- Welding Stud
- Solicitation number
- SPMYM4-26-Q-3723
About this file
This is a Request for Quote (RFQ) for welding studs issued by DLA Maritime under solicitation number SPMYM426Q3723 with a deadline of September 4, 2026 at 8:00 AM. The government seeks 150 units of 3/8-16UNC-2A X 1-5/8" welding studs manufactured per MIL-S-24149C specification in CRES 316L stainless steel (UNS S31603), Type V, Class 1, with delivery required by September 30, 2026 to Pearl Harbor Naval Shipyard IMF in Hawaii. A separate shipping line item (CLIN 0002) is also included with an allowable cost limit. The acquisition is set aside 100 percent for women-owned small businesses (WOSB) under the North American Industry Classification Standard (NAICS) 332722 with a 600-employee size standard.
The contract employs a firm fixed price arrangement and requires first article testing (FAT) with contractor testing and production lot conformance testing per MIL-S-24149C. All items must be mercury-free, and contractors must maintain supply chain traceability documentation for six years post-award. Evaluation will be based on technical capability, price, and delivery schedule, with award to the lowest-priced technically acceptable offeror. Contractors must be registered in the System for Award Management (SAM), have a CAGE code and DUNS number, and submit payment requests through Wide Area WorkFlow (WAWF). Payment will be made by electronic funds transfer, and the contracting specialist is Joseph East at 808-473-8000 extension 2322.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - First Article Inspection Required_Weld Studs_Mil-S-24149.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
Section A - Solicitation/Contract Form
Welding Stud
SPMYM426Q3723
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
WELDING STUD, 3/8-16UNC-2A X 1-5/8" LONG (1-1/2" LONG
AFTER WELDING), MIL-S-24149C, CRES 316L (UNS NO.
S31603), TY V, CL 1, M24149/3-42 (MOD - 316L).
PER MS NO. 6350-081-006 REV E CHANGE -8, PAGE 4
PARAGRAPH 1.B(2)(A) STUDS MUST BE TYPE 316L (UNS NO.
S31603) IN ACCORDANCE WITH MIL-S-24149.
ACQUISITION REQUIREMENTS (PARA 6.2): A) STUDS,
WELDING AND ARC SHIELDS (FERRULES), GENERAL
SPECIFICATION FOR MIL-S-24149C DTD 27 MAR 89 W/AMD-1
DTD 01 DEC 89 AND REINST NOTICE-2 DTD 21 AUG 00.
SPECIFICATION SHEET: STUDS, WELDING AND ARC
SHIELDS (FERRULES); TYPE V CLASS 1 ,4, 5, 5A, CORROSION
RESISTANT-STEEL, FOR DIRECT ENERGY ARC WELDING,
MIL-S-24149/3D DTD 27 MAR 89 W/AMD-1 DTD 01 DEC 89 AND
REINST NOTICE-2 DTD 21 AUG 00. B) LATEST IN EFFECT AT
TIME OF AWARD. C) TYPE V CL 1. D) M24149/3-42 (MOD -
316L). E) FIRST ARTICLE REQUIRED IAW ATTACHED SHEET.
FIRST ARTICLE TESTING MAY BE WAIVED IF PURCHASED
FROM PREVIOUSLY QUALIFIED SOURCES LISTED BELOW. F)
N/A. G) N/A. H) LEVEL C. I) N/A. ADDITIONAL
REQUIREMENTS: MOD MATL TO 316L (UNS NO. S31603).
TENSILE STRENGTH AND BEND TEST RESULTS ARE
DOCUMENTED ON THE MATERIAL CERTIFICATION. LOT
CONFORMANCE TESTING BE PERFORMED IAW MIL-S-
24149C. DUE TO THE SIZE OF THE STUDS, PERMANENT
MARKING ON THE STUDS IS NOT REQUIRED. THE STUDS
SHALL BE BAGGED/BOXED AND THE BAG/BOX SHALL BE
UNIQUELY MARKED WITH NUMBERS TRACEABLE TO THE
REQUIRED OQE FOR CHEMICAL AND MECHANICAL
PROPERTIES IN CONFORMANCE WITH THE APPLICABLE
SPEC.
Pricing Arrangement: Firm Fixed Price
ACRN: AA
PR Number: N3225326PR01795 PR Line Item Number: 0001
150 Each
SHIPPING
FFP
SHIPPING CHARGES SHOULD NOT EXCEED AMOUNT
ALLOWED BY THIS LINE ITEM.
Pricing Arrangement: Firm Fixed Price
1 Each
Section C - Description/Specifications/Statement of Work
Requirements Welding Stud
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C7F758 MERCURY EXCLUSION CLAUSE FOR MERCURY FREE PROCUREMENT (Oct 2025)
MERCURY EXCLUSION CLAUSE FOR MERCURY FREE PROCUREMENT (LC-2, JAN 2013)
1. Mercury or mercury compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.
Supplier shall certify that all items furnished under this contract are free of mercury or mercury compounds.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Other instructions not applicable.
DoDAAC: N32253 CountryCode: USA
PEARL HARBOR NAVAL SHIPYARD IMF
667 SAFEGUARD ST SUITE 100, PEARL HARBOR HI 96860-5033
PEARL HARBOR, HI 96860-5033
UNITED STATES
Government Representative, DLA Distribution Email: distrcustomerservice@dla.mil Telephone: 808-473-8000 x4961
Inspection and Acceptance Location
Both Destination Instructions: Other instructions not applicable.
DoDAAC: N32253 CountryCode: USA
PEARL HARBOR NAVAL SHIPYARD IMF
667 SAFEGUARD ST SUITE 100, PEARL HARBOR HI 96860-5033
PEARL HARBOR, HI 96860-5033
UNITED STATES
Government Representative, DLA Distribution Email: distrcustomerservice@dla.mil Telephone: 808-473-8000 x4961
Section F - Deliveries or Performance
Overall Contract Delivery Period
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
Delivery Requested By Delivery Date 30 Sep
150 Each Ship To DoDAAC: N32253 CountryCode: USA
PEARL HARBOR NAVAL SHIPYARD IMF
667 SAFEGUARD STREET, BLDG 167-1 RECV 808-
473-8000X4961
PEARL HARBOR, HI 96860-5033
UNITED STATES
Government Representative, DLA Distribution Email: distrcustomerservice@dla.mil Telephone: 808-473-8000 x4961
FoB Details Contractor Destination
Delivery Requested By Delivery Date 30 Sep
1 Each Ship To DoDAAC: N32253 CountryCode: USA
PEARL HARBOR NAVAL SHIPYARD IMF
667 SAFEGUARD STREET, BLDG 167-1 RECV 808-
473-8000X4961
PEARL HARBOR, HI 96860-5033
UNITED STATES
Government Representative, DLA Distribution Email: distrcustomerservice@dla.mil Telephone: 808-473-8000 x4961
FoB Details Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.242-15 Stop-Work Order. Aug 1989 52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
ACRN LOA Total Amount
AA
^^^017^2026^2026^^1804^000^^260^D^1B4B^^^^^7B4B^17008711^050120^700SH^A00010257175^^130139387
1^6100.3260^^00000-00-LOCAL00^
USD 0.00Line Item PR/MIPR - PR Line Item# CIN Amount
CLIN 0001 N3225326PR01795 - 0001 USD 0.00
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC ____
Issue By DoDAAC ____
Admin DoDAAC ____
Inspect By DoDAAC ____
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
DLAD Procurement Notes
C01 Superseded Part Numbered Items (SEP 2016)
If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly. *****
C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016)
The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.
dmsms@dla.mil. *****
C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2020)
(1) By submitting a quotation or offer, the contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence
(supply chain traceability documentation), as described in paragraph (2) of this procurement note, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. In addition, the contractor will obtain and supply any quality requirements necessary to prove the material meets the technical description. Evidence of quality consist of test results, material certifications, and manufacturing process sheets, identified by the technical data.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the
Counterfeit Detection and Avoidance Program (CDAP) website
(http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/).
(4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies. *****
C04 Unused Former Government Surplus Property (SEP 2021)
To be considered for award, the offeror must complete and submit the following representation with their offer. Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer. (1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes [__] No [__] The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and Government Entity (CAGE) Code and part number, specification, etc.). Yes [__] No __ The material conforms to the revision letter/number, if any is cited. Yes [__] No [__] Unknown __ If No, the revision does not affect form, fit, function, or interface. Yes__ No __ Unknown __ The material was manufactured by: (Name): ______________________________________________________________________ (Address):
___________________________________________________________________ (2) The offeror currently possesses the material Yes __ No __ If yes, the offeror purchased the material from a Government selling agency or other source. Yes __ No __ If yes, complete the following: Government Selling Agency: ___________________________________________________ Contract Number: ____________________________________________________________ Contract Date: (Month, Year):
__________________________________________________ Other Source:
________________________________________________________________ Address:
____________________________________________________________________ Date Acquired: (Month/Year) ___________________________________________________ (3) The material has been altered or modified. Yes __ No __ If Yes, complete the following: Name of the company that performed the alternation or modification:
____________________________________________________________________________ [(Address):
__________________________________________________________________ Complete description of the alterations or modifications. ____________________________________________________________________________ ____________________________________________________________________________ (4) The material has been reconditioned. Yes __ No __ If Yes, complete the following: (i) The price offered includes the cost of reconditioning /refurbishment. Yes __ No __ (ii) Name of the company that reconditioned the material.
____________________________________________________________________ (iii) Description of any work done or to be done, including the components to be replaced and the applicable rebuild standard.
____________________________________________________________________________ The material contains cure-dated components. Yes __ No __ If Yes, complete the following: (i) The price includes replacement of cure-dated components. Yes __ No __ (ii) Cure date: ____________________ (5) The material has data plates attached. Yes __ No __ If Yes, insert all information contained on the data plate.
_____________________________________________________________________________ (6) The offered material is in its original package. Yes __ No __ If yes, complete the following: Contract Number NSN_________________________________________________________________________ CAGE Code__________________________________________________________________ Part Number __________________________________________________________________ Other Markings /Data___________________________________________________________ (7) The offeror has supplied this same material (National Stock Number) to the Government before. Yes __ No __ If Yes, complete the following: (i) The material being offered is from the same original Government contract number as that provided previously. Yes __ No __ (ii) State below the Government Agency and contract number under which the material was previously provided: Agency ______________________________________________________________________ Contract Number_______________________________________________________________ (8) The material is manufactured in accordance with a specification or drawing. Yes __ No __ If Yes, complete the following: (i) The specification/drawing is in the possession of the offeror. Yes __ No __ (ii) The offeror has stated the applicable information below: Yes __ No __ Specification
/Drawing Number ___________________________________________________ Revision (if any) Date__________________________________________________________________________ (9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes __ No __ If Yes, complete the following: (i) Material has been re-preserved. Yes __ No __ (ii) Material has been repackaged. Yes __ No __ (iii) Percentage of material that has been inspected is ____%; and/or (iv) Number of items inspected is _______ (v) A written report was prepared.
Yes __ No __ The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation, inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection. The offeror will forward one of the following, within 24 hours of request by the contracting officer, to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies): ___ For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document. ___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material. ___ When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (6) of this procurement note Yes __ No __) ___ When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe:
____________________________________________________________________________ This procurement note only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer's overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items. If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted. In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract. *****
C08 Tailored Logistics Support Purchasing Reviews (FEB 2017)
(1) From the commencement of performance of this contract until 3 years after the final contract payment, the contractor must allow the contracting officer, ACO, Defense Contract Management
Agency (DCMA), Defense Contract Audit Agency (DCAA), and any other duly authorized representative of the contracting officer access to all records and information pertaining to those items or services for which the Government is relying on the contractor's purchasing system to determine that competition was obtained or to justify that prices are fair and reasonable. The contractor must maintain records subject to this clause for not less than 3 years after the contract final payment.
(2) The contracting officer may conduct reviews of purchased items or services provided under this contract regardless of dollar value that meet the criteria in paragraph (1) to ascertain whether the contractor has obtained the best value. The contractor must obtain competition to the maximum extent practicable for all purchases. Prior to purchasing any supplies or services, the contractor must solicit a competitive quotation from at least two independently-competing firms. For other than sole source items, the request for quotations must, to the maximum extent practical, solicit offers from different manufacturers or producers. If the contractor is unable to obtain quotes for competing items from two or more independently-competing firms, the contractor must retain documentation supporting its rationale for selection of the suppliers solicited and selected and its determination that the price was fair and reasonable. The contractor is responsible for maintaining this documentation for all sole source/non-competitive actions. The following price reasonableness and documentation requirements are applicable to all purchases, regardless of dollar value:
(i) A price is reasonable if it does not exceed a price incurred by a prudent person in the conduct of competitive business. The contracting officer will examine the prices with particular care in connection with buys that may not be subject to effective competition restraints. The contractor's price will not be presumed to be reasonable. If an initial review of the facts results in a challenge of a specific price by the contracting officer or the contracting officer's representative, the burden of proof must be upon the contractor to establish that the price is reasonable under the standards in FAR Subpart 15.4 and FAR
31.201-3.
(ii) The contractor must keep the documentation to a minimum, but must retain data supporting the purchases either by paper or electronically. At a minimum, price quotations and invoices must be retained. Should the contractor receive an oral price quotation, the contractor must document who the supplier or subcontractor is by complete name, address, telephone number, price, terms and other conditions quoted by each vendor. Price quotes for supplies must be broken down by individual items, shipping costs, and any other included expenses. Price quotes for incidental services which are not pre-priced in the contract must include labor hours and costs or prices, as applicable, including the total price of the job, individual pricing for the portions of the work if applicable, materials, and all other elements of cost, overhead, and profit. This price breakdown documentation must be made for each subcontractor performing work on this contract.
(3) When applicable, if the contractor is purchasing from subcontractors or other sources and receives a discount or rebates, the contractor must immediately pass these savings to the Government in the contract price and invoice for payment. The contractor is required to use diligence in the selection of the most economical method of delivery of the product or services by selecting a best value method of delivery based on the urgency and nature of the work or product required. When labor hours are involved in the work to be accomplished and the contractor has not already pre-priced the effort to use its own labor force, the contractor must provide the labor at rates required by the contract (for example, Service
Contract Act or Davis-Bacon Act rates) or at rates based on competition if mandatory rates are not required by the contract.
(4) If the contracting officer determines that the purchased product or service is unreasonably priced, the contractor must refund to the Government the amount the contracting officer determines is in excess of a reasonable price. The contracting officer must notify the contractor in writing in accordance with FAR 32.604 Demand for Payment, giving the basis for the determination and the amount to be refunded. The contractor must make the refund payment in accordance with directions from the contracting officer, and must provide proof of the refund payment to the contracting officer. The contracting officer may collect the amount due using all available means in accordance with FAR Subpart 32.6. FAR 52.232-17, Interest, is applicable to payments not made within 30 days of the demand for payment. Any disputes arising under this provision must be handled in accordance with the "Disputes" clause of this contract.
C14 Correction of Nonconforming Packaging or Marking (MAY 2020)
(1) The Government may correct nonconforming packaging or marking for receipts of DLAowned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government's costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies. (2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor's expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government's costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
C18 Shipping Instructions for Export and U.S. Territories (AUG 2017)
(1) Mail instructions (Army Post Office (APO) or Fleet Post Office (FPO) addresses). Route shipments within mail limitations to the address cited with each contract line-item (CLIN) in the following manner, based on the TP (Transportation Priority) reflected in the "mark for" data with each CLIN: (a) U.S. mail is the only mode authorized for shipments to APO or FPO addresses. (b) Commercial small parcel carriers (e.g., UPS, RPS or Federal Express) and Commercial Motor Carriers are never an acceptable mode to any APO/FPO address. A small parcel carrier may not be used for any destination in Alaska, Hawaii, or Puerto Rico, unless the carrier guarantees delivery to that specific consignee. (c) Address parcel post shipments to an APO/FPO address to the "Commander" or "Commanding Officer" if there is no title preceding the address. Annotate shipments under the return address as follows: "Contents for official use - exempt from customs requirements." (d) Contact the cognizant office prior to shipment for TP1, TP2, (IPD 01-08), 999, NMCS, regardless of distance from origin to the APO/FPO address. Package shipments for transportation by Military Air (MILAIR). (e) Use surface parcel post (fourth class) for TP3 (IPD 09-15). (f) The cost of parcel post insurance will not be paid by the Government. (2) Shipments to container consolidation points (CCPs): (a) Contact the Government Transportation Office for the Contract Administration Office: either DCMA for DCMA administered awards or DLA Distribution for awards administered by the issuing office. See Block 7 of Department of Defense (DD) form 1155 (page 1 of an order) to obtain shipping instructions for release to the carrier. (3) Shipments to container consolidation points (CCPs): (a) Prepare shipments directed to a CCP shown with each individual CLIN on Schedule Continuation Sheet(s) in accordance with instructions provided within this contract for Preparation for Delivery. (b) Contact the Transportation Officer for shipping instructions for the following CCP shipments: (i) Cargo requiring refrigeration/temperature control. (ii) Classified or sensitive items requiring signature control. (iii) When dimensions of an item or package exceed 456 inches (38 feet) long by 89 inches wide by 88 inches high, or weight exceeds 10,000 pounds. Cargo cannot exceed any one of the dimensions or the weight. (iv) When volume or weight constitutes a full SEAVAN load for each activity code. (v) Hazardous material such as material which is flammable, corrosive, combustible, explosive, toxic, radioactive, unduly magnetic, or which contains oxidizing agents. (vi) Type 1 shelf life items, (vii) TP1 and 2 (IPD 01-08) with RDD of 999, 777, or 555. (4) The contractor shall furnish the above data no later than five (5) days prior to the scheduled shipment date for shipments weighing less than 10,000 pounds which will not be tendered as a carload or truckload (5) The contractor may not ship prior to furnishing required data, regardless of weight. (6) The contractor must clearly identify in invoices when shipment is made by air. (7) The carrier must research the Transportation Facilities Guide (TFG) on the consignee to get information on who to contact to make delivery appointments.
The carrier should schedule appointments as soon as they are given the load via the Carrier Appointment System (CAS) /prelodge desk prior to delivery of freight shipments (other than small parcels). Bills of Lading must be annotated with pertinent TFG data and carrier appointment times. (8) The contractor must include the mailing address of the ultimate Consignee and "Mark For" information required as part of the address for parcel post or freight shipments, as applicable, included with the data cited with each individual CLIN. The contractor will comply with the paragraph (7) and ship in accordance with instructions furnished by the Transportation office. The Transportation Officer will furnish the addresses of Aerial terminals, as required.
(Parcel post shipments will not be made to water or air terminals).
C21 Shipping Instruction Request (SIR) (JUN 2020)
(1) The DCMA Shipping Instruction Request (SIR) is a web-based system that contractors and transportation specialists use to provide transportation management for contracts administered by
DCMA.
(2) The contractor shall use SIR for the following contracts:
(a) If the ultimate destination is outside the contiguous United States.
(b) Hazardous material (HAZMAT).
(c) Foreign Military Sales (FMS).
(d) If Transportation Protective Service requirements apply.
(3) Contractors shall submit information to DCMA via the DCMA Shipping Instruction Request (SIR) e-Tool (https://www.
).dcma.mil/WBT/sir/
E01 Supplemental First Article Exhibit Disposition - Contractor Maintained (MAY 2020) -If applicable
The Government will return approved first article units to the contractor. The contractor shall hold the approved first article units at the production facility until it has produced and the
Government has accepted all production quantities. In the case of indefinite delivery contracts, the contractor shall hold the first article units until the Government has approved the final production run and accepted the first delivery order. The units shall serve as a production guide or manufacturing standard if the Government receives reports of defects on delivered material or problems encountered during production. When disposing of the first article units, the contractor shall follow DFARS 252.245-7004(d).
E02 Supplemental First Article Exhibit Disposition - Government Maintained (MAY 2020)- If applicable.
The Government will hold the first article units, either destroyed in testing or maintained as a manufacturing standard. The contractor shall produce/deliver the full quantity indicated on the contract order. The first article units will not be part of the production quantity.
E03 Production Lot Testing - Contractor (MAY 2020) - If applicable
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The contractor shall complete PLT on the production lot(s) after first article approval, if the contract requires first article testing. The contractor shall price the PLT CLIN to cover the cost of the final test report and any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).
(2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and discuss clarifications directly with contractors. If the Government and/or the contractor identify changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the "Issued By" blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/change(s). (3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to conducting the production lot test, the contractor shall provide written notice of the time and location of the test to the contracting officer and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA, so the Government may witness sample selection and the test. (4) Unless otherwise stated, the contractor shall select [contracting officer shall insert number of samples identified in material master] samples at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ," the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer. (5) The contractor shall perform all tests on the PLT samples needed to verify/validate the items meet the contract technical/quality requirements.
(6) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate. (7) The contractor shall prepare and disseminate the PLT report and applicable traceability documentation as follows: (a) Prepare the test report in accordance with data item description DI-NDTI-80809B, and mark the test report, "Production Lot Test Report, Contract Number [contractor insert] and Lot/Item Number [contractor insert]." (b) Present the PLT report to the contracting officer for review. (c) Include the following documentation with all shipments of PLT Reports: (i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250); (ii) Copy of the contract/order; (iii) Copy of all applicable test reports, showing actual results and tolerances specified in the technical data package; (iv) Material and process certifications; (v) Process operations and inspection method sheets; (vi) Copies of drawings used to manufacture the PLT sample, with proper marking to restrict public disclosure (if desired) and from Government use other than for evaluation to the extent consistent with the Government's data rights under the contract; and (vii) Documents required under a contract deliverables requirements list, if applicable. (d) Submit all required documentation to the Government activity specified in the contract in time to allow for at least [contracting officer shall insert number of days as shown in material master] calendar days for review of the PLT report, and for the contracting officer to provide written notification of approval/disapproval to the contractor. (e) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. (f) Delivery. (i) Ship test report to [contracting officer insert address of the Government activity to receive the report]. (ii) Delivery Schedule Information: (A) _____ Total Delivery Days for FAT (If Applicable) (B) _____ Days: Completion of Production Units (to include PLT samples), PLT, and Submission of PLT Report (C) _____ Days: Government PLT Report Evaluation and Notification to Contractor (D) _____ Days: Delivery of final production quantity to Government (E) _____ Total Delivery Days (Sum of paragraph (ii)(A) through (D) above.
E04 Production Lot Testing - Government (MAY 2020) - If applicable
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The Government conducts PLT on the production lot(s) after first article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT). (2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and conduct clarifications directly with contractors. If this results in necessary changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the "Issued By" blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/change(s). (3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot for selection of PLT samples, the contractor shall provide written notice to the contracting officer (and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA). (4) Unless otherwise stated, the contractor shall select [contracting officer shall insert the number of samples identified in the material master] samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ," the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer. (5) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall propose corrective action, if appropriate. (6) The Government will return PLT samples to the contractor, with a copy of the test report, at contractor expense. (7) The contractor shall prepare and disseminate the samples as follows: (a) Ship the selected PLT samples by traceable means. [Mark the shipment "Production Lot Samples - Do Not Post To Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]". Place a copy of the system of record receiving report (i.e., WAWF or DD Form 250) on the exterior of the shipping container in accordance with DFARS Appendix F. Mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph 5.11. (b) Include the following interior documentation: (i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250); (ii) Copy of contract/order; (iii) Copy of test reports, showing actual results and tolerances specified in the technical data package; (iv) Material and process certifications; (v) Process operations and inspection method sheets; (vi) Copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor's responsibility); (vii) Documents required under contract deliverables requirements list; and (viii) A prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government. (8) At the time of shipment, the contractor shall sign and provide copies of the DD Form 1222, system of record receiving report (i.e., WAWF or DD Form 250), transportation tracking information, and information for return of the PLT samples to the contracting officer. The Government testing time will be [contracting officer insert number of days for test, as shown in the material master calendar days for the test results to be provided to the contractor. (9) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. (10) Delivery. (a) Ship samples to [contracting officer insert address of the Government activity to receive the samples]. (b) Delivery Schedule Information: (i)___ Total Delivery Days for FAT (If Applicable) (ii)___ Days: Completion of Production Units (to include PLT samples), and Submission of samples for Government Testing (iii)___ Days: Government PLT Report Evaluation and Notification to Contractor (iv)___ Days: Delivery of final production quantity to Government (v)___ Total Delivery Days (Sum of paragraph (i) through (iv))
E05 Product Verification Testing (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory. (2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing. (3) The contractor shall provide and maintain an inspection system acceptable to the Governmentin accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, "Product Verification Test Samples - Do Not Post to Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]" adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph
5.11. The contractor shall send samples by traceable means (e.g.,certified or registered mail, United Parcel Service, Federal Express).
This is the start of the file's text. The full file is on GovTribe.