Solicitation - N4008426Q4017.pdf
PDF 2 MB Posted
- Solicitation number
- N40084-26-Q-4017
About this file
This is a Request for Quotation (RFQ) for WPC deck replacement work at Naval Base Chinhae, Republic of Korea.
The solicitation seeks quotations for furnishing all labor, material, equipment, transportation, and supervision necessary to perform WPC (wood polymer composite) deck replacement for all family housing units at Commander Fleet Activities (CFA) Chinhae, Korea. The work is a firm fixed-price task order contract with a completion deadline of 180 calendar days after award. The contract will be administered using paperless contracting methods. Quotations must be submitted in Korean Won only by 30 June 2026 at 02:00 PM (KST) to the Naval Facilities Engineering Systems Command Far East, Facilities Engineering Acquisition Division (FEAD) Chinhae, Building #613, PSC 479, FPO AP 96269-1100. A mandatory site visitation is scheduled for 17 June 2026 at 10:00 AM at the Main Gate of CFA Chinhae. Quoters must submit completed SF-18 Pages 1 and 2 only (without cost breakdowns), the company's most recent Stock Change Certificate as certified to the ROK Local Tax Office, and a Certified Copy of Register as certified to the ROK Supreme Court. Award will be made to the quoter submitting the lowest price quote that conforms to the solicitation and meets all minimum mandatory requirements. The solicitation is not a small business set-aside. Quoters must have an active SAM registration, provide Cage Code/UEI information, and submit an Electronic Funds Transfer (EFT) form signed by a Korean bank official prior to contract award. The solicitation incorporates numerous FAR and DFARS clauses covering areas including cybersecurity maturity model certification (CMMC) compliance, Korean labor law compliance, tax exemptions under the U.S.-Korea Status of Forces Agreement, and deployment requirements for contractor personnel.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
02:00 PM (KST)
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
The contractor shall furnish all labor, material, equipment, transportation and supervision necessary to perform WPC DECK
REPLACEMENT FOR ALL FAMILY HOUSING UNITS, CFA
CHINHAE, KOREA in accordance with Statement of Work dated 23 April 2026 and attachment as follows: (1) NAVFAC DWG/SKETCH # 17366058~17366072 (15 pages)
Pricing Arrangement: Firm Fixed Price
1 Task
N4008426Q4017
W__________
ADDITIONAL INFORMATION (Continued):
1. SITE VISITATION:
SITE VISITATION for all interested parties will be held on 17 June 2026, 10:00 A.M. at the Main Gate of CFA Chinhae for Chinhae site. Inquires regarding the site visit should be made to FEAD Chinhae, Mr. Kim,Yun at 050-3363-5871 or email:
yun.c.kim4.ln@us.navy.mil
* The date and time for the site visitation are subject to change.
When SITE VISITATION is required for your company, notify Mr. Kim, Yun of a list of personnel who are attending the site visitation via email (yun.c.kim4.ln@us.navy.mil) as shown on the above before 4:00 P.M., 15 June 2026. Korean personnel who need escort must present an official KID Card or ROK Driver License to access the Main Gate.
2. Quoters are required to complete and submit the following items by 30 June 2026, 02:00 P.M. local time to the following address:
Naval Facilities Engineering Systems Command Far East Facilities Engineering Acquisition Division (FEAD) Chinhae Building #613 (Attn: Mr. Kim, Yun)
PSC 479, FPO AP 96269-1100
1) Completed SF18 Pages 1 and 2, Request for Quotation
* Do NOT submit a cost breakdown other than total price. If your company submits us your firm's cost breakdown, your company may be declared as a non-responsive offeror.
입찰서류 (SF18 Pages #1 and #2) 제출시 총가격 이외 세부명세서는 제출하지 마십시오.
세부명세서를 제출하실 경우, 비자격자로 간주되어 입찰 경쟁에서 제외될 수도 있습니다.
2) The offeror's most recent Stock Change Certificate (주식변동상황명세서), as certified and submitted to the ROK Local Tax Office (국세청),
3) The offeror's Certified Copy of Register [등기부등본 (유효사항)], as certified and submitted to the ROK Supreme Court (대법원).
(Failure to submit the above items as specified in 1), 2), and 3) will be considered nonresponsive and will not be evaluated.)
N4008426Q4017
Section I - Contract Clauses FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.203-5 Covenant Against Contingent Fees. May 2014 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Feb 2026 52.204-13 System for Award Management-Maintenance. Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. Feb 2026 52.211-13 Time Extensions. Sep 2000 52.213-4 Terms and Conditions-Simplified Acquisitions (Noncommercial). Feb 2026 52.222-50 Combating Trafficking in Persons. Feb 2026 52.223-5 Pollution Prevention and Right-to-Know Information. May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-1 Payments. Apr 1984 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-11 Extras. Apr 1984 52.232-17 Interest. May 2014 52.232-18 Availability of Funds. Apr 1984 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.233-1 Disputes. Feb 2026 52.233-3 Protest after Award. Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. Feb 2026 52.236-2 Differing Site Conditions. Feb 2026 52.236-3 Site Investigation and Conditions Affecting the Work. Feb 2026 52.236-5 Material and Workmanship. Feb 2026 52.236-6 Superintendence by the Contractor. Feb 2026 52.236-7 Permits and Responsibilities. Feb 2026 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. Feb 2026 52.236-10 Operations and Storage Areas. Feb 2026 52.236-11 Use and Possession Prior to Completion. Feb 2026 52.236-12 Cleaning Up. Feb 2026 52.236-13 Accident Prevention. Feb 2026 52.236-17 Layout of Work. Feb 2026 52.236-21 Specifications and Drawings for Construction. Feb 2026 52.242-14 Suspension of Work. Apr 1984 52.243-1 Changes-Fixed Price. Feb 2026 52.243-5 Changes and Changed Conditions. Feb 2026 52.245-1 Government Property. Sep 2021 52.246-21 Warranty of Construction. Mar 1994 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Apr 1984 52.249-8 Default (Fixed-Price Supply and Service). Apr 1984 52.249-10 Default (Fixed-Price Construction). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7000 Disclosure of Information. Oct 2016 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2023
252.222-7002 Compliance with Local Labor Laws (Overseas). Jun 1997 252.225-7041 Correspondence in English. Jun 1997 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023
Apr 1966 Dec 2006 Jun 1997 Dec 1991
Oct 2024
252.227-7033 Rights in Shop Drawings.
252.232-7010 Levies on Contract Payments.
252.233-7001 Choice of Law (Overseas).
252.243-7001 Pricing of Contract Modifications.
252.245-7005 Management and Reporting of Government Property 252.247-7023 Transportation of Supplies by Sea.
FAR Clauses Incorporated by Full Text
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 Calendar days after award.* The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.219-14 Limitations on Subcontracting. (Feb 2026)
LIMITATIONS ON SUBCONTRACTING (FEB 2026)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) , as used in this clause, means a first-tier subcontractor, including an independent contractor, that-Definition. Similarly situated entity
(1) Has the same small business program status as that which qualified the prime contractor for the award ( , for a small business set-asidee.g.
contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) This clause applies only to-Applicability.
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with sections 19.105, 19.106, 19.107, and 19.108;
(4) Orders expected to exceed the simplified acquisition threshold and that are set aside for small business concerns under multiple-award contracts, as described in 8.4 and 16.5;
(5) Orders, regardless of dollar value, that are set aside in accordance with sections 19.105, 19.106, 19.107, and 19.108 under multiple-award contracts, as described in 8.4 and 16.5; and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) An independent contractor shall be considered a subcontractor.Independent contractors.
(e) By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for-
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
N4008426Q4017
Jan 2024
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause-
[ ] Contracting Officer check as appropriate.
By the end of the base term of the contract and then by the end of each subsequent option period; or
By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014)
PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
(a) . The Government shall pay the Contractor the contract price as provided in this contract.Payment of price
(b) . The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determinedProgress payments by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) . Along with each request for progress payments, the Contractor shall furnish the following certification, or paymentContractor certification shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ ( )Name
____ ( )Title
____ ( )Date
(d) . If the Contractor, after making a certified request for progress payments, discovers that a portion or all of suchRefund of unearned amounts request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8 thday after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) . If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to beRetainage made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) . All material and work covered by progress payments made shall, at the time of payment, become theTitle, liability, and reservation of rights sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) . In making these progress payments, the Government shall, upon request, reimburse the Contractor for theReimbursement for bond premiums amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) . The Government shall pay the amount due the Contractor under this contract after-Final payment
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 (31 U.S.C.3727 and 41 U.S.C.6305).
(i) . Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent onLimitation because of undefinitized work work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) . In accordance with 31 U.S.C.3903(c)(1), the amount payable under paragraph (d)(2) of this clauseInterest computation on unearned amounts shall be-
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
(End of clause)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR): https://www.acquisition.gov/browse/index/far
Department of Defense Far Supplement (DFARS): https://www.acquisition.gov/dfars
DFARS Clauses Incorporated by Full Text
252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirements.
(Nov 2025)
CONTRACTOR COMPLIANCE WITH THE CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)
(a) . As used in this clause-Definitions
"Controlled unclassified information" means information the Government creates or possesses, or information an entity creates or possesses for or on behalf of the Government, that a law, regulation, or Governmentwide policy requires or permits an agency to handle using safeguarding or dissemination controls (32 CFR 2002.4(h)).
"Current" means-
(1) With regard to Conditional Cybersecurity Maturity Model Certification (CMMC) Status-
(i) Not older than 180 days for Conditional Level 2 (Self) assessments and Conditional Level 2 (certified third-party assessment organization (C3PAO)) assessments, with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Conditional CMMC Status date (see 32 CFR
170.16 and 170.17); and
(B) A corresponding affirmation of continuous compliance by an affirming official (see 32 CFR 170.4); and
(ii) Not older than 180 days for Conditional Level 3 (Defense Industrial Base Cybersecurity Assessment Center (DIBCAC)) assessments, with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Conditional CMMC Status date (see 32 CFR 170.18); and
(B) A corresponding affirmation of continuous compliance by an affirming official;
(2) With regard to Final CMMC Status-
(i) Not older than 1 year for Final Level 1 (Self), with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.15); and
(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official;
(ii) Not older than 3 years for Final Level 2 (Self) assessments and Final Level 2 (C3PAO) assessments, with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.16 and 170.17); and
(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official; and
(iii) Not older than 3 years for Final Level 3 (DIBCAC) assessments, with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.18); and
(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official; and
(3) With regard to affirmation of continuous compliance (32 CFR 170.22), not older than 1 year with no changes in compliance with the requirements at 32 CFR part 170.
"Cybersecurity Maturity Model Certification (CMMC) status" means the result of meeting or exceeding the minimum required score for the corresponding assessment. The potential statuses are as follows:
(1) Final Level 1 (Self).
(2) Conditional Level 2 (Self).
(3) Final Level 2 (Self).
(4) Conditional Level 2 (C3PAO).
(5) Final Level 2 (C3PAO).
(6) Conditional Level 3 (DIBCAC).
(7) Final Level 3 (DIBCAC).
"Cybersecurity Maturity Model Certification unique identifier (CMMC UID)" means 10 alpha-numeric characters assigned to each CMMC assessment and reflected in the Supplier Performance Risk System (SPRS) for each contractor information system.
"Federal contract information (FCI)" means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government. It does not include information provided by the Government to the public, such as on public websites, or simple transactional information, such as information necessary to process payments.
"Plan of action and milestones" means a document that identifies tasks to be accomplished. It details resources required to accomplish the elements of the plan, any milestones in meeting the tasks, and scheduled completion dates for the milestones, as defined in National Institute of Standards and Technology Special Publication 800-115 (32 CFR 170.21).
(b) . The Cybersecurity Maturity Model Certification (CMMC) is a framework for assessing a contractor's compliance withFramework applicable information security protections (see 32 CFR part 170).
(c) . The CMMC assessments will not duplicate efforts from any other comparable DoD assessment, except for rare circumstancesDuplication when a reassessment may be necessary, for example, when there are indications of issues with cybersecurity and/or compliance with CMMC requirements.
(d) . The Contractor shall-Requirements
(1)(i) Have and maintain for the duration of the contract a current CMMC status at the following CMMC level, or higher: ____ Contracting Officer insert: CMMC Level 1 (Self); CMMC Level 2 (Self); CMMC Level 2 (C3PAO); or CMMC Level 3 (DIBCAC) for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI; and
(ii) Consult 32 CFR 170.23 related to the flowdown of the CMMC requirements, and flow down the correct CMMC level to subcontracts and other contractual instruments;
(2) Only process, store, or transmit FCI or CUI on contractor information systems that have a CMMC status at the CMMC level required in paragraph (d)(1) of this clause, or higher;
(3) Complete on an annual basis, and maintain as current, an affirmation, by the affirming official (see 32 CFR 170.4), of continuous compliance with the requirements associated with the CMMC level required in paragraph (d)(1) of this clause in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil) for each CMMC UID applicable to each of the contractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the contract;
(4) Ensure all subcontractors and suppliers complete prior to subcontract award, and maintain on an annual basis, an affirmation, by the affirming official (see 32 CFR 170.4), of continuous compliance with the requirements associated with the CMMC level required for the subcontract or other contractual instrument for each of the subcontractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the subcontract; and
(5) If the Contractor has a CMMC Status of Conditional, successfully close out a valid plan of action and milestones (32 CFR 170.21) to achieve a CMMC Status of Final.
(e) . The Contractor shall-Reporting
(1) Submit to the Contracting Officer-
(i) The CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI or CUI during performance of the contract; and
(ii) Any changes in the CMMC UIDs generated in SPRS throughout the life of the contract, task order, or delivery order, if applicable;
(2) Enter into SPRS the results of a current self-assessment for each CMMC UID, not covered by a C3PAO assessment or DIBCAC assessment, applicable to each of the contractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the contract; and
(3) Complete in SPRS on an annual basis and maintain as current an affirmation of continuous compliance by the affirming official (see 32 CFR 170.4) for each self-assessment, C3PAO assessment, or DIBCAC assessment required under the contract in SPRS.
(f) . The Contractor shall-Subcontracts
(1) Insert the substance of this clause, including this paragraph (f) and excluding paragraph (e)(1), in subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and
(2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the CMMC level that is appropriate for the information that is being flowed down to the subcontractor based on the requirements at 32 CFR 170.23.
(End of clause)
252.204-7025 Notice of Cybersecurity Maturity Model Certification Level Requirements. (Nov 2025)
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)
(a) Definitions. As used in this provision, "controlled unclassified information (CUI)," "current," "Cybersecurity Maturity Model Certification (CMMC) status," "Cybersecurity Maturity Model Certification unique identifier (CMMC UID)," "Federal contract information (FCI)", and "plan of action and milestones" have the meaning given in the Defense Federal Acquisition Regulation Supplement 252.204-7021, Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements, clause of this solicitation.
(b)(1) . The CMMC level required by this solicitation is: Cybersecurity Maturity Model Certification (CMMC) level ____ [Contracting Officer insert: CMMC Level 1 (Self); CMMC Level 2 (Self); CMMC Level 2 (C3PAO); or CMMC Level 3 (DIBCAC)]. This CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit Federal contract information.
(FCI) or controlled unclassified information (CUI) during performance of the contract.
(2) The Offeror will not be eligible for award of a contract, task order, or delivery order resulting from this solicitation if the Offeror does not have, for each of the contractor information systems that will process, store, or transmit FCI or CUI and that will be used in performance of a contract resulting from this solicitation-
(i) The current CMMC status entered in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil) at the CMMC level required by paragraph (b)(1) of this provision; and
(ii) A current affirmation of continuous compliance with the security requirements identified at 32 CFR part 170 in SPRS.
(c) Plan of action and milestones. If the Offeror has a CMMC Status of Conditional, the Offeror shall successfully close out a valid plan of action and milestones (32 CFR 170.21) to achieve a CMMC Status of Final.
(d) CMMC unique identifiers. The Offeror shall provide, in the proposal, the CMMC unique identifier(s) (CMMC UIDs) issued by SPRS for each contractor information system that will process, store, or transmit FCI or CUI during performance of a contract, task order, or delivery order resulting from this solicitation. The Offeror also shall update the list when new CMMC UIDs are generated in SPRS. The CMMC UIDs are provided in SPRS after the Offeror enters the results of self-assessment(s) for each such information system.
(End of provision)
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
INSTRUCTIONS FOR QUOTERS
REQUEST FOR QUOTATION (RFQ) No.: N40084-26-Q-4017
NOTE: 1. The words "BIDS" & "BIDDERS" shall be construed to mean "QUOTATION" and "QUOTER".
2. There will not be a Public Opening.
1. In the event any amendments are issued prior to receipt of the quotations, quoter should acknowledge receipt byAcknowledgement of Amendment.
signing and returning the amendment.
2. Any explanation desired by a quoter regarding the meaning or interpretation of the Request for Quotations (RFQ)Explanation to Quoters.
drawings, specifications, etc., must be requested in writing and with sufficient time allowed for a reply to reach all quoters before the submission of their quotations. Any interpretation made will be in the form of an amendment to the RFQ, drawings, specifications, etc., and will be furnished to all prospective quoters. Oral explanation or instruction given before the award of the contract will not be binding.
3. Before a quotation is considered for award, the quoter may be requested by the Government to submit a statementQuoter's Qualifications.
regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work (ifrequired in specifications).
4. Quotations shall be submitted on the forms furnished, or via electronic medium when authorized by the ContractingPreparation of Quotations.
Officer.
5. Submission of Quotes.
a. Written quotations and modifications thereof shall be submitted in sealed envelopes or packages (1) addressed to the office specified in the Request for Quotations (RFQ) and (2) showing the time and date specified for receipt, the RFQ number, and the name and address of the quoter.
b. Quoters using commercial carrier services shall ensure that the proposal is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(l) and (2) above when delivered to the office specified in the RFQ.
c. Facsimile or e-Mail quotes, modifications or withdrawals will be considered.
d. Item samples, ifrequired, must be submitted within the time specified for receipt of quotes. Unless otherwise specified in the RFQ, these samples shall be (1) submitted at no expense to the Government, and (2) returned at the sender's request and expense, unless they are destroyed during preaward testing.
e. All offerors are required to be registered in beta.SAM at the time their offer/quotation/bid is submitted. Offerors with no active SAM registration upon receipt of their offer/quotation/bid shall be considered "ineligible for award'.
f. When the offerors need to download CUI (Controlled Unclassified Information) files such as SOW (Statement of Work), drawings, etc. from SAM, the offerors must provide the offeror's or information. Otherwise, please note that the offeror's request may beCage Code UEI (Unique Entity ID) rejected.
6. Contract Award. Award shall be made to the quoter whose quote is the most advantageous to the Government, based on price.
The Government reserves the right to eliminate from consideration from award any or all quotes at any time prior to award of the contract(s) that do not conform to the solicitation; to negotiate with offerors in the competitive range; and to award Purchase Order(s) to the responsible offeror(s) submitting the lowest price quote(s) that conforms to the solicitation (i.e., meets all minimum mandatory requirements specified in Attachment 1: Statement of Work and Drawings - Mandatory Characteristics for each item being purchased under this solicitation).
7. Currency of Quotations. Quotations shall be priced in Korean Won only. Quotations not priced in Korean Won will be considered nonresponsive and will not be evaluated
8. Payment Information: The price of the contract is expressed in U. S. dollars for the administrative convenience of the U. S. Government, but payment will be made in Korean Won.
Accordingly, in order to pay the invoices under this contract, the Contractor must submit the attached Electronic Funds Transfer (EFT) form signed by a bank official of the bank located in Korea prior to entering into the contract.
FAILURE TO SUBMIT AN EFT FORM SIGNED BY A KOREAN BANK OFFICIAL WILL BE CONSIDERED NON-RESPONSIVE
AND WILL NOT BE EVALUATED.
Companies that have previously submitted an EFT form are not required to resubmit under this contract.
9.Continuing Resolution Authority. "Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation."
10. "The offeror agrees to perform the work required at the prices specified in CLIN 0001 in strict accordance withGovernment Acceptance Period.
the terms of this solicitation, if this offer is accepted by the Government in writing within 120 calendar days after the date offers are due. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected."
11. All questions to the solicitation shall be submitted by e-mail ( ), 07 calendar days prior to the RFQ closing date.yun.c.kim4.ln@us.navy.mil Questions received after this date may not be answered.
LOCAL CLAUSE
1.CONCILIATION
a.Any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to theU.S.-Korea Joint Committee for Conciliation in accordance with paragraph 3, Article XXII, of the Status of Forces Agreementin pursuant to Public Law 89-497, of the Treatues and Other International Acts Series 6127.
b.Recourse to the Joint Committee for Conciliation for resolving disputes is available in addition to the procedures set forth inthe Contract Disputes Act of 1978 and the Disputes Clause ofthis contract, 52.233-1.
A request for conciliation by the Joint Committee, however, shall not toll the time periods allowed under the Contract DisputesAct for appealing a contracting officer's final decision to either the Armed Services Board of Contract Appeals or U.S. CourtofFederal Claims.
c.Upon filing a request for conciliation with the Joint Committee, the Contractor shall immediately notify the ContractingOfficer in writing of the request.
2.TAX EXEMPTION, CUSTOMS, REPUBLIC OF KOREA
(a)EXEMPTION: This clause is in implementation of Article IX of the Status of Forces Agreement between the Republic ofKorea and the United States of America granting contractors exemption from Republic of Korea customs duties and other suchcharges. At the time this contract is awarded, the Contractor shall certify to the Contracting Officer that all materials, supplies,and equipment to be imported for the contract have been proposed to the Government exclusive of customs duties and othersuch charges and; further, that the contract price includes no customs duty whatsoever. It shall indicate to the ContractingOfficer the total amount of customs duties excluded from the contract price. The USFK Contracting Officer will verify theamount of customs duty that would otherwise be applicable to the contract and will issue USFK Form(s) 75 to the Contractor.The contractor will submit the original USFK Form 75 to the governing ROK Customs Office at the time of import declaration.The Chiefofthe Customs Office will review the USFK Form 75 and will exempt the Contractor from customs duties and othersuch charges. During the review process the customs office will post on the Contractor's Import Permit the anticipatedsubmission date for a completed USFK Form 76, which will be prepared by the Contracting Officer and given to the contractorimmediately after contract performance. The Contractor will submit the original USFK Form 76 to the governing ROKCustoms Office no later than the date posted on the Import Permit. If the USFK Form 76 is not submitted by the anticipateddate, the ROK Customs Office will immediately collect the customs duties and other such charges previously exempted.
(b)If for any reason the Contractor has paid customs duties on materials, supplies, or equipment prior to award of this contractand desires to use such materials, supplies, or equipment for performance of this contract, the Contractor must exclude suchduties from the contract price and may obtain refund of such previously paid duties by submitting a completed USFK Form 76to the governing ROK Customs Office.
(c)Refund: Any Contractor that requires refund of customs duties and other such charges on items used for USFK contracts,can claim refund of such charges by submitting a copy of a completed USFK Form 76 to the governing ROK Customs Office.
(d)This entire clause is inapplicable to contracts, or any portions of contracts, funded by the Republic of Korea.
3. TAX EXEMPTION, SPECIAL EXCISE TAX, REPUBLIC OF KOREA
This clause is in implementation of Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States, granting Contractors exemption from Republic of Korea Special Excise Taxes. At the time this contract is awarded the Contractor shall indicate to the Contracting Officer which items will be purchased for the contract that are subject to Special Excise Tax. It shall indicate the name of the item, the number of units to be purchased, the cost per unit without tax, the percentage of tax, the tax amount per unit, the total tax, and the manufacturer of the item. The Contracting Officer will verify the reasonableness of the quantities claimed and ensure that the Contractor has certified that the contract price excludes Special Excise Tax on those items subject to the tax.
The contractor shall purchase the special-excise-taxed items from the manufacturer, tax-inclusive. For construction and single-delivery type supply and service contracts, the contractor shall employ the following procedure: At the time it purchases the items it shall present the manufacturer with a notification letter requesting refund of the Special Excise Tax. (Copies of this letter can be obtained from the 411 th CSB, Korea Contracting Officer.)
The manufacturer will endorse the letter to the manufacturer's District Tax Office which will make refund to the manufacturer. The manufacturer will make subsequent refund to the Contractor.
Requests for refund under requirements-type contracts will be submitted monthly and will be accompanied by copies of the USFK delivery orders issue.
4. TAX EXEMPTION, VALUE ADDED TAX, REPUBLIC OF KOREA
This clause implements Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States of America, which exempts contractors from paying the Republic of Korea Value-Added Taxes. When the contractor submits an offer, it shall certify to the Contracting Officer that all the costs in the offer will be exclusive of any Value-Added Tax; and further, that the proposed contract price includes no Value-Added Tax. The contractor shall also indicate the amount and type of Value-Added Taxes excluded from the contract price. If supplies and/or services which the contractor purchases for this contract include Value-Added Taxes, it can obtain a full refund for the amount of the Value-Added Tax by submitting to the ROK District Tax Office tax invoices which the contractor receives when it purchases materials and/or services for this contract.
The contractor must submit a copy of the USFK contract with its first tax invoice submission. Subsequent tax invoice submissions must be accompanied by a letter which references the USFK contract submitted with the first tax invoice submission.
5. TAX EXEMPTION POL PRODUCTS, REPUBLIC OF KOREA
(a) This clause is in implementation of Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States of America, granting Contractors exemption from Republic of Korea taxes for petroleum products (POL) utilized on USFK acquisitions in the Republic of Korea. At the time this contract is awarded, the Contractor shall make a final nomination in writing of its point of purchase for POL products to be used on this contract. If the Contractor intends to purchase directly from an oil company refinery, it may nominate any of the three ROK oil companies below which have agreed to sell to Contractor FOB refinery at a fixed exempt price.
List of Oil Companies and their Respective Tax Offices
(1) Hyundai Oil Refinery Co., Ltd.: Dong-Inchon District Tax ATTN: POL Tax Administrator Inchon City, Korea
(2) SK Corporation: Ulsan District Tax Office ATTN: POL Tax Administrator Ulsan City, Kyongsang Nam Do, Korea
(3) LG Caltex Company: Yosu District Tax Office ATTN: POL Tax Administrator Yosu City, Chon1a Nam Do, Korea
(b) If the contractor instead intends to purchase its POL products from an individual gasoline station, the Contracting Officer will advise the contractor as to which individual gasoline stations will sell to it at the fixed exempt price. The contractor shall specify from which of those stations it will purchase. In addition to specifying the oil company/gas station, the Contractor shall state the estimated quantity and the amount of POL to be purchased from each refinery/gas station. The USFK Contracting Officer will verify the reasonableness of the amounts of POL products claimed for use on the contract and, based on this verification, the USFK Responsible Officer will issue USFK POL Tax Exemption Coupons. If the Contractor wishes to purchase from an individual gas station, it will be required to make advance payment for the amount of POL covered by the coupons.
Advance payment will be at the fixed exempt price and will be made to the gas station(s) previously nominated. Representatives from the nominated gas station(s) shall be present at the issuing session. They will collect the advance payments; marks "paid" on the back of the original copy of the coupons issued, and provide the purchasing Contractor with tax invoices to be used by the Contractor to obtain a refund from its governing ROK District Tax Office. All coupons for construction contracts will be issued at the time of award. Coupons for requirements-type contracts will be issued on a delivery order increment basis or on a monthly basis. Pre-selected oil company refmeries will sell their POL products at the fixed exempted prices upon presentation of the coupons. Individual gas stations, which have previously collected POL payment in advance will accept the pre-paid USFK POL Tax Exemption Coupons from contractors and will provide the POL amounts reflected on tendered coupons without any further charge.
6. PAPERLESS CONTRACTING.
a. The U.S. Navy (hereafter referred to as the Government) intends to administer any contract awarded under this solicitation using paperless contracting methods to the greatest extent practicable. Paperless contracting involves the use of an electronic medium such as the internet, computer diskettes, CD-ROM, or electronic mail ( e-mail) in place of paper documents to award, solicit, or administer a contract.
b. In order to facilitate the use of paperless contracting methods, the Contractor shall possess the capability to communicate and exchange authenticated documents with the Government electronically during the contract performance period. Such capability shall include the ability to receive, acknowledge, reply to, and send documents via electronic mail. Additionally, such capability shall not require or be contingent upon any modification or upgrade to existing Government software. The Contractor also agrees to maintain such capability notwithstanding any changes or modifications to existing Government software during the contract performance period so long as the Government provides reasonable notice and any equipment and/or software required to maintain such capability is commercially available.
c. The Contractor shall utilize the paperless contracting capability described above as directed by the contracting officer during the contract performance period. Documents which may be required to be exchanged electronically include, but are not limited to, task orders, modifications, requests for cost proposals, and other routine correspondence. Exceptions to the contracting officer's direction may be granted in unusual circumstances with the prior approval of the contracting officer.
d. Both the Contractor and the Government agree to share all such technical information as is necessary to facilitate efficient and reliable electronic communications during the period of contract performance. Such information may include such data as e-mail addresses, available software, and mutually agreed procedures, but shall not include any information the disclosure of which would violate any applicable licenses or other agreements.
In case of any technical difficulties precluding the use of electronic communications, both the Government and the Contractor agree to work in good faith to resolve any such difficulties.
e. For informational purposes, the Government anticipates that its contracting personnel will utilize the following computer software programs during the administration of this contract: Microsoft Office (Excel and Word), Adobe Acrobat, and AutoCAD.
7. CONTRACTOR SUPPORT OF ELECTRONIC FACILITIES SUPPORT CONTRACTING (e-FSC).
The contractor is required to offer IQ pre-priced line item services to authorized Government personnel when they are ordering the work directly via the Government Purchase Card (GPC) program. When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.
The contractor agrees to accept and process electronically submitted GPC orders for IQ services, including those orders issued through the DoD EMALL. The DoD EMALL is a U.S. Government (USG) owned and operated web based ordering system that enables any Department of Defense (DoD) or Federal activity to search for and order goods and services.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .