Solicitation - N0038326RN052.pdf

PDF 2 MB Posted

Attached to
N0038326PR0R062_FMS
Solicitation number
N0038326RN052
Issued by

About this file

This is a Foreign Military Sales (FMS) repair solicitation issued by NAVSUP Weapon System Support (NAVSUPWSS) Philadelphia for the repair of four optical and electronic components. The solicitation number is N0038326RN052, issued on April 16, 2026, with a receipt deadline of May 16, 2026 at 4:00 PM local time. The contract is rated as a Defense Priorities and Allocations System (DPAS) order under 15 CFR 700.

The solicitation covers repair services for six individual line items (0001AA through 0001AF) consisting of one Prism Optical Instrument (NSN 6650013346856, PN 131400-19), one Power Supply (NSN 6130011708280, PN 37120-9A), one Circuit Card Assembly (NSN 5998013546197, PN 129060-39A), and three Sweep Generator Subassemblies (NSN 5980013336675, PN 131050-9). The induction period for initial units is 365 calendar days from contract award, with the option to extend for an additional 365 days. Contractors must propose firm fixed pricing for the entire contract period and may adjust pricing after the initial 365-day period if specified separately. The Government reserves the right to place initial orders for any quantity up to the specified maximum, with contract value calculated using the highest proposed unit price multiplied by maximum quantities for threshold purposes. All repairs shall meet operational and functional requirements per manufacturer specifications and drawings. Packaging and marking must comply with best standard commercial packaging for overseas shipment. The contract includes Commercial Asset Visibility (CAV) Repairables Portal reporting requirements, and contractors must provide Inventory Labels to the Quality Assurance Representative before acceptance. The solicitation incorporates extensive FAR and DFARS clauses including configuration management, inspection and acceptance, hazardous material identification, and representation and certification requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

FMS Requirement

Section A - Solicitation/Contract Form

N0038326PR0R062_FMS

This solicitation is for FMS REPAIR

Induction Period The induction period for the initial units in this order is 365 calendar days from the date of contract award. The Government reserves the right to extend this period by an additional 365 days, for a total of two years. Any unused induction slots from the initial year may be carried over into the second year.

Pricing and Options The contractor shall propose option pricing over the entire contract period, inclusive of the initial quantity. If pricing will change after the first 365 days, please provide separate pricing for the second year.

Contract Award The Government reserves the right to place the initial order for any number of units up to the specified maximum. For threshold purposes, the total contract value will be calculated by multiplying the highest proposed unit price by the maximum number of units.

N0038326RN052

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Case: KU-P-GHY Cage: C09344

NSN: 6650013346856

Nomenclature: PRISM,OPTICAL INSTR

PN: 131400-19

RMC: 3D

Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AA - PKUAE43228031R - SN: 2146

0001AB - PKUAE43228032R - SN: 2127

0001AC - PKUAE43228033R - SN: 2098

0001AD - PKUAE43228034R - SN: 2119

0001AE - PKUAE43228035R - SN: 2133

0001AF - PKUAE44122109R - SN: 2144

National Stock Number: 6650013346856

0001AA

Case: KU-P-GHY Cage: C09344

NSN: 6650013346856

Nomenclature: PRISM,OPTICAL INSTR

PN: 131400-19

RMC: 3D

Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AA - PKUAE43228031R - SN: 2146

National Stock Number: 6650013346856 Pricing Arrangement: Firm Fixed Price PR Number: NOPR PR Line Item Number: 0001AA

1 Each

0001AB

Case: KU-P-GHY Cage: C09344

NSN: 6650013346856

Nomenclature: PRISM,OPTICAL INSTR

PN: 131400-19

RMC: 3D

Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AB - PKUAE43228032R - SN: 2127

National Stock Number: 6650013346856 Pricing Arrangement: Firm Fixed Price PR Number: NOPR PR Line Item Number: 0001AB

1 Each

Case: KU-P-GHY Cage: C09344

NSN: 6650013346856

Nomenclature: PRISM,OPTICAL INSTR

PN: 131400-19

RMC: 3D

0001AC Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AC - PKUAE43228033R - SN: 2098

National Stock Number: 6650013346856 Pricing Arrangement: Firm Fixed Price PR Number: NOPR PR Line Item Number: 0001AC

1 Each

0001AD

Case: KU-P-GHY Cage: C09344

NSN: 6650013346856

Nomenclature: PRISM,OPTICAL INSTR

PN: 131400-19

RMC: 3D

Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AD - PKUAE43228034R - SN: 2119

National Stock Number: 6650013346856 Pricing Arrangement: Firm Fixed Price PR Number: NOPR PR Line Item Number: 0001AD

1 Each

0001AE

Case: KU-P-GHY Cage: C09344

NSN: 6650013346856

Nomenclature: PRISM,OPTICAL INSTR

PN: 131400-19

RMC: 3D

Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AE - PKUAE43228035R - SN: 2133

National Stock Number: 6650013346856 Pricing Arrangement: Firm Fixed Price PR Number: NOPR PR Line Item Number: 0001AE

1 Each

0001AF

Case: KU-P-GHY Cage: C09344

NSN: 6650013346856

Nomenclature: PRISM,OPTICAL INSTR

PN: 131400-19

RMC: 3D

Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AF - PKUAE44122109R - SN: 2144

National Stock Number: 6650013346856 Pricing Arrangement: Firm Fixed Price PR Number: NOPR PR Line Item Number: 0001AF

1 Each

Case: KU-P-GHY Cage: C09344

NSN: 6130011708280

Nomenclature: POWER SUPPLY

PN: 37120-9A

RMC: N/A

0002 Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AA - PKUAE42171019R - SN: 46538A

National Stock Number: 6130011708280

ACRN: AB

PR Number: N00383FMS121687 PR Line Item Number: 0001

Case: KU-P-GHY Cage: C09344

NSN: 5998013546197

Nomenclature: CIRCUIT CARD ASSEMB

PN: 129060-39A

RMC: 3D

Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AA - PKUAE45308057R - SN: 1434

National Stock Number: 5998013546197

ACRN: AA

PR Number: N00383FMS121622 PR Line Item Number: 0001

Case: KU-P-GHY Cage: C09344

NSN: 5980013336675

Nomenclature: SWEEP GENERATOR SUB

PN: 131050-9

RMC: 3D

Mark for MAPAC: DKUA00

SUPPAD: DA5GHY

0001AA - PKUAE42171020R - SN: 0456

0001AB - PKUAE45308064R - SN: 0561

0001AC - PKUAE45308065R - SN: 0319

National Stock Number: 5980013336675

ACRN:

PR Number: N00383FMS121319 PR Line Item Number: 0001

Additional Regulation or Supplemental Clauses Incorporated by Full Text

WSSTERMBA00 CONTACT INFORMATION (Dec 2020)

When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.

Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:

Code N731.44 Weapon System LRC: N00383

Telephone: 2156975970

E-Mail: Danielle.DiCiacco.civ@us.navy.mil

In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.

fct@navy.mil.

N0038326RN052

mailto:itimp.wss.fct@navy.mil mailto:itimp.wss.fct@navy.mil

WSSTERMBZ01 IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION

REPORTING

(Aug 2023)

Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Detailed information on Commercial Asset Visibility (CAV) Repairables Portal (RP) reporting requirements can be found in the CAV Statement of Work (SOW) located at:

https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/

Questions can be addressed to usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104).

WSSTERMBZ04 IMPORTANT NOTICE REGARDING HAZARDOUS MATERIAL (Sep 2006)

FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data, is incorporated by reference in Section I in this solicitation and requires offerors to--

(1) identify any hazardous material (defined in FED STD 313 as an item or chemical which is a "health or physical hazard" per OSHA in 29 CFR 1910.1200) that will be delivered under a resultant contract, and

(2) provide a Material Safety Data Sheet meeting OSHA/FED STD 313 requirements for all hazardous material identified.

While not an all-inclusive listing of hazardous material, at a minimum, any item with a four-digit Federal Supply Code (FSC), which correlates to the first four positions of the National Stock Number (NSN), of 6810, 6820, 6830, 6840, 6850, 7930, 8010, 8030, 8040, 9110, 9135, 9140, 9150, or 9160 is considered hazardous material and requires submission of a Material Safety Data Sheet or an appropriate representation that there is no hazardous material contained in the item.

Failure to provide the required information and documentation may render you ineligible for award. If you have questions about whether a solicited item is classified as hazardous, contact the NAVICP HAZMAT point of contact, NAVSUP WSS Code N26 Director Jeff Whitman, at (564) 230-3019 or .jeff.w.whitman.civ@us.navy.mil

N0038326RN052

https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ mailto:usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil mailto:usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil

Section C - Description/Specifications/Statement of Work

CLIN: 0001

NIIN:

013346856 013336675 013546197 011708280

ITEM NAME:

PRISM,OPTICAL INSTR

SWEEP GENERATOR SUB

CIRCUIT CARD ASSEMB

POWER SUPPLY

1. SCOPE

1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PRISM, .OPTICAL INSTR SWEEP GENERATOR SUB CIRCUIT CARD ASSEMB POWER SUPPLY

2. APPLICABLE DOCUMENTS

2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.

2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The PRISM,OPTICAL INSTR SWEEP GENERATOR SUB CIRCUIT repaired under this contract/purchase order shall meet the operational and functional CARD ASSEMB POWER SUPPLY requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractor's repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.

131400-19 131050-9 129060-39A 37120-9A

3.2 Marking - PACKAGING AND MARKING SHALL BE IN ACCORDANCE WITH BEST STANDARD

COMMERCIAL PACKAGING FOR OVERSEAS SHIPMENT.

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVSUP-WSS- MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVSUP-WSS-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old.

Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable.

Requirements Case: KU-P-GHY Cage: C09344

See Miscellaneous Text for Details

Additional Regulation or Supplemental Clauses Incorporated by Full Text

WSSTERMCZ01 CONFIGURATION MANAGEMENT AND CONTROLS (Nov 2023)

Prescription: Required in all Navy Aviation (Phil only) solicitations/contracts

1.0 Configuration Management

1.1 The cognizant Naval Air Systems Command (NAVAIR) Program Manager will maintain configuration control and change authority for all items in this contract.

1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.

NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.

2.0 Engineering Changes

2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as Class I (Major) or Class II (Minor).

For detailed classification criteria refer to the DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS- 80639E, Engineering Change Proposal (ECP).

NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.

2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant NAVAIR Program Office prior to any Class I ECP submission. The Contractor must submit all Class I changes, via the Defense Contract Management Agency (DCMA) Contract Management Office (CMO) and the Procurement Contracting Officer (PCO), to the cognizant NAVAIR Program Office for approval

The Contractor must notify the PCO of any pending or approved Class I engineering changes with another or disapproval.

Government activity that the Contractor proposes to incorporate under this contract. The cognizant NAVAIR Program Office will approve or disapprove of all Class I changes. Any approved Class I change may necessitate contract changes by the contracting officer, which changes may be handled under the Changes clause of this contract, FAR 52.243-1. The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.

2.1.2 Any Class II change involving a Critical Safety Item (CSI) must be submitted to the PCO for Class II (Minor) Changes:

NAVAIR Program Office approval unless NAVAIR has delegated approval authority to the cognizant DCMA CMO. For Class II changes to items without a criticality determination, the items will be considered CSI for the purposes of processing in accordance with this paragraph. Class II changes related to non-CSI's must be submitted to the cognizant DCMA CMO for concurrence in classification and may be implemented only upon receiving DCMA concurrence. Class II changes must be made at no additional cost to the Government.

2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.

3.0 Variances

3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's approved configuration. RFV's are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Any variance requests to CSI's must be classified as major, at a minimum. For variances to items without a criticality determination, the items will be considered CSI for the purposes of processing and classified as a major, at a minimum. Variance requests shall be prepared in accordance with DI-SESS- 80640E - Request for Variance (RFV).

NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be submitted to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.

NOTE: Should a variance be discovered after product delivery, the Contractor must notify the PCO and NAVSUP WSS Quality (NOE_N22@us.navy.mil).

3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests, via the DCMA CMO and the PCO, to the cognizant NAVAIR Program Office for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.

3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until approved by the cognizant DCMA CMO.

3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a critical, major, or minor variance.

WSSTERMCZ05 CONFIGURATION MANAGEMENT – MARITIME (Nov 2023)

Prescription: Required in all Navy Maritime (Mech only) solicitations/contracts

1.0 Configuration Management

1.1 The cognizant systems command (SYSCOM), Naval Sea Systems Command (NAVSEA) or Naval Information Warfare Systems Command (NAVWAR), Program Manager will maintain configuration control and change authority for all items in this contract.

1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.

NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.

2.0 Engineering Changes

2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as either Class I (Major) or Class II (Minor). For detailed classification criteria refer to DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI- SESS-80639E, Engineering Change Proposal (ECP).

NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.

2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant SYSCOM Program Office prior to any Class I ECP submission. The Contractor must notify the Procurement Contracting Officer (PCO) of any pending or approved Class I engineering changes with another Government activity that the Contractor proposes to incorporate under this contract. The cognizant SYSCOM Program Office will approve or disapprove of Class I changes. Any approved Class I change may necessitate contract changes by the PCO, which changes may be handled under the Changes clause of this contract, FAR 52.243-1 The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.

2.1.2 Class II (Minor) Changes: Class II changes must be submitted to the cognizant Defense Contract Management Agency (DCMA) Contract Management Office (CMO), or to the Supervisor of Shipbuilding (SUPSHIP) Groton, for concurrence in classification and may be implemented only upon receiving DCMA, SUPSHIP, or NAVSEA/NAVWAR Technical Warrant Holder (TWH) concurrence. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit the Class II (Minor) change to the PCO for approval or disapproval. Class II changes must be made at no additional cost to the Government.

2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.

3.0 Variances

3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline. RFVs are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Variance requests must be prepared in accordance with DI-SESS-80640E - Request for Variance (RFV).

NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.

3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests via DCMA or SUPSHIP and the PCO, to the SYCOM Program Office or their delegated representative, for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.

3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until the request is approved by the cognizant DCMA CMO, SUPSHIP, or SYSCOM TWH. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit minor variance requests via DCMA or SUPSHIP and the PCO, to the SYSCOM Program Office or their delegated representative, for approval or disapproval.

3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a major/critical or minor variance.

Section D - Packaging and Marking

NIIN:

PRISM,OPTICAL INSTR

SWEEP GENERATOR SUB

CIRCUIT CARD ASSEMB

POWER SUPPLY

ITEM NAME:

013346856

013336675 013546197 011708280

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.

Marking - PACKAGING AND MARKING SHALL BE IN ACCORDANCE WITH BEST STANDARD COMMERCIAL

PACKAGING FOR OVERSEAS SHIPMENT.

Additional Regulation or Supplemental Clauses Incorporated by Full Text

WSSTERMDZ03 PRESERVATION, PACKAGING, PACKING AND MARKING (Nov 2025)

PRESERVATION, PACKAGING, PACKING AND MARKING

The contractor shall preserve, package, pack and mark all items as cited below. Where specifications or standards are cited herein the latest revision of that specification or standard shall apply.

1. PRESERVATION REQUIREMENTS

a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to in enter the military distribution system for stock accordance with the MIL-STD-2073-1, "Standard Practice for Military Packaging", Packaging Requirements Code specified in the Schedule.

When a Specialized Preservation Code/Method of Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence. Contractors should disregard the LP field and third digit of the PACK field and use the Unit Container Level (UCL) to identify the level of packing protection the unit container meets for packing requirements. When HM = D, the item is regulated in accordance with Title 49 Code of Federal

; when HM = N the item is not regulated for transportation.Regulations (CFR)

1) When a specified packaging material has an associated Qualified Products List (QPL), the contractor shall use only packaging materials produced by a manufacturer listed on the applicable QPL. Barrier materials that have QPLs are MIL-PRF-131, MIL-PRF-81705, MIL-PRF- 22191, MIL-PRF-3420 and MIL-PRF-22019. Sources for QPL material can be obtained from the Qualified Products Database at http://qpldocs.dla.mil/.

b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS - Government PCO or ACO approval is required to use the packaging standards outlined in this paragraph. Any national stock numbered (NSN) item required for immediate use (used or consumed within or part numbered item (authority granted to ship without NSN) shall be preserved and packed in 7 days of receipt) or direct installation, accordance with ASTM D3951 , "Standard Practice for Commercial Packaging", for all shipments to a Continental United States -18 (2023) (CONUS) government activity or contractor-owned facility. All material destined for overseas shipment (OCONUS) shall be preserved in accordance with MIL-STD-2073-1.

c. GOVERNMENT-OWNED MATERIAL - In the event that the contract expires, is terminated, or completed, and Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1.a.

2. PROTECTION FROM DEGRADATION DUE TO ELECTROSTATIC (ES)/ELECTROMAGNETIC (EM) FORCES

a. When ASTM D3951 is authorized for packaging and the item is considered Electrostatic Discharge Sensitive (ESDS), protection -18 (2023) shall be in accordance with ANSI/ESD S20.20-2021, "For the Development of an ESD Control Program for - Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)."

b. When MIL-STD-2073-1 is specified and the preservation method code (PMT) in the solicitation does not specify ESD/EM protection (PMT = GX) and the contractor's proposed item of supply is subject to degradation from ES/EM forces, contractors shall provide recommended packaging data with their proposals/quotes.

3. PACKING REQUIREMENTS - The contractor shall pack as follows:

Domestic Shipments (CONUS): Level B

Overseas Shipments (OCONUS) (including Navy ships at sea):

Via air, FPO, APO Level B

Via freight forwarder Level B

Via surface Level A

Exterior shipping containers for Packing Levels A and B are listed in MIL-STD-2073-1, Appendix C, Table C.II. Long-life reusable containers and wood containers are shipping containers which do not require overpacking for shipment.

4. MARKING REQUIREMENTS - All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129. In addition, the following specific requirements apply:

a. ADDITIONAL MARKING FOR SPARES ONLY Each MIL-STD-129 label shall also include the following:-

1) Procurement Instrument Identifier (PIID) - the 13-digit contract order number,

2) Contract Line Item Number (CLIN) - the 4-digit individual line item number (e.g. 0001, 0002, etc.), and

3) SubCLIN - the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).

b. DEPOT LEVEL REPAIRABLE (DLR) LABELS

1) Items identified with a Cognizance (COG) Code of either "7" or an even number preceding the NSN, excluding 6A, 6H and 6X COGs (e.

g. 7RH 5826-014289999), are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, intermediate and shipping containers as close to the bar code label as possible.

EXCEPTION: When a DLR item requires use of both a reusable inner unit container and a reusable outer shipping and storage container (excluding wood and fiberboard), only the inner unit container shall be affixed with a DLR label. In these cases only, DLR labels shall NOT be placed on the outer reusable container.

2) Labels are available via the Naval Forms Online website: . The website will advise the https://forms.documentservices.dla.mil/order/ procedures for ordering and establishing an account.

3) NAVSUP WSS authorizes contractors to create and print their own DLR labels.

Labels shall follow the standard size and font options listed in below chart. Text shall be in all upper case letters of the same style font. The label used shall be sized proportionate to the size of the container. Labels shall be horizontally printed and consist of yellow "DLR" text font on a solid blue background. Labels shall meet requirements of MIL-STD-129 section 4.2.2. Labels shall be of a water-resistant grade of paper, film, or plastic, coated on one side with water-insoluble, permanent type adhesive. The adhesive shall adhere to metal, plastic, aluminum or fiberboard surfaces under high and low temperatures. Labels shall have a finish suitable for printing and writing on with ink without feathering or spreading, be capable of withstanding normal handling and storage conditions, and remain securely in position. Application specific performance criteria and durability requirements to ensure functionality in various climatic environments should be tailored, if required, using MIL-PRF-61002. MIL-PRF-61002 can be used as an acquisition tool when labels presently being used are not performing satisfactorily or when new conditions or applications require special label stock for those particular situations.

NSN DESCRIPTION

QUANTITY

PER UNIT PACKAGE

APPLICATION FORM NUMBER

DLR Label Unit

N0038326RN052

https://forms.documentservices.dla.mil/order/%20

0108LF5055300

2 in. x 3 in.

Container

NAVSUP 1397-1

0108LF5055000

DLR Label

3 in. x 5 in.

Intermediate / Shipping

Container

NAVSUP 1397

c. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MARITIME REQUIREMENTS ONLY

1) Certain program related items are identified by a two-position SMIC, which appears as a suffix to the NSN (e.g. 1H 4730 009001317 L1), and require special markings. Containers shall be marked or labeled with letters, maximum two inches high on two (2) sides and two

(2) ends as follows:

SMIC MARKINGS COLOR TYPE CONTAINER

L1 LEVEL 1 RED Unit, intermediate and shipping (size permitting)

S1

SURFACE

LEVEL 1

RED Unit, intermediate and shipping (size permitting)

D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping (size permitting)

C1 *

LEVEL 1 SPECIAL

CLEAN O2-N2

GREEN Unit, intermediate and shipping

CP/VG *

SPECIAL CLEAN

O2-N2 GREEN Unit, intermediate and shipping

D0/D6/D8 * DSS-SOC SPECIAL CLEAN O2-N2 GREEN Unit, intermediate and shipping

VU FBW SFCC VU BLUE Unit, intermediate and shipping (size permitting)

SW FBW SFCC SW BLUE Unit, intermediate and shipping (size permitting)

Q3/Q5 Q3 or Q5 RED

Unit, intermediate and shipping

* denotes Oxygen Clean requirements in accordance with MIL-STD-1330 "Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium- Oxygen, Nitrogen, and Hydrogen Systems."

5. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147 "DOD Standard Practice: Palletized Unit Loads." Failure to meet these palletization/packaging requirements and measures, without a written waiver from the PCO or ACO, may result in charges back to the contractor for repalletization and/or repackaging of items. Pallets shall conform to the requirements of American National Standards Institute, Material Handling-MH1-2016, Pallets, Slip Sheets, and Other Bases for Unit Loads. MH1-2016 may be obtained at the following website: http://www.mhi.org

a. General Purpose Unit Loads - When shipping directly to a Navy afloat unit, pallets meeting MH1-2016, Part No. MH1/9-02SW4048 or MH1 /9-10BW4048 for unit loads under 1,500 pounds and MH1/9-03SW4048 for unit loads over 1,500 pounds shall be used.

b. Hazardous Material Unit Loads - Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums, shall be palletized utilizing MH1-2016 Part No. MH1/9-07SW4848 pallets.

c. Use of nonstandard commercial pallets is prohibited.

6. WOOD PACKAGING MATERIAL (WPM). All shipments destined to the DOD must be treated and marked in accordance with the International Standards for Phytosanitary Measures Guidelines for Regulating Wood Packaging Material in International Trade ( ) for ISPM 15 OCONUS shipments . for OCONUS shipments

a. For all WPM furnished under this contract the contractor shall ensure the American Lumber Standards Committee (ALSC) approved mark is applied to every shipment regardless of destination.

b. Failure to comply with the requirements of ISPM 15 may result in refusal of the shipment, destruction or corrective treatment of WPM at the point of receipt and the associated costs charged back to the contractor.

7. NAVY SHELF-LIFE PROGRAM. Navy shelf-life requirements are listed under the item description in a 3-digit alpha/numeric code. Position one (1) is the DOD shelf-life code, defining the type of shelf-life for an item (Type I, non-extendible or Type II, extendible), and the number of months an item can remain ready for issue in a Navy specified package. Positions two (2) and three (3) combined form the Navy-unique shelf-life action codes used by storage activities, and do not impose any requirements on the contractor. The contractor shall use the applicable shelf-life paragraphs and table in MIL-STD-129 to apply either Type I or Type II shelf-life markings to an item's unit, intermediate and shipping containers. Contractors will ensure that at least eighty-five percent (85%) of the Navy shelf-life requirement is remaining when received by the first government activity.

8. REUSABLE NSN CONTAINERS. An item that has an NSN assigned in the "Container NSN" field (e.g. 8145 012622982) requires shipment in a reusable shipping and storage container.

a. REUSABLE CONTAINERS FOR NAVSUP WSS, MARITIME REQUIREMENTS - Reusable NSN containers for maritime material (designated by a COG Code of "7E", "7G" and "7H") shall be provided as contractor-furnished material (CFM).

b. REUSABLE CONTAINERS FOR NAVSUP WSS, AVIATION REQUIREMENTS - Reusable NSN containers (excluding fiberboard and most wood) for aviation material (designated by a COG Code of "7R", "6K" or "0R") shall be provided as government-furnished material (GFM).

Fast pack containers will not be provided as GFM. To obtain GFM reusable containers, the contractor must request via email usn.philadelphia.

navsupwssphil.mbx.navsupcrf@us.navy.mil at least 90 days prior to the anticipated shipping date, 30 days prior for repair contracts. If the Navy's Container Management Area (CMA) informs the contractor that containers are unavailable, the following alternate packaging requirements apply. The unavailability of reusable containers shall not be an excusable delivery delay.

ALTERNATE PACKAGING REQUIREMENTS FOR ITEMS ASSIGNED THE FOLLOWING CONTAINERS

Container NSN Container Part Number (80132) Alternate Packaging Code

IAW MIL-STD-2073-1

8145 002609548 P069-2

N 001 000 GX 1 00 K3 LT B ED

UCL = B

SPMK = 39

PACK = QFF

N0038326RN052

https://www.ippc.int/en/publications/640/

8145 002609556 P069-1

8145 002609559 P069-3

8145 002609562 P069-4

8145 010124088 P069-6

8145 010140440 P069-5

8145 011644073 P069-7

8145 012622982 15450-1

If MOP/PMT = GX

N 001 000 GX 1 00 K3 GH Z ED

Z= use 1.5" of "GH" cushioning between barrier bag and Unit Container

UCL = B

SPMK = 39

PACK = QFF

For all other MOPs/PMTs

N 001 000 51 1 00 EA GH F ED

UCL = B

SPMK = 03

PACK = QFF

8145 012622983 15450-2

8145 012622984 15450-3

8145 012622985 15450-4

8145 012622986 15450-5

8145 012622987 15450-6

8145 012622988 15450-7

c. All excess empty reusable shipping and storage containers shall be turned-in to the nearest Container Reuse and Refurbishment Center (CRRC). CRRC locations/points of contact: Program Manager - 215-697-2063

Norfolk, VA - 757-445-9099 ext. 124 Yokosuka, JAPAN - 011-81-46-816-6304

Cherry Point, NC - 252-466-2331 Lemoore, CA - 559-998-0220

Jacksonville, FL - 904-542-1014 Okinawa, JAPAN - 011-81-46-816-6304

San Diego, CA - 619-545-8360 Iwakuni, JAPAN - 011-81-46-816-6304

Puget Sound, WA - 360-476-9777 Bahrain - 011-318-439-9553

d. The stock-numbered, long-life, reusable containers identified herein as GFM are property of the U.S. Navy and only shall be used to fulfill orders from the Navy and U.S. Marine Corps; these containers shall not be used to fulfill orders from the U.S. Army, U.S. Air Force, any other agency of the U.S. Government or Foreign Military Sales (FMS) customer.

9. REUSABLE NSN CONTAINERS FOR FOREIGN MILITARY SALES (FMS), JOINT PROGRAM OFFICE (JPO) OR OTHER

FOREIGN FORCES ACQUISITION

a. Reusable shipping and storage containers shall be provided as CONTRACTOR-FURNISHED MATERIAL (CFM), unless otherwise specified.

b. Contractors may tender offers including alternate, non-reusable, packaging methods and be considered responsive.

10. HAZARDOUS MATERIALS. This section applies when items to be delivered under this contract are considered hazardous materials as defined by 49 CFR, FED-STD-313, or by the Government's technical representative.

a. Packaging and marking for hazardous materials shall comply with applicable requirements for Performance Oriented Packaging (POP) contained in 49 CFR and the international modal regulations. All performance test requirements shall be supported by test certificates and reports attesting to the date and the results obtained from performance oriented packaging testing. The contractor shall be responsible for assuring that sources providing performance testing services are registered with the U.S. Department of Transportation (DOT). The contractor's signed certification that the packaged configuration meets the applicable modal regulation shall be incorporated on the Wide Area Workflow Receiving Report (WAWF RR), DD Form 250, Material Inspection and Receiving Report, or other related acceptance documents if a WAWF RR, DD Form 250 is not used. The Shipper's Declaration for Dangerous Goods (SDDG) must be included for all air shipments and uploaded to WAWF. All test certificates, reports and training records shall be available for inspection by authorized Government representatives for a period of three years.

b. When a contract/order for hazardous material requires shipment to a military aerial port or through a military container consolidation point including DODAACs SW3225, SW3123, SW3142, N45627, FB4427, FB9150, FB4497, FY8910, FY9125, FB4418, FY4462, FB4484, FB4479, those shipments shall comply with NAVSUP PUB 505/AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipment.

11. SAFETY DATA SHEETS. As required by clauses FAR 52.223-3 "Hazardous Material Identification and Material Safety Data" and DFARS 252.223-7001 "Hazard Warning Labels" the contractor/offeror is required to list any hazardous material to be delivered under the resultant contract by the submission of Safety Data Sheets (SDSs) and Globally Harmonized System (GHS) compliant product label, when applicable, to the NAVSUP WSS or DLA Contracting Officer prior to award. An electronic copy in PDF format of the SDS and GHS product label must also be emailed to NAVSUP WSS Code N242 at Please include the NSN, CAGE, Part Number, quantity of NAVSUPWSSMECH.HAZMAT@US.NAVY.MIL.

hazardous material, contract number, and point of contact for hazardous material questions in the body of the email.

12. REPACKAGING TO CORRECT PACKAGING DEFICIENCIES

a. Notwithstanding inspection and acceptance by the Government of items furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the contractor guarantees that the preservation, packaging, packing and marking (PPP&M), and the preparation of, and method of shipment of such items will conform to the requirements of this contract.

b. Items that do not conform to the PPP&M requirements of this contract may have a Supply Discrepancy Report (SDR, SF-364) written against the contractor at the time of receipt.

c. The Government may at the option of the PCO or ACO, correct PPP&M deficiencies, without prior contractor notification, and require an equitable adjustment in the contract price to cover labor and material when corrective actions are warranted, or return the non-conforming material to the contractor for repackaging at the contractor's expense.

N0038326RN052

mailto:NAVSUPWSSMECH.HAZMAT@US.NAVY.MIL

Section E - Inspection and Acceptance

NIIN:

PRISM,OPTICAL INSTR

SWEEP GENERATOR SUB

CIRCUIT CARD ASSEMB

POWER SUPPLY

ITEM NAME:

013346856

013336675 013546197 011708280

4. QUALITY ASSURANCE PROVISIONS

4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material.

4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.

4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings.

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-15 Certificate of Conformance. Apr 1984 52.246-16 Responsibility for Supplies. Apr 1984

FAR Clauses Incorporated by Full Text

52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

____[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

WSSTERMEZ04 INSPECTION AND ACCEPTANCE – SHORT VERSION (May 2022)

Supplies furnished hereunder shall be inspected at . Acceptance shall be at .

Manufacturing Site:

Address:

If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:

Packaging House:

Address:

Overall Contract Inspection/Acceptance Locations

0001AA

Inspection and Acceptance Location

Both Destination Instructions: Inspect for damage and confirm as anticipated before acceptance

MAPAC: DKU005

0001AB

Inspection and Acceptance Location

Both Destination Instructions: Inspect for damage and confirm as anticipated before acceptance

MAPAC: DKU005

0001AC

Inspection and Acceptance Location

Both Destination Instructions: Inspect for damage and confirm as anticipated before acceptance

MAPAC: DKU005

0001AD

Inspection and Acceptance Location

Both Destination Instructions: Inspect for damage and confirm as anticipated before acceptance

MAPAC: DKU005

0001AE

Inspection and Acceptance Location

Both Destination Instructions: Inspect for damage and confirm as anticipated before acceptance

MAPAC: DKU005

0001AF

Inspection and Acceptance Location

Both Destination Instructions: Inspect for damage and confirm as anticipated before acceptance

MAPAC: DKU005

Section F - Deliveries or Performance

Line Item Delivery Schedule Quantity Address and POC

0001AA

Delivery Estimated By Delivery Date 14 Apr 2031

1 Each Ship To

MAPAC: DKU005

0001AB

Delivery Estimated By Delivery Date 14 Apr 2031

1 Each Ship To

MAPAC: DKU005

0001AC

Delivery Estimated By Delivery Date 14 Apr 2031

1 Each Ship To

MAPAC: DKU005

0001AD

Delivery Estimated By Delivery Date 14 Apr 2031

1 Each Ship To

MAPAC: DKU005

0001AE

Delivery Estimated By Delivery Date 14 Apr 2031

1 Each Ship To

MAPAC: DKU005

0001AF

Delivery Estimated By Delivery Date 14 Apr 2031

1 Each Ship To

MAPAC: DKU005

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.247-29 F.o.b. Origin. Feb 2006 52.247-61 F.o.b. Origin-Minimum Size of Shipments. Apr 1984 52.247-65 F.o.b. Origin, Prepaid Freight-Small Package Shipments. Jan 1991

Additional Regulation or Supplemental Clauses Incorporated by Full Text

WSSTERMFZ05 FMS DELIVERY AND SHIPPING INSTRUCTIONS (rev. 1) (Feb 2004)

Material to be delivered FOB Origin at or near contractor's plant in the manner specified below. Use of Agency Official Indicia mail by contractors is not authorized. Quantities will not be divided into mailable lots for the express purpose of avoiding movement by other modes of transportation.

Consignment instructions provided herein are subject to change. In order to obtain the most current "Ship To" and "Mark For" information, the contractor is required to contact the cognizant DCMA Transportation Office ten days prior to shipment.

MATERIAL/TRANSPORTATION DATA:

If shipment qualifies as a small parcel under current specifications, ship via a Mode 5 small parcel carrier within the Continental United States (CONUS). Contractor will add prepaid transportation charges as a separate item on the invoice for reimbursement purposes.

If shipment does not qualify as a small parcel (Mode 5) shipment, ship to the Freight Forwarder on a collect commercial Bill of Lading.

International FMS Parcel Post (PP) shipments destined for the Government of Canada will be made via "Certificate of Mailing" using United States Postal Service (USPS) Form 3817, 3877 or 3877A.

If an X appears in the following parentheses ( ), ship on a Prepaid Commercial Bill of Lading (CBL). Request transportation instructions from the cognizant DCMA transportation Office. Transportation Account Code (TAC) ( ) applies.

SPECIAL MARKINGS:

For record accounting identification purposes, the Document Number, National Stock Number (NSN), and Supplementary Address, which appear under each line item(s) subclin, must be referenced in all Contracts, Invoices, Shipping, Inspection, and Financial Documents.

For FMS shipments only, regardless of size, the shipper shall bar code and apply the below listed identification with the appropriate bar coding format as specified in the MILSTD-129-P (disregarding 4.4.1.2) based on the packaging standard used.

The Bar Code Lines should read as shown below.

(NOTE: The 14-15 position Requisition Number, which can be found under each line item(s) subclin, shall be bar coded vice the Contract number.)

Bar Code Line 1:

National Stock Number (NSN) or CAGE and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .