be observed on the following Monday.
3.4. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the contractor must notify the Contracting Officer (or the Contracting Officer's Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer's Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings.
3.5. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.
4. INVOICING AND PAYMENT
4.1. Properly prepared invoices, bearing the contract number, shall be submitted in quadruplicate to the Contracting Office, (KO FOR CAANG 1560 GRAEBER ST SUITE 29 MARCH ARB, CA 92518-1715 United States) or 163msg.msc.contracting_org@us.af.mil , on designated invoice forms provided at the pre-construction meeting PRIOR to uploading in Wide Area Workflow (WAWF) the DFAS paying system. This submission will be for review prior to submitting an electronic invoice through Wide Area Workflow (WAWF). See end of this Section for important information and codes needed.). Payment will be made by in accordance with FAR Clause 52.232- 5 Fixed-Price Construction Contracts and FAR Clause 52.232-27, Prompt Payment for Construction Contracts, All payments will be made by electronic transfer of funds (EFT).
4.2. To meet compliance with DFARS 252.232-7003, Electronic Submission of Payment Requests, you shall submit your request for payment (invoice) through WAWF. For more information on the WAWF system, including how to register, visit https://wawf.eb.mil. Payment will be made by paying office specified in the contract award in accordance with the clauses Payments under Fixed-Price Construction Contracts, FAR 52.232-5, and Prompt Payment for Construction Contracts, FAR 52.232-27.
4.3. The Government will make payment through WAWF upon satisfactory completion of work AND receipt of a proper certification for payment. Do not input invoice into WAWF until the pre-approval of invoice is received from the contracting officer. This will lessen the need for rejections in WAWF Payment may be withheld unless all contractual requirements including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, Small Business Subcontracting Reports, have been timely received.
4.4. All requests for payments through WAWF must include a Subcontractor Payment Register pursuant to FAR Clause 52.232-5 and a contractor's certification that reads as follows:
I hereby certify, to the best of my knowledge and belief that -
The amounts requested are only for performance in accordance with the specifications, terms and conditions of the contract; All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and requirements of Chapter 39 of Title 31, United States Code; This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor's performance.
4.5. The Government will make payment upon satisfactory completion of work AND receipt of a proper certification for payment. Payment may be withheld unless all contractual requirements, including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, and Small Business Subcontracting Reports, have been timely received.
Payrolls shall indicate CLIN to which they are applicable.
4.6. A release of claims is required for all final payment requests and shall be submitted by the contractor with the final invoice.
5. CONTRACT ADMINISTRATION
5.1. The contracting office of 163 ATKW Contracting is the office having administrative jurisdiction over this contract for all matters. A list of the names and telephone numbers of the Government team comprising the contract administrator, Contracting Officer's Representative (COR), consultant, and point of contact at the project site will be provided at the post-award/pre-construction conference.
5.2. All correspondence shall be addressed to the Contracting Officer. A copy of all correspondence shall be furnished to the contracting officer's representative. Enclosures attached to or transmitted with the correspondence shall also be furnished with an original and one copy.
Each letter shall make reference to the contract name, contract number, project number, and project title, and shall have only one subject. For tracking purposes, a sequential numbering system should be used for all correspondence.
6. PAPERLESS CONTRACTING
6.1. The National Guard is fully committed to the Federal Government's electronic commerce and paperless contracting initiatives. As such, it is anticipated that to the maximum extent possible to include but not limited to correspondence, modification distribution, etc., to include specifications and drawings, will be issued using electronic methods, i.e., electronic mail (e-mail). Contractors shall have and maintain capability to receive documents in this manner.
6.2. Additionally, it is anticipated that within the life of this contract, other electronic processes will be enacted. These include, but are not limited to, electronic bidding/offers, change order proposals, and electronic invoicing. When implemented by the Contracting Officer, contractors shall participate fully in any of these new requirements at no additional cost to the Government.
7. TELEPHONE COMMUNICATIONS SECURITY MONITORING
All communications with DOD organizations are subject to communications security (COMSEC) review. Contractor personnel must be aware that telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian contractor personnel are advised that any time they place a call to, or receive a call from, a DOD organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.
8. UTILITY SERVICES
The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled "Availability and Use of Utility Services" (FAR Clause 52.236-14). The following utilities will be available: Water and electrical.
9. PREPARATION OF MATERIAL APPROVAL SUBMITTALS
The contractor shall submit all materials and articles requiring approval, as required by the Material and Workmanship Clause, FAR 52.236-5. Submittals shall be made using AF Form 3000, or approved equal. Submittals shall be processed in accordance with the procedures in Section 01 33 00, Submittals. Submittals shall be given a distinct identification system by CLIN if multiple CLINS are applicable. Individual submittal documents shall not be comprised of items for more than one CLIN. Address for delivery of submittals will be provided at the post award/pre-construction conference. The contractor is reminded that an individual within the company who has authority to make the certification must sign the certification on the AF Form 3000.
10. WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS
10.1. A weekly meeting may be held with the Contractor, COR and Contracting Officer (KO), if necessary, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. Prior to beginning work on specific work elements of a project, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premises and buildings; space for storage of materials and equipment; delivery of materials; and use of approaches, use of corridors, stairways and similar means of passage.
10.1.1. In accordance with FAR Clause 52.236-15, "Schedules for Construction Contracts", the contractor shall within five days after work commences on the contract, or another period of time determined by the KO, prepare and submit to the KO for approval three copies of a practicable schedule showing the order in which the contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing features of work. A composite schedule for the overall contract shall also be provided. The schedule shall be on an AF Form 3064, Contract Progress Schedule, or an approved computer generated format similar to the AF Form 3064. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. Both the Contractor and the COR are required to provide monthly progress reports covering the period from notice to proceed through final inspection. Unless agreement cannot be made on the applicable percentage of progress a joint report will be submitted to the Contracting Officer. This reports shall be submitted on the NGB Contract Progress Report form (similar to an AF Form 3065), or an approved computer generated similar format. These reports shall track progress by CLIN, if contract contains multiple CLINs, multiple AF Form 3064 and NG Contract Progress Reports will also be required for payment purposes.
10.2. Additionally, for projects exceeding $1M, the contractor shall provide a project plan in a commercially available network scheduling software that meets requirements of the specification to define work tasks and track progress.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .