Solicitation - N0017426Q1020.pdf
PDF 1 MB Posted
- Attached to
- M12 EXTRUSION MK88 ELBA SOLVENT
- Solicitation number
- N0017426Q1020
About this file
This is a Request for Quotation (RFQ) issued by the Naval Surface Warfare Center (NSWC), Indian Head Division for the procurement of Ethyl Lactate-Butyl Acetate (ELBA) Solvent. The solicitation requests quotations for 20 drums of 55-gallon ELBA Solvent (1,100 gallons total) meeting MIL-A-3167 Type III Class 2 specifications, with delivery required 90 days after contract award to Indian Head, Maryland. The ELBA Solvent must consist of 34.6% to 39.0% Ethyl Lactate by weight with the balance Normal Butyl Acetate, and must comply with strict chemical requirements including moisture content not exceeding 0.50% by weight, acidity as acetic acid not exceeding 0.10% by weight, and nonvolatile matter not exceeding 0.04 g/100mL. The solicitation also requires submission of a Certification Data Report (CDRL A001) per DI-MISC-82386 documenting conformance to all chemical and test requirements within the same 90-day delivery window.
Award is expected to be made to a single contractor on a firm fixed-price basis. The RFQ is not a small business set-aside. Quotations must be received by February 20, 2026. Contractors must comply with extensive federal requirements including cybersecurity controls per NIST SP 800-171, Voluntary Protection Program (VPP) safety standards, hazardous material identification and labeling requirements, and multiple FAR and DFARS clauses addressing topics such as payment processing through Wide Area Workflow (WAWF), representations and certifications in the System for Award Management (SAM), buy American provisions, and organizational conflict of interest disclosures. Packaging must comply with commercial standards, with drums labeled with contract number, lot number per MIL-STD-1168, manufacturer information, and hazardous material data. The material will be packaged in 55-gallon metal drums stretched-wrapped on pallets to commercial standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Updated 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
Created On:
22 Jan 2026, 19:27 PM Greenwich Mean Time
Section A - Solicitation/Contract Form
M12 EXTRUSION MK88 ELBA SOLVENT
N0017426Q1020
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
Ethyl Lactate-Butyl Acetat (ELBA) SOLVENT Quantity 20 x 55 gallon drums = Total 1,100 gallons
Part Number Description: MIL-A-3167 TYP lll Class 2 Pricing Arrangement: Firm Fixed Price
20 55 Gallon Drum
CDRL A001
Certification Data Report/DI-MISC-82386 BLK 14: The following address should be used for the distribution of this data item. The "attn" code shall change appropriately to correspond to the addresses listed in block 14a. TPOC has 15 days to provide comments.
Note: Electronic copies are preferred.
Naval Surface Warfare Center, Indian Head Division TPOC: Daniel Martin daniel.b.martin46.civ@us.navy.mil
Pricing Arrangement: Firm Fixed Price
1 Lot
1.
Section C - Description/Specifications/Statement of Work
Manufacturing ELBA Solvent - Performance-Based Statement of Work
0 Introduction
This Statement of Work (SOW) establishes and define s all requirements for the order of Ethyl Lactate-Butyl Acetate (ELBA) Solvent.
2.0 Referenced Documents
MIL-A-3167: Adhesives (for Plastic Inhibitors)
ASTM D1364: Standard Test Method for Water in Volatile Solvents (Karl Fischer Reagent Titration Method)
ASTM D1613: Standard Test Method for Acidity in Volatile and Chemical Intermediates Used in Paint, Varnish, Lacquer, and Related Products
ASTM D1744: Standard Test Method for Determination of Water in Liquid Petroleum Products by Karl Fischer Reagent
ASTM D4615: Standard Specification for n-Butyl Acetate (All Grades)
ASTM D1078: Standard test Method for Distillation Range of Volatile Organic Liquids
MIL-STD-1168: Department of Defense Standard Practice Ammunition Lot Numbering and Ammunition Data Card
DI-MISC-82386: Certification Data Report
3.0 Chemical Requirements
The chemical requirements for both the ELBA Solvent and Normal Butyl Acetate are defined below.
No. 3
Nomenclature or Description: Adhesive (Ethyl Lactate-Butyl Acetate)
Specification: MIL-A-3167
Part or Identifying No. Type III, Class 2
Adhesive, find No. 3, shall consist of a homogeneous mixture by weight of 34.6% to 39.0% Ethyl Lactate with the balance Normal Butyl Acetate.
i. The mixture (Ethyl Lactate - Butyl Acetate) shall meet the following requirements when tested in accordance with Paragraph 4.3 of MIL-A-3167.
a. Moisture, %WT .50 max
i. Alternate moisture test method: ASTM D1364 Water in Volatile Solvents (Karl Fischer Reagent Titration Method), using a titration system and reagents demonstrated to be functionally equivalent to those specified in ASTM D1364.
b. Acidity as acetic acid, %WT .10 max
i. Alternate acidity as acetic acid test method: ASTM D1613 (Standard Test Method for Acidity in Volatile Solvents and Chemical Intermediates)
c. Nonvolatile matter, g/100mL .04 max
i. Alternate nonvolatile material test method as follows: Dry a platinum evaporating dish in an oven at 105 5C, cool in a desiccator, and weigh. Pour 100mL of ELBA Solvent sample into the dish. Place the dish on a steam chest under an exhaust fume hood. Allow to evaporate for approximately 7 hours, or until dry as observed by no residual liquid in the dish. Cool and reweigh the dish and residue. Determine the non-volatile matter as follows:
Non-volatile matter, g/100mL = (weight dish and residue) - (weight dish)
ii. The ethyl lactate used herein shall conform to MIL-A-3167 except as follows:
Alternate moisture test method: ASTM D1744 (Karl Fischer Reagent), .50% maximum.
a. Alternate moisture test method: ASTM D1364 Water in Volatile Solvents (Karl Fischer Reagent Titration Method), using a titration system and reagents demonstrated to be functionally equivalent to those specified in ASTM D1364.
iii. The normal butyl acetate used herein shall conform to ASTM D4615 except as follows:
a. Specific gravity at 20/20C .874 to .884
b. Alternate moisture test method: ASTM D1744 (Karl Fischer Reagent), .50% maximum.
c. Allow the alternate method of ester content (purity) determination of butyl acetate as follows:
Place one to two grams of sample in a tared ampoule. Seal the ampoule and weigh to the nearest milligram. Pour 50mL of 0.5N alcoholic potassium hydroxide into a 200mL Erlenmeyer flask. Place the sample ampoule into the flask and break the ampoule with a stirring rod. Attach a reflux condenser to the flask and heat on a steam bath for 1 to 2 hours, or until saponification is complete. Swirl the flask often during heating. Cool the flask and wash down the condenser with distilled water. Remove the condenser. Add three drops of phenolphthalein indicator to the flask. Titrate the contents of the flask with 0.5N hydrochloric acid. Run two blanks of alcoholic potassium hydroxide along with the sample. The blanks must check within one-tenth of a millimeter.
% purity = (B-a)F*100/S
Where:
A = mL or 0.5N hydrochloric acid required for titration or sample
B = average mL of 0.5N hydrochloric acid required for titration of blanks
F = 0.058 (factor, 1 mL of 0.5N KHO = 0.058g of Butyl Acetate)
S = grams of sample used
d. Allow the alternate method of distillation range determination of butyl acetate for Paragraph 6.1 and 9.1.4 of ASTM D1078 as follows:
:ASTM D1078 Paragraph 6.1 Distillation apparatus: Liebig style condenser tube; Jacket Length 300 50mm with a 24/40 ground glass joint, 200mL distillation flak, 100mL graduated cylinder and electric heating mantle capable of maintaining the heating rate required in Paragraph 9.1.3.1 of ASTM D1078.
:ASTM D1078 Paragraph 9.1.4 Adjust the heat input so that the distillation proceeds at a rate of 4 to 5 mL/min (about 2 drops per second). After the first drop falls, move the graduated cylinder so that the tip of the condenser tube touches one side of the graduated cylinder. Record the temperature of the thermometer at the initial boiling. Regularly monitor the distillation throughout the collection of distillate.
e. Moisture test method: ASTM D1364 Water in Volatile Solvents (Karl Fischer Reagent Titration Method), using a titration system and reagents demonstrated to be functionally equivalent to those specified in ASTM D1364.
4.0 Manufacture, Inspect, Shipment and Delivery Requirements
This section discusses the requirements for the manufacture, inspection, shipment and delivery of the ELBA Solvent.
Naval Surface Warfare Center, Indian Head Division (NSWC IHD) reserves the right to inspect and reject the delivered material. If the delivered chemicals are rejected, the vendor is liable for all chemical reworks and re-inspection costs.
4.1 Quantity
A quantity of 20 drums, 55-gallons per drum, of ELBA Solvent shall be manufactured in accordance with the Chemical Requirements in Section 3.0 of this SOW. Material shall be made from one single homogenous lot and under the same processing conditions as the First Article quantity, as applicable.
4.2 Quality Assurance
The ELBA Solvent shall be inspected in accordance with the Chemical Requirements in Section 3.0 of this SOW. A Certification Data Report (CDRL A001) per DI-MISC-82386 is required to the Chemical Requirements in Section 3.0 of this SOW and all test properties in the table below.
Test Property
Minimum
Maximum ELBA Solvent:
a) Ethyl Lactate, % wt 34.6 39.0
b) Butyl Acetate,% wt 61.0 65.4
c) Moisture,% wt 0.50
d) Acidity as Acetic Acid,% wt 0.10
e) Nonvolatile matter, gm/100 ml 0.04
Ethyl Lactate Component:
a) Ethyl Lactate, % wt 98.0
b) Specific Gravity, 25 C/25 C 1.030
c) Distillation Range C 125.0 170.0
d) Moisture 0.50
e) Acidity, as Lactic Acid,% wt 0.08
f) Odor Non-residual
g) Nonvolatile Matter gm/100ML 0.02
h) Suspended Matter Substantially None
Butyl Acetate Component:
a) Butyl Acetate, Normal,% wt 90.0
b) Specific Gravity 20 C/20 C 0.874 0.884
c) Distillation Ranging, 760 mm, C 118.0 128.0
d) Moisture 0.50
e) Acidity, as Acetic Acid,% wt 0.01
f) Odor Non-residual
g) Nonvolatile Matter, gm/lO0ML 0.005
h) Suspended Matter Substantially None
4.3 Lot Numbering
The lot shall be assigned and marked with a lot number per MIL-STD-1168, Section 4. The appropriate lot number shall be listed on each Certificate of Analysis and each drum.
4.4 Packaging
ELBA Solvent shall be packaged in 55-gallon metal drums per commercial standards. Each drum shall be labeled with "Extruded Products Branch (Code M12)", item description or component part name, manufacturer name, contract number, lot number per MIL- STD-1168, and weight. Drums of components shall be stretched wrapped on pallets to commercial standards. Drums shall be properly labeled with MSDS or SOS hazardous material information.
5.0 Deliverables
Documentation deliverables as specified herein shall be delivered to the Production Points of Contact, for arrangement of review and approval /acceptance:
Production Points of Contact:
Daniel Martin and/or Donna Tibbs
Email: and/or Phone: (540) 642-8748 and/or (240) 320-3322daniel.b.martin46.civ@us.navy.mil donna.1.tibbs.civ@us.navy.mil
N0017426Q1020 mailto:daniel.b.martin46.civ@us.navy.mil mailto:donna.1.tibbs.civ@us.navy.mil
ELBA Solvent deliverables as specified herein shall be delivered to the Delivery Address below with attention to a Production Point of Contact, for arrangement of inspection and approval/acceptance:
Delivery Address: (Will provide once awarded)
Deliverables
Deliverable Quantity Due
ELBA Solvent 20 X 55Gallon Drum =1,100 gallons 90 days after receipt of order
ELBA Solvent Certification Data Report
(CDRL A00l) 90 days after receipt of order
Requirements M12 EXTRUSION MK88 ELBA SOLVENT for Organization M12 FY: 2026, AMS: N00174-26-SIMACQ- M12-0006
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-204-H002 IMPLEMENTATION OF ENHANCED SECURITY CONTROLS ON SELECT
DEFENSE INDUSTRIAL BASE PARTNER NETWORKS
(Sep 2024)
1. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews
a) Within thirty (30) days of contract award, the Contractor shall make its System Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor's facility.
The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government's review of the SSPs at the Contractor's facility.
b) If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government.
The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a POAM.
c) Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor's facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).
d) The Government may, in its sole discretion, conduct subsequent reviews at the Contractor's site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days' notice to the Contractor.
2. Compliance to NIST 800-171
a) The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800-171 (Rev. 2) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b) (2), for all covered contractor information systems affecting this contract.
b) Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:
(1) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;
(2) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;
(3) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.
(4) Audit user privileges on at least an annual basis;
(5) Implement:
i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.
e. FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM);
and,
ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);
(6) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.
(7) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.
3. Cyber Incident Response
a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.
b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs /Instructions_for_Submitting_Media.docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.
c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification. The contracting officer will approve or disapprove the request after coordination with DC3.
4. Naval Criminal Investigative Service (NCIS) Outreach
The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.
5. NCIS/Industry Monitoring
a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.
b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.
c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non-US law.
(End of Text)
Section D - Packaging and Marking ELBA Solvent shall be packaged in 55-gallon metal drums per commercial standards. Each drum shall be labeled with "Extruded Products Branch (Code M12)", item description or component part name, manufacturer name, contract number, lot number per MIL-STD-1168, and weight. Drums of components shall be stretched wrapped on pallets to commercial standards. Drums shall be properly labeled with MSDS or SDS hazardous material information.
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-9 Inspection of Research and Development (Short Form). Apr 1984 52.246-15 Certificate of Conformance. Apr 1984
Additional Regulation or Supplemental Clauses Incorporated by Full Text
E-246-W006 SAMPLING OF RECEIVED MATERIAL – ORDNANCE MATERIAL AND
ORDNANCE COMPONENT PARTS (NAVSEA) (MAY 2021)
(May 2021)
(a) When NAVSEA, Naval Surface Warfare Center Indian Head Division receipt inspects ordnance material and/or ordnance component parts, under this contract, for rockets, missiles and their related component parts; the sampling plan utilized shall be as outlined in the technical data package or as otherwise specified in other applicable controlling documentation. If the sampling plan is not specified within any applicable controlling documentation, the sampling plan and the sampling size shall be as outlined in the specification checked below:
ASQ Z1.4 (ANSI/ASQ Z1.4 -2003 (R2018):
Critical: 100%
Major:
Minor:
ASQ Z1.9 (ANSI/ASQ Z1.9 -2003 (R2018)):
Critical: 100%
Major:
Minor:
(DTD 1 APR 96 with NOTICE 2 DTD 5 JUN 14): MIL-STD-1916
Critical: 100%
Major:
Minor:
OTHER: [ ]Insert applicable specification
Critical: 100%
Major:
Minor:
(b) In all cases the acceptance number of defects will be ZERO (0), the entire lot will be rejected for any defect unless specifically otherwise specified by the inspection type and code.
(c) Notwithstanding the above, NAVSEA, Naval Surface Warfare Center Indian Head Division may, at its discretion, accept a defect on an approved waiver on a case-by-case basis.
(End of Text)
E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018) (Oct 2018)
N0017426Q1020 https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=120287
(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).
(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Beneath the signature include the typed name of the individual signing this certificate.
(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.
(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.
(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(g) The certificate shall read as follows:
I certify that on ___________ [insert date], the ______________________________ [insert Contractor's name] furnished the supplies called for by the Order/Contract No.___________________ via _________ [Carrier] on __________________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.
Date of Execution: ________________________________
Signature: _______________________________________
Typed Name: ____________________________________
Title: ___________________________________________
(End of Text)
Section F - Deliveries or Performance Delivery Due 90 Days After Contract Awarded
Delivery to Indian Head, MD 20640
Overall Contract Delivery Period
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
20 55 Gallon Drum FoB Details
Contractor Destination
1 Lot FoB Details
Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.211-17 Delivery of Excess Quantities. Sep 1989 52.242-17 Government Delay of Work. Apr 1984
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
INVOICE AND RECEIVING REPORTS (COMBO) DESINTATION/DESTINATION
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
INVOICE AND RECEIVING REPORTS (COMBO) DESINTATION/DESTINATION
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N62838
Issue By DoDAAC N00174
Admin DoDAAC N00174
Inspect By DoDAAC N00174
Ship To Code N00174
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN
2019)
(Jan 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
(End of Text)
G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)
(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.
S. Government.
(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.
(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.
(f) The hours of operation are as follows:
AREA FROM TO
[ ] [ ]insert specific Departments insert times
(g) All deliveries to the Receiving Officer, [ Negotiator insert delivery location],shall be made Monday through Friday from [ ] to [ ], local time. Deliveries will not be accepted after Negotiator enter beginning hour of operation Negotiator enter closing hour of operation
[ ]. No deliveries will be accepted on federal government holidays.Negotiator enter closing hour of operation
(End of Text)
G-242-H001 GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND
RESPONSIBILITIES (NAVSEA) (OCT 2023)
(Oct 2023)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Name: [ * ] Address:
[ *Street ]
N0017426Q1020 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays
[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(ii) The Contract Specialist is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(iii) The Administrative Contracting Officer (ACO)is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.
The Contracting Officer's Representative (COR) is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(e) The Alternate Contracting Officer's Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.
The Alternate Contracting Officer's Representative (ACOR) is:
Name: [ * ] Address:
[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(f) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.
The Technical Point of Contact (TPOC) is:
Name: [ * ] Address: [ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(g) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.
The Alternate Technical Point of Contact (ATPOC) is:
Name: [ * ] Address:
[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(h) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract. No per-call order shall be placed outside the scope of this contract and the cumulative total of all orders shall not be in excess of any not-to-exceed amount specified in the contract. Per-call orders shall not, in any way, modify any terms and conditions of the contract.
(i) The Authorized Ordering Person(s) for Per-Call Maintenance is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx];
E-mail: [ * ]
(j) The Contractor's point of contact for performance under this contract is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
[ * ] To be completed at contract award
(End of Text)
Section H - Special Contract Requirements
Voluntary Protection Program (VPP)
1. Voluntary Protection Program:
1.1. In August 2006, Indian Head Division (IHD) Naval Surface Warfare Center (NSWC) was nominated to participate in the DoD Voluntary Protection Program Center of Excellence Implementation Initiative of the Defense Safety Oversight Council (DSOC). The Voluntary Protection Program (VPP) was established by the Occupational Safety and Health Administration (OSHA) in 1982 to recognize and promote effective worksite-based safety and health management systems. IHD NSWC, through the utilization of VPP, desires to be a model of safety and health excellence.
VPP's emphasis on trust and cooperation between OSHA, the employer, employees, employees representatives, and contractors complements the Agency's enforcement activity but does not take its place. All parties, including Contractors, are to work together to identify and resolve any safety and health problems that may arise, yet obtain Contracting Officer approval of any changes that would impact the terms of the contract. IHD NSWC as the VPP participant develops and implements systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees and contractors are prevented. Contractor and sub-contractor personnel are subject to occupational safety and health oversight. This oversight will be accomplished by IHD NSWC personnel and Contracting Officers. Contractors, sub-contractors, and their employees, while in performance of a contractual action on-site within the geographical boundaries of Naval Support Facility (NSF) Indian Head, shall be subject to the requirements of the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual" regardless of the type or duration of the contract. Chapter 13 of the
IHDIVNAVSURFWARCENINST
5100.22, "Safety Manual", entitled "Contractor Safety" is provided as Attachment 8. Appendix 13-A, of the chapter 13 entitled "Contractor Safety Requirements When Performing Work at the Naval Support Facility (NSF) Indian Head, MD" shall be signed by the Contractor prior to commencement of services on-site at NSF Indian Head. The Contractor shall maintain one signed copy for future reference in educating its personnel and sub-contractors. A second signed copy shall be provided to the Contracting Officer to be maintained in the contract file. If an occupational safety or health related injury or illness occurs during the performance or as a result of this contractual action, the Contractor shall notify the Contracting Officer Representative (COR) as soon as practicable, who will notify the Safety Office and the Contracting Officer.
1.2 In support of VPP and in compliance with Chapter 13 of the Safety Manual, entitled "Contractor Safety," all Contractors performing on-site at NSF Indian Head shall comply with the following:
1.2.1 Public Law 91-596 (and Amendments), also known as the Occupational Safety and Act of 1970, establishes that all employers, including Contractors, are responsible, as far as possible, for providing every employee a safe and healthful working environment. All employers, including Contractors, shall conform to the standards as issued by OSHA. Contractors are responsible for complying with safety requirements specified in the contract as well as all Federal, State, and local safety and security regulations. Non-compliance may be cause for the removal of a Contractor or any Contractor employee from the activity and such non-compliance may form the basis for contractual action, up to and including termination for default.
1.2.2 Contractor personnel shall participate in basic safety awareness and hazard identification training offered by the Government activity at the work area they are supporting. Contractors performing on-site shall attend area weekly safety meetings and annual safety stand-downs, as determined by the
COR.
1.3 The best Safety and Health Programs involve every level of the organization, instilling a safety culture that reduces accidents for workers and improves the bottom line for managers. When Safety and Health are part of the organization and a way of life, everyone wins. IHD NSWC is committed to safety excellence. The Contractor shall familiarize itself with the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual," Appendix 13-C entitled "OSHA Voluntary Protection program (VPP) Fundamentals Training for Contractors".
2. Contractor On Site Training:
2.1 A Contractor providing support on-site at any IHD NSWC site may be required to have its on-site Contractor personnel participate in training covering rules, practices, procedures, equipment and systems, as needed, based on the type of support being provided. This training may include, but is not limited to: Operation Security training
(OPSEC); Personally Identifiable Information training; DoD Information Assurance Awareness training; Information Technology Security; Voluntary Protection Program (VPP) training; and Personnel Security training.
2.1.2 This training will be provided at no cost by the IHD NSWC site and will take place on-site during normal contract working hours without any additional compensation for the Contractor. This training does not relieve the Contractor of its responsibility to train its employees in such areas as environment, health, safety, security, sexual harassment, ethics, etc. to ensure compliance with all federal, state, and local laws and DoD Regulations.
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.
Dec 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
Nov 2021
52.204-27 Prohibition on a ByteDance Covered Application. Jun 2023
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded
Jan 2025
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services. Nov 2023 52.219-6 Notice of Total Small Business Set-Aside. Nov 2020 52.222-50 Combating Trafficking in Persons. Oct 2025 52.223-23 Sustainable Products and Services. May 2024 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-1 Payments. Apr 1984 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-11 Extras. Apr 1984 52.232-18 Availability of Funds. Apr 1984 52.232-25 Prompt Payment. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. May 2014 52.233-1 Disputes. (Alternate I) May 2014 Alternate I Dec 1991 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.239-1 Privacy or Security Safeguards. Aug 1996
52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities.
Nov 2024
52.243-1 Changes-Fixed-Price. Aug 1987 52.243-1 Changes-Fixed-Price. (Alternate I) Aug 1987 Alternate I Apr 1984 52.244-6 Subcontracts for Commercial Products and Commercial Services. Oct 2025 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information.
Jan 2023
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2023
252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.211-7008 Use of Government-Assigned Serial Numbers. Sep 2010 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7001 Buy American and Balance of Payments Program. Feb 2024 252.225-7002 Qualifying Country Sources as Subcontractors. Mar 2022 252.225-7013 Duty-Free Entry. Aug 2025 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.239-7000 Protection Against Compromising Emanations. Oct 2019
252.243-7001 Pricing of Contract Modifications. Dec 1991 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.246-7007 Contractor Counterfeit Electronic Part Detection and Avoidance System. Jan 2023 252.246-7008 Sources of Electronic Parts. Jan 2023 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.204-1 Approval of Contract. (Dec 1989)
APPROVAL OF CONTRACT (DEC 1989)
This contract is subject to the written approval of [identify title of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .