Solicitation - N0038326RD051.pdf
PDF 3 MB Posted
- Attached to
- 5 Yr Displays LTC
- Solicitation number
- N0038326RD051
About this file
This document is a Department of the Navy solicitation (N0038326RD051) for a 5-year Long-Term Contract (LTC) with Honeywell International Inc. for repair of display components. The solicitation is for a requirements contract to repair various NIINs (National Item Identification Numbers) with an anticipated contract duration from November 23, 2026 to November 22, 2031. Honeywell International Inc. (CAGE code 5Y043), located in Phoenix, AZ, is identified as the sole source provider with full repair capability for the listed items, as the government does not possess complete technical data, drawings, or repair rights.
The contract includes specific terms such as a Repair Turnaround Time (RTAT) for processing repaired items, with the contractor required to report transactions in the Commercial Asset Visibility (CAV) system within 5 business days of occurrence. The contract will be a fixed-price requirements contract with pricing for repair/modification of items specified in Attachment A. The induction period for assets is 365 days after contract award, and the contractor must maintain detailed records and follow specific reporting and quality assurance requirements throughout the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1105773434 PKG1.pdf | ||
| 1105773434_EXHIBIT1_A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Section A - Solicitation/Contract Form
CRR Honeywell Displays LTC
Product Service Code: 6625
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor’s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: Various days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of 000 per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation:
A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email.
The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
Early and incremental deliveries accepted and preferred.
IF AN ITEM IS FOUND TO BE EITHER BEYOND ECONOMICAL REPAIR (BER) OR BEYOND
PHYSICAL REPAIR (BPR), THE CONTRACTOR SHALL NOTIFY THE DEFENSE CONTRACT
MANAGEMENT AGENCY (DCMA) QUALITY ASSURANCE REPRESENTATIVE (QAR) FOR
VERIFICATION OF THE ITEM'S CONDITION. THE QAR WILL PROVIDE THEIR ASSESSMENT OF
THE ITEM'S CONDITION ALONG WITH ANY OTHER PERTINENT INFORMATION TO THE DCMA
ADMINISTRATIVE CONTRACTING OFFICER (ACO). THE CONTRACTOR SHALL NOT SCRAP OR
CANNIBALIZE THE ITEM UNTIL WRITTEN AUTHORIZATION IS PROVIDED BY THE NAVSUP WSS
PCO.
N0038326RD051
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
This solicitation will ultimately result in award of a 5 year REQUIREMENTS contract. For information explaining how this type of contract works, see the following pages.
Prices will be for Repair/Modification of the items specified on Attachment A hereto, for a period of 5 years from the date of award and 0 successive twelve (12) month Option Period(s). The quantities shown are the Government's best estimates and are neither minimum nor maximum quantities.
All orders placed for repair during this time period shall be issued as priced orders. Therefore, offerors should insert firm-fixed prices for each year included in the Base and Option Periods.
All parts necessary to effect repairs shall be furnished by the contractor and shall be considered to have been included in the price of repairs.
(a) : The Government may place orders for articles to be serviced hereunder, during the period commencing on the date of Ordering Period execution of this contract and ending five (5) years from the date thereof, or the last day of any exercised option period, whichever is later. Each order placed shall be issued and processed in the manner hereafter provided.
(b) : The NAVSUP WSS Procuring Contracting Officer (PCO) shall place orders under this agreement in the manner Authorized Ordering Activity provided elsewhere herein;
(c) : Orders issued under this Contract shall be prepared on DD Form 1155; however, if exigency so demands, order Form and Content of Orders may be issued via electronic transmission (e.g., e-mail) and will be confirmed by DD Form 1155 as soon as practicable thereafter, and will bear the notation "CONFIRMING ORDER." In addition, each DD Form 1155 order shall include the following:
(1) The order number, date, and appropriate reference to this contract;
(2) Citation of the negotiation authority pursuant to which the order is negotiated;
(3) Appropriation and accounting data and special invoicing instructions.
(4) Special shipping instructions, place of delivery, place of inspection, DoD Priority designator and surveillance criticality designator.
(5) Defense Order Rating certified under the Defense Priorities and Allocations System.
(6) Description of work to be performed and identification of specific articles to be repaired including part number and stock number, serial number if available, and quantities thereof.
(7) The model designation of the end unit for which the parts ordered applies, if available.
(8) The agreed upon delivery schedule.
(9) A DD form 1423 setting forth the date ordered.
(d) Obligations of Contractor
(1) The contractor shall, except as specified in paragraphs (2) or (3) below, immediately proceed with the repair of the articles covered by the order.
(2) Where the contractor cannot proceed, or is not authorized to proceed, the contractor shall so advise the PCO (by e-mail, if available) within five (5) working days after receipt of the order. The contractor shall await instruction from the PCO regarding such orders; which shall be issued within five (5) working days, or such additional period as the PCO may require after being advised by the contractor of the circumstances preventing the start of performance.
(3) The contractor shall advise the PCO of any specific representation or certification that cannot be made as to an order and reason(s) therefore.
(4) In regard to (d)(2) or (d)(3), the contractor shall notify the PCO and the cognizant ACO and shall stop work until given further instructions or disposition of the item by the PCO.
(5) The contractor shall establish and maintain:
(i) A summary of all costs incurred applicable to all orders placed pursuant to the terms of this contract.
(ii) The summary records required in (5)(i) shall be furnished to the Contracting Officer upon request.
(6) Sixty (60) days after induction of the last unit received against delivery orders issued hereunder, Contractor shall notify the ACO (with a copy to the PCO) of the actual quantities inducted for repair.
(e) Within thirty (30) days of ACO's receipt of contractor's notice of last induction ((d)(6), above), unless otherwise specified by NAVSUP WSS, ACO shall modify the delivery order, to reduce all excess quantities and funds.
Note to Contractor:
Sixty (60) days after induction of the last unit received against delivery orders issued hereunder, Contractor shall notify the ACO (with a copy to the PCO, Code N7 ) of the actual quantities inducted for repair.21
Note to ACO:
Within thirty (30) days of ACO's receipt of contractor's notice of last induction, unless otherwise specified by NAVSUP WSS, ACO shall modify the delivery order, to reduce all excess quantities and funds.
(a) The Government may issue Delivery Orders, in the manner provided elsewhere herein, the following types of effort:
(1) Repair and/or Modification: The contractor shall furnish all effort including labor, material, and facilities as may be required to repair and/or modify the ordered quantities of repairable assemblies (hereinafter repairable assemblies or items) in the Common Displays System. The repairable assemblies to be repaired and/or modified under this agreement are set forth by manufacturer's part number or National Stock Number (NSN) in Attachment "A" and constitute "Government Property" as defined in FAR clause 52.245-1 or 52.245-1 Alternate I, as applicable.
Repair and/or modification of repairable assemblies will be accomplished in accordance with the Specifications for Repair/Modification Statement of Work.
(2) Web-based Commercial Asset Visibility (WEBCAV) Reporting: The Contractor's effort on each Delivery Order for repair and/or modification of government property shall include furnishing all effort, including labor, materials, and facilities as may be required to accumulate, format, and transmit the transactions.
Item Supplies/Service Estimated Quantity
Unit Unit Price Amount
Various NIINs
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Pricing Arrangement: Firm Fixed Price
1 Each
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMBA00 CONTACT INFORMATION (Dec 2020)
When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.
Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:
Code N721.15 Weapon System LRC: B1Z
Telephone: 215-697-6278
E-Mail: svitlana.shvets.civ@us.navy.mil
In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.
fct@navy.mil.
WSSTERMBZ01 IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION
REPORTING
(Aug 2023)
N0038326RD051
mailto:itimp.wss.fct@navy.mil mailto:itimp.wss.fct@navy.mil
Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Detailed information on Commercial Asset Visibility (CAV) Repairables Portal (RP) reporting requirements can be found in the CAV Statement of Work (SOW) located at:
https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/
Questions can be addressed to usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104).
N0038326RD051
https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ mailto:usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil mailto:usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil mailto:usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil
Section C - Description/Specifications/Statement of Work
(a) Articles to be repaired and/or modified under this agreement, as shown on Attachment "A", will be shipped at the Government's expense to the plant of the contractor at:
TBD (TBD)
TBD
The contractor shall receive for each shipment a list (referencing this agreement number) of the articles included in the shipment.
(b) Upon receipt of such articles, the contractor shall:
(1) Verify that the articles received corresponds with the list of the articles furnished for such shipment; and further verify that the articles received are covered by the applicable Delivery Order;
(2) Segregate those assets that were improperly sent to the contractor, contact PCO for return shipping instructions, and return improperly sent items to the Government;
(3) Advise the Government PCO if any portion of the required repair is covered under a warranty; or is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished;
(4) Further advise the Government (PCO) of the results of the foregoing preliminary inspection, together with a list of the articles and quantities required to be repaired.
1.0 SCOPE
1.1. General. The items to be furnished hereunder are Government Furnished Property (GFP) and shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this Contract. Equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided for on Attachment This TBD limitation regarding the furnishing of equipment applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the Contract items.
1.2. Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items (see Attachment A for a list of these items) to a Ready For Issue (RFI) condition. RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The Contractor shall identify on Attachment the governing repair manual(s)/documents for each item covered by this Contract. On the same attachment, the Contractor A must identify the facility for each item where repair, including final test and inspection, is completed. If no governing repair manual(s) /documents are identified on Attachment , the contractor's most current repair manuals, technical specifications, engineering [A, optional] orders, and/or drawings shall be used for product inspection and acceptance.
1.2.1. Changes to repair manuals/documents and changes to drawings or specifications for the manufacture of parts utilized in these repairs require Procuring Contracting Officer (PCO) approval. In addition, as provided for in Section 2.3, requests for changes to a repair source or repair facility shall be submitted in writing to the PCO and must be approved prior to making any such change.
1.2.2. Any repairs performed using unapproved changes to manuals, drawings, specifications, or unapproved changes to a repair source or facility are not permitted.
1.2.3. The Contractor is not entitled to any equitable adjustment to the price or Contract terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.
1.3. Beyond Physical Repair (BPR)
1.3.1. Scope. An item is BPR when the item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage.
1.3.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BPR. All such determinations, including the basis for the determination and the DCMA written concurrence shall be provided by the Contractor to the PCO, with a copy to the Inventory Manager (IM). After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either requesting the submission of a proposal for BPR pricing, or ordering the disposal of the item. If asked to provide a BPR pricing proposal, the Contractor shall provide the proposal to the PCO within 30 days of receipt of the request. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor's approved Government property disposal procedures.
1.4. Beyond Economical Repair (BER)
1.4.1. Scope. An item is BER if the cost of the repair exceeds of the replacement price for items identified on Attachment A. This % 80 replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this Contract.
1.4.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BER.
All such determinations, including the basis for the determination, the repair required, the Contractor's proposed BER price to repair, and the DCMA written concurrence, shall be provided by the Contractor to the PCO, with a copy to the IM. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either providing contractual authority for repair of the item or ordering the disposal of the item. The Contractor is not authorized to proceed with the repair until notification is received from the PCO. If provided disposition disposal instructions, the contractor shall submit a proposal for disposal pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor's approved Government property disposal procedures.
The following additional procedures may apply, if authorized, for the replacement of a BER SRA (Shop Repairable Assembly) 1.4.3.
within a WRA (Weapons Repairable Assembly) when the SRA has not been separately inducted. The Contractor may request authorization to:
Ship in place an accepted item from an existing spares or repair contract/delivery order, if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. The Contractor must provide written notification of any item shipped in place or MILSTRIPed to the PCO and an equitable adjustment may be required. If authorization to ship in place or MILSTRIP is not provided, the Contractor shall contact the PCO for further instructions.
1.5. Missing on Induction (MOI).
1.5.1. Scope. A WRA is subject to this MOI provision if the item received by the Contractor for repair is missing one or more SRAs and the SRA is not a separately inducted item. Contractor replacement of MOI SRAs is not included in the contract price. Items received by the Contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the Contractor under this contract.
1.5.2. Procedures. The Contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The Contractor shall provide written notice of all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the IM with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The Contractor shall not proceed with repair of WRAs with MOI SRAs until instructions on how to proceed are provided to the Contractor.
1.5.3. The following additional procedures may apply, if authorized, for the replacement of a MOI SRA within a WRA. The Contractor may request authorization to:
Ship in place an accepted item from an existing spares or repair contract/delivery order, if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. If either of these options is not authorized, the Contractor shall contact the PCO for further instructions.
1.6. Swapping SRAs
1.6.1. Scope. On rare occasions the Contractor may request authority to replace a failed but repairable SRA (within an inducted WRA) that is not BPR, BER or MOI.
1.6.2. Procedures. The Contractor may request authorization to replace the failed SRA unit from the Contractor's production line, by MILSTRIP for an RFI item from Government stock, or with another repairable WRA, i.e. cannibalization. Permission from the PCO must be obtained and an equitable adjustment may be required. Authorization to ship in place from the Contractor's production line or MILSTRIP must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. Although permission from the PCO is required if the SRA is obtained from another repairable WRA (cannibalized), that transaction does not have to be input into CAV.
2.0 PARTS AND MATERIAL
2.1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this Contract unless parts or material are specifically identified on Attachment as Government Furnished Material (GFM). All parts and material used in TBD performance of this Contract shall be in accordance with the latest approved revision of applicable drawings and specifications. The Contractor shall ensure it has access for the duration of this Contract to updated drawings and specifications for parts and material required for repairs performed under this Contract. Any change to such parts/material drawings or specifications requires Government PCO approval.
2.2. All parts and material shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.
Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization of piece parts must be approved by the PCO. Cannibalization of units that have not been inducted is not authorized and requires specific additional approval by the PCO. Cannibalization or swapping shall not , including any actions authorized under paragraphs 1.4, 1.5 and 1.6, render an item BER or BPR.
2.3. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval. However, if the Contractor has been delegated authority in writing by another Navy Command to approve a change in manufacturing source or a manufacturing facility, the Contractor may implement such a change after notifying the PCO, providing a copy of such delegation to the PCO, and receiving acknowledgment of such delegation from the PCO.
2.3.1. Where there has been a change to a manufacturing source, the Contractor shall complete all qualification testing that was required when that item or component was originally qualified. Any changes in such testing shall be submitted to the Contracting Officer for Government review and approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are not authorized. The Contractor is not authorized to deliver any items until such testing (including revised testing as properly approved) has been completed and the delivered items are repaired/manufactured in accordance with the qualification requirements package.
2.3.2. The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.
2.4. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, ensure that the parts and material purchased are in compliance with the requirements of this Contract.
2.5. Receiving Inspection of Purchased Parts and Material. Purchased parts and material shall be inspected by the Contractor upon receipt at the Contractor's facility to ensure conformance with all requirements of the applicable drawings and specifications. Alternatively, the Contractor shall submit, prior to contract award, evidence for Government review and approval of a purchased parts and material system which provides for adequate inspection to ensure parts and material conform with all requirements of the applicable drawings and specifications.
2.5.1. Evidence of such inspections shall be maintained by the Contractor or Subcontractor for Government review at least twelve (12) months following the conclusion of the contract. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and processes with appropriate pass/fail criteria, such as certifications, and actual dimensional readings.
3.0 INSPECTION PROVISIONS
3.1. Government inspection shall be in accordance with FAR 52.246-2, Inspection of Supplies - Fixed-Price incorporated by reference in Section E, at source by DCMA unless otherwise specified in the Contract/Delivery Order or as authorized by the Administrative Contracting Officer (ACO) or PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR. These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide Ready For-Issue material. The DCMA retains the authority to require the Contractor to conduct or reconduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this Contract.
The CAV Statement of Work (SOW) is located at: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support /Provisions-Instructions-and-Contract/; and incorporated herein by reference. The CAV SOW applies to all Orders for repair.
The contractor shall furnish on an "as required" basis all parts required to complete servicing of repairable articles hereunder within established delivery schedules. Such parts shall be in accordance with applicable drawings and specifications.
Requirements COMMERCIAL REPAIR RENEWAL Honeywell Displays LTC REQUISITION/PURCHASE NUMBER:
N00383-25-Y-8612 RVPR: 1105773434 Renew LTC 5 Year Requirements contract with firm-fixed pricing.
HONEYWELL INTERNATIONAL INC Honeywell International - Aerospace CAGE # 5Y043
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMCZ01 CONFIGURATION MANAGEMENT AND CONTROLS (Nov 2023)
N0038326RD051
https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/
Prescription: Required in all Navy Aviation (Phil only) solicitations/contracts
1.0 Configuration Management
1.1 The cognizant Naval Air Systems Command (NAVAIR) Program Manager will maintain configuration control and change authority for all items in this contract.
1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.
2.0 Engineering Changes
2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as Class I (Major) or Class II (Minor).
For detailed classification criteria refer to the DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS- 80639E, Engineering Change Proposal (ECP).
NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.
2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant NAVAIR Program Office prior to any Class I ECP submission. The Contractor must submit all Class I changes, via the Defense Contract Management Agency (DCMA) Contract Management Office (CMO) and the Procurement Contracting Officer (PCO), to the cognizant NAVAIR Program Office for approval
The Contractor must notify the PCO of any pending or approved Class I engineering changes with another or disapproval.
Government activity that the Contractor proposes to incorporate under this contract. The cognizant NAVAIR Program Office will approve or disapprove of all Class I changes. Any approved Class I change may necessitate contract changes by the contracting officer, which changes may be handled under the Changes clause of this contract, FAR 52.243-1. The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.
2.1.2 Any Class II change involving a Critical Safety Item (CSI) must be submitted to the PCO for Class II (Minor) Changes:
NAVAIR Program Office approval unless NAVAIR has delegated approval authority to the cognizant DCMA CMO. For Class II changes to items without a criticality determination, the items will be considered CSI for the purposes of processing in accordance with this paragraph. Class II changes related to non-CSI's must be submitted to the cognizant DCMA CMO for concurrence in classification and may be implemented only upon receiving DCMA concurrence. Class II changes must be made at no additional cost to the Government.
2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.
3.0 Variances
3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's approved configuration. RFV's are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Any variance requests to CSI's must be classified as major, at a minimum. For variances to items without a criticality determination, the items will be considered CSI for the purposes of processing and classified as a major, at a minimum. Variance requests shall be prepared in accordance with DI-SESS- 80640E - Request for Variance (RFV).
NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be submitted to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.
NOTE: Should a variance be discovered after product delivery, the Contractor must notify the PCO and NAVSUP WSS Quality (NOE_N22@us.navy.mil).
3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests, via the DCMA CMO and the PCO, to the cognizant NAVAIR Program Office for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.
3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until approved by the cognizant DCMA CMO.
3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a critical, major, or minor variance.
WSSTERMCZ04 GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (GIDEP) (Jan 2025)
a. The Contractor will actively participate in the Government Industry Data Exchange Program (GIDEP) per the Operations Manual (OM). The Contractor will submit information concerning critical or major nonconformances, as defined in FAR 46.101, to the GIDEP information system.
b. The Contractor will insert paragraph (a) above in any subcontract when deemed necessary by the Contractor. When so inserted, the word "contractor" will be changed to "subcontractor."
c. The Contractor will when it elects not to insert paragraph (a) in a subcontract, provide the subcontractor any GIDEP data, which may be pertinent to items of its manufacture and verify that the subcontractor utilizes any such data.
d. The Contractor shall, whether it elects to insert paragraph (a) in a subcontract or not, verify that the subcontractor utilizes and provides feedback on any GIDEP data that may be pertinent to items of its manufacture.
e. Associated Data Item Description (DID) DI-QCIC-80125B: Alert/Safe-Alert Reporting to GIDEP.
243-9400(1-92) SUPTXT243-9400(1-92) AUTHORIZED CHANGES ONLY BY THE
CONTRACTING OFFICER
(Dec 2023)
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is:
NAME:
ADDRESS:
TELEPHONE:
Section D - Packaging and Marking
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMDZ03 PRESERVATION, PACKAGING, PACKING AND MARKING (Oct 2024)
PRESERVATION, PACKAGING, PACKING AND MARKING
The contractor shall preserve, package, pack and mark all items as cited below. Where specifications or standards are cited herein the latest revision of that specification or standard shall apply.
1. PRESERVATION REQUIREMENTS
a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to in enter the military distribution system for stock accordance with the MIL-STD-2073-1, "Standard Practice for Military Packaging", Packaging Requirements Code specified in the Schedule.
When a Specialized Preservation Code/Method of Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence. Contractors should disregard the LP field and third digit of the PACK field and use the Unit Container Level (UCL) to identify the level of packing protection the unit container meets for packing requirements. When HM = D, the item is regulated in accordance with Title 49 Code of Federal
; when HM = N the item is not regulated for transportation.Regulations (CFR)
1) When a specified packaging material has an associated Qualified Products List (QPL), the contractor shall use only packaging materials produced by a manufacturer listed on the applicable QPL. Barrier materials that have QPLs are MIL-PRF-131, MIL-PRF-81705, MIL-PRF- 22191, MIL-PRF-3420 and MIL-PRF-22019. Sources for QPL material can be obtained from the Qualified Products Database at http://qpldocs.dla.mil/.
b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS - Government PCO or ACO approval is required to use the packaging standards outlined in this paragraph. Any national stock numbered (NSN) item required for immediate use (used or consumed within or part numbered item (authority granted to ship without NSN) shall be preserved and packed in 7 days of receipt) or direct installation, accordance with ASTM D3951, "Standard Practice for Commercial Packaging", for all shipments to a Continental United States (CONUS) government activity or contractor-owned facility. All material destined for overseas shipment (OCONUS) shall be preserved in accordance with
MIL-STD-2073-1.
c. GOVERNMENT-OWNED MATERIAL - In the event that the contract expires, is terminated, or completed, and Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1.a.
2. PROTECTION FROM DEGRADATION DUE TO ELECTROSTATIC (ES)/ELECTROMAGNETIC (EM) FORCES
a. When ASTM D3951 is authorized for packaging and the item is considered Electrostatic Discharge Sensitive (ESDS), protection shall be in accordance with ANSI/ESD S20.20-2021, "For the Development of an ESD Control Program for - Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)."
b. When MIL-STD-2073-1 is specified and the preservation method code (PMT) in the solicitation does not specify ESD/EM protection (PMT = GX) and the contractor's proposed item of supply is subject to degradation from ES/EM forces, contractors shall provide recommended packaging data with their proposals/quotes.
3. PACKING REQUIREMENTS - The contractor shall pack as follows:
Domestic Shipments (CONUS): Level B
Overseas Shipments (OCONUS) (including Navy ships at sea):
Via air, FPO, APO Level B
Via freight forwarder Level B
Via surface Level A
Exterior shipping containers for Packing Levels A and B are listed in MIL-STD-2073-1, Appendix C, Table C.II. Long-life reusable containers and wood containers are shipping containers which do not require overpacking for shipment.
4. MARKING REQUIREMENTS - All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129. In addition, the following specific requirements apply:
a. ADDITIONAL MARKING FOR SPARES ONLY Each MIL-STD-129 label shall also include the following:-
1) Procurement Instrument Identifier (PIID) - the 13-digit contract order number,
2) Contract Line Item Number (CLIN) - the 4-digit individual line item number (e.g. 0001, 0002, etc.), and
3) SubCLIN - the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).
b. DEPOT LEVEL REPAIRABLE (DLR) LABELS
1) Items identified with a Cognizance (COG) Code of either "7" or an even number preceding the NSN, excluding 6A, 6H and 6X COGs (e.
g. 7RH 5826-014289999), are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, intermediate and shipping containers as close to the bar code label as possible.
2) Labels are available via the Naval Forms Online website: . The website will advise the https://forms.documentservices.dla.mil/order/ procedures for ordering and establishing an account.
3) NAVSUP WSS authorizes contractors to create and print their own DLR labels.
Labels shall follow the standard size and font options listed in below chart. Text shall be in all upper case letters of the same style font. The label used shall be sized proportionate to the size of the container. Labels shall be horizontally printed and consist of yellow "DLR" text font on a solid blue background. Labels shall meet requirements of MIL-STD-129 section 4.2.2. Labels shall be of a water-resistant grade of paper, film, or plastic, coated on one side with water-insoluble, permanent type adhesive. The adhesive shall adhere to metal, plastic, aluminum or fiberboard surfaces under high and low temperatures. Labels shall have a finish suitable for printing and writing on with ink without feathering or spreading, be capable of withstanding normal handling and storage conditions, and remain securely in position. Application specific performance criteria and durability requirements to ensure functionality in various climatic environments should be tailored, if required, using MIL-PRF-61002. MIL-PRF-61002 can be used as an acquisition tool when labels presently being used are not performing satisfactorily or when new conditions or applications require special label stock for those particular situations.
NSN DESCRIPTION
QUANTITY
PER UNIT PACKAGE
APPLICATION FORM NUMBER
0108LF5055300
DLR Label
2 in. x 3 in.
Unit
Container
NAVSUP 1397-1
0108LF5055000
DLR Label
3 in. x 5 in.
Intermediate / Shipping
Container
NAVSUP 1397
c. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MARITIME REQUIREMENTS ONLY
1) Certain program related items are identified by a two-position SMIC, which appears as a suffix to the NSN (e.g. 1H 4730 009001317 L1), and require special markings. Containers shall be marked or labeled with letters, maximum two inches high on two (2) sides and two
(2) ends as follows:
SMIC MARKINGS COLOR TYPE CONTAINER
L1 LEVEL 1 RED Unit, intermediate and shipping (size permitting)
S1
SURFACE
LEVEL 1
RED Unit, intermediate and shipping (size permitting)
N0038326RD051
https://forms.documentservices.dla.mil/order/%20
D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping (size permitting)
C1 *
LEVEL 1 SPECIAL
CLEAN O2-N2
GREEN Unit, intermediate and shipping
CP/VG *
SPECIAL CLEAN
O2-N2 GREEN Unit, intermediate and shipping
D0/D6/D8 * DSS-SOC SPECIAL CLEAN O2-N2 GREEN Unit, intermediate and shipping
VU FBW SFCC VU BLUE Unit, intermediate and shipping (size permitting)
SW FBW SFCC SW BLUE Unit, intermediate and shipping (size permitting)
Q3/Q5 Q3 or Q5 RED Unit, intermediate and shipping
* denotes Oxygen Clean requirements in accordance with MIL-STD-1330 "Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium- Oxygen, Nitrogen, and Hydrogen Systems."
5. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147 "DOD Standard Practice: Palletized Unit Loads." Failure to meet these palletization/packaging requirements and measures, without a written waiver from the PCO or ACO, may result in charges back to the contractor for repalletization and/or repackaging of items. Pallets shall conform to the requirements of American National Standards Institute, Material Handling-MH1-2016, Pallets, Slip Sheets, and Other Bases for Unit Loads. MH1-2016 may be obtained at the following website: http://www.mhi.org
a. General Purpose Unit Loads - When shipping directly to a Navy afloat unit, pallets meeting MH1-2016, Part No. MH1/9-02SW4048 or MH1 /9-10BW4048 for unit loads under 1,500 pounds and MH1/9-03SW4048 for unit loads over 1,500 pounds shall be used.
b. Hazardous Material Unit Loads - Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums, shall be palletized utilizing MH1-2016 Part No. MH1/9-07SW4848 pallets.
c. Use of nonstandard commercial pallets is prohibited.
6. WOOD PACKAGING MATERIAL (WPM). All shipments destined to the DOD must be treated and marked in accordance with the International Standards for Phytosanitary Measures Guidelines for Regulating Wood Packaging Material in International Trade ( ) for ISPM 15 OCONUS shipments.
a. For all WPM furnished under this contract the contractor shall ensure the American Lumber Standards Committee (ALSC) approved mark is applied to every shipment regardless of destination.
b. Failure to comply with the requirements of ISPM 15 may result in refusal of the shipment, destruction or corrective treatment of WPM at the point of receipt and the associated costs charged back to the contractor.
7. NAVY SHELF-LIFE PROGRAM. Navy shelf-life requirements are listed under the item description in a 3-digit alpha/numeric code. Position one (1) is the DOD shelf-life code, defining the type of shelf-life for an item (Type I, non-extendible or Type II, extendible), and the number of months an item can remain ready for issue in a Navy specified package. Positions two (2) and three (3) combined form the Navy-unique shelf-life action codes used by storage activities, and do not impose any requirements on the contractor. The contractor shall use the applicable shelf-life paragraphs and table in MIL-STD-129 to apply either Type I or Type II shelf-life markings to an item's unit, intermediate and shipping
N0038326RD051
https://www.ippc.int/en/publications/640/ containers. Contractors will ensure that at least eighty-five percent (85%) of the Navy shelf-life requirement is remaining when received by the first government activity.
8. REUSABLE NSN CONTAINERS. An item that has an NSN assigned in the "Container NSN" field (e.g. 8145 012622982) requires shipment in a reusable shipping and storage container.
a. REUSABLE CONTAINERS FOR NAVSUP WSS, MARITIME REQUIREMENTS - Reusable NSN containers for maritime material (designated by a COG Code of "7E", "7G" and "7H") shall be provided as contractor-furnished material (CFM).
b. REUSABLE CONTAINERS FOR NAVSUP WSS, AVIATION REQUIREMENTS - Reusable NSN containers (excluding fiberboard and most wood) for aviation material (designated by a COG Code of "7R", "6K" or "0R") shall be provided as government-furnished material (GFM).
Fast pack containers will not be provided as GFM. To obtain GFM reusable containers, the contractor must request via email usn.philadelphia.
navsupwssphil.mbx.navsupcrf@us.navy.mil at least 90 days prior to the anticipated shipping date, 30 days prior for repair contracts. If the Navy's Container Management Area (CMA) informs the contractor that containers are unavailable, the following alternate packaging requirements apply. The unavailability of reusable containers shall not be an excusable delivery delay.
ALTERNATE PACKAGING REQUIREMENTS FOR ITEMS ASSIGNED THE FOLLOWING CONTAINERS
Container NSN Container Part Number (80132) Alternate Packaging Code
IAW MIL-STD-2073-1
8145 002609548 P069-2
N 001 000 GX 1 00 K3 LT B ED
UCL = B
SPMK = 39
PACK = QFF
8145 002609556 P069-1
8145 002609559 P069-3
8145 002609562 P069-4
8145 010124088 P069-6
8145 010140440 P069-5
8145 011644073 P069-7
If MOP/PMT = GX
N 001 000 GX 1 00 K3 GH Z ED
8145 012622982 15450-1
Z= use 1.5"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .