Solicitation - N6264926RA067.pdf
PDF 2 MB Posted
- Attached to
- FY26 SEARAY BARGE OVERHAUL
- Solicitation number
- N6264926RA067
About this file
This is a negotiated Request for Proposal (RFP) for the FY26 SEARAY BARGE OVERHAUL, C984, issued by NAVSUP Fleet Logistics Center Yokosuka on August 11, 2026. The solicitation number is N6264926RA067, and sealed offers are due by 10:00 AM Japan Standard Time on August 28, 2026, with a 90-calendar-day proposal validity period. The work is a firm fixed-price job order for ship repair services valued in Japanese Yen (JPY), with the FY26 budget exchange rate of JPY 150.4415 per USD 1.00 applied for government administrative purposes. Offerors must be registered in the System for Award Management (SAM) and possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) certification as a prime contractor; those lacking certification must request an application package from flcy_msra_abr_group@us.navy.mil, noting the process may require up to one year to complete. The solicitation is restricted to sources duly authorized to operate and conduct business in Japan per DFARS 252.225-7042.
The contract requires comprehensive overhaul work on the SEARAY BARGE (Large), a 15.0-meter-long, 12.0-meter-wide vessel with a 3.0-meter depth, currently moored at Dry Dock No. 2, U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC), Yokosuka. The period of performance extends from September 21, 2026, to April 15, 2027. Principal work includes towing the barge to and from the contractor's facility; performing visual inspections of exterior fittings, underwater hull, boot top, and freeboard, as well as interior ballast tanks; repairing and straightening deformed shell plating and fender brackets; replacing eighteen zinc anodes on the underwater hull exterior; cleaning and reinstalling existing zinc anodes on ballast tank interiors; and comprehensive preservation work including near-white blast cleaning and multi-layer marine-grade paint application to freeboard and underwater hull areas per SSPC SP-10 standards, with a required service life exceeding ten years. The contractor must provide all necessary management, scheduling, testing, quality assurance, and technical documentation, maintain a quality management system per NAVSEA Standard Item 009-04, conduct post-award planning meetings within 15 working days, and provide a 90-day warranty following completion. Technical acceptability will be evaluated based on whether proposed labor hours and material costs reflect sufficient understanding and capability to complete the scope of work, with award made to the responsible, technically acceptable offeror offering the lowest evaluated price. Proposals must include a completed itemized price breakdown using the provided Attachment II form, current MSRA/ABR certification documentation, and proof of authorization to conduct business in Japan if the offeror is located outside Japan.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Created On:
11 Aug 2026, 06:44 AM Greenwich Mean Time
Section A - Solicitation/Contract Form
FY26 SEARAY BARGE OVERHAUL, C984
Product Service Code: J999
MASTER AGREEMENT FOR THE REPAIR AND ALTERATION OF VESSELS (MARAV): In the event the successful offeror possesses a Master Agreement for Repair and Alteration of Vessels (MARAV) with the U.S. Navy in the form of either a Master Ship Repair Agreement (MSRA) or an Agreement for Boat Repair (ABR), award for this requirement will be made in the form of a firm fixed price job order under the applicable agreement and all of the terms and conditions of the offer's existing MARAV will apply.
MSRA/ABR Number: ___________________
Firms who do not possess an active U.S MSRA/ABR as a Prime Contractor are ineligible for award. Non MSRA /ABR holders may request an application for an MSRA or an ABR certification by requesting an application package from: flcy_msra_abr_group@us.navy.mil. Please note that the MSRA/ABR Certification process may require a year to complete. This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by DFARS 252.225-7042.
N6264926RA067
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
The contractor is required to submit an itemized breakdown of the total price proposal using Attachment II Price Proposal Breakdown Sheet provided in Section J.
Failure to properly complete and submit Attachment II by the specified closing date may cause rejection of the proposal. Note: Award will be made in Japanese Yen (JPY) - The U.S. Dollar amounts shown are for the Government administrative purposes only. FY26 Budget Exchange Rate of JPY
150.4415 per USD 1.00 applies. Below is the Contract Price in United States Dollar (USD):
CLIN 0001: _______________USD
TOTAL PRICE: ________________USD
Item Supplies/Service Quantity Unit Unit Price Amount
The contractor shall accomplish the work specification package as outlined in the provided drawings and specification in Section C, and as attached in Section J ATTACHMENT (I).
The contractor will be responsible for ship repair work to include providing the necessary management, scheduling, testing, quality assurance, technical documentations to support the SEARAY BARGE FY26 Overhaul.
Pricing Arrangement: Firm Fixed Price
1 Job
Section C - Description/Specifications/Statement of Work
Statement of Work (SOW)
FY26 SEARAY BARGE OVERHAUL, C984
1. General
The Contractor shall accomplish overhaul work for Searay Barge (Large) (hereinafter referred to as "the barge") that is moored at around Dry Dock No. 2, U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC), Yokosuka.
2. Reference
The Contractor shall refer to the following standard documents to accomplish the work to the extent specified herein.
(1) The Code of Federal Regulation
a. 29 CFR 1910 - Occupational Safety and Health Standards
b. 29 CFR 1915 - Occupational Safety and Health Standards for Shipyard Employment
(2) Japan Environmental Governing Standards (JEGS)
(3) The Society for Protective Coatings (SSPC), Joint Surface Preparation Standard
3. Enclosures
(1) Upper Deck Plan
(2) Forward End Shell Plating (Starboard)
(3) Side Shell Plating (Starboard)
(4) After End Shell Plating (Starboard)
(5) Bottom Plating (Port)
(6) Bottom Plating (Starboard)
(7) Upper Fender Bracket
4. Principal dimensions of the barge
(1) Length overall: 15.0m
(2) Width: 12.0m
(3) Depth: 3.0m
(4) Draft (Designated): 1.5m
5. Requirements
The Contractor shall accomplish overhaul work listed in Paragraphs 5.(1) through 5.(6). See Enclosures (1) through (7) for details.
(1) Towing
Tow the barge to and from the contractor's facility. Obtain permission from CFAY Port Operation prior to the towing.
(2) Visual Inspection
a. Exterior
Accomplish visual inspection to fittings, underwater hull, boot top, and freeboard for structural integrity, deterioration, pitting, cracks, and area of damage or distortion and submit report for the result of visual inspection. The inspection shall be accomplished after hull blast cleaning listed in Paragraphs 5.(6).a and 5.(6).b.
b. Interior
Accomplish visual inspection to six (6) each of ballast tank for structural integrity, deterioration, pitting, cracks, and area of damage or distortion and submit report for the result of visual inspection.
(3) Repair Work
a. Forward end shell, side shell, after end shell, and bottom plating
Straighten and fair up deformed portion of side shell and bottom plating listed in Enclosures (2) through (6).
Preservation of disturbed exterior and interior surfaces caused by the repair shall be covered by Paragraph 5.(6).
b. Upper fender bracket
Remove and reinstall existing fender as interference. Straighten and fair up deformed portion of upper fender bracket listed in Enclosure (7). Preservation of disturbed exterior and interior surfaces caused by the repair shall be covered by Paragraphs 5.(6).a and 5.(6).c.
(4) Replacement Work
a. Zinc anode on exterior surface of underwater hull
Remove existing and install new eighteen (18) each of zinc anodes with studs and putty on exterior surface of underwater hull area. Inspect and submit report for the condition of all existing zinc anodes with the zinc location.
Government will provide eighteen (18) each of zinc anode and thirty-six (36) each of stud. Preservation of disturbed exterior and interior surfaces caused by the repair shall be covered by Paragraphs 5.(6).b and 5.(6).c.
(5) Cleaning
a. Zinc Anode on interior surface of six (6) each of ballast tanks
Remove, inspect, clean, and reinstall all existing zinc anodes on interior of forward end shell plating, side shell plating, and after end shell plating. Submit report for the result of inspection with the zinc location.
(6) Preservation
a. Entire exterior surface of freeboard
Remove nearly all of existing coating, rust, and soluble salts (e.g chlorides and sulfates) on entire freeboard including all fender brackets. Near-White blast clean shall be required for the freeboard prior to the preservation in accordance with SSPC SP-10 or equivalent. An appropriate marine grade paint (see below) shall be applied to the preservation.
Preserved surfaces retentive service life shall be more than ten (10) years. Apply temporally primer when the bare metal will be exposed long time or becoming rusty is expected.
1st Primer: EPICON ZINC RICH B-2, 18m
2nd Primer: BANNO 500 gray, 100m
Top coat : UNY MARINE haze gray, 25m
b. Entire exterior surface of underwater hull and boot top
Remove nearly all of existing coating, rust, and soluble salts (e.g chlorides and sulfates) on entire underwater hull and boot top. Near-White blast clean shall be required for the underwater hull and boot top prior to the preservation in accordance with SSPC SP-10 or equivalent. An appropriate marine grade and same color paint (see below) as existing shall be applied to the preservation. Apply additional AF (black) paint to the underwater hull and boot top. Preserved surfaces retentive service life shall be more than ten (10) years. Apply temporally primer when the bare metal will be exposed for a long time or if there is a risk of rusting.
1st Primer: EPICON ZINC RICH B-2, 18m
2nd Primer: BANNO 500 Light gray, 100m
Binder coat: CMP AC S, 40m
Top coat (1st layer): SEA TENDER 20 Black, 75m
Top coat (2nd layer): SEA TENDER 20 Blown, 75m
Top coat (3rd layer): SEA TENDER 20 Black,, 75m
c. Partial interior surface of six (6) each of ballast tank
Remove existing coating, rust, and soluble salts (e.g chlorides and sulfates) from damaged paint surface on side shell, forward end shell, after end shell, and bottom plating including the area of touch up paint for the repair and replacement listed in Paragraphs 5.(3) and 5.(4) a minimum of 200 square feet. Power tool clean shall be required for the interior surface prior to the preservation in accordance with SSPC SP-11 or equivalent. An appropriate marine grade and same color paint as existing shall be applied to the preservation.
6. Administration
(1) Post award meeting
The Contractor shall conduct post award meeting for schedule. The Contractor shall contact Technical Point of Contact (TPOC) and inform the person in charge within 15 working days after contract award.
(2) Document submission
The Contractor shall submit the documents that are listed in Submittals to the TPOC by the deadline. The Government will accept or return with comments within ten (10) working days after receipt from the Contractor. The Contractor shall not proceed the work before Government approval.
(3) Period of Performance (POP)
The Contractor shall complete this contract within the following POP. This long-term POP is for taking into account duty of the Barge. Therefore the Contractor shall effort to complete this contract without undue delay.
a. POP: 9/21/2026 to 4/15/2027
(4) Safety
The Contractor shall have responsibility for safety working. Field supervisor shall conduct and record a safety brief meeting with workers prior to start work every working day. The Government will request submitting safety brief meeting record as necessary. All the arranged personnel by contractor shall equip proper PPE (Personal Protective Equipment) during stay at site in accordance with Reference (1).
(5) Disposal and Environments
The Contractor shall dispose industrial waste derived from all this contracted works. The Contractor shall prepare protections for spillage, leakage, spread out and/or exposure of hazardous material in accordance with Reference (2).
(6) Warranty
The Contractor has responsibility to guarantee for maintenance work of this Contract for ninety (90) days after the day of completion.
(7) Management of Scope and Unforeseen Work
During the execution of these repairs, it is anticipated that unforeseen damage or "growth work" may be discovered. Any condition identified by the Contractor that requires effort outside this baseline scope must be formally documented via a Condition Found Report (CFR) and validated by the TPOC. The Contractor is strictly prohibited from commencing any out-of-scope work, or incurring additional costs, without a fully executed contract modification explicitly authorized in writing by the Contracting Officer.
7. TPOC
HIRUTA Ryouta, SRF-JRMC Yokosuka, Code 981
Phone No.: 243-4105
E-mail: Ryouta.Hiruta.ln@us.navy.mil
N6264926RA067
mailto:Ryouta.Hiruta.ln@us.navy.mil
Note: Please refer to Section J Attachment (I) and Exhibits (Contract Data Requirements List) for the required submittals.
Requirements
FY26 SEARAY BARGE OVERHAUL, C984
Section D - Packaging and Marking
Section E - Inspection and Acceptance
Inspection of the work accomplished hereunder shall be performed periodically by an authorized representative during the performance of the E-1.0 work and at the final inspection upon completion of the work. The representative will be identified in writing at time of contract award.
: The Contractor shall provide and maintain a quality management system acceptable to the Government, and shall perform E-2.0 Quality Assurance or have performed the inspections and tests pursuant to that system to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. For U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Yokosuka/Detachment Sasebo, Japan requirements and Commander, Logistics Group Western Pacific (COMLOGWESTPAC) SRU Singapore requirements, the Contractor's quality management system shall be in accordance with that set forth in NAVSEA Standard Item 009-04. In addition to its rights under DFARS clause 252.217-7005 Inspection and Manner of Doing Work of the Master Agreement for Repair and Alteration of Vessels, the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality management system and, as such, the Contractor shall not be entitled to progress payments for said work and material.
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-1 Contractor Inspection Requirements. Apr 1984
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Acceptance and Inspection will be conducted in accordance with contract terms and conditions.
DoDAAC: N62758 CountryCode: JPN
SRF AND JRMC YOKOSUKA
PHONE 011-81-46-816-9177, 1 CHOME HON CHO BLDG A61
YOKOSUKA 238-0041
JAPAN
Mr. Ryouta Hiruta, SRF-JRMC Yokosuka, Code 981 Email: Ryouta.Hiruta.ln@us.navy.mil
Section F - Deliveries or Performance
F-1.0 :Time of Performance
Contractor Work Start Date: 21 September 2026
Contractor Work Completion Date: 15 April 2027
F-2.0 : Place of Performance The performance of all work set forth in SECTION B shall be accomplished at Contractor's facility.
Overall Contract Delivery Period
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC
Delivery Period From 21 Sep 2026 to 15 Apr 2027
Period of Performance From 21 Sep 2026 To 15 Apr 2027
1 Job Ship To DoDAAC: N62758 CountryCode: JPN
SRF AND JRMC YOKOSUKA
PHONE 011-81-46-816-9177, 1 CHOME HON CHO BLDG A61
YOKOSUKA 238-0041
JAPAN
Mr. Ryouta Hiruta, SRF-JRMC Yokosuka, Code 981 Email: Ryouta.Hiruta.ln@us.navy.mil
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7008 Assignment of Claims (Overseas). Jun 1997
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2in1
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0907
Issue By DoDAAC N62649
Admin DoDAAC N62649
Inspect By DoDAAC N/A
Ship To Code N62758
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N62758
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Miyuki Hiwatari (miyuki.hiwatari.ln@us.navy.mil), Kayo Oobayashi (kayo.oobayashi.ln@us.navy.mil)
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
H-1.0 OCCUPATIONAL AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT (29 CFR 1915)
The Contractor shall fully comply with 29 Code of Federal Regulations Part 1915, Occupational and Health Standards for Shipyard Employment (29 CFR 1915), as it is effective at the date of contract award, while performing any contract that is awarded from this solicitation. The provisions of 29 CFR 1915 shall apply to the same extent as if the ship repairing, shipbuilding, and shipbreaking employments and related employments to be performed under the contract are wholly accomplished on the navigable waters of the United States. The Contractor shall comply with applicable provisions of the laws and regulations where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed in addition to complying with the corresponding provisions of 29 CFR 1915 in instances in which those laws and regulations require compliance with more stringent safety standards.
The Contractor shall promptly notify the contracting officer if it becomes aware of any law or regulation that is applicable where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed that precludes compliance with any provision of 29 CFR 1915.
H-2.0 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
H-3.0 CONTROL OF UNCLASSIFIED INFORMATION (SRF-JRMC Requirements Only)
The Contractor shall not provide Controlled Unclassified Information (CUI) U.S. Navy technical information (engineering drawings, technical manuals, system or equipment photographs or any other U.S. Navy engineering data in any form (orally, paper copy, film or digital file/image) to anyone except SRF-JRMC employees, other Department of Defense (DoD) employees or U.S. DoD Contractors requiring the data for accomplishment of an SRF-JRMC business processes unless the data is marked Distribution Statement "A" (Approved for public release: distribution is unlimited) or has been approved for unrestricted public release by the Commanding Officer of SRF-JRMC or Commander U.S. Naval Forces Japan (COMNAVFORJAPAN) Public Affairs Officer (PAO). The Contractor shall notify SRF-JRMC Code 700 (Code 950 in Sasebo) and request written permission to release CUI outside of SRF- JRMC, DoD Activities or U.S. DoD Contractors that are not involved in the SRF-JRMC business process if the Contractor believes that the release is required to support a SRF-JRMC business or Public Affairs requirement.
H-4.0 Applicable to Contracts Performed in Japan:
HISTORIC AND CULTURAL RESOURCES
If ship repair work is being performed in and around potentially significant historic buildings and structures (cultural properties) such as Dry Docks 1 through 6 and Cave 682 in Yokosuka Base, the contractor shall avoid changing the original materials and finishes used in the properties.
If work is being performed to repair or change a historical building/structure, the contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work.
If work is being performed on a cultural or historical asset, such as a historical building/structure or archeological site, special precautions may be necessary. The contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work. The contractor shall contact the CFAY Cultural Resources Manager through the Contracting Officer to determine if the work involves any archaeological, historical or cultural assets.
The contractor must conduct an archaeological monitoring by a qualified archaeologist for the planned excavations. During the monitoring, use of flat bladed bucket is required for backhoe operations. If any cultural/historical artifacts/assets include brick structures, manufactures plates indicating years before 1945 on the machines and equipment are discovered during work, the contractor shall notify the Public Works Department (PWD) Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager (DSN 243-5136/COMM 046-816-5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area until further direction from the PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer.
If the items need to be temporarily removed, carefully protect them from disturbance, including weather conditions, unforeseen traffic, and pilfering. The PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the
Contracting Officer will provide further direction/guidance on how to protect the items. The Government retains ownership and control over historical and archaeological resources.
The contractor shall carefully protect in-place and report immediately to the Contracting Officer historical and archaeological items or human skeletal remains discovered in the course of work. Upon discovery, the contractor shall notify Cultural, Historical, and/or Natural Resources (CHNR) Manager (DSN 243-5136/COMM 046-816- 5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area. The Government retains ownership and control over historical and archaeological resources."
JAPANESE CONCILIATION PROCEDURES
(a) Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the US-Japan Joint Committee for conciliation in accordance with paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Request by the Contractor for conciliation shall be made in accordance with the procedures provided herein.
(b) In the event the Contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact within the time limits described therein before filing request for conciliation with the Joint Committee and then request for appellate authority under the clause of this contract entitled Disputes to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.
(c) The request for conciliation will be submitted by the Contractor through the nearest local Japanese Defense Facilities Administration Bureau to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the Contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.
(d) In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the Contractor to notify the appellate authority designated in the clause of this contract, entitled Disputes, of the settlement of the dispute and to withdraw his appeal.
(e) In the event the Contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding the pending request for conciliation, that action by the appropriate authority under the clause of this contract entitled Disputes be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the Contractor of his action taken hereunder.
(f) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled Disputes has been rendered. Pending the hearing of conciliation panel the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file a civil suit.
CONSUMPTION TAX
(a) The Governments of the United States and Japan have agreed that this contract is exempt from the Japanese Consumption Tax. In accordance with paragraph (c) of the clause FAR 52.229-6, "TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)," the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations.
By submission of your proposal or quotation, you are certifying that your proposal or quotation does not contain any such tax.
The following U.S. Government (USG) proof of purchase forms shall be used to claim the exemption at tax offices:
USG Standard Form 1034
USG Standard Form 1113
USG Standard Form 44
Department of Defense Form 1155
Navy Comptroller Form 2277
(b) The Contractor shall retain the appropriate USG proof of purchase forms set forth above for a period of seven (7) years. In addition, the Contractor shall maintain adequate records containing all pertinent information with regard to the claiming of Consumption Tax exemptions related to this contract. These records shall be subject to review by the Contracting Officer, or his or her designated representative, at any time up to seven (7) years from the date of final payment under this contract.
(c) Any questions concerning the applicability of the Consumption Tax should be directed to the appropriate local tax office.
CUSTOMS AND TAX EXEMPTION
(a) The Contractor shall, notwithstanding any other clause in this contract to the contrary, be required to submit a request in writing to the Contracting Officer for issuance of a Tax Exemption Certificate for any import duties and all taxes paid or to be paid from which the U.S. Government is entitled to an exemption. These taxes and duties are enumerated in Article XII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between the Governments of the United States of America and Japan, regarding facilities areas and the status of United States Armed Forces in Japan. The Contractor's request shall include the following information:
(1) Name of contractor;
(2) Contract number and job order number (if applicable);
(3) Nomenclature of taxable material to be delivered and intended use;
(4) Quantity of taxable material used or to be delivered; and
(5) Period of taxable material use.
(b) In the case of gasoline and other petroleum products, the Contractor shall be responsible for making every reasonable effort to determine the accuracy of his figures on consumption. In this regard, the Contractor shall, upon request of the Contracting Officer, present all available data used by the Contractor as the basis for determining such figures. The Contractor shall be required to maintain adequate records containing all pertinent information with regard to the above requirements. Further, these records shall be subject to review by the Contracting Officer at any time up to three years from the date of final payment under this contract.
Section I - Contract Clauses
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer(s) are:
NAME: All Authorized NAVSUP Fleet Logistics Center Yokosuka (FLCY) Contracting Officers
ADDRESS: CONTRACTING DEPARTMENT (CODE 200)
NAVSUP FLCY
PSC 473 BOX 11
FPO AP 96349-0011
TELEPHONE: DSN: 315-243-6908 / COMM 011-81-46-816-6908
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
Jan 2017
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards.
(Deviation 2026-O0038)
Feb 2026
52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.
(Deviation 2026-O0038)
Feb 2026
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026-O0038)
Feb 2026
52.213-4 Terms and Conditions-Simplified Acquisitions (Noncommercial). (Deviation 2026-O0038)
Feb 2026
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.223-23 Sustainable Products and Services. (DEVIATION 2025-O0004) Feb 2026 Deviation 2025-O0004 Mar 2025 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-1 Payments. Apr 1984 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-11 Extras. Apr 1984 52.232-18 Availability of Funds. Apr 1984 52.232-25 Prompt Payment. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. (Deviation 2026-O0038) Feb 2026 52.233-1 Disputes. (Deviation 2026-O0038) (Alternate I) Feb 2026 Alternate I Feb 2026 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026 52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026 52.243-1 Changes-Fixed-Price. (Deviation 2026-O0038) Feb 2026 52.243-1 Changes-Fixed-Price. (Deviation 2026-O0038) (Alternate I) Feb 2026 Alternate I Feb 2026
Subcontracts for Commercial Products and Commercial Services. (Deviation
52.244-6 2026-O0038) Apr 2026
52.244-6 Subcontracts for Commercial Products and Commercial Services.
(DEVIATION 2025-O0003)
Apr 2026 Deviation 2025-O0003 Mar 2025
52.245-1 Government Property. Sep 2021 52.245-9 Use and Charges. Apr 2012 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7000 Disclosure of Information. Oct 2016 252.204-7003 Control of Government Personnel Work Product. Apr 1992
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
(DEVIATION 2026-O0025)
May 2024 Deviation 2026-O0025 Jun 2026
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2023
252.222-7002 Compliance with Local Labor Laws (Overseas). Jun 1997
252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.
Sep 2014
252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7021 Trade Agreements. Feb 2024 252.225-7041 Correspondence in English. Jun 1997 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
Jun 2023
252.225-7962 Vendor Threat Mitigation Support to Operations. (DEVIATION 2026-O0051) Jun 2026 Deviation 2026-O0051 Jun 2026
252.225-7975 Additional Access to Contractor and Subcontractor Records. (DEVIATION 2026-O0051)
Jun 2026 Deviation 2026-O0051 Jun 2026
252.225-7976 Contractor Personnel Performing in Japan (DEVIATION 2018-O0019) Aug 2018 Deviation 2018-O0019 Aug 2018 252.232-7010 Levies on Contract Payments. Dec 2006 252.233-7001 Choice of Law (Overseas). Jun 1997 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023
252.240-7997 NIST SP 800-171 DoD Assessment Requirements. (DEVIATION 2026- O0025)
Feb 2026 Deviation 2026-O0025 Feb 2026
252.243-7001 Pricing of Contract Modifications. Dec 1991
252.244-7999 Subcontracts for Commercial Products or Commercial Services.
(DEVIATION 2026-O0015)
Feb 2026 Deviation 2026-O0015 Feb 2026
252.245-7003 Contractor Property Management System Administration Jan 2025 252.245-7005 Management and Reporting of Government Property. Jan 2024 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.223-3 Hazardous Material Identification and Safety Data. (Deviation 2026-O0038) (Feb 2026)
HAZARDOUS MATERIAL IDENTIFICATION AND SAFETY DATA (FEB 2026) (DEVIATION 2026-O0038)
(a) , as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 Hazardous material (including revisions adopted during the term of the contract).
(b) The Offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Safety Data Sheet submitted under this contract.
Material (If none, insert )None Identification No.
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to-
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The Government is not precluded from using similar or identical data acquired from other sources.
(End of clause)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Revolutionary FAR Overhaul - https://www.acquisition.gov/far-overhaul/far-part-deviation-guide ____ DFARS Revolutionary FAR Overhaul [Insert one or more Internet addresses]Class Deviations - https://www.acq.osd.mil/dpap/dars/dfars_far_overhaul_class_deviations.html
(End of clause)
52.252-6 Authorized Deviations in Clauses. (Nov 2020)
AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any [insert regulation name] (48 CFR ) clause with an authorized deviation is DFARS Chapter 2 indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of clause)
DFARS Clauses Incorporated by Full Text
252.223-7001 Hazard Warning Labels. (Dec 1991)
HAZARD WARNING LABELS (DEC 1991)
(a) "Hazardous material," as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.
(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et ). The Standard requires that the hazard warning label conform to the seq requirements of the standard unless the material is otherwise subject to the requirements of one of the following statutes:labelling
(1) Federal Insecticide, Fungicide and Act; Rodenticide
(2) Federal Food, Drug and Cosmetics Act;
(3) Consumer Product Safety Act;
(4) Federal Hazardous Substances Act; or
(5) Federal Alcohol Administration Act.
(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication labelled Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.
MATERIAL (If None, Insert "None.") ACT
(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph (c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.
(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
242-9405 SUPTXT242-9405 EXPEDITING CONTRACT CLOSEOUT (Jan 2024)
SUPTXT242-9405 EXPEDITING CONTRACT CLOSEOUT
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
Section J - List of Attachments
Attachment (I) Work Specification(s) for Statement of Work (SOW)
Attachment (II) Proposal Breakdown Form (Contractor Response Required)
Attachment (III) Request for Information Sheet
Attachment (IV) Government Furnished Property (GFP-GFM listings)
Attachment (V) Warranty Tracking Information
Attachment (VI) Source of Repair Instruction
Exhibits: Contract Data Requirements List (CDRL):
SOW a. (1) Working Plan.pdf SOW a. (2) Repair Plan.pdf SOW a. (3) Paint Schedule.pdf SOW a. (4) Material List.pdf SOW a. (5) Work Schedule.pdf SOW b. (1)(2) Inspect Test Repor.pdf SOW b. (3) Condition Report.pdf SOW c. (1) Work Summary.pdf SOW c. (2) Details of Working.pdf SOW c. (3) Final Material List.pdf SOW c. (4) Final Inspection Report.pdf SOW c. (5) Final Condition Report.pdf
Section K - Representations, Certification, & Other Statements
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.240-90 Security Prohibitions and Exclusions Representations and Certifications. (Deviation 2026- O0038)
Feb 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7005 Representation Relating to Compensation of Former DoD Officials. Sep 2022 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls. Oct 2016 252.225-7055 Representation Regarding Business Operations with the Maduro Regime. May 2022
252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region- Representation.
Jun 2023
DFARS Clauses Incorporated by Full Text
252.204-7017 Prohibition on the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .