Solicitation - N0017426Q1003.pdf

PDF 1 MB Posted

Attached to
containers
Solicitation number
N0017426Q1003
Issued by

About this file

This is a Request for Quotation (RFQ) issued by the Naval Surface Warfare Center Indian Head Division (NSWC IHD) for 600 Smokey SAM shipping containers to be manufactured using excess styrofoam containers from a previous lot. The containers will be fabricated in accordance with drawing 1335AS283, with a delivery deadline of 31 December 2025 and a lead time of 45 calendar days after receipt of order. The contract is a firm fixed-price arrangement, with the contractor required to maintain quality control processes adhering to ISO 9001:2015 standards and provide a Certificate of Conformance for each production lot.

Key requirements include using government-furnished equipment (excess styrofoam containers), ensuring material homogeneity, maintaining a counterfeit material prevention program, and complying with various military and industry standards including MIL-STD-129, ANSI/NCSL Z540.3, and SAE AS6174. The containers will be delivered to NSWC Indian Head Division at 4522 McMahon Road, Indian Head, MD 20640, with the government reserving the right to inspect and test the deliverables. The contractor must also participate in safety training and adhere to the facility's Voluntary Protection Program (VPP) safety guidelines.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

N0017426Q1003

Section A - Solicitation/Contract Form

Smokey Containers

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

0001 Smokey Sam shipping container DRAWING:1335AS283

Pricing Arrangement: Firm Fixed Price

600 Set

1.

1.

1.

Section C - Description/Specifications/Statement of Work

MANUFACTURING OF PROPELLANT GRAINS USING DRAWINGS

PERFORMANCE WORK STATEMENT

Scope of Work

The requirements in this document contain the information necessary to manufacture GTR-18A Smokey SAM.

at the Naval Surface Warfare Center Indian Head Division (NSWC IHD).

Applicable Documents

General Specifications

Department of Defense Specifications

MIL-STD-129

MIL-P-19644, Type 2, Class I

Marking for Shipment and Storage

Plastic Molding Material (Polystyrene Foam, Expanded Bead)

Technical Drawings

1335AS283 Rev B Shipping Container, Smokey SAM

American National Standards Institute (ANSI)/National Conference of Standards Laboratories (NCSL) Standards:

ANSI/NCSL Z540.3 Requirements for the Calibration of Measuring and Test Equipment

American Society of Mechanical Engineers (ASME) Standards:

ASME Y14.5M-2009

ASME Y14.100-2004 With Appendices B-E

Dimensioning and Tolerancing

Engineering Drawing Practices

1.

1.

1.

International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:

ISO 9001 Quality Management Systems

ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories

Society of Automotive Engineers (SAE) Standards:

SAE AS6174 Counterfeit Material; Assuring Acquisition of Authentic and Conforming Material

Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

Requirements

3.1 General

The Contractor shall fabricate and deliver 600 Shipping Container, Smokey SAM in accordance with drawing 1335AS283. Deliverables shall be packaged and ready for use. The Contractor shall use Government Furnished Equipment (GFE) to manufacture the deliverables. The GFE will be excess styrofoam containers from the last lot.

Deliverable Lot Homogeneity

Material shall be made from one single homogeneous lot. A single continuous production run or batch may be used to meet several deliverable line items.

Test and Inspection

The Contractor shall maintain and control processes to inspect and test deliverables as described in this PWS.

These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.

1.

Product Certification

The Contractor shall submit a Certificate of Conformance in accordance with DI-QCIC-81356A per CDRL A00 1 to accompany the shipment of each production lot, as required by Table 1. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.

The Certificates of Conformance shall state, above the signature of a legally authorized representative of the company, the following:

"This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001."

Order Test Requirement Certificate

Specification Location

Drawing 1335AS283, Rev B Styrofoam Density 1335AS283 Material List Conformance

Table 1: Certification Requirements

Quality Control

Quality System and Quality Control Processes

The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of Para. 4.5.

ISO 9001:2015 standards.

The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.

1.

1.

1.

1.

Calibration of Measuring and Testing Equipment

Calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of either ANSI /NCSL Z540.3 or ISO/IEC 17025.

Acceptance of Product

Final acceptance of production deliverables will be determined by Government sample testing and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 30 days of receipt of all documentation and deliverables relevant to the line item in question.

The Government shall dimensionally inspect the deliverables. The deliverables shall meet the requirements of Table 2. The Government reserves the right to perform additional testing to verify acceptability, which may include testing at other facilities.

Order Test Requirement

Specification Location

Drawing 1335AS283 Shipping Container, Smokey SAM Drawing 1335AS283 Main Body

Table 2: Government Acceptance Test Requirements

Government-Identified Nonconformity Reporting Procedures

The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.

Packing and Shipping

The Contractor shall be responsible for packing and packaging of to prevent any potential damage during transport. Specifically, shall be labeled with at minimum the contract number.

Counterfeit Material

The Contractor shall maintain a counterfeit material prevention program in accordance with SAE AS6174A, or comparable. The Contractor shall notify the Contracting Officer (KO) if material cannot be obtained from an authorized supplier.

Deliverables

The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor's representative authorized to make such certification.

CDRL Drawing Section Title

A001 8568289 N/A Certificate of Conformance

Deliveries

The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.

Lead times listed below represent the maximum allowable delivery timeframe; early deliveries are permitted.

Item Year Drawing Qty UOI Lead Items

0001 Base 1335AS283 600 Ea 45 Calendar Days ARO

After receipt of order (ARO)

Delivery address provided below:

Naval Surface Warfare Center Indian Head Division

4522 McMahon Road

Bldg. 116, Suite 100

Indian Head, MD 20640

Requirements Smokey Sam shipping container- dwg 1335AS283

Section D - Packaging and Marking

Section E - Inspection and Acceptance

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: NOT REQUIRED

DoDAAC: N00174 CountryCode: USA

NSWC INDIAN HEAD DIVISION

NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD

INDIAN HEAD, MD 20640-1525

UNITED STATES

Patricia.r.Nalborczyk, M Email: Patricia.r.Nalborczyk.civ@us.navy.mil Telephone: 3012781333

Section F - Deliveries or Performance

Ship To DoDAAC: N00174 CountryCode: USA

NSWC INDIAN HEAD DIVISION

NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD

INDIAN HEAD, MD 20640-1525

UNITED STATES

Patricia Nalborczyk Email: Patricia.r.Nalborczyk.civ@us.navy.mil Telephone: 3012781333

Contractor Destination

Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes

Delivery On Or Before Delivery Date 31 Dec

600 Set Ship To DoDAAC: N00174 CountryCode: USA

NSWC INDIAN HEAD DIVISION

NAVAL SURFACE WARFARE CENTER, 4522

MCMAHON ROAD

INDIAN HEAD, MD 20640-1525

UNITED STATES

Patricia.r.Nalborczyk, M Email: Patricia.r.Nalborczyk.civ@us.navy.mil Telephone: 3012781333

FoB Details Contractor Destination

Section G - Contract Administration Data

Voluntary Protection Program (VPP)

1. Voluntary Protection Program:

1.1. In August 2006, Indian Head Division (IHD) Naval Surface Warfare Center (NSWC) was nominated to participate in the DoD Voluntary Protection Program Center of Excellence Implementation Initiative of the Defense Safety Oversight Council (DSOC). The Voluntary Protection Program (VPP) was established by the Occupational Safety and Health Administration (OSHA) in 1982 to recognize and promote effective worksite-based safety and health management systems. IHD NSWC, through the utilization of VPP, desires to be a model of safety and health excellence.

VPP's emphasis on trust and cooperation between OSHA, the employer, employees, employees representatives, and contractors complements the Agency's enforcement activity but does not take its place. All parties, including Contractors, are to work together to identify and resolve any safety and health problems that may arise, yet obtain Contracting Officer approval of any changes that would impact the terms of the contract. IHD NSWC as the VPP participant develops and implements systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees and contractors are prevented. Contractor and sub-contractor personnel are subject to occupational safety and health oversight. This oversight will be accomplished by IHD NSWC personnel and Contracting Officers. Contractors, sub-contractors, and their employees, while in performance of a contractual action on-site within the geographical boundaries of Naval Support Facility (NSF) Indian Head, shall be subject to the requirements of the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual" regardless of the type or duration of the contract. Chapter 13 of the

IHDIVNAVSURFWARCENINST

5100.22, "Safety Manual", entitled "Contractor Safety" is provided as Attachment 8. Appendix 13-A, of the chapter 13 entitled "Contractor Safety Requirements When Performing Work at the Naval Support Facility (NSF) Indian Head, MD" shall be signed by the Contractor prior to commencement of services on-site at NSF Indian Head. The Contractor shall maintain one signed copy for future reference in educating its personnel and sub-contractors. A second signed copy shall be provided to the Contracting Officer to be maintained in the contract file. If an occupational safety or health related injury or illness occurs during the performance or as a result of this contractual action, the Contractor shall notify the Contracting Officer Representative (COR) as soon as practicable, who will notify the Safety Office and the Contracting Officer.

1.2 In support of VPP and in compliance with Chapter 13 of the Safety Manual, entitled "Contractor Safety," all Contractors performing on-site at NSF Indian Head shall comply with the following:

1.2.1 Public Law 91-596 (and Amendments), also known as the Occupational Safety and Act of 1970, establishes that all employers, including Contractors, are responsible, as far as possible, for providing every employee a safe and healthful working environment. All employers, including Contractors, shall conform to the standards as issued by OSHA. Contractors are responsible for complying with safety requirements specified in the contract as well as all Federal, State, and local safety and security regulations. Non-compliance may be cause for the removal of a Contractor or any Contractor employee from the activity and such non-compliance may form the basis for contractual action, up to and including termination for default.

1.2.2 Contractor personnel shall participate in basic safety awareness and hazard identification training offered by the Government activity at the work area they are supporting. Contractors performing on-site shall attend area weekly safety meetings and annual safety stand-downs, as determined by the

COR.

1.3 The best Safety and Health Programs involve every level of the organization, instilling a safety culture that reduces accidents for workers and improves the bottom line for managers. When Safety and Health are part of the organization and a way of life, everyone wins. IHD NSWC is committed to safety excellence. The Contractor shall familiarize itself with the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual," Appendix 13-C entitled "OSHA Voluntary Protection program (VPP) Fundamentals Training for Contractors".

2. Contractor On Site Training:

2.1 A Contractor providing support on-site at any IHD NSWC site may be required to have its on-site Contractor personnel participate in training covering rules, practices, procedures, equipment and systems, as needed, based on the type of support being provided. This training may include, but is not limited to: Operation Security training

(OPSEC); Personally Identifiable Information training; DoD Information Assurance Awareness training; Information Technology Security; Voluntary Protection Program (VPP) training; and Personnel Security training.

2.1.2 This training will be provided at no cost by the IHD NSWC site and will take place on-site during normal contract working hours without any additional compensation for the Contractor. This training does not relieve the Contractor of its responsibility to train its employees in such areas as environment, health, safety, security, sexual harassment, ethics, etc. to ensure compliance with all federal, state, and local laws and DoD Regulations.

Section H - Special Contract Requirements

Section I - Contract Clauses

Section J - List of Attachments

Exhibits:

Id Exhibit Name Exhibit Description Reference Identifier

Date Line Item

A

CDRL A0001 SMOKEY SAM

CONTAINER

Data item submittals under CDRLS, not elsewhere listed

01 Oct

Section K - Representations, Certification, & Other Statements

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Section M - Evaluation Factors for Award

Solicitation/Contract Form Continuation
Continuation of Supplies or Services and Prices/Costs
Continuation of Description
Continuation of Packaging and Marking
Continuation of Inspection and Acceptance
Continuation of Deliveries or Performance
Continuation of Accounting and Appropriation Data
Special Contract Requirements
Contract Clauses
List of Attachments
Representations, Certification, & Other Statements
Instructions, Conditions, & Notices to Offerors or Quoters
Evaluation Factors for Award
topmostSubform[0]:
Page1[0]:
p07_isFobDestination[0]: 1
p07_isNotFobDestination[0]:
ZipCode3[0]:
NameOfSigner[0]:
AreaCode2[0]:
Number2[0]:
Title[0]:
State3[0]:
City3[0]:
StreetAddress3[0]:
Country[0]:
NameOfQuoter[0]:
ItemNumber[0]:
ItemNumber[1]:
ItemNumber[2]:
ItemNumber[3]:
ItemNumber[4]:
ItemNumber[5]:
ItemNumber[6]:
ItemNumber[7]:
ItemNumber[8]:
ItemNumber[9]:
ItemNumber[10]:
ItemNumber[11]:
ItemNumber[12]:
ItemNumber[13]:
ItemNumber[14]:
ItemNumber[15]:
ItemNumber[16]:
ItemNumber[17]:
SuppliesServices[0]:
SuppliesServices[1]:
SuppliesServices[2]:
SuppliesServices[3]:
SuppliesServices[4]:
SuppliesServices[5]:
SuppliesServices[6]:
SuppliesServices[7]:
SuppliesServices[8]:
SuppliesServices[9]:
SuppliesServices[10]:
SuppliesServices[11]:
SuppliesServices[12]:
SuppliesServices[13]:
SuppliesServices[14]:
SuppliesServices[15]:
SuppliesServices[16]:
Quantity1[0]:
Quantity2[0]:
Quantity3[0]:
Quantity4[0]:
Quantity5[0]:
Quantity6[0]:
Quantity7[0]:
Quantity8[0]:
Quantity9[0]:
Quantity10[0]:
Quantity11[0]:
Quantity12[0]:
Quantity13[0]:
Quantity14[0]:
Quantity15[0]:
Quantity16[0]:
Quantity17[0]:
Quantity18[0]:
Unit[0]:
Unit[1]:
Unit[2]:
Unit[3]:
Unit[4]:
Unit[5]:
Unit[6]:
Unit[7]:
Unit[8]:
Unit[9]:
Unit[10]:
Unit[11]:
Unit[12]:
Unit[13]:
Unit[14]:
Unit[15]:
Unit[16]:
Unit[17]:
p10_responseDueDate[0]: 10/15/2025
DateOfQuotation[0]:
UnitPrice1[0]:
Amount1[0]:
Amount2[0]:
Amount3[0]:
Amount4[0]:
Amount5[0]:
Amount6[0]:
Amount7[0]:
Amount8[0]:
Amount9[0]:
Amount10[0]:
Amount11[0]:
Amount12[0]:
Amount13[0]:
Amount14[0]:
Amount15[0]:
Amount16[0]:
Amount17[0]:
Amount18[0]:
UnitPrice2[0]:
UnitPrice3[0]:
UnitPrice4[0]:
UnitPrice5[0]:
UnitPrice6[0]:
UnitPrice7[0]:
UnitPrice8[0]:
UnitPrice9[0]:
UnitPrice10[0]:
UnitPrice11[0]:
UnitPrice12[0]:
UnitPrice13[0]:
UnitPrice14[0]:
UnitPrice15[0]:
UnitPrice16[0]:
UnitPrice17[0]:
UnitPrice18[0]:
CalendarDays10[0]:
CalendarDays20[0]:
CalendarDays30[0]:
NumberDays[0]:
Percentage[0]:
AuthorizedSignature[0]:
p00_pageNumber: 1
p00_isSmallBusiness: 1
p00_isNotSmallBusiness:
p00_totalPages: 15
p01_requestNumber: N0017426Q1003
p02_dateIssued:
p03_purchaseRequestNumber:
p04_dpasRating:
p05a_issuedBy: NSWC INDIAN HEAD DIVISION
p06_deliverBy:
p05b_contactName: FRANCINE KEYS
p05b_contactAreaCode:
p05b_contactPhone: 3017446687
p09a_destinationName:
p09b_destinationStreetAddress: 4522 MCMAHON ROAD
p09c_destinationCity: INDIAN HEAD
p09e_destinationZipCode: 20640-1525
p09d_destinationState: MD
p08f_issueToZipCode: 20640-1533
p08e_issueToState: MD
p08d_issueToCity: INDIAN HEAD
p08c_issueToStreetAddress: INDIAN HEAD MD 20640-1533
p08b_issueToCompany:
p08a_issueToName:
p11_seeSchedule: SEE SCHEDULE
p12_isAttachments: 1
p12_isNotAttachments:

File details come from the government source that posted it. Updated .