Solicitation - SPMYM426Q3629.pdf
PDF 2 MB Posted
- Attached to
- Screw
- Solicitation number
- SPMYM426Q3629
About this file
This is a Request for Quote (RFQ) for commercial products issued by the Defense Logistics Agency (DLA) Maritime - Pearl Harbor Competitive Sourcing Division on behalf of the U.S. Navy. The solicitation number is SPMYM426Q3629 with an issue date of August 7, 2026, and an offer due date of August 11, 2026, at 12:00 PM local time.
The requirement is for socket head cap screws manufactured to specification FF-S-86 (J), Type VI, with material designation nickel-copper-aluminum alloy (K-Monel), per specification QQ-N-286 (G). The exact specifications are: 0.500-13UNRC-3A X 3.000 length, with EB part number 68-12-4300 or equal. The quantity required is 1,000 units, with pricing under a firm fixed-price arrangement. Delivery is to be FOB Destination. The solicitation is designated as a Women-Owned Small Business (WOSB) set-aside for 100 percent. The contracting activity is DLA Maritime - Pearl Harbor with contact information provided for Quincy Dillenback (808-473-8000 x 4697).
Key requirements include: vendor acknowledgement of K-Monel heat review is mandatory; K-Monel screws must comply with FF-S-86G (dated January 27, 2021 or later) and be produced per K-Monel supplemental processing requirements with proper dot-K marking; two copies of controlled industrial material (CIM) certification meeting traceable objective quality evidence standards are required with delivery; mercury-free certification is required; and supply chain traceability documentation must be retained for ten years. Offerors must provide commercial catalog pricing, business size classification, prompt payment terms, delivery schedule, manufacturer information, and country of origin. Additional certifications, representations, and compliance with various FAR and DFARS clauses apply, including ISO 9001 quality standards, configuration control procedures, and item unique identification requirements for items exceeding $5,000 in acquisition cost.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
Section A - Solicitation/Contract Form
Screw
SPMYM426Q3629
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
SCREW
SOCKET HEAD CAP SCREW, 0.500-13UNRC-3A X 3.000,
NICUAL, FF-S-86 (J), TY-VI, QQ-N-286 (G).
EB PN: 68-12-4300 OR EQUAL.
**CIM**
ORDERING DATA:
(A) SCREW, CAP, SOCKET-HEAD; FF-S-86J DTD 01APR2025
(B) TYPE-VI, NICUAL, QQ-N-286G DTD 07DEC00,
0.500-13UNRC-3A X 3.000 L
(C) N/A
(D) REQUIRED
(E) N/A
(F) N/A
(G) 13UNRC-3A
(H) NOT REQUIRED
(I & J) N/A
(K & L) REQUIRED.
ADDITIONAL REQUIREMENTS:
(1) VENDOR ACKNOWLEDGEMENT OF K-MONEL HEAT
REVIEW IS REQUIRED (SEE ATTACHED).
(2) K-MONEL SOCKET HEAD CAP SCREWS
MANUFACTURED TO FF-S-86 MUST BE MANUFACTURED
IN ACCORDANCE WITH
FF-S-86G OF 27 JAN 21, OR LATER REVISION, AND
PRODUCED IN ACCORDANCE WITH THE K-MONEL
SUPPLEMENTAL
PROCESSING REQUIREMENTS. ALL K-MONEL SOCKET
HEAD CAP SCREWS MANUFACTURED TO FF-S-86H MUST
HAVE THE
"-K-" (Dot K Dot) MARKING.
Pricing Arrangement: Firm Fixed Price
1,000 Each
000101
CONTROLLED INDUSTRIAL MATERIAL (CIM)
REQUIREMENT
CERTIFICATION IS REQUIRED AS SPECIFIED IN
TRACEABLE OBJECTIVE QUALITY
**2 COPIES OF CERTIFICATION IS REQUIRED**
Section C - Description/Specifications/Statement of Work
Requirements Screw
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD C03 DLAD PROC NOTE C03 (Oct 2025)
C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023)
(1) By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer. (2) Supply Chain Traceability Documentation
(i) Supply chain traceability documentation shall include basic item description; part number; drawing or specification; national stock number;
manufacturing source; manufacturing source's Commercial and Government Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance.
(ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection- AvoidanceProgram/).
(iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.
(3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
DLAD C14 DLAD PROC NOTE C14 (Oct 2025)
C14 Correction of Nonconforming Packaging or Marking (MAY 2020).
(1) The Government may correct nonconforming packaging or marking for receipts of DLA- owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking.
The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government's costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
(2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor's expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government's costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies. *****
DLAD C08 DLAD PROC NOTE C08 (Oct 2025)
C08 Tailored Logistics Support Purchasing Reviews (FEB 2017)
(1) From the commencement of performance of this contract until 3 years after the final contract payment, the contractor must allow the contracting officer, ACO, Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), and any other duly authorized representative of the contracting officer access to all records and information pertaining to those items or services for which the Government is relying on the contractor's purchasing system to determine that competition was obtained or to justify that prices are fair and reasonable. The contractor must maintain records subject to this clause for not less than 3 years after the contract final payment.
(2) The contracting officer may conduct reviews of purchased items or services provided under this contract regardless of dollar value that meet the criteria in paragraph (1) to ascertain whether the contractor has obtained the best value. The contractor must obtain competition to the maximum extent practicable for all purchases. Prior to purchasing any supplies or services, the contractor must solicit a competitive quotation from at least two independently-competing firms. For other than sole source items, the request for quotations must, to the maximum extent practical, solicit offers from different manufacturers or producers. If the contractor is unable to obtain quotes for competing items from two or more independently-competing firms, the contractor must retain documentation supporting its rationale for selection of the suppliers solicited and selected and its determination that the price was fair and reasonable. The contractor is responsible for maintaining this documentation for all sole source/non-competitive actions. The following price reasonableness and documentation requirements are applicable to all purchases, regardless of dollar value: (i) A price is reasonable if it does not exceed a price incurred by a prudent person in the conduct of competitive business. The contracting officer will examine the prices with particular care in connection with buys that may not be subject to effective competition restraints. The contractor's price will not be presumed to be reasonable. If an initial review of the facts results in a challenge of a specific price by the contracting officer or the contracting officer's representative, the burden of proof must be upon the contractor to establish that the price is reasonable under the standards in FAR Subpart 15.4 and FAR 31.201-3.
(ii) The contractor must keep the documentation to a minimum, but must retain data supporting the purchases either by paper or electronically. At a minimum, price quotations and invoices must be retained. Should the contractor receive an oral price quotation, the contractor must document who the supplier or subcontractor is by complete name, address, telephone number, price, terms and other conditions quoted by each vendor. Price quotes for supplies must be broken down by individual items, shipping costs, and any other included expenses. Price quotes for incidental services which are not pre- priced in the contract must include labor hours and costs or prices, as applicable, including the total price of the job, individual pricing for the portions of the work if applicable, materials, and all other elements of cost, overhead, and profit. This price breakdown documentation must be made for each subcontractor performing work on this contract.
(3) When applicable, if the contractor is purchasing from subcontractors or other sources and receives a discount or rebates, the contractor must immediately pass these savings to the Government in the contract price and invoice for payment. The contractor is required to use diligence in the selection of the most economical method of delivery of the product or services by selecting a best value method of delivery based on the urgency and nature of the work or product required. When labor hours are involved in the work to be accomplished and the contractor has not already pre-priced the effort to use its own labor force, the contractor must provide the labor at rates required by the contract (for example, Service Contract Act or Davis-Bacon Act rates) or at rates based on competition if mandatory rates are not required by the contract.
(4) If the contracting officer determines that the purchased product or service is unreasonably priced, the contractor must refund to the Government the amount the contracting officer determines is in excess of a reasonable price. The contracting officer must notify the contractor in writing in accordance with FAR 32.604 Demand for Payment, giving the basis for the determination and the amount to be refunded. The contractor must make the refund payment in accordance with directions from the contracting officer, and must provide proof of the refund payment to the contracting officer. The contracting officer may collect the amount due using all available means in accordance with FAR Subpart 32.6. FAR 52.232-17, Interest, is applicable to payments not made within 30 days of the demand for payment. Any disputes arising under this provision must be handled in accordance with the "Disputes" clause of this contract.
DLAD C18 DLAD PROC NOTE C18 (Oct 2025)
C18 Shipping Instructions for Export and U.S. Territories (SEP 2024)
(1) Mail Instructions for shipments to container consolidation points (CCPs): Contact the Government Transportation Office for the Contract Administration Office: either DCMA for DCMA administered awards or DLA Distribution for awards administered by the issuing office. See Block 7 of Department of Defense (DD) form 1155 (page 1 of an order) to obtain shipping instructions for release to the carrier.
(2) Shipments to container consolidation points (CCPs): (a) Prepare shipments directed to a CCP shown with each individual CLIN on Schedule Continuation Sheet(s) in accordance with instructions provided within this contract for Preparation for Delivery.
(b) Contact the Transportation Officer for shipping instructions for the following CCP shipments: (i) Cargo requiring refrigeration/temperature control.
(ii) Classified or sensitive items requiring signature control.
(iii) When dimensions of an item or package exceed 456 inches (38 feet) long by 89 inches wide by 88 inches high, or weight exceeds 10,000 pounds. Cargo cannot exceed any one of the dimensions or the weight.
(iv) When volume or weight constitutes a full SEAVAN load for each activity code.
(v) Hazardous material such as material, which is flammable, corrosive, combustible, explosive, toxic, radioactive, unduly magnetic, or which contains oxidizing agents.
(vi) Type 1 shelf-life items,
(vii) TP1 and 2 (IPD 01-08) with RDD of 999, 777, or 555.
(3) The contractor shall furnish the above data no later than five (5) days prior to the scheduled shipment date for shipments weighing less than 10,000 pounds which will not be tendered as a carload or truckload
(4) The contractor may not ship prior to furnishing required data, regardless of weight.
(5) The contractor must clearly identify in invoices when shipment is made by air.
(6) The carrier must research the Transportation Facilities Guide (TFG) on the consignee to get information on who to contact to make delivery appointments. The carrier should schedule appointments as soon as they are given the load via the Carrier Appointment System (CAS)/prelodge desk prior to delivery of freight shipments (other than small parcels). Bills of Lading must be annotated with pertinent TFG data and carrier appointment times.
(7) The contractor will comply with the paragraph (6) and ship in accordance with instructions furnished by the Transportation office. The Transportation Officer will furnish the addresses of aerial terminals, as required. (Parcel post shipments will not be made to water or air terminals).
(8) Ship in accordance with instructions furnished by the Transportation office. The Transportation Officer will furnish the addresses of Aerial terminals, as required. (Parcel post shipments will not be made to water or air terminals).
DLAD C01 DLAD PROC NOTE C01 (Oct 2025)
C01 Superseded Part Numbered Items (FEB 2025) When the award identifies supplies by manufacturer's name, Commercial and Government Entity (CAGE) code, and part number, the specified item(s) are the only item(s) acceptable under this contract. If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.
DLAD C02 DLAD PROC NOTE C02 (Oct 2025)
C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-15 Certificate of Conformance. Apr 1984
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD E05 DLAD PROC NOTE E05 (Oct 2025)
E05 Product Verification Testing (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.
(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246- 3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, "Product Verification Test Samples - Do Not Post to Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]" adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package: (a) Hard copies of the contract;
(b) Material certifications/process operation sheets; and
(c) Drawings used to manufacture the units and return shipping information.
(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.
(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
Section F - Deliveries or Performance
Overall Contract Delivery Period
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
1,000 Each FoB Details
Contractor Destination
000101 FoB Details Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC ____
Issue By DoDAAC ____
Admin DoDAAC ____
Inspect By DoDAAC ____
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD G01 DLAD PROC NOTE G01 (Oct 2025)
G01 Additional Wide Area Workflow (WAWF) Information (AUG 2017) Contractors shall include the Transportation Control Number (TCN) and carrier shipment tracking information when submitting the DD250/iRAPT Receiving Report in Wide Area Workflow (WAWF) in order to assist with material inspection and acceptance. *****
Section H - Special Contract Requirements
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD L31 DLAD PROC NOTE L31 (Oct 2025)
L31 Additive Manufacturing (JUN 2018)
(1) Additive manufacturing (AM) is a process of joining materials to make objects from three- dimensional (3D) model data, usually layer upon layer, as opposed to subtractive manufacturing methodologies, which remove material from areas where it is not desired, or other traditional manufacturing technologies, such as molding or stamping.
(2) Unless AM is specifically authorized in the solicitation/contract, quotes/offers may not include parts or supplies made using the additive manufacturing process. The Government will not evaluate offers that include an item or items produced using AM, and such offers are not eligible for award for the current procurement. A quoter/offeror proposing to supply an AM- produced item may submit a request to the contracting officer for approval of the item for evaluation by the Engineering Support Activity (ESA) for acceptability for future procurements of the same items. (3) If an item produced using AM is presented to the Government for inspection and acceptance that was not authorized in the solicitation/contract, the Government may reject the item as nonconforming.
DLAD H15 DLAD PROC NOTE H15 (Oct 2025)
H15 Transporter proof of delivery (TPD) (JAN 2021)
(a) Definition. As used in this procurement note, transporter proof of delivery (TPD) means a commercial document that is generated by the Contractor and/or the Contractor's transporter of supplies and that is signed by the Government customer in order to document delivery of supplies under this contract/order. Examples of TPD are United Parcel Service (UPS) or Federal Express (FEDEX) delivery tracking reports. TPD documentation must include a customer signature, or visibility of the name of the customer who signed.
(b) When this procurement note is included in the contract or order, the Government may use TPD, in combination with adequate Contractor documentation cross-referencing the TPD to the specific supplies provided, as a basis for accepting the supplies. TPD with adequate supporting documentation satisfies the receipt report requirement and, coupled with acceptance, allows the Government to initiate the payment process, if all other applicable payment conditions are satisfied.
(c) To facilitate the payment process, the Government will initiate a request for the Contractor to provide TPD when the customer has not provided receipt acknowledgement to the buying activity. If TPD is requested and the Contractor agrees to provide it, the documentation must include the customer signature, or visibility of the name of the customer who signed, and as much of the following information as possible:
(1) Contract number or order number;
(2) Contract line item number (CLIN);
(3) Unit price;
(4) Quantity of items;
(5) Extended price;
(6) National stock number (NSN);
(7) Delivery date;
(8) Recipient organization's name and address;
(9) Receiving activity Department of Defense activity address code (DoDAAC);
(10) Requisition document number (and suffix, when applicable);
(11) Shipment number;
(12) Invoice number; and
(13) Location where the carrier made delivery (activity name, building number, city, state). (d) Process for submitting TPD documentation.
(1) Enter wide area workflow (WAWF) using the ``history folder,'' enter the appropriate contract data, and recall the receiving report (RR);
(2) Click on "attachment." Browse and upload the TPD and any additional Contractor documentation required to provide the information identified in paragraph (c) of this procurement note. (Attachments created in any Microsoft Office product or in PDF format are acceptable.); and
(3) Click on "submit."
(e) Responsibility for supplies.
(1) Title to the supplies passes to the Government after delivery to the point of first receipt by the Government and subsequent acceptance.
(2) Notwithstanding any other provision of the contract, order, or blanket purchase agreement, the Contractor shall:
(i)Assume all responsibility and risk of loss for supplies not received at destination, damaged in transit, or not conforming to purchase requirements;
and (ii)Replace, repair, or correct those supplies promptly at the Contractor's expense, if instructed to do so by the Contracting Officer within 180 days from the date title to the supplies vests in the Government.
YM4CIMSCREWS YM4 CIM SCREWS (Sep 2025)
MERCURY EXCLUSION CLAUSE FOR MERCURY FREE PROCUREMENT ( LC-2, JAN 2013)
1. Mercury or mercury compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Supplier shall certify that all items furnished under this contract are free of mercury or mercury compounds.
TRACEABLE OBJECTIVE QUALITY EVIDENCE (OQE) (CIM 2024)
(a) OQE shows actual test results for chemical and mechanical properties in conformance to the material specification required.
(b) The material specification along with revision and amendment must be cited on the OQE.
(c) A Certificate of Compliance (COC), which is a signed document attesting the items delivered on the contract are in full compliance with all contract requirements, must be provided.
(d) Traceability must be provided via a unique heat, lot number and code permanently marked on the material per MIL-STD-792 and shown on the OQE certification document.
(e) Where the applicable product specification does not require permanent heat or lot markings, the material must be tagged or received in a package, envelope, bag or box that is annotated with the heat, lot number and code that is traceable to the OQE certification document.
NAVSIPYD&IMFPEARLINST 4855.17 CH-1 DAT AUG 12, 2024
ADDITIONAL CIM REQUIREMENTS (CIM 2012-1)
1. All certifications are required to be delivered with the material. Payment on material for which certifications are not received will be withheld.
2. Material markings shall comply with the requirements and limitations set forth in MIL-STD-792 (latest).
3. All nickel-copper-aluminum alloy (K-500) raw stock, and K-500 raw stock used in the manufacture of finished products, shall be procured to QQ-N-286 Revision G with slow strain rate tests done by the following approved laboratories:
a. Huntington Alloys, a Special Metals Company
3200 Riverside Drive
Huntington, WV 25705
b. Metallurgical Consultants, Inc.
4820 Caroline
PO Box 88046
Houston, TX 77288-0046
c. Naval Surface Warfare Center, Caderock Division
Code 614
9500 Macarthur Blvd
West Bethesda, MD 20817-5700
d. Teledyne Allvac
2020 Ashcraft Ave.
Monroe, NC 28110
e. Mannesmann Rohrenwerke
Mannesmann Forschungsinstitut (MFI)
Postfach 251160
47251 Duisburg
Germany
f. Westmoreland Mechanical Testing and Research Inc.
P.O. Box 388 Youngstown, PA 15696-0388
g. ThyssenKrupp VDM USA, Inc.
11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939
4. Vendor acknowledgement of K-Monel heat review.
a. Recent investigations into mechanical property failures of fasteners manufactured from NiCuAl(K-Monel) material that was produced by Special Metals Corporation (formerly INCO Alloys) of Huntington, West Virginia have found eighty (80) heats of material which may not meet the mechanical property requirements of QQ-N-286 throughout the heat. In 1994, Special Metals Corporation implemented a process change that eliminated the addition of extra aluminum at the toe of each NiCuAl(K-Monel) ingot resulting in the toe portion of the heat being non-homogeneous in comparison to the rest of the heat. Due to cropping practices at Special Metals Corporation, material from the toe of the ingot with non-homogeneous aluminum content was not cropped from production material prior to shipment. A recent study has shown that the aluminum concentration in the toe portion of the ingot could be as low as approximately 2.0% with a corresponding yield strength as low as approximately 40,000 PSI. QQ-N-286 specifies an aluminum content of 2.3% minimum and a yield strength of 90,000 PSI minimum or 85,000 PSI minimum for material 1". As a result of the investigation, the eighty (80) heats listed in Table I are considered suspect of having problems with insufficient aluminum content and an inability to consistently attain the required minimum yield strength.
b. You are requested to review your records of in stock and in process K-Monel material from the Special Metals Corporation for the suspect heat numbers listed in Table I below. You are prohibited from providing raw stock or finished products made from the suspect K-Monel heats. If suspect heats are intended to be used, contact the PHNS & IMF contracting officer for adjudication of the material.
Table I - List of Suspect Special Metals Corporation K-Monel Heat Numbers
M00J6KG M00J7KG M01J1KG M02J8KG
M02J9KG M03J8KG M04J2KG M04J6KG
M04J7KG M06J5KG M06J8KG M11J2KG
M11J3KG M11J4KG M11J5KG M15J6KG
M17J2KG M17J3KG M17J4KG M18J7KG
M19J7KG M21J2KG M22J7KG M22J8KG
M23J2KG M24J5KG M26J8KG M26J9KG
M27J9KG M28J4KG M30J9KG M31J9KG
M33J7KG M34H4KG M35H0KG M35J0KG
M35J7KG M35H8KG M36H7KG M36J2KG
M36J3KG M37J4KG M39J3KG M41J1KG
M41J2KG M41H3KG M41J3KG M41J7KG
M41J8KG M44J4KG M44J6KG M45J2KG
M45J8KG M45J9KG M46J7KG M52H9KG
M61J8KG M61J9KG M62J5KG M64J4KG
M64J5KG M64J6KG M67H2KG M67J4KG
M69J1KG M70J6KG M73J4KG M76H6KG
M80H2KG M80H3KG M84H9KG M85H0KG
M88H6KG M88H7KG M89H5KG M89H6KG
M92H0KG M95H7KG M97H8KG M99H3KG
CERTIFICATIONS REQUIRED WITH DELIVERY OF MATERIAL (CIM 2012-1)
All certifications are required to be delivered with the material. Payment on material for which certifications are not received will be withheld.
EUROPEAN UNION RESTRICTIONS REGARDING NONMANUFACTURED WOOD PACKAGING AND PALLETS
All European shipments with wood pallets and wood containers produced of nonmanufactured wood shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) material and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Nonmanufactured Wood Packing Policy and Nonmanufactured Wood Packing Enforcement Regulations dated May 30, 2001.
Reference:
http://www.aphis.usda.gov/ppq/swp/eunmwp.html for information and material sources
Award of the contract resulting from this solicitation will be made to the responsible offeror whose proposal is technically acceptable, in full compliance to all other requirements set forth in the solicitation, and the lowest cost or price. The Government reserves the right to judge which proposals show the required capability. The Government also reserves the right to eliminate from further consideration those proposals
REVIEW OF AGENCY PROTESTS
(a) The contracting activity, will process agency protests in accordance with the requirements set forth in FAR 33.103(d).
(b) Pursuant to FAR 33.103(d)(4), agency protests may be filed directly with the appropriate Reviewing Authority or a protester may appeal a decision rendered by a Contracting Officer to the Reviewing Authority.
(c) Agency procurement protests should clearly identify the initial adjudicating official, i.e., the "Contracting Officer" or "Reviewing Official".
(d) Offerors should note this review of the Contracting Officer's decision will not extend GAO's timeliness requirements. Therefore, any subsequent protest to GAO must be filed within 10 days of knowledge of initial adverse agency action.
EVALUATION FACTORS FOR AWARD (LOW COST, TECHNICALLY ACCEPTABLE)
Award of the contract resulting from this solicitation will be made to the responsible offeror whose proposal is technically acceptable, in full compliance to all other requirements set forth in the solicitation, and the lowest cost or price. The Government reserves the right to judge which proposals show the required capability. The Government also reserves the right to eliminate from further consideration those proposals which are considered unacceptable and not capable of being made acceptable without major rewrite or revision.
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (ISO 9001)
NOTICE: When the Contractor is not the manufacturer of the items to be furnished, the Contractor represents it is offering to furnish items produced in a manufacturing facility conforming to the higher-level quality standard required in this purchase order/contract. When requested, either prior to award or at time of Government inspection, the Contractor shall furnish evidence to document this representation (e.g., the Contractor's purchasing system contracts and records; in-plant audits of the manufacturer's quality system by third parties; registration/certification documents; and/or other relevant supporting documents).
The contractor shall comply with the International Organization for Standardization (ISO) 9001, dated January 1, 1994. (The ISO 9001 standard can be ordered from the ANSI Electronics Standards Store at http:/ www.ansi.org/ http://www.ansi.org/)
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FULL ISO 9002)
NOTICE: When the Contractor is not the manufacturer of the items to be furnished, the Contractor represents it is offering to furnish items produced in a manufacturing facility conforming to the higher-level quality standard required in this purchase order/contract. When requested, either prior to award or at time of Government inspection, the Contractor shall furnish evidence to document this representation (e.g., the Contractor's purchasing system contracts and records; in-plant audits of the manufacturer's quality system by third parties; registration/certification documents; and/or other relevant supporting documents).
The contractor shall comply with the International Organization for Standardization (ISO 9002), Second Edition, dated July 1, 1994. (The ISO 9002 Standard can be ordered from the ANSI Electronics Standards Store at http://www.ansi.org/)
CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS
a. DEFINITIONS:
(1) . A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the Engineering change item.
(2) . A proposed engineering change and the documentation by which the change is described, justified, and Engineering change proposal (ECP) submitted to the Government for approval or disapproval.
(3) . A specific written authorization, granted prior to the manufacture of an item, to depart from a particular requirement(s) of an item's Deviation current approved configuration documentation for a specific number of units or a specified period of time. (A deviation differs from an engineering change in that an approved engineering change requires corresponding revision of the item's current approved configuration documentation, whereas a deviation does not.)
(4) . A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or Waiver acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method.
b. . ECPs should be used to make permanent changes in the Government Technical Data Package (TDP). Contractual Contractor Responsibility relief should be requested using a Request for Deviation or Waiver. This is because the Government requires more time to analyze any proposal to permanently change the specifications or TDP. Cost saving improvements to the TDP should be submitted as a Value Engineering Change Proposal
(VECP).
NOTE: MIL-STD-973* allows ninety days to process routine ECPs. If the contractor needs a response in less than ninety days to meet contract requirements, the contractor should consider submitting a waiver or deviation along with the ECP.
Processing Emergency and Urgent ECPs. Ordinarily, ECPs submitted by the contractor will be deemed routine. If an ECP is considered to be an emergency or urgent (as defined in MIL-STD-973), immediately notify the PCO. ECPs will be reviewed for a determination on criticality, and, if determined to be urgent or critical, the appropriate processing time-frame in paragraph 5.4.2.3.1.1 of MIL-STD-973 will be followed or the contractor will be notified otherwise.
When submitting an ECP or Request for Deviation/Request for Waiver (RFD/RFW), the contractor must follow the instructions in MIL-STD-973 (as tailored in the following paragraphs).
(1) Engineering Change Proposals--Required Content.
(a) Follow the short form procedure in MIL-STD-973.
1. paragraphs 5.4.8 through 5.4.8.2.1;
2. paragraphs 5.4.8.2.3 through 5.4.8.2.7; and
3. Appendix D instructions.
(b) Include:
1. Requirements for notices of revision (NOR). (Instructions for NORs are in MIL-STD-973, paragraph 5.4.7 and Appendix G.)
2. Copies of drawings that have clearly been marked to identify the proposed change.
3. Any other documentation that will help in reviewing the proposed change.
(2) Request for Deviation/Request for Waiver - Required Content.
(a) Follow the short form procedure in MIL-STD-973.
For RFD(s) -- paragraphs 5.4.8.3 through 5.4.8.3.4; Appendix E instructions.
For RFW(s) -- paragraphs 5.4.8.4 through 5.4.8.4.4; Appendix E instructions.
(b) Include marked drawings and any other documentation that will be required to review the proposed RFD/RFW.
(c) Identify the number of parts affected in block 17 of DD Form 1694.
c. Submittal Procedures
(1) Engineering Change Proposals (ECP), Deviations and Waivers initiated by the contractor must be prepared and submitted in 7 copies with supporting data as required by b.(1) above to the ACO, with an information copy to the PCO.
WARNING: If you do not submit complete, legible packages, ECPs may be returned without processing.
(2) Value Engineering Change Proposals (VECPs) must comply with the requirements of the Value Engineering Incentive clause of the contract and MIL-STD-973 and be submitted utilizing DD Form 1693 in 6 copies to the PCO with an information copy to the ACO, and an additional copy mailed direct to Defense Supply Center Columbus, P.O. Box 3990, Columbus, Ohio 43216-5000, ATTN: DSCC-VE.
d. Contracting Agency responsibilities.
(1) ACO Responsibility. Within ten working days from the date of receipt of contractor's request, the ACO must submit an original and two complete legible copies of the contractor's request to the applicable technical support office.
(2) ECPs will be reviewed and decided upon within the ninety day time frame established by MIL-STD-973. Notification of decision will be done in accordance with paragraphs 5.4.8.2.6 and 5.4.8.2.7 of MIL-STD-973.
(3) RFDs/RFWs will be reviewed per MIL-STD-973 and decisions made within 75 days from the date of receipt from the ACO.
e. Reminder - Only the PCO can change the Contract. NO OTHER GOVERNMENT REPRESENTATIVE is authorized to make a commitment for, or bind the Government.
f. Questions about the status of change requests already submitted should be directed to the procuring activity.
g. The period of time for evaluation and approval/disapproval of ECPs (90 days) and Deviation/Waiver (75 days) shall not constitute excusable delay in the performance of this contract by the contractor or in any way relieve the contractor from compliance with the contract delivery schedule. The submission of ECPs or deviation/waiver requests by the contractor shall not preclude the Government from exercising its rights under the default clause or any other provision of the contract. Further, any such submission shall not afford the contractor any basis for a delay claim or adjustment of the contract delivery schedule, provided the Government approves or disapproves the submission within a period of 90 days after receipt thereof by the contracting officer.
*This standard has been cancelled effective September 30, 2000 (MIL-STD-973, Notice 4), but is still required for the procurement and control of this item. Copies of MIL-STD-973, Notice 3, which includes the base document, may be obtained from: http://assist.daps.dla.mil
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038)
Feb 2026
52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026- O0038)
Feb 2026
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026-O0038) Feb 2026 52.222-3 Convict Labor. (Deviation 2026-O0038) Feb 2026 52.222-19 Child Labor-Cooperation with Authorities and Remedies. (Deviation 2026-O0038) Mar 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026-O0038) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026
52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0040, Revision 1)
Apr 2026
52.223-23 Sustainable Products. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026 52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026- O0038)
Apr 2026
52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.253-1 Computer Generated Forms. (Deviation 2026-O0038) Feb 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022
252.204-7012 Safeguarding Covered…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .