Solicitation N4008526R0125.pdf
PDF 239 KB Posted
- Solicitation number
- N4008526R0125
About this file
This is a Request for Proposal (RFP) for a task order under a Multiple Award Construction Contract (MACC) issued by Naval Facilities Engineering Command Mid-Atlantic for renovation work at Naval Station Norfolk.
The solicitation seeks proposals for task order LC-3147 to renovate the men's locker room in Rockwell Hall Gym located at Joint Expeditionary Base Little Creek–Fort Story in Virginia Beach, Virginia. The estimated price range is $250,000 to $500,000 with a firm-fixed-price award structure. All work must be completed within 120 calendar days after task order award, including an initial 15-day period for administrative requirements such as insurance and bonding approval. The Government will award this task order on a low-price basis to the responsible offeror. Ten MACC contractors are eligible to submit proposals under contract group ML-C00081. Offerors must submit a completed Price Proposal Form, a bid guarantee equal to 20 percent of the offer price or $3,000,000 (whichever is less), acknowledged amendments, and current VETS 4212 registration. Additionally, the awardee must provide performance and payment bonds and maintain minimum insurance coverage including $500,000 comprehensive general liability and $200,000 per person automobile liability within ten days of award. The site visit is scheduled for April 1, 2026, at 1030 hours EDT; pre-proposal inquiries are due by April 8, 2026, at 1000 hours EDT; and proposals are due by April 20, 2026, at 1400 hours EDT. All proposals must be submitted electronically through PIEE in PDF format. The work involves providing supervision, labor, materials, and equipment in accordance with the provided specifications and scope of work to deliver a complete, usable, and finished locker room renovation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008526R0125 Amendment 0002.pdf | ||
| Amendment 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC
9324 VIRGINIA AVE, BLDG Z-140
NAVAL STATION NORFOLK, NORFOLK, VA 23511
POC: Madison Tatem, madison.e.tatem.civ@us.navy.mil
Alternate POC: Kate Dinneen, katherine.l.dinneen.civ@us.navy.mil
DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE
DELIVERY/INDEFINITE QUANTITY (ID/IQ) MULTIPLE AWARD CONSTRUCTION
CONTRACT (MACC) GENERAL CONSTRUCTION IN THE HAMPTON ROADS, VIRGINIA
AREA OF RESPONSIBLITY
(AOR)
MACC GROUP: ML-C00081
PROPOSED TASK ORDER:
LC-3147 Rockwell Hall Gym Renovate Men's Locker Room
DATE OF SOLICITATION: 20 MARCH 2026
GENERAL CONSTRUCTION FOR HAMPTON ROADS, VIRGINIA MACC CONTRACT
HOLDERS:
N4008524D0030 CJW Contractors, Inc.
13849 Park Center Road, Suite B Herndon, Virginia 20171 POC: Ralph Crews
Email: ralph@cjwcontractors.com anuj@cjwcontractors.com bishnu@cjwcontractors.com bids@cjwcontractors.com
N4008524D0031 Addon Services LLC 1800 Diagonal Road, Suite 600 Alexandria, VA 22314 POC: Robert Pastorelli
RFP Email: NAVFACHR@addonservicesllc.com Contract Mods:
robert.pastorelli@addonservicesllc.com;
prita.abraham@addonservicesllc.com
N4008524D0032 Bay Electric Co, Inc 627 36th Street Newport News, VA 23607 POC: John Biagas
Email: john.biagas@bayelectricco.com Daryl.lanouette@bayelectricco.com Kerri.pennybacker@bayelectricco.com
N4008524D0033 ENCON Desbuild JV3 LLC 8201 Corporate Drive, Suite 720 Hyattsville, MD 20785 POC: Devang Ajmera
Email: devang@enconcorp.org ananthb@desbuild.com
N4008524D0034 Mark Turner Construction 10474 Cobbs Road Glen Allen, VA 23059 POC: Franklin Bowser
Email: fbowser@markturnerconstruction.com aarrowood@markturnerconstruction.com dbennett@markturnerconstruction.com
N4008524D0035
MIG WMJ JV1 LLC
545 South Birdneck Road, Suite 202H Virginia Beach, VA 23451 POC: Jose Gutierrez
Email: jose.g@miggov.com estimating@miggov.com estimating@wmjordan.com
LC-3147 Rockwell Hall Gym Renovate Men's Locker Room RFP: N4008526R0125
WO# 1917970
vjames@markturnerconstruction.com
N4008524D0036 Ocean Construction Services 104 Aragona Boulevard, Suite 101 Virginia Beach, VA 23462 POC: Thor Elmore
Email: thor.elmore@ocsinc.us Kara.canter@ocsinc.us
N4008524D0037 SAW Eastern JV 2876 Guardian Lane, Suite 200 Virginia Beach, VA 23452 POC: Anthony Williams
Email: awilliams@sawcontracting.com Emery.c@easterncoastconstruction.com bids@easterncoastconstruction.com
N4008524D0038 VIRTEXCO Corporation 977 Norfolk Square Norfolk, VA 23502 POC: Donald Adams
Email: estimating@virtexco.com
N4008524D0069 Within Interior Design, Inc. DBA Tazewell Contracting 1008 Granby Street Norfolk, VA 23510 POC: Heather Robinson
Email: hrobinson@tazewellcontracting.com estimating@tazewellcontracting.com
GENERAL REQUIREMENTS
All terms and conditions of N40085-24-D-0030/0031/0032/0033/0034/0035/ 0036/ 0037/ 0038/ 0069 Indefinite Delivery / Indefinite Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue, please contact Madison Tatem at madison.e.tatem.civ@us.navy.mil or Alternate POC: Kate Dinneen, katherine.l.dinneen.civ@us.navy.mil.
Amendments will be posted directly to PIEE under the ‘Solicitation Module’. Offerors are responsible for referring to this site for any amendments to the RFP. Please check box next to ‘Please notify me of amendments to this solicitation’ to ensure you are notified of any amendments.
The specifications, drawings, and other pertinent attachments are posted on PIEE and SAM.gov under “Attachments/Links”. Due to file size limitations, large files (such as Drawings) will be sent via DOD
SAFE.
NAVFAC RFP No.: N4008526R0125
Title: LC-3147 Rockwell Hall Gym Renovate Men's Locker Room
Location of the work: Joint Expeditionary Base Little Creek – Fort Story, (Little Creek Site), Virginia Beach, VA
The Government intends to award a firm-fixed price task order.
Description of the work: Reference the Specifications (ATTACHMENT A) and (Scope of Work) (ATTACHMENT B). This project includes providing supervision, labor, material, and equipment as required to perform the following work listed in the Specifications (ATTACHMENT A) and (Scope of Work) (ATTACHMENT B), and must be done in a manner to provide a complete, usable, and finished end product to renovate men's locker room.
Time for completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984), all work and options shall be completed within 120 calendar days after award. The days are calculated from date of task order award, and includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance and bonding, and other requirements set forth in the task order/MACC.
Task order award is considered notice to proceed.
***Offerors must consider the total time to complete the project which includes, but not limited to, lead times of supplies, materials, and equipment. If the construction contract duration in the RFP is not feasible, offerors must submit a pre-proposal inquiry (PPI) by the PPI deadline with a proposed construction contract duration and explanation why additional time is needed.***
Estimated Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range is between $250,000 and $500,000.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
Wage Determination: General Decision Number VA20260167 dated 1/30/2026 (ATTACHMENT D) as of the date of this RFP. Should this wage determination be modified by DoL prior to award, the most current wage determination will be issued via amendment and incorporated into the final task order award.
Liquidated damages: N/A
Utilities: If Applicable; Refer to the Specifications (ATTACHMENT A) NOTE: Any Government utility costs will be charged to the Contractor at prevailing rates.
Record Shop Drawings: In accordance with FAR 52.236-21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are not required.
Government Furnished Property: There is no Government Furnished Property.
Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The basis for award will be low price.
Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.
In accordance with FAR 28.102-1, the following payment protections are required from the awardee ten
(10) days after date of award: Payment Bond and Performance Bond.
Minimum Insurance Requirements: Offerors shall consider the costs of incorporating the required Minimum Insurance Requirements when submitting proposals. The awardee will be required to demonstrate proof of the following insurance requirements within ten (10) calendar days after award:
Comprehensive general liability: $500,000 per occurrence.
Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage.
Workmen’s compensation as required by Federal and State workers’ compensation and occupational disease laws.
Employer’s liability coverage of $100,000, except in States where workers compensation may not be written by private carriers.
Others as required by state law.
Per FAR 52.228-5, policies must contain an endorsement to the effect of the following:
Any cancellation or any material change in the policies adversely affecting the Government’s interest shall not be effective 1) for such period the laws of the State in which this contract is to be performed prescribe or, 2) until thirty (30) days after the insurer or contractor gives written notice to the Contracting Officer, whichever period is longer.
Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.
OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE
NOT AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS
RESULTING FROM THIS SOLICITATION.
FAR 52.236‐27 Site Visit (Construction)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions
Affecting the Work, will be included in any contract awarded as a result of this solicitation.
Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for April 1st, 2026, at 1030 hours EDT.
(c) Participants will meet on-site at 3147 5th Street at the entrance of Bldg. 3147 JEB Little Creek-
Fort Story (Little Creek Site), Virginia Beach, VA.
This will be the ONLY Government scheduled Site Visit. Please follow the instructions below if you will need base access. Start this process as early as possible as escorts will not be available the day of the site visit.
***NOTE: Please inform Madison Tatem at madison.e.tatem.civ@us.navy.mil at your soonest if you will or will not be attending the site visit.
All prospective offerors are urged to attend this site visit. The pre‐proposal site visit will be held for the following purposes: familiarization with the extent and nature of project; explaining concepts involved, specifications, terms and conditions, and unique RFP features. The Government will not provide any verbal answers to any verbal questions posed during the pre‐proposal conference/site visit. Offerors shall submit written questions for any issues that may arise during the conference (see Pre-Proposal Inquiries below). The Government will provide written responses to any such questions via electronic RFP amendment posted to PIEE under the ‘Solicitation Module.
No minutes of this meeting will be issued. Remarks and explanations addressed during the conference shall not qualify or alter any RFP terms or conditions. The terms and conditions of this RFP will remain unchanged unless amended in writing.
Contractors ARE NOT ALLOWED to use any cameras, tape recorders, or other recording devices during the site visit unless approved by appropriate NAVFAC personnel.
CONTRACTOR ACCESS FOR THE SITE VISIT:
All prime contractors on MACC GROUP: ML-C00081 that require base access/ escort for their employees or sub-contractors need to have the individuals needing access to fill SECNAV 5512 form (ATTACHMENT E) according to instructions provided in Solicitation General Requirement and have a PRINTED COPY BEFORE arriving at the Pass and ID office. Please also bring a REAL ID or Passport with you so that you may be sponsored.
Box 24. Base Sponsor’s Name: Madison Tatem- NAVFAC- madison.e.tatem.civ@us.navy.mil
Sponsor Phone: 252-340-0473
Send an email to the contract specialist Madison Tatem to inform her of the number of individuals that need access and their name ONLY. Do not send any attachments.
The contract specialist/sponsor will be at LITTLE CREEK’s pass and ID office 9:50 – 10:20. Anyone arriving after 10:20 will not be sponsored.
Contact Madison Tatem 252-340-0473 if you have any questions.
Pre-Proposal Inquiries (PPIs): PPIs must be submitted electronically via Pre-Proposal Inquiry Form (ATTACHMENT G), to Madison Tatem at madison.e.tatem.civ@us.navy.mil and Kate Dinneen, katherine.l.dinneen.civ@us.navy.mil no later than April 8th, 2026, at 1000 hours EDT in order to process all inquiries by the proposal due date.
Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. Responses will be published via amendment posted to PIEE.
Proposal Due Date: April 20th, 2026, at 1400 hours EDT. LATE PROPOSALS WILL NOT BE
CONSIDERED.
Proposal Delivery Information: PROPOSALS SHALL BE SUBMITTED THROUGH PIEE.
Facsimile transmissions of proposals, acknowledgements of amendments, or modifications to proposals are not authorized.
*PIEE Submissions:
Offerors shall submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation.
Electronic proposal submissions should be no larger than 1.9 GB per file.
Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via (ATTACHMENT G).
Emailed submissions will not be accepted.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened or are otherwise missing the required content are the responsibility of the Offeror.
PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL
NOT BE CONSIDERED.
All required proposal documents shall be submitted in accordance with FAR 15.208. Refer to “Basis for Award” for complete submittal instructions.
BASIS FOR AWARD
1. The proposed task order will be awarded to the responsible offeror offering the best value to the
Government. For this order, the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each offeror on price only.
2. Submittal Requirements and Basis of Evaluation:
a. Offeror shall submit the following:
Cover Page to include:
o RFP Number, RFP Title, Prime Contractor Name, Employer Identification
Number (EIN), Address, Phone Number, Fax Number, DUNS and Cage Code, Point of Contact – Name, Phone Number and Email
Completed and Signed Price Proposal Form (ATTACHMENT H) Acknowledged Amendments (if applicable) (ATTACHMENT H) Bid guarantee Copy of current VETS 4212 Registration
Note: The costs for preparation of task order proposals shall be the responsibility of the offeror and not directly reimbursable.
b. Basis of Evaluation: The Government will evaluate price based on the lump sum price. No provision is made for economic price adjustment. The lump sum price shall be deemed to include all costs required for the specified work, completed in accordance with the drawings and specifications, including all labor, materials, equipment, tools, management, supervision, disposal, and related items.
Analysis will be performed by one or more of the following techniques:
Comparison of proposed prices received in response to the RFP.
Comparison of proposed prices with the IGE.
Comparison of proposed prices with available historical information.
Comparison of market survey results.
A price, which is found to be unreasonably high or unbalanced in relation to the proposed work and/or Government Estimate may negatively impact the offeror’s evaluation and may result in the proposal not being eligible for award. A proposal that fails to submit pricing as required will be considered unresponsive and will not be evaluated or considered for award.
EVALUATION
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with any or all offerors; and to award the task order to the offeror submitting the lowest price proposal.
2. As stated in the RFP, the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306 (a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
Additional Instructions to Offerors:
1. Pursuant to the basic contract award, offerors are required to submit proposals on all Task Order
Requests for Proposals received from the Government. In the event MACC awardees are unable to submit a proposal, a written explanation is required to be submitted to the contracting officer issuing the RFP within five (5) working days of receipt of the RFP. A contract awardees’ failure to comply with submitting Task Order proposals or appropriate explanations in response to RFPs may result in the Government choosing not to exercise remaining option periods and/or to exercise its termination rights.
2. Offerors are strongly recommended to participate in the site visit, examine specifications, schedule and all instructions. Failure to do so will be at the offeror’s risk.
3. Offers for supplies or services other than those specified will not be considered unless authorized by the RFP.
4. Offerors must state a definite time for delivery of supplies or for performance of services unless otherwise specified in the RFP.
5. Time for completion, if stated as the number of days, includes all calendar days (i.e., Saturdays, Sundays, and holidays) unless otherwise specified.
6. Offerors must adhere to all terms and conditions provided in the Base award for this task order, as well as this Request for Proposal.
THE FOLLOWING PROVISIONS/CLAUSES ARE APPLICABLE TO THIS SOLICITATION:
52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Feb 2026)
52.240-91 Security Prohibitions and Exclusions (Feb 2026)
52.219‐14 Limitations on Subcontracting (Feb 2023)(DEVIATION 2021-O0008)
52.222-8 Payrolls and Basic Records (Jul 2021)
52.222-11 Subcontracts (Labor Standards) (May 2014)
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022)
52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022)
52.228-15 Performance and Payment Bonds-Construction (Jun 2020)(DEVIATION 2020-O0016)
52.236-6 Superintendence by the Contractor (Apr 1984)
252.204-7024 Notice on the Use of the Supplier Performance Risk System (Mar 2023)
252.225-7059 Prohibition on Certain Procurements from The Xinjiang Uyghur Autonomous Region – Representation (Jun 2023)
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region (Jun 2023)
252.225-7966 Prohibition Regarding Russian Fossil Fuel Business Operations - Representation (DEVIATION 2024-O0006, REVISION 1) (Mar 2024)
252.225-7967 Prohibition Regarding Russian Fossil Fuel Operations (DEVIATION 2024-O0006, REVISION 1) (Feb 2024)
252.225-7972 Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems.
(DEVIATION 2020-O0015)
252.225-7973 Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems— Representation. (DEVIATION 2020-O0015)(May 2020)
ATTACHMENTS:
A – Specifications B – SOW (Scope of Work) C – Asbestos Report
D – DBA WD VA20260167
E – SECNAV 5512
F – Pre-Proposal Inquiry Form
G – PIEE_VENDOR_ACCESS_INSTRUCTIONS
H – Price Proposal / Amendment Acknowledgement Form
RECAP OF IMPORTANT DATES:
SITE VISIT: April 1st, 2026, at 1100 hours EDT PPI DUE DATE: April 8th, 2026, at 1000 hours EDT PROPOSAL DUE DATE: April 20th, 2026, at 1400 hours EDT