Solicitation_Package_140R6024Q0082.pdf
PDF 11 MB Posted
- Solicitation number
- 140R6024Q0082
About this file
This document is a Solicitation Package for the MT- CF-HELLGATE CAMPGROUND WATER SYSTEMS EXPANSION contract opportunity, Solicitation Number 140R6024Q0082, issued by the Department of the Interior Bureau of Reclamation.
The solicitation seeks a contractor to provide water system expansion services at the Hellgate Campground. Key requirements include upgrading the existing water distribution system, expanding the number of water hookups, and installing new water lines. The period of performance is 120 days from the date of award. Pricing is requested on a firm-fixed-price basis. The procurement is unrestricted, with no set-asides. Proposals are due by 4:00 PM MT on May 16, 2024, and the anticipated award date is June 15, 2024. The incumbent contractor is unknown.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R6024Q0082_Amd_0001.pdf | ||
| SF30_0001_140R6024Q0082_0001.pdf | ||
| Solicitation_140R6024Q0082_Amend_0001_0001.pdf | ||
| Sol_140R6024Q0082.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hellgate Campground Water System Expansion Bureau of Reclamation Solicitation #: 140R6024Q0082 Missouri Basin Regional Office
Cover Page Hellgate Campground Water System Expansion
This combined Synopsis / Solicitation is a Total Small Business Set-Aside using NAICS code 221310 Water Supply and Irrigation Systems; This is a total small business set-aside with size standard of $41 million. This combined synopsis/solicitation for commercial items is prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice.
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05 effective 5/22/2024.
This announcement constitutes the only solicitation to be issued; quotes are being requested and a written solicitation using the Standard Form 1449 will not be issued.
Combined Synopsis / Solicitation Closing Date: 5 September 2024 Combined Synopsis / Solicitation Closing Time: 16:30 (4:30 PM) Mountain Daylight Time
ONLY ELECTRONIC QUOTES will be accepted for this requirement. Quotes must be electronically delivered to:
Ms. Branddy Stevenson E-mail: bstevenson@usbr.gov
E-mailed proposals must be in the following format: One (1) PDF document for full quote.
E-mailed proposals must be received by the Contract Specialist via e-mail no later than 16:30 hours (4:30 PM) MDT 5 September 2024 to be considered for award.
E-mail subject line must contain the following naming scheme:
Request for Quotes – Company Name RFQ # 140R6024Q0082 – Hellgate Campground Water System Expansion
Inquiries regarding this Solicitation should be made to:
Ms. Branddy Stevenson, Contract Specialist
E-mail: bstevenson@usbr.gov
All correspondence regarding this Solicitation should reference RFQ No. 140R6024Q0082 – Hellgate Campground Water System Expansion in the subject line.
DEADLINE FOR QUESTIONS: Questions must be submitted to the Contract Specialist at least 48 business hours prior to the closing. Any questions submitted after the deadline will not be answered.
In order to have a quote considered for award, the contractor must be registered at the System for Award Management (SAM) website (https://www.sam.gov) as an active vendor by the time an award decision is necessary.
NOTE: A filled-out Price Schedule MUST be submitted. The required missing Price Schedule will be considered non-responsive.
mailto:E-mail:%20mhirsch@usbr.gov mailto:bstevenson@usbr.gov
P a g e 1 | 2
Combined Synopsis / Solicitation Hellgate Campground Water System Expansion for Missouri Basin Region
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(1) Offerors shall complete Price Schedule.
(b) Offers are subject to the terms and conditions of this combined synopsis/solicitation.
(c) CLIN – Contract Line-Item Number
(d) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05 effective 05/22/2024. This announcement constitutes the only solicitation to be issued; quotes are being requested and a written solicitation using the Standard Form 1449 will not be issued.
Price Schedule
Item Work or Material Unit of Measure
Unit Price Total Amount
1 Pre-Cast Concrete Utility Building EA $ $
2 Booster Pump EA $ $
3 Piping, fittings, and storage LS
(LUMP
SUM)
TOTAL FOR PRICE SCHEDULE $_________________
Vendor Name
Point of Contact
Address
Name
City, State
ZIP
SAM UEI # Phone
P a g e 2 | 2
Anticipated Delivery days from receipt of purchase order
Hellgate Campground Water System Expansion Bureau of Reclamation Solicitation No. 140R6024Q0082 Missouri Basin Regional Office
Price Schedule B - 1
Statement of Work Water Distribution and Storage Material Supply
Bureau of Reclamation
CANYON FERRY RESERVOIR, MT
1.0 Background
The Bureau of Reclamation’s Missouri Basin Regional Office (MBRO) anticipates the award of a purchase order for the supply and delivery of the following to an area on the Hellgate Campground at Canyon Ferry Reservoir:
A. Potable water buried pipe and fittings;
B. Process piping and plumbing pipe, fittings, valves, including specialty valves and controls, and appurtenances;
C. Pumps and controls;
D. Potable water storage tanks, fittings, and appurtenances; and E. Pre-cast concrete utility building.
Government forces will construct the project. This Statement of Work is for procurement of materials to build the project. Measurement and Payment sections of these specifications are in reference to this Supply Contract. Specialty Items that include work beyond procurement as part of this Contract are as follows:
A. Pre-Cast Concrete Utility Building: Supplier shall off-load the building and set it in its final location.
B. Pressure Sustaining Valve: Supplier shall provide qualified representative for one-time valve startup and testing during commissioning phase of project.
C. Booster Pump: Supplier shall provide qualified representative for one-time pump startup and testing during commissioning phase of project.
2.0 Scope
The Supplier shall provide all labor, equipment, tools, materials, transportation, expertise, supervision, start-up services on specialty valves and pumps, and other items and incidental services necessary to supply and deliver the specified materials needed for the construction of the project as shown in the project Plans and Specifications. Supplier is responsible for reviewing and understanding the Plans in order to assure reasonable material supply.
3.0 Objectives
The project will consist of the supply and delivery of the specified materials on site. The Contract includes all pipe, fittings, buildings, tanks, pumps, controls, plumbing and appurtenances to construct the project Plans following the Specifications.
Hellgate Campground Water System Expansion Bureau of Reclamation
B - 2
4.0 Reference Standards
Reference Standards are defined in applicable Specifications.
5.0 Tasks
The Supplier shall provide all labor, equipment, tools, materials, transportation, expertise, supervision, start-up services on specialty valves and pumps, and other items and incidental services necessary to supply and deliver the specified materials needed for the construction of the project. The following Exhibits are incorporated into this Contract:
A. The Bid Schedule is included in Exhibit A as Section B – Supplies and Prices.
B. The project Plans and Specifications are included in Exhibit B:
6.0 Delivery
The contractor shall furnish everything (equipment, materials, supplies, incidentals, etc.) required to successfully complete the tasks identified in the purchase order.
Supplier of the Utility building shall provide equipment and personnel to pick and set the building in its final place.
Delivery Dates:
Buried pipe components shall be delivered within 75 days of Notice to Proceed.
Utility Building shall be delivered and set in place within 90 days of Notice to Proceed.
All interior building process piping, tanks, pumps, specialty valves and controls shall be delivered within 90 Days of Notice to Proceed.
Supplier shall notify Onsite Delivery Contact at least 3 days in advance of delivery.
Onsite Delivery Contact:
Dustin Ramoie Office: (406) 475-3922 Cell: (406) 217-2560
7.0 Site Conditions
The Government will provide a suitable location for the Supplier to stockpile delivered materials. The Government will provide equipment and personnel to off-load delivered items with the exception of the Utility Building.
Hellgate Campground Water System Expansion Bureau of Reclamation
B - 3
8.0 Place of Performance
Work will be performed at the following location:
Department of the Interior Bureau of Reclamation Hellgate Campground Canyon Ferry Reservoir Lewis and Clark County, MT
Approximate GPS Coordinates: 46.612637° N, -111.649702° W
9.0 Definitions
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. CO indicates Contracting Officer.
10.0 Submittals
RSN Submittal Submittal Required Due date or Delivery Time
Submit to
13 34 25-1 Manufacturer’s Information
Product Data and Installation Instructions
Minimum of 28 days prior to Manufacturing
CO
33 10 10-1 Product Data Manufacturer’s Data Sheets Minimum of 14 days prior to Ordering
CO
33 10 10-2 Shop Drawings Pump, Controls and Accessories Shop Drawings
Minimum of 14 days prior to Ordering
CO
33 26 60-1 Approval Data Manufacturers Pipe, Fittings, Valves, Fixtures, and Accessory Data
Minimum of 14 days prior to Ordering
CO
33 26 60-2 Qualifications Manufacturer Certifications Minimum of 14 days prior to Ordering
CO
33 26 61-1 Product Data Tank Manufacturer Data Minimum of 28 days prior to Manufacturing
CO
33 26 61-2 Shop Drawings Tank Detailed Shop Drawings
Minimum of 28 days prior to Manufacturing
CO
Contract Specialist: Branddy Stevenson, bstevenson@usbr.gov
Contracting Officer: Michael Hirsch, mhirsch@usbr.gov mailto:mhirsch@usbr.gov
Hellgate Campground Water System Expansion Bureau of Reclamation
B - 4
SECTION B – SUPPLIES OR SERVICES AND PRICES
HELLGATE CAMPGROUND WATER DISTRIBUTION SYSTEM EXPANSION
CANYON FERRY RESERVOIR
Canyon Ferry, Montana
C.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 13 34 25 Pre-Cast Concrete Utility Building
For the lump sum of $
2 33 10 10 Booster Pump For the lump sum of $
3 33 26 60 3” DR-11 HDPE 5,000 lin ft $ $
4 33 26 60 1 ½” DR-11 HDPE 1,000 lin ft $ $
5 33 26 60 3” DR-11 90˚ Butt End Bend
5 ea $ $
6 33 26 60 3” x1 ½” SDR-11 Butt End Reducer
10 ea $ $
B - 5
Hellgate Campground Water System Expansion Bureau of Reclamation
Unit Price
Amount
7 33 26 60 3” Curb Stop and Box (or 3” Flanged Gate Valve with flange adapters and Box)
8 ea $ $
8 33 26 60 1 ½” FIP Ball Curb Stop and Box with DR-11 HDPE Butt x MIP Adapters
10 ea $ $
9 33 26 60 Self Closing Sanitary Yard Hydrant
8 ea $ $
10 33 26 60 Draining Frost-Free Sanitary Yard Hydrant
2 ea $ $
11 33 26 60 2 ½” Type L Hard Copper Tube
20 lin ft $ $
12 33 26 60 2 ½” Type L Hard Copper x 3” DR-ll HDPE Transition Coupler
2 ea $ $
13 33 26 60 1 ½” Type L Hard Copper Tube
20 lin ft $ $
14 33 26 60 1 ½” x 2 ½” Type L Hard Copper Reducer
2 ea $ $
15 33 26 60 ½” Type L Hard Copper Tube
20 lin ft $ $
16 33 26 60 Pressure Sustaining Valve 1 ea $ $
17 33 26 60 Flow Meter 1 ea $ $
18 33 26 60 Copper Flange Adapters ANSI 150# 1 ½” to 1 ½”Type L Copper
2 ea $ $
19 33 26 60 Type L Tube Style U Pipe Support
10 ea $ $
20 33 26 60 Overflow and Vent Piping Clevis Hanger Pipe Support
4 ea $ $
21 33 26 60 Overflow Piping Style U Pipe Support
2 ea $ $
22 33 26 60 Bladder Pressure Tank 1 ea $ $
B - 6
Hellgate Campground Water System Expansion Bureau of Reclamation
Unit Price
Amount
23 33 26 60 3” Sch. 40 PVC 10 lin ft $ $
24 33 26 60 3” Sch. 40 PVC 90˚ Bend 4 ea $ $
25 33 26 60 4” Sch. 40 PVC 10 lin ft $ $
26 33 26 60 4” Sch. 40 PVC 90˚ Bend 6 ea $ $
27 33 26 60 2 ½” Ball Valve 4 ea $ $
28 33 26 60 1 ½” Ball Valve 2 ea $ $
29 33 26 60 ½” Ball Valve 3 ea $ $
30 33 26 61 500 Gallon Potable Water Tank
2 ea $ $
TOTAL FOR PRICE SCHEDULE $
END OF SUPPLIES OR SERVICES AND PRICES
B - 7
Hellgate Campground Water System Expansion Bureau of Reclamation
This page intentionally left blank.
Table of Contents 00 01 10 - 1
Hellgate Campground Water System Expansion Bureau of Reclamation
SECTION C - DESCRIPTION / SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 25 Utility Building
DIVISION 31 - EARTHWORK
31 23 02 Compacting Earth Materials 31 23 22 Pipe Trench Earthwork 31 23 39 Disposal of Excavated Materials
DIVISION 33 - UTILITIES
33 10 10 Booster Pumps 33 26 60 Water Distribution 33 26 61 Potable Water Tanks
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 13 34 Photographs
DIVISION 52 - DRAWINGS
52 00 00 Drawings
END OF CONTENTS
Table of Contents 00 01 10 - 2
Hellgate Campground Water System Expansion Bureau of Reclamation
Utility Building 13 34 25 - 1
Hellgate Campground Water System Expansion Bureau of Reclamation
SECTION 13 34 25
UTILITY BUILDING
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Pre-Cast Concrete Utility Building:
1. Measurement: Each Pre-Cast Concrete Utility Building supplied, designed, delivered, and placed at site.
2. Payment: Unit Price offered in the Price Schedule.
1.02 SUBMITTALS
A. RSN 13 34 25-1, By Supplier. Manufacturer’s Information:
1. Manufacturer’s product data.
2. Manufacturer’s installation instructions.
PART 2 PRODUCTS
2.01 UTILITY BUILDING-By Supplier
A. Utility Building shall match existing pre-cast concrete utility buildings at the Campground (see Section 51 13 34 – Photographs).
B. Model Schweitzer II Utility Building manufactured by CXT Concrete Building Model Schweitzer II Utility Building as manufactured by LB Foster Company, 606 N. Pines Road, Suite 202, Spokane Valley, WA 99206, lbfoster.com or approved equal having the following salient characteristics:
1. 10.5 ft by 20 ft Utility Building.
2. Wall Texture: Barn Wood
3. 60” wide by 68” high bi-fold door assembly
4. Color: Java Brown.
5. Roof Texture: Cedar Shingles
2.02 PIPE PENETRATION-By Supplier
A. Design and install pipe penetrations in the floor as shown on plans.
B. Design and install wall pipe penetrations for tank overflow piping as shown on plans.
13 34 25 - 2
Hellgate Campground Water System Expansion Bureau of Reclamation
2.03 LOCK CYLINDERS AND KEYING-By Supplier
A. Furnish locks with seven-pin, Best Interchangeable Core, lock cylinders.
1. Furnish lock cylinders with temporary construction core system which can be voided after contract completion.
2. Key locks alike.
B. Government will furnish permanent core system after contract completion.
C. Stamp construction keys with "U.S. Property - Do Not Duplicate" and appropriate key numbers.
D. Furnish three construction keys to CO for Government’s use during construction.
E. Deliver all construction keys to COR at jobsite after completion of work when directed by CO.
2.04 AGGREGATE LEVELING COURSE-By Government
A. 6" thick course of 3/4" minus crushed rock (i.e. road base material). Grade 6A in Table 701-8 from Montana Department of Transportation Standard Specifications for Road and Bridge Construction 2020 Edition V5.0 is acceptable for use.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install in accordance with manufacturer’s instructions.
1. Government:
a. Prepare subgrade in accordance with the manufacturer’s recommendations. If no recommendations are provided:
1) Ensure the soil and base have a minimum capacity of 1,500 pounds per square foot bearing pressure. Compact in accordance with Section 31 23 02 – Compacting Earth Materials.
2) Compact 3/4"minus crushed rock per in accordance with Section 31 23 02 – Compacting Earth Materials
3) Finish surface of sub-base shall be flat and level, with a maximum deviation of -1/2", +0" from a true horizontal plane.
4) Grade to provide an even and uniform surface, and compact.
13 34 25 - 3
Hellgate Campground Water System Expansion Bureau of Reclamation
b. Finish ground surface around building perimeter shall be graded a minimum of 2% for a distance of at least 25 feet from the building to provide positive drainage. Grade all areas within 50 feet of the building in such a way as to prevent standing surface water.
2. Supplier
a. Offload and set building in its final location.
END OF SECTION
13 34 25 - 4
Hellgate Campground Water System Expansion Bureau of Reclamation
Compacting Earth Materials 31 23 02 - 5
Hellgate Campground Water System Expansion Bureau of Reclamation
SECTION 31 23 02
COMPACTING EARTH MATERIALS
This Section in its entirety is to be completed by Government.
1.01 DEFINITIONS
A. Use definitions from ASTM D653 (USBR 3900).
B. Control Fraction: The portion of a soil sample consisting of particles smaller than a designated sieve size. The fraction is used to compare in-place unit weight with standard laboratory unit weight. The control sieve size depends on the laboratory test used to determine laboratory maximum density.
C. C-Value: The ratio expressed as a percentage of (1) in-place unit weight at fill moisture content to (2) the wet unit weight of a laboratory-compacted specimen prepared at fill moisture content as determined by the rapid method of construction control in accordance with ASTM D5080 (USBR7240). The C-Value is a comparison of compactive effort of field compaction equipment to standard laboratory compactive effort.
D. D-value: The ratio expressed as a percentage of (1) in-place wet unit weight at fill moisture content to (2) laboratory maximum wet unit weight as determined from a compaction curve constructed at fill moisture content as determined by the rapid method of construction control ASTM D5080 (USBR 7240). The D-value is the equivalent of percent compaction in accordance with ASTM D698 (USBR5500).
E. Percent Compaction: The ratio expressed as a percentage of the in place unit dry unit weight to the laboratory maximum dry unit weight
F. Special compaction: Compaction close to structures or in spaces not accessible by standard width rollers.
1.02 REFERENCE STANDARDS
A. ASTM International (ASTM)
1. ASTM D653-14 Terminology Relating to Soil, Rock, and
Contained Fluids
2. ASTM D698-12 Laboratory Compaction Characteristics of
Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3))
31 23 02 - 6
Hellgate Campground Water System Expansion Bureau of Reclamation
3. ASTM D1140-14 Determining the Amount of Material in Soils Finer than 75-μm (No. 200) Sieve in Soils by Washing
4. ASTM D1556-15 Density and Unit Weight of Soil in Place by the Sand-Cone Method
5. ASTM D2216-10 Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass
6. ASTM D2487-11 Classification of Soils for Engineering Purposes (Unified Soil Classification System)
7. ASTM D2488-09a Description and Identification of Soils (Visual-Manual Procedure)
8. ASTM D4318-10 Liquid Limit, Plastic Limit, and Plasticity Index of Soils
9. ASTM D4546-14 One-Dimensional Swell or Collapse of Soils
10. ASTM D4647/D4647M-13 Identification and Classification of
Dispersive Clay Soils by the Pinhole Test
11. ASTM D4718-15 Correction of Unit Weight and Water
Content for Soils Containing Oversize Particles
12. ASTM D4914-16 Density and Unit Weight of Soil and Rock in Place by the Sand Replacement Method in a Test Pit
13. ASTM D5030-13a Density of Soil and Rock in Place by the Water Replacement Method in a Test Pit
14. ASTM D5080-08 Rapid Determination of Percent Compaction
15. ASTM D6572-13 Determining Dispersive Characteristics of
Clayey Soils by the Crumb Test
16. ASTM D6913-04(2009) Particle-Size Distribution (Gradation) of
Soils Using Sieve Analysis
17. ASTM D6938-15 In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
18. ASTM D7382-08 Determination of Maximum Dry Unit Weight and Water Content Range for Effective Compaction of Granular Soils Using a Vibrating Hammer
19.
31 23 02 - 7
Hellgate Campground Water System Expansion Bureau of Reclamation
B. Bureau of Reclamation (USBR)
1. USBR EM - Earth Manual, Part 2, Third Edition (1990)
2. Procedure No. and Title:
a. USBR 3900-89 Standard Definitions of Terms and Symbols Relating to Soil Mechanics
b. USBR 5000-86 Determining Unified Soil Classification (Laboratory Method)
c. USBR 5005-86 Determining Unified Soil Classification (Visual Method)
d. USBR 5300-89 Determining Moisture Content of Soil and Rock by the Oven Method
e. USBR 5325-89 Performing Gradation Analysis of Gravel Size Fraction of Soils
f. USBR 5330-89 Performing Gradation Analysis of Fines and Sand Size Fraction of Soils, Including Hydrometer Analysis
g. USBR 5335-89 Performing Gradation Analysis of Soils Without Hydrometer
h. USBR 5350-89 Determining the Liquid Limit of Soils by the One-Point Method
i. USBR 5360-89 Determining the Plastic Limit and Plasticity Index of Soils
j. USBR 5400-89 Determining Dispersibility of Clayey Soils by the Crumb Test Method
k. USBR 5410-89 Determining Dispersibility of Clayey Soils by the Pinhole Test Method
l. USBR 5500-89 Performing Laboratory Compaction of Soils--5.5-lbm Rammer and 18-in Drop
m. USBR 7205-89 Determining Unit Weight of Soils In-Place by the Sand-Cone Method
n. USBR 7220-89 Determining Unit Weight of Soils In-Place by the Sand Replacement Method in a Test Pit
o. USBR 7221-89 Determining Unit Weight of Soils In-Place by the Water Replacement Method in a Test Pit
31 23 02 - 8
Hellgate Campground Water System Expansion Bureau of Reclamation
p. USBR 7230-89 Determining Unit Weight and Moisture Content of Soil In-Place - Nuclear Moisture- Density Gauge
q. USBR 7240-89 Performing Rapid Method of Construction Control
3. Guidelines for Earthwork Construction Control Testing of Gravelly Soils, Earth Sciences and Research Laboratory, Technical Service Center, Bureau of Reclamation, Denver, Colorado, September 2008.
1.03 AMBIENT CONDITIONS
A. Do not place and compact soil under following conditions:
1. Rain that creates puddles in clayey or silty materials.
2. Heat or wind or both that dries material below specified moisture conditions.
3. Ice, frost, or snow pockets are visible in soil being placed or in underlying materials.
B. Ambient air temperature below freezing may make placement and compaction operations difficult.
1. Minimize interruptions of operations.
2. Continuous operations may be required to eliminate freezing of materials.
3. Obtain COR approval, before performing operations when ambient air temperatures are below freezing.
4. Cease operations when placed materials are freezing or below freezing.
2.01 CLASSIFICATION
A. When required, classify earth materials using the Unified Soil Classification System (USCS) according to ASTM D2487 (USBR 5000) or ASTM D2488 (USBR 5005).
1. Gradation tests for classification: ASTM D422 or D1140 (USBR 5325, 5330 or
5335).
2. Atterberg limits testing for classification: ASTM D4318 (USBR 5350, 5335, or
5360).
31 23 02 - 9
Hellgate Campground Water System Expansion Bureau of Reclamation
2.02 SOIL TYPES
A. Clean Fill:
1. Any soil except soils with classifications Peat (PT), Organic Silts and Organic
Clays (OL and OH), or Elastic Silt (MH) per ASTM D2487 (USBR 5000).
2. Do not use soils that exhibit expansive or dispersive characteristics in accordance with ASTM D4546, ASTM D4647 (USBR 5410), or ASTM D6572 (USBR 5400).
3. Free of roots, stumps, limbs, vegetation, organic matter, and ice.
4. Does not contain construction debris, scrap materials, refuse, man-made wastes, or chemical or hydro-carbon contamination.
B. Do not use frozen soils.
C. Special Gradations and Plasticity.
1. In some cases, such as embankment materials, embedment for buried pipe, special gradations and/or plasticity characteristics may be required. These requirements are in the applicable Section.
2.03 DESIGNATION OF SOILS FOR COMPACTION
A. Requirements for lift thickness, method of compaction, and method of determining degree of compaction depends on whether soil is considered to be silty or clayey, cohesionless, or cohesionless containing some silt and clay.
B. Silty or Clayey Soils:
1. Contains appreciable amounts of fines (more than 15 percent plastic fines or 30 percent non-plastic fines).
C. Cohesionless Soils:
1. Contains few fines (less than 5 percent fines).
D. Cohesionless Soils Containing Some Clay and Silt:
1. Contains some clay and silt (between 5 percent fines and 15 percent plastic fines or
30 percent non-plastic fines).
2.04 MAXIMUM PARTICLE SIZE
A. Soil for compacted backfill and embankment:
1. Maximum particle size limitations described in appropriate Sections for backfill against specific structures and zoned embankment materials.
2. Otherwise, no cobbles larger than 5-inches or boulders.
31 23 02 - 10
Hellgate Campground Water System Expansion Bureau of Reclamation
3.01 SURFACE PREPARATION
A. Clear, grub, and strip.
B. Prepare surface so that first compacted lift will be placed on firm, stable base. Compact surface to specified compaction, if necessary.
C. For water-retaining compacted fill, scarify and moisten surface to provide satisfactory bonding surface before placing layer of material to be compacted.
3.02 SOIL MOISTURE CONTENT
A. Moisten or aerate material, as necessary, to provide moisture content that will readily facilitate obtaining specified compaction. Add water to soil only in increments that will permit moisture content to be uniform and homogenous throughout each layer after mixing.
B. Silty and Clayey Soils and Cohesionless Soils Containing Some Silt and Clay:
1. Add no more than 2 percent water to fill by sprinkling just prior to compaction when fill is clayey and contains dry clods of clay.
a. If clayey borrow soil is more than 2 percent below optimum moisture, pre-conditioning and curing may be required to obtain uniform and homogenous distribution of moisture in the clods.
b. Use of disks, harrows, or rakes may be required to blend moisture in the borrow area.
2. Moisture content during compaction:
a. Soils controlled by impact compaction.
1) Not greater than 2 percentage points wet or not less than 4 percentage points dry of optimum moisture content.
b. Soils controlled by the vibrating hammer.
1) Within the water content range for effective compaction as determined by ASTM D7382.
C. Cohesionless Soils:
1. Add water during compaction, as necessary, since these soils are free-draining.
31 23 02 - 11
Hellgate Campground Water System Expansion Bureau of Reclamation
D. Determine moisture with one of the following:
1. ASTM D1556 (USBR 7205).
2. ASTM D4914 (USBR 7220).
3. ASTM D5030 (USBR 7221).
4. ASTM D5080 (USBR 7240).
5. ASTM D2216 (USBR 5300).
6. ASTM D6938 (USBR 7230).
a. Correct moisture from the nuclear gage for gauge error for the specific soils tested and the moisture content of the total material may require adjustment for the control fraction. See ASTM D4718 (USBR 7230, Method-C).
3.03 PLACEMENT
A. Place soils to be compacted in horizontal layers.
B. If necessary, blend materials so that compacted fill is homogenous and free from lenses, pockets, streaks, voids, laminations, or other imperfections.
3.04 COMPACTION
A. Compact material with following methods and techniques appropriate to type of soil.
B. Silty or clayey material:
1. Compact with mechanical impact tampers, tamping rollers, vibrating pad foot rollers, rubber tire rollers, other suitable compaction equipment, or equipment travel.
a. Uniformly distribute equipment passes.
b. Compact in horizontal layers to compacted thickness of 6 inches or less.
2. Special compaction: Compact with hand held impact tampers, or small tamping equipment.
a. Uniformly distribute effort.
b. Compact in horizontal layers to compacted thickness of 4 inches.
3. Density:
a. Percent Compaction, minimum: match existing compaction in native grass areas and 95% in areas under roads, concrete pads or buildings.
C. Cohesionless free-draining material:
1. Compact with crawler-type tractors, vibrating drum rollers, surface plate vibrator, or similar equipment
31 23 02 - 12
Hellgate Campground Water System Expansion Bureau of Reclamation
a. Uniformly distribute equipment passes.
b. Compact in horizontal layers to compacted thickness of 12 inches or less.
2. Special compaction: Compact with hand held impact tampers, vibrating plate tampers, or small tamping equipment.
a. Uniformly distribute effort.
b. Compact in horizontal layers to compacted thickness of 6 inches.
3. Density:
a. Percent Compaction, minimum: match existing compaction in native grass areas and 95% in areas under roads, concrete pads or buildings.
D. Cohesionless Soils Containing Some Silt and Clay:
1. Compact in accordance with either procedure above.
2. Density:
3. Percent Compaction, minimum: Density:
a. Percent Compaction, minimum: match existing compaction in native grass areas and 95% in areas under roads, concrete pads or buildings.
E. Demonstration:
1. Lift thicknesses may vary depending on equipment and methods. Before changing requirements in this Section, demonstrate that required density will be obtained.
3.05 MEASURE OF COMPACTION
A. Determine unit weight of soils in-place using one of the following methods:
1. Silty or Clayey and Cohesionless Soils:
a. ASTM D1556 (USBR 7205).
b. ASTM D4914 (USBR 7220).
c. ASTM D5030 (USBR 7221).
d. ASTM D6938 (USBR 7230).
B. Determine soil compaction by one of the following.
1. Silty or clayey soils:
a. Percent Compaction:
1) Rapid Method: ASTM D5080 (USBR 7240).
31 23 02 - 13
Hellgate Campground Water System Expansion Bureau of Reclamation
2) Laboratory Compaction Test: Comparison of in-place dry unit weight of minus no. 4 sieve size control fraction to laboratory maximum dry unit weight as determined by ASTM D698, Procedure A (USBR 5500).
2. Cohesionless soils:
a. Percent Compaction: In-place dry unit weight compared to the maximum dry unit weight determined by ASTM D7382.
3. Cohesionless Soils Containing Some Silt and Clay:
a. Use whichever testing procedure result requires higher in-place dry density.
C. Adjustment:
1. For soils with 5 to 30 percent oversized particles: In-place unit weight of minus
no. 4 size control fraction determined by screening gravel, washing, and determining mass and volume by assuming surface saturated dried moisture as outlined in ASTM D4718 (USBR 7205).
2. For soils containing greater than 30 percent oversized particles: Required D ratio or Percent Compaction may be adjusted in accordance with appropriate curve on
Figure 3 in USBR Guidelines for Earthwork Construction Control Testing of Gravelly Soils.
3.06 GOVERNMENT CONTRACT FIELD QUALITY ASSURANCE
A. Testing:
1. The Government will perform tests as required to verify that type of soil used, placement of soil, and compaction of soil conform to contract requirements.
2. Standards listed in Table 31 23 02A - Testing Standards and Frequency will be used by the Government for testing compacted soil for conformance with specification requirements. Substitution or modification of standards shall be done only with concurrence of all parties.
B. Testing Frequency:
1. Frequency of testing is at discretion of the Government.
2. Greater frequency of testing is normally performed at beginning of new work, new work crew, or new equipment.
3. After a successful work operation pattern is established, testing frequency is normally performed as listed in Table 31 23 02A - Testing Standards and Frequency.
31 23 02 - 14
Hellgate Campground Water System Expansion Bureau of Reclamation
Table 31 23 02A –Testing Standards and Frequency
PROCEDURE TEST
STANDARD
STANDARD TITLE MINIMUM FREQUENCY OF
TESTING
Soil Classification
ASTM D2487
(USBR 5000)
Classification of Soils for Engineering Purposes
As necessary to classify material to meet specification requirements or to index material for determining density by nuclear method. ASTM D2488
(USBR 5005)
Description and Identification of Soils
Moisture Content
ASTM D2216
(USBR 5300)
Laboratory Determination of Water (Moisture Content of Soil and Rock by Mass.
With in-place density or as required to index material for determining density by nuclear method.
Oversized Correction
ASTM D4718 Correction of Unit Weight and Water Content for Soils Containing Oversize Particles
When oversize material is between 5 to 30 percent
Rock Factor USBR Guidelines for Earthwork Construction Control Testing of Gravelly Soils
When oversize material is greater than 30 percent
Nuclear Method
ASTM D 6938
(USBR 7230)
In-Place Density and Water Content of Soil and Soil- Aggregate by Nuclear Methods (Shallow Depth)
Compacted Base: One test every lift of building subbase and base backfill. Minimum 1 test per foundation prior to concrete placement.
C. Government Support:
1. Provide timely access to areas for density testing and excavate and level an area in compacted material to provide a surface for testing.
a. Test fills compacted by sheepsfoot rollers one or two lifts below surface.
2. Dig test pits as requested to examine compacted soil against structures or pipe.
3. Backfill test pits to original requirements.
4. Provide warning lights, flags, or other safety devices as needed by testing personnel.
Pipe Trench Earthwork 31 23 22 - 1
Hellgate Campground Water System Expansion Bureau of Reclamation
SECTION 31 23 22
PIPE TRENCH EARTHWORK
1.01 REFERENCE STANDARDS
A. American Association of State Highway Officials (AASHTO)
1. AASHTO SSHB-02 Standard Specifications for Highway
Bridges, 17th Edition
1.02 DEFINITIONS
A. Additional Excavation: Excavation beyond specified lines as directed by the COR to remove unsuitable foundation material.
B. Overexcavation: Excavation performed for the convenience, fault, or operation of the Contractor beyond specified or directed additional excavation lines.
2.01 MATERIALS FOR BACKFILL
A. Use materials removed in excavating for pipe trenches or from other sources arranged for by the Contractor.
1. The Government makes no guarantee that specified backfill materials are contained in or can be processed from materials excavated from pipe trenches.
B. Provide processing equipment and perform work necessary to process excavated materials to produce materials meeting the requirements of these specifications.
C. Bedding and embedment:
1. Select material: Conform to gradation limits for select material shown in tables on Standard Drawing 40-D-6551.
2. Where pipeline grades exceed 30%, silty or clayey material may be used for embedment in lieu of select material as approved by the COR.
D. Maximum backfill particle size within 1 foot of the outside of pipe: Conform to requirements of Table 31 23 22A – Maximum Backfill Particle Size.
31 23 22 - 2
Hellgate Campground Water System Expansion Bureau of Reclamation
Table 31 23 22A – Maximum Backfill Particle Size
Type of Pipe Maximum Particle Size, inches
Fiberglass, PVC, metallic pipe with dielectric coating, or metallic pipe encased in polyethylene
3/4
Polyethylene Pipe Diameter up to 4-inches
1/2
All other pipe 3
E. Particle size of material placed in compacted backfill, maximum: 3 inches.
F. Backfill placed where pipelines cross under open irrigation ditches and other watercourses: Silty or clayey material with a plasticity index of 8 or more.
3.01 EXCAVATION
A. Excavate pipe trenches for pipelines, delivery installations, and pipeline accessories to lines, grades, and dimensions shown on drawings.
B. Pipe trenches for flexible pipe: Type 1
C. Finish bottom of trench accurately to lines and grades shown on drawings.
D. Perform excavation in the dry.
E. Do not excavate in frozen materials without written approval of the COR.
3.02 ADDITIONAL EXCAVATION
A. Perform additional excavation in trench bottom for pipe foundations as shown on drawings and other additional excavation beyond specified lines, as directed by the COR.
3.03 OVEREXCAVATION
A. When foundation material is overexcavated beyond specified or directed lines, fill the overexcavation with backfill materials and compact in accordance with Section 31 23 02
– Compacting Earth Materials.
31 23 22 - 3
Hellgate Campground Water System Expansion Bureau of Reclamation
B. If foundation material is overexcavated by being disturbed or loosened during excavation, compact material in place or remove and replace with backfill material and compact in accordance with Section 31 23 02 – Compacting Earth Materials.
3.04 STOCKPILING
A. Stockpile excavated materials which meet or will be processed to meet material requirements for backfill in pipe trenches until processed or used as backfill material.
B. Stockpile the top 1 foot of excavated material through grass areas for use as backfill in the top of the trench through grass areas.
3.05 DISPOSAL
A. Dispose of excess excavated materials in accordance with Section 31 23 39 – Disposal of Excavated Materials.
1. Excess excavated materials: Materials which are not used or processed for use as backfill material and waste materials from such processing.
3.06 BACKFILL PLACEMENT
A. Place backfill in pipe trenches to lines shown on drawings, or as directed by the COR.
B. Do not place material in backfill when either the material or the surfaces on which the backfill is to be placed are frozen.
C. Place backfill for overexcavation performed outside specified or directed paylines for excavation for pipe trenches in the same manner as specified for adjacent backfill or embedment.
D. Place bedding material below bottom of pipe before pipe is laid. Grade bedding material parallel to bottom of pipe.
E. Do not drop backfill directly on pipe.
F. Place backfill carefully and spread in uniform layers so that spaces about rocks and clods will be filled.
G. Place backfill in lifts:
1. Backfill to be compacted: In accordance with Section 31 23 02 – Compacting
Earth Materials.
2. Maximum lift height of other backfill: 1 foot.
H. Backfill above compacted backfill may be placed as soon as compacting of backfill is completed although placing of this backfill shall be delayed at locations designated by the COR for the procurement of samples of compacted backfill for testing.
31 23 22 - 4
Hellgate Campground Water System Expansion Bureau of Reclamation
3.07 COMPACTING BACKFILL
A. Compact backfill in pipe trenches in layers having about the same top elevation on both sides of the pipe to prevent unequal loading and displacement of the pipe.
B. Compact backfill as specified in Section 31 23 02 – Compacting Earth Materials.
C. Location of compacted backfill:
1. Backfill where pipelines cross under roadways and driveways.
2. Backfill where other pipelines cross lateral pipelines: To horizontal centerline of the pipeline crossing the lateral pipeline and to dimensions and slopes as shown on the drawings.
3. Backfill at tees with horizontal outlets, pipe bends, encasements, collars including collar-type blocking, and pipe plugs as shown on drawings.
4. Backfill around valve boxes and pipe erected vertically for air valves as shown on drawings.
5. Where additional excavation for pipe trenches is directed by the COR to remove foundation material or other material, compact backfill for this additional excavation as specified within paylines.
D. When tests indicate insufficient density of compacted backfill about pipe:
1. Remove backfill above compacted backfill
2. Compact backfill until proper density is obtained
3. Replace backfill above compacted backfill
4. This work shall be at the Contractor's expense.
3.08 PROTECTION
A. To provide adequate protection for compacted backfill in pipe trenches, the Government reserves the right to direct the Contractor to place a sufficient amount of backfill material over compacted backfill within 72 hours after compacting of backfill has been completed.
B. Place uncompacted backfill to a minimum depth of 3 feet or compact backfill to a minimum depth of 2 feet above top of pipe before allowing construction equipment to travel over pipe.
1. After these minimum earth covers are in place, the maximum equipment loading allowed over the pipe shall be HS-20 loading (16,000-pound wheel load) in accordance with AASHTO SSHB.
31 23 22 - 5
Hellgate Campground Water System Expansion Bureau of Reclamation
2. If construction equipment that exerts a larger wheel load is proposed to be used, submit construction equipment loadings to the COR for analysis and determination of required backfill depths or other protective measures.
31 23 22 - 6
Hellgate Campground Water System Expansion Bureau of Reclamation
Disposal of Excavated Materials 31 23 39 - 1
Hellgate Campground Water System Expansion Bureau of Reclamation
SECTION 31 23 39
DISPOSAL OF EXCAVATED MATERIALS
Not Used
3.01 DISPOSAL OF EXCAVATED MATERIALS
A. Waste material from required excavation which is not suitable or required for backfill, building site grading, or topsoil.
B. Deposit waste excavated material in waste banks on rights-of-way controlled by the Government.
C. Do not place waste material in wetlands, within 12 feet of drainage channels, within 20 feet of edge of prescribed or actual canal cut; within 12 feet of edge of prescribed or actual cuts for laterals, wasteways, or drains.
D. Government will designate waste areas for excavated materials.
1. Place waste banks so they will not:
a. Impede or alter natural flow of streams or cross drainage.
b. Restrict accessibility of completed structures.
c. Detract from appearance of completed project.
E. Do not waste material by dumping from top of slope.
F. Grade waste banks to reasonably even and uniform surfaces that blend with natural terrain.
1. Minimum slope: 2 percent.
2. Maximum slope: 4H:1V.
G. Leave surface in a condition that will facilitate natural revegetation.
Disposal of Excavated Materials 31 23 39 - 2
Hellgate Campground Water System Expansion Bureau of Reclamation
Booster Pumps 33 10 10 - 1
Hellgate Campground Water System Expansion Bureau of Reclamation
SECTION 33 10 10
BOOSTER PUMPS
A. Booster Pump:
1. Measurement: Each duplex booster pump system including controls supplied and delivered to site.
2. Payment: Unit Price offered in the Price Schedule.
1.02 REFERENCE STANDARDS
A. American Water Works Association (AWWA)
1. ANSI/AWWA D120-19 Thermosetting Fiberglass-Reinforced Plastic
Tanks
2. AWWA C652-19 Disinfection of Water Storage Facilities
B. Montana Department of Environmental Quality (MDEQ)
1. Circular MDEQ 1-22 Standards for Water Works
2. Circular MDEQ 3-18 Standards for Small Water Systems
1.03 SUBMITTALS
A. Submit the following to design Engineer of Record for review prior to purchase.
B. RSN 33 10 10-1, By Supplier, Product Data:
1. Submit manufacturer's data sheets on each product to be used, including, but not limited to, the following:
a. Preparation instructions and recommendations.
b. Storage and handling requirements and recommendations.
c. Installation manual and operating guidelines.
C. RSN 33 10 10-2, By Supplier, Shop Drawings:
a. Detailed shop drawings of pump and controls complete with all accessories supplied by the manufacturer.
b. Detailed shipping, handling and installation instructions.
33 10 10 - 2
Hellgate Campground Water System Expansion Bureau of Reclamation
1.04 DELIVERY, STORAGE, AND HANDLING-By Supplier
A. Comply with the pump manufacturer’s Installation and Operating Guidelines recommendations for delivery, storage and handling.
1.05 WARRANTY-By Supplier
A. Provide manufacturer’s standard limited warranty.
PART 2 PRODUCTS
2.01 BOOSTER PUMP-By Supplier
A. Booster pumps shall be a duplex pump system. Booster pump Model CMBE TWIN 99503861 by Grundfos Pump Corporation, 902 Koomey Rd, Brookshire, TX 77423, or approved equal with the following characteristics:
1. NSF Approved for Potable Water.
2. Unit includes duplex pumps, motors, Two (2) 0.528 gallon expansion tanks, pressure and flow sensor controller, check valve, fuse box, base plate and manifold, five-way valve, and communication cables.
3. 1 HP variable speed.
4. Operating point of 32 gpm at 118.27 feet head (51.2 psi).
5. Maximum pumping frequency of 100 starts per hour.
6. Controls (supplied by same manufacturer as pump) shall include cascade control to ensure that second pump starts in case high flow is needed.
7. Pump controls shall alternate pump starts.
8. Pump shall maintain outlet pressure of 51.2 psi.
3.01 TESTING-By Supplier
A. Pump system shall be tested according to the pump manufacturer’s Installation Manual and Operating Guidelines in effect at the time of installation. Supplier shall provide start-up and testing for the pump.
3.02 INSTALLATION-By Government
A. Install the pump, controls, and attached piping and accessories according to the pump manufacturer’s Installation Manual and Operating Guidelines in effect at the time of installation.
B. Set pump controls to maintain minimum pressure.
33 10 10 - 3
Hellgate Campground Water System Expansion Bureau of Reclamation
C. Integrate pressure sustaining valve controls into pump control panel. See Section 33 26 60 – Water Distribution.
33 10 10 - 4
Hellgate Campground Water System Expansion Bureau of Reclamation
Water Distribution 33 26 60 - 5
Hellgate Campground Water System Expansion Bureau of Reclamation
SECTION 33 26 60
WATER DISTRIBUTION
A. Pipe and Tubing:
1. Measurement: All pipe and tube delivered to the site will be measured by the lineal foot of pipe delivered for each type and diameter. Price includes cost of Pipe Accessories-Buried for buried pipe.
2. Payment: Unit Price offered in the Price Schedule.
B. Fittings:
1. Measurement: Each fitting delivered to the for each type and diameter. Fittings that require transitions or appurtenances will be measured as one fitting.
2. Payment: Unit Price offered in the Price Schedule
C. Buried Valves with Valve Boxes:
1. Measurement: Each buried valve with valve box, such as curb stop with curb box, delivered to the site for each type and diameter. Valves that require transitions or appurtenances will be measured as one buried valve.
2. Payment: Unit Price offered in the Price Schedule
A. Frost-Free Hydrants
1. Measurement: Each frost-free hydrant delivered to the site for each type.
Measurement includes transitions and appurtenances.
2. Payment: Unit Price offered in the Price Schedule
B. Above Grade Valves:
1. Measurement: Each above grade valve delivered to the site for each type and diameter. Valves that require transitions or appurtenances will be measured as one buried valve.
2. Payment: Unit Price offered in the Price Schedule
C. Pressure Sustaining Valves:
1. Measurement: Each pressure sustaining valve delivered to the site. Pressure sustaining valve includes controls and supplier start-up assistance.
2. Payment: Unit Price offered in the Price Schedule
33 26 60 - 6
Hellgate Campground Water System Expansion Bureau of Reclamation
D. Flow Meter:
1. Measurement: Each flow meter delivered to the site including controls.
2. Payment: Unit Price offered in the Price Schedule
E. Bladder Pressure Tank
1. Measurement: Each bladder pressure tank delivered to the site, all plumbing, controls, and appurtenances required for installation of the Bladder Pressure Tank.
2. Payment: Unit Price offered in the Price Schedule
1.02 DEFINITIONS
Not Used
1.03 REFERENCE STANDARDS
A. ASTM International (ASTM)
1. ASTM B16.18-21 Cast Copper Alloy Solder Joint Pressure Fittings
2. ASTM B16.24-21 Cast Copper Alloy Pipe Flanges, Flanged Fittings, and Valves: Classes 150, 300, 600, 900, 1500, and
3. ASTM B32-00 Standard Specification for Solder Metal
4. ASTM B88-22 Standard Specification for Seamless Copper Water
Tube
5. ASTM B813-16 Standard Specification for Liquid and Paste Fluxes for Joining by Soldering of Copper and Copper Alloy Tube.
6. ASTM D1785-21 Standard Specification for Poly(Vinyl Chloride)(PVC) Plastic Pipe, Schedules 40, 80, and
7. ASTM D2564-20 Standard Specification for Solvent Cements for Poly(Vinyl Chloride)(PVC) Plastic Piping Systems
8. ASTM D2665-20 Standard Specification for Poly(Vinyl Chloride)(PVC) Plastic Drain, Waste, and Vent Pipe and Fittings
9. ASTM D2729-20 Standard Specification for Poly(Vinyl Chloride)(PVC) Sewer Pipe and Fittings
10. ASTM D2855-20 Standard Practice for the Two-Step (Primer and Solvent Cement) Method of joining Poly(Vinyl Chloride)(CPVC) Pipe and Piping Components with Tapered Sockets.
33 26 60 - 7
Hellgate Campground Water System Expansion Bureau of Reclamation
11. ASTM F626-21 Standard Specification for Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride)(PVC) Plastic Pipe and Fittings.
B. American Water Works Association (AWWA)
1. AWWA C800 Underground Service Line Valves and Fittings
2. AWWA C901-22 Polyethene (PE) Pressure Pipe and Tubing, 3/4 in.
(19 mm) Through 3 in. (76 mm), for Water Service
3. AWWA C651-14 Disinfecting Water Mains
C. American National Standards Institute (ANSI) / National Science Foundation (NSF)
1. ANSI/NSF 61-17 Drinking Water System Components-Health Effects
2. ANSI/NSF 372-22 Drinking Water System Components-Lead Content
D. International Organization for Standardization (ISO)
1. ISO:9001-15 Quality Management Systems Requirements
E. Manufacturers Standardization Society (MSS)
1. MSS SP-123 Non-Ferrous Threaded and Solder-Joint Unions for Use With Copper Water Tube
F. Montana Public Works Standard Specification (MPWSS)
1. MPWSS-22 Montana Public Works Standard Specifications-
Current Edition.
1.04 SUBMITTALS
A. Submit the following to design Engineer of Record for review prior to purchase or testing.
B. RSN 33 26 60-1, By Supplier, Approval Data:
1. Submit manufacturer’s data on pipe materials, fittings, valves, fixtures, and accessories.
C. RSN 33 26 60-2, By Supplier, Qualifications:
1. Certification of line pipe and fitting manufacturers.
2. Certification of NSF 61 compliance of line pipe materials.
33 26 60 - 8
Hellgate Campground Water System Expansion Bureau of Reclamation
D. RSN 33 26 60-3, By Government, Filling and Testing Plan:
1. Proposed rate, time, and procedure for:
a. Cleaning.
b. Filling.
c. Field and pressure testing.
d. Draining pipeline.
2. Method for disposing of water drained from pipeline to enable repair of leaks.
1.05 DELIVERY, STORAGE, AND HANDLING-By Supplier
A. Prevent damage to pipe and fittings during loading, transporting, unloading, storing, and laying.
B. Support and store pipe above ground surface.
C. Government will inspect pipe once it is delivered.
D. Replace or repair, as approved by COR, any pipe that is damaged during shipment at Supplier’s expense. Include linings and coatings.
1.06 QUALIFICATIONS
A. By Supplier: Pipe manufacturers shall be certified in accordance with ISO:9001 or similar nationally certified program approved by CO.
B. By Supplier: Line pipe and fitting manufacturers:
1. 10-years successful experience producing products as specified.
2. Provide references for at least 3 completed projects…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .