0011418084-0001

PROJECT NO : WG-156-8J & ED-26-8J

PROJECT TITLE: Indefinite Delivery Indefinite Quantity (IDIQ) Roofing - The ordering period is one tw elve (12) months base w ith tw o (2) tw elve (12) months option periods.

PROJECT LOCATION: Fort Stew art and Hunter Army Airf ield, Georgia.

SET ASIDE: 100% Hubzone.

NAICS CODE: 238160

SIZE STANDARD: $16,500,000.00

MAGNITUDE OF CONSTRUCTION PROJECT: $5,000,000.00 - $10,000,000.00

SITE VISIT: NO SITE VISIT for this requirement.

DUE DATE FOR ALL QUESTIONS: Wednesday, 8 April 2020 @ 1:00p.m EST BONDS: Offer Guarantee is required.

* Instructions for the preparation of proposals are located in Section L. Faxed or email proposal w ill not be accepted.

TATJANA M. FISHER 912-767-3747

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Apr-2020

(RFP)

(IFB)

X

CALL:

ROOFING

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Task Orders

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________24 Apr 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

MICC - FORT STEWART

976 WILLIAM H. WILSON AVE SUITE 100

FORT STEWART GA 31314

W9124M

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

WG156-8J & ED-26-8J

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: (912)767-8420 TEL: FAX:

W9124M20R0006 254

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section A - Solicitation/Contract Form

TABLE OF CONTENTS

SECTION A –Table of Contents

TABLE OF CONTENTS

PART I – THE SCHEDULE

• SECTION A – Solicitation/Contract Form

• SECTION B – Supplies or Services and Prices/Costs

• SECTION C – Descriptions/Specifications/Statement of Work

• SECTION D – Packaging and Marking

• SECTION E – Inspection and Acceptance

• SECTION F – Description and Performance

• SECTION G – Contract Administration Data

• SECTION H – Special Contract Requirements

PART II – CONTRACT CLAUSES

SECTION I – Contract Clauses

PART III – LIST OF DOCUMENTS, EXIBITS AND OTHER ATTACHMENTS

SECTION J – List of Exhibits, Attachments, and Appendices

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K – Representations, Certifications and Other Statements of Offerors or

Respondents SECTION L – Instructions, Conditions, and Notice to Offerors SECTION M – Evaluation Factors for Award

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job IDIQ Roofing - Base Year

FFP

10 Apr 2020 - 09 Mar 2021 - WILLCHANGE PERIOD OF PERFORMANCE

AFTER FINAL APPROVAL - DON'T KNOW TRUE DATE

The Contractor shall furnish all labor ,materials & equipment ,to provide roofing repair and replacement as described in the general Statement of work, Task Order statement of work,drawings and specifications in support of Fort Stewart and Hunter Army Airfield, GA.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011418084-0001

PSC CD: Y1JZ

NET AMT

1001 1 Job OPTION IDIQ Roofing - 1st Option Year

FFP

10 Apr 2021 - 09 March 2022 WILLCHANGE PERIOD OF PERFORMANCE AFTER FINAL APPROVAL AND BEFORE UPLOADING TO beta.sam.gov The Contractor shall furnish all labor ,materials & equipment , to provide roofing repair and replacement as described in the general statement of work , task order statement of work, drawings and speciifications in support of Fort Stewart and Hunter Army Airfield , GA.

FOB: Destination

2001 1 Job OPTION IDIQ Roofing - 2nd Option Year

FFP

10 Apr 2022 - 09 March 2023 WILLCHANGE PERIOD OF PERFORMANCE AFTER FINAL APPROVAL AND BEFORE UPLOADING TO beta.sam.gov The Contractor shall furnish all labor ,materials & equipment , to provide roofing repair and replacement as described in the general statement of work , task order statement of work, drawings and speciifications in support of Fort Stewart and Hunter Army Airfield , GA.

FOB: Destination

BID PRICE SCHEDULE

Base Year

ITEM DESCRIPTION Quantity UNIT U/P Amount 0001 Provide and install roof hatch, 36" x 30" 10 EA 0002 Provide and install gypsum deck plank 2" 1340 SF 0003 Demolition of gypsum deck, 2" 1340 SF 0004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized

2340 SF

0005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized

2340 SF

0006 Provide and install 3"x16 gauge open-type metal deck, galvanized

2340 SF

0007 Demolition of 3"x16 gauge open-type metal deck, galvanized 2340 SF

0008 Provide and install sheet metal patch, .020 galvanized 1140 SF

0009 Demolition of lumber up 2x10 2000 BF 0010 Provide and install lumber, treated up to 2x10 2000 BF 0011 Provide and install cant strips, treated 4 X 4, cut diagonally 2660 LF

0012 Demolition of cant strips 2660 LF 0013 Provide and install CDX plywood sheathing up to 3/4" 16000 SF

0014 Demolition of CDX plywood sheathing up to 3/4" 16000 SF 0015 Provide and install exterior trim, pine, corner board, 1x4 400 LF

0016 Demolition of exterior trim, pine, corner board, 1x4 400 LF

0017 Provide and install exterior trim, pine, corner board, 1x6 400 LF

0018 Demolition of exterior trim, pine, corner board, 1x6 400 LF

0019 Provide and install exterior trim, pine, fascia, 1x6 400 LF 0020 Demolition of exterior trim, pine, fascia, 1x6 400 LF 0021 Provide and install exterior trim, pine, fascia, 1x8 400 LF 0022 Demolition of exterior trim, pine, fascia, 1x8 400 LF 0023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11

2000 SF

0024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11

2000 SF

0025 Provide and install fiberglass flexible insulation 6" kraft faced 2000 SF

0026 Demolition of fiberglass flexible insulation 6" kraft faced 2000 SF

0027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11

2000 SF

0028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11

2000 SF

0029 Provide and install fiberglass flexible insulation 6" foil side R19

2000 SF

0030 Demolition of fiberglass flexible insulation 6" foil side, R19 2000 SF

0031 Provide and install flexible fiberglass insulation, 9" foil side, R30

2000 SF

0032 Demolition of 9" flexible fiberglass insulation, foil side, R30 2000 SF

0033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11

2000 SF

0034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11

2000 SF

0035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19

2000 SF

0036 Demolition of fiberglass flexible insulation 6" unfaced batt insulation, R19

2000 SF

0037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30

2000 SF

0038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30

2000 SF

0039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia

1000 SF

0040 Demolition of soffit, perforated or solid, and fascia 1000 SF

0041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78

1340 SF

0042 Demolition of rigid board insulation, up to 2" 2000 SF 0043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56

2000 SF

0044 Demolition of rigid board insulation, wood fiber, up to 1" 540 SF

0045 Demolition of rigid board insulation wood fiber, up to 2' 270 SF

0046 Provide and install rigid board insulation, 1" Perlite, R2.78 60000 SF

0047 Demolition of rigid board insulation, Perlite, up to 2" 60000 SF

0048 Demolition of rigid board insulation, perlite, up to 1" 60000 SF

0049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14

60000 SF

0050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29

60000 SF

0051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate

660 BF

0052 Demolition of rigid insulation, up to 1" polyisocyanurate 660 SF

0053 Demolition of rigid insulation, up to 2" polyisocyanurate 40000 SF

0054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed

260 SQ

0055 Add 1 layer #15 felt for low/steep slope 260 SQ 0056 Demolition of asphalt shingles 23340 SF 0057 Provide and install glass roofing felt 34 SQ 0058 Provide and install glass roofing felt, mopped 34 SQ

0059 Provide and install organic roofing felt 34 SQ 0060 Provide and install organic roofing felt, mopped 6 SQ 0061 Install pitch pockets 140 EA 0062 Demolition of 3 ply built up roof with gravel 4000 SF 0063 Demolition of 3 ply built up roof with smooth surface 9340 SF

0064 Demolition of 4 ply built up roof with gravel 5340 SF 0065 Demolition of shingle, felt or roll roofing 340 SQ 0066 Demolition of gravel ballast 1340 CY 0067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies

14 SQ

0068 Demolition of 3 plies glass fiber felt 6 SQ 0069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations

6 SQ

0070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered

26 SQ

0071 Demolition of single ply roofing 5000 SF 0072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered

26 SQ

0073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached

26 SQ

0074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered

26 SQ

0075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered

26 SQ

0076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached

26 SQ

0077 Provide and install #15 organic felt, nailed to deck 340 SF

0078 Provide and install #15 organic felt, spot mopped to deck 3340 SF

0079 Provide and install #15 organic felt, fully mopped to deck 3340 SF

0080 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

9340 SF

0081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

9340 SF

0082 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty

9340 SF

0083 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty

9340 SF

0084 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty

9340 SF

0085 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced

10000 SF

0086 Demolition of modified bitumen roofing 1060 SF 0087 Demolition of thermoplastic roofing system 60 SQ 0088 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached

60 SQ

0089 Provide and install concrete pavers 2x2x1 1/2" 6 EA 0090 Remove and replace screws and new neoprene washers 3000 EA

0091 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system

13340 SF

0092 Framing system, light gage structural, 4 and 12 pitch 13340 SF

0093 Framing system, Sub-purlins, metal, 4" wide, 16 gage 460 LF

0094 Metal roof system, fascia, (Same as roof panels) 2600 SF 0095 Metal roof system, Perforated soffit panel, steel painted 2600 SF

0096 Provide and install ridge cap 1860 SF 0097 Demolition of ridge cap 1860 SF 0098 Demolition of PVC pipe flashing 120 EA 0099 Provide and install PVC pipe flashing, 90 mil thick, up to 4" diameter pipe

120 EA

0100 Demolition of copper flashing 34 SF 0101 Demolition of aluminum flashing 2340 SF 0102 Provide and install aluminum flashing, .032" thick 2340 SF 0103 Provide and install up to 4" diameter plumbing vent flashing 134 EA

0104 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish

234 LF

0105 Provide and install stainless steel flashing, .015" thick 260 SF

0106 Demolition of stainless steel flashing 260 SF

0107 Provide and install stainless steel flashing T-Section waterstop, 22 gauge

150 SF

0108 Provide and install stainless steel scupper outlets 10x10x4" 6 EA

0109 Demolition of scupper outlets 14 EA 0110 Provide and install stainless steel scupper outlets 22x14x4" 4 EA

0111 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered

4 EA

0112 Provide and install stainless steel flashing drip edge, 5" girth 260 LF

0113 Provide and install stainless steel flashing drip edge, 8" girth 26 LF

0114 Provide demolition of steel fascia 260 SF 0115 Demolition of gutters and downspouts 1340 LF 0116 Provide and install downspouts .024 aluminum, 3x4", enameled

260 LF

0117 Provide and install downspouts .025 aluminum, 4"x5" enameled

260 LF

0118 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel

260 LF

0119 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted

460 LF

0120 Provide and install gutter .027 thick 5" box type aluminum gutter

200 LF

0121 Provide and install gutter .032" thick 5" box type aluminum gutter, enamel painted

460 LF

0122 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter

134 LF

0123 Provide and install gutter 28 gauge 5" galvanized steel painted

134 LF

0124 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted

1000 LF

0125 Demolition of cast iron boots 12 EA 0126 Provide and install cast iron roof drainage boots 12 EA 0127 Provide and install metal equipment curb, painted up to

48"x48"

80 EA

0128 Demolition of metal equipment curb, painted up to 48"x48" 80 SF

0129 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish

1340 LF

0130 Demolition of gravel stops 1340 LF

0131 Provide and install coping cap, .050 aluminum, painted 1660 SF

0132 Remove and replace roof drains 44 EA 0133 Remove and reset curb and equipment, no electrical work included

30 EA

0134 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets

30 EA

0135 Remove and install mushroom vents 6 EA 0136 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen

1660 SF

0137 Gable louver, aluminum, painted, large with insect screen 20 EA

0138 Remove and reinstall ventilator 6 EA 0139 Provide continuous low profile ridge ventilator 20 EA 0140 Remove and reset ridge vent 6 EA 0141 Provide and install aluminum ridge vent, painted 60 LF 0142 Demolition of ridge vent 60 LF 0143 Demolition of soffit vents 60 LF 0144 Provide and install up to 3" aluminum soffit vent, mill or enamel finish

60 LF

0145 Provide and install under eave aluminum vent, mill finish 30 EA

0146 Demolition of eave vents 30 EA 0147 Provide and install expansion joint cover, roof to roof, aluminum

114 LF

0148 Provide and install expansion joint cover, roof to wall, aluminum

114 LF

0149 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick

500 LF

0150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick

20 LF

0151 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.

1000 SF

0152 Demolition of suspension system without lath, with channels 1000 SF

0153 Demolition of drywall 1000 SF

0154 Provide for ceiling installation. Add to cost of gypsum wallboard

60 SF

0155 Provide for ceiling over 8' in height. Add to cost of gypsum board

60 SF

0156 Provide and install gypsum wallboard 5/8" drywall, taped and finished

1000 SF

0157 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels

1000 SF

0158 Demolition of acoustical ceiling panels 1000 SF 0159 Pressure wash metal roof 30000 SF 0160 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat

2334 SF

0161 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint. Painting task includes protective work

260 SF

0162 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work

660 SF

0163 Provide individual tests for asbestos containing material.

Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer

5 EA

0164 Provide removal of asbestos containing roofing material;

built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.

20 SQ

0165 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestos abatement contractor.

334 SF

0166 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.

60 SF

0167 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer

14 EA

0168 Demolish pvc piping, up to 2" 26 LF 0169 Provide and install up to 2" pvc piping, schedule 40, include fittings

26 LF

0170 Extend galvanized plumbing vents, (3' to 7') 6 EA 0171 Extend hot flue stacks to 12" dia. (5' to 7') 4 EA 0172 Remove from roof air handler, refrigerant lines and reinstall 2 EA

0173 Extend duct work, insulated aluminum 50 LF 0174 Remove/reinstall lightning Protection System up to 25 points 25 EA

0175 Remove/reinstall LPS up to 100 points 75 EA 0176 Non-prepriced items LS 0177 Lightning Protection System. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection. Up to 100 points.

75 EA

SUBTOTAL FORT STEWART, BASE PERIOD (TOTAL OF LINE ITEMS 0001 THROUGH 0177)

IDIQ ROOFING, FORT STEWART, GEORGIA

Option Year 1

1001 Provide and install roof hatch, 36" x 30" 10 EA 1002 Provide and install gypsum deck plank 2" 1340 SF 1003 Demolition of gypsum deck, 2" 1340 SF 1004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized

2340 SF

1005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized

2340 SF

1006 Provide and install 3"x16 gauge open-type metal deck, galvanized

2340 SF

1007 Demolition of 3"x16 gauge open-type metal deck, galvanized 2340 SF

1008 Provide and install sheet metal patch, .020 galvanized 1140 SF

1009 Demolition of lumber up 2x10 2000 BF 1010 Provide and install lumber, treated up to 2x10 2000 BF 1011 Provide and install cant strips, treated 4 X 4, cut diagonally 2660 LF

1012 Demolition of cant strips 2660 LF 1013 Provide and install CDX plywood sheathing up to 3/4" 16000 SF

1014 Demolition of CDX plywood sheathing up to 3/4" 16000 SF 1015 Provide and install exterior trim, pine, corner board, 1x4 400 LF

1016 Demolition of exterior trim, pine, corner board, 1x4 400 LF

1017 Provide and install exterior trim, pine, corner board, 1x6 400 LF

1018 Demolition of exterior trim, pine, corner board, 1x6 400 LF

1019 Provide and install exterior trim, pine, fascia, 1x6 400 LF 1020 Demolition of exterior trim, pine, fascia, 1x6 400 LF 1021 Provide and install exterior trim, pine, fascia, 1x8 400 LF 1022 Demolition of exterior trim, pine, fascia, 1x8 400 LF 1023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11

2000 SF

1024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11

2000 SF

1025 Provide and install fiberglass flexible insulation 6" kraft faced 2000 SF

1026 Demolition of fiberglass flexible insulation 6" kraft faced 2000 SF

1027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11

2000 SF

1028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11

2000 SF

1029 Provide and install fiberglass flexible insulation 6" foil side R19

1030 Demolition of fiberglass flexible insulation 6" foil side, R19 2000 SF

1031 Provide and install flexible fiberglass insulation, 9" foil side, R30

2000 SF

1032 Demolition of 9" flexible fiberglass insulation, foil side, R30 2000 SF

1033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11

2000 SF

1034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11

2000 SF

1035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19

2000 SF

1036 Demolition of fiberglass flexible insulation 6" unfaced batt insulation, R19

2000 SF

1037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30

2000 SF

1038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30

2000 SF

1039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia

1000 SF

1040 Demolition of soffit, perforated or solid, and fascia 1000 SF

1041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78

1340 SF

1042 Demolition of rigid board insulation, up to 2" 2000 SF 1043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56

2000 SF

1044 Demolition of rigid board insulation, wood fiber, up to 1" 540 SF

1045 Demolition of rigid board insulation wood fiber, up to 2' 270 SF

1046 Provide and install rigid board insulation, 1" Perlite, R2.78 60000 SF

1047 Demolition of rigid board insulation, Perlite, up to 2" 60000 SF

1048 Demolition of rigid board insulation, perlite, up to 1" 60000 SF

1049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14

60000 SF

1050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29

60000 SF

1051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate

660 BF

1052 Demolition of rigid insulation, up to 1" polyisocyanurate 660 SF

1053 Demolition of rigid insulation, up to 2" polyisocyanurate 40000 SF

1054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed

260 SQ

1055 Add 1 layer #15 felt for low/steep slope 260 SQ 1056 Demolition of asphalt shingles 23340 SF 1057 Provide and install glass roofing felt 34 SQ 1058 Provide and install glass roofing felt, mopped 34 SQ 1059 Provide and install organic roofing felt 34 SQ 1060 Provide and install organic roofing felt, mopped 6 SQ 1061 Install pitch pockets 140 EA 1062 Demolition of 3 ply built up roof with gravel 4000 SF 1063 Demolition of 3 ply built up roof with smooth surface 9340 SF

1064 Demolition of 4 ply built up roof with gravel 5340 SF 1065 Demolition of shingle, felt or roll roofing 340 SQ 1066 Demolition of gravel ballast 1340 CY 1067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies

14 SQ

1068 Demolition of 3 plies glass fiber felt 6 SQ 1069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations

6 SQ

1070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered

26 SQ

1071 Demolition of single ply roofing 5000 SF 1072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered

26 SQ

1073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached

26 SQ

1074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered

26 SQ

1075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered

26 SQ

1076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached

26 SQ

1077 Provide and install #15 organic felt, nailed to deck 340 SF

1078 Provide and install #15 organic felt, spot mopped to deck 3340 SF

1079 Provide and install #15 organic felt, fully mopped to deck 3340 SF

1080 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

9340 SF

1081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

9340 SF

1082 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty

9340 SF

1083 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty

9340 SF

1084 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty

9340 SF

1085 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced

10000 SF

1086 Demolition of modified bitumen roofing 1060 SF 1087 Demolition of thermoplastic roofing system 60 SQ 1088 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached

60 SQ

1089 Provide and install concrete pavers 2x2x1 1/2" 6 EA 1090 Remove and replace screws and new neoprene washers 3000 EA

1091 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system

13340 SF

1092 Framing system, light gage structural, 4 and 12 pitch 13340 SF

1093 Framing system, Sub-purlins, metal, 4" wide, 16 gage 460 LF

1094 Metal roof system, fascia, (Same as roof panels) 2600 SF 1095 Metal roof system, Perforated soffit panel, steel painted 2600 SF

1096 Provide and install ridge cap 1860 SF 1097 Demolition of ridge cap 1860 SF 1098 Demolition of PVC pipe flashing 120 EA

1099 Provide and install PVC pipe flashing, 90 mil thick, up to 4" diameter pipe

120 EA

1100 Demolition of copper flashing 34 SF 1101 Demolition of aluminum flashing 2340 SF 1102 Provide and install aluminum flashing, .032" thick 2340 SF 1103 Provide and install up to 4" diameter plumbing vent flashing 134 EA

1104 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish

234 LF

1105 Provide and install stainless steel flashing, .015" thick 260 SF

1106 Demolition of stainless steel flashing 260 SF 1107 Provide and install stainless steel flashing T-Section waterstop, 22 gauge

150 SF

1108 Provide and install stainless steel scupper outlets 10x10x4" 6 EA

1109 Demolition of scupper outlets 14 EA 1110 Provide and install stainless steel scupper outlets 22x14x4" 4 EA

1111 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered

4 EA

1112 Provide and install stainless steel flashing drip edge, 5" girth 260 LF

1113 Provide and install stainless steel flashing drip edge, 8" girth 26 LF

1114 Provide demolition of steel fascia 260 SF 1115 Demolition of gutters and downspouts 1340 LF 1116 Provide and install downspouts .024 aluminum, 3x4", enameled

260 LF

1117 Provide and install downspouts .025 aluminum, 4"x5" enameled

260 LF

1118 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel

260 LF

1119 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted

460 LF

1120 Provide and install gutter .027 thick 5" box type aluminum gutter

200 LF

1121 Provide and install gutter .032" thick 5" box type aluminum gutter, enamel painted

460 LF

1122 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter

134 LF

1123 Provide and install gutter 28 gauge 5" galvanized steel painted

134 LF

1124 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted

1000 LF

1125 Demolition of cast iron boots 12 EA 1126 Provide and install cast iron roof drainage boots 12 EA 1127 Provide and install metal equipment curb, painted up to

48"x48"

80 EA

1128 Demolition of metal equipment curb, painted up to 48"x48" 80 SF

1129 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish

1340 LF

1130 Demolition of gravel stops 1340 LF 1131 Provide and install coping cap, .050 aluminum, painted 1660 SF

1132 Remove and replace roof drains 44 EA 1133 Remove and reset curb and equipment, no electrical work included

30 EA

1134 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets

30 EA

1135 Remove and install mushroom vents 6 EA 1136 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen

1660 SF

1137 Gable louver, aluminum, painted, large with insect screen 20 EA

1138 Remove and reinstall ventilator 6 EA 1139 Provide continuous low profile ridge ventilator 20 EA 1140 Remove and reset ridge vent 6 EA 1141 Provide and install aluminum ridge vent, painted 60 LF 1142 Demolition of ridge vent 60 LF 1143 Demolition of soffit vents 60 LF 1144 Provide and install up to 3" aluminum soffit vent, mill or enamel finish

60 LF

1145 Provide and install under eave aluminum vent, mill finish 30 EA

1146 Demolition of eave vents 30 EA 1147 Provide and install expansion joint cover, roof to roof, aluminum

114 LF

1148 Provide and install expansion joint cover, roof to wall, aluminum

114 LF

1149 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick

500 LF

1150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick

20 LF

1151 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.

1000 SF

1152 Demolition of suspension system without lath, with channels 1000 SF

1153 Demolition of drywall 1000 SF 1154 Provide for ceiling installation. Add to cost of gypsum wallboard

60 SF

1155 Provide for ceiling over 8' in height. Add to cost of gypsum board

60 SF

1156 Provide and install gypsum wallboard 5/8" drywall, taped and finished

1000 SF

1157 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels

1000 SF

1158 Demolition of acoustical ceiling panels 1000 SF 1159 Pressure wash metal roof 30000 SF 1160 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat

2334 SF

1161 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint. Painting task includes protective work

260 SF

1162 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work

660 SF

1163 Provide individual tests for asbestos containing material.

Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer

5 EA

1164 Provide removal of asbestos containing roofing material;

built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.

20 SQ

1165 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestos abatement contractor.

334 SF

1166 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.

60 SF

1167 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer

14 EA

1168 Demolish pvc piping, up to 2" 26 LF 1169 Provide and install up to 2" pvc piping, schedule 40, include fittings

26 LF

1170 Extend galvanized plumbing vents, (3' to 7') 6 EA 1171 Extend hot flue stacks to 12" dia. (5' to 7') 4 EA 1172 Remove from roof air handler, refrigerant lines and reinstall 2 EA

1173 Extend duct work, insulated aluminum 50 LF 1174 Remove/reinstall lightning Protection System up to 25 points 25 EA

1175 Remove/reinstall LPS up to 100 points 75 EA 1176 Non-prepriced items LS 1177 Lightning Protection System. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection. Up to 100 points.

SUBTOTAL FORT STEWART, 1ST YEAR OPTION PERIOD (TOTAL OF LINE ITEMS 1001 THROUGH 1177)

Option Year 2

2001 Provide and install roof hatch, 36" x 30" 10 EA 2002 Provide and install gypsum deck plank 2" 1340 SF 2003 Demolition of gypsum deck, 2" 1340 SF 2004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized

2340 SF

2005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized

2340 SF

2006 Provide and install 3"x16 gauge open-type metal deck, galvanized

2340 SF

2007 Demolition of 3"x16 gauge open-type metal deck, galvanized 2340 SF

2008 Provide and install sheet metal patch, .020 galvanized 1140 SF

2009 Demolition of lumber up 2x10 2000 BF 2010 Provide and install lumber, treated up to 2x10 2000 BF 2011 Provide and install cant strips, treated 4 X 4, cut diagonally 2660 LF

2012 Demolition of cant strips 2660 LF 2013 Provide and install CDX plywood sheathing up to 3/4" 16000 SF

2014 Demolition of CDX plywood sheathing up to 3/4" 16000 SF 2015 Provide and install exterior trim, pine, corner board, 1x4 400 LF

2016 Demolition of exterior trim, pine, corner board, 1x4 400 LF

2017 Provide and install exterior trim, pine, corner board, 1x6 400 LF

2018 Demolition of exterior trim, pine, corner board, 1x6 400 LF

2019 Provide and install exterior trim, pine, fascia, 1x6 400 LF 2020 Demolition of exterior trim, pine, fascia, 1x6 400 LF 2021 Provide and install exterior trim, pine, fascia, 1x8 400 LF 2022 Demolition of exterior trim, pine, fascia, 1x8 400 LF

2023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11

2000 SF

2024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11

2000 SF

2025 Provide and install fiberglass flexible insulation 6" kraft faced 2000 SF

2026 Demolition of fiberglass flexible insulation 6" kraft faced 2000 SF

2027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11

2000 SF

2028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11

2000 SF

2029 Provide and install fiberglass flexible insulation 6" foil side R19

2000 SF

2030 Demolition of fiberglass flexible insulation 6" foil side, R19 2000 SF

2031 Provide and install flexible fiberglass insulation, 9" foil side, R30

2000 SF

2032 Demolition of 9" flexible fiberglass insulation, foil side, R30 2000 SF

2033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11

2000 SF

2034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11

2000 SF

2035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19

2000 SF

2036 Demolition of fiberglass flexible insulation 6" unfaced batt insulation, R19

2000 SF

2037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30

2000 SF

2038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30

2000 SF

2039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia

1000 SF

2040 Demolition of soffit, perforated or solid, and fascia 1000 SF

2041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78

1340 SF

2042 Demolition of rigid board insulation, up to 2" 2000 SF 2043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56

2044 Demolition of rigid board insulation, wood fiber, up to 1" 540 SF

2045 Demolition of rigid board insulation wood fiber, up to 2' 270 SF

2046 Provide and install rigid board insulation, 1" Perlite, R2.78 60000 SF

2047 Demolition of rigid board insulation, Perlite, up to 2" 60000 SF

2048 Demolition of rigid board insulation, perlite, up to 1" 60000 SF

2049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14

60000 SF

2050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29

60000 SF

2051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate

660 BF

2052 Demolition of rigid insulation, up to 1" polyisocyanurate 660 SF

2053 Demolition of rigid insulation, up to 2" polyisocyanurate 40000 SF

2054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed

260 SQ

2055 Add 1 layer #15 felt for low/steep slope 260 SQ 2056 Demolition of asphalt shingles 23340 SF 2057 Provide and install glass roofing felt 34 SQ 2058 Provide and install glass roofing felt, mopped 34 SQ 2059 Provide and install organic roofing felt 34 SQ 2060 Provide and install organic roofing felt, mopped 6 SQ 2061 Install pitch pockets 140 EA 2062 Demolition of 3 ply built up roof with gravel 4000 SF 2063 Demolition of 3 ply built up roof with smooth surface 9340 SF

2064 Demolition of 4 ply built up roof with gravel 5340 SF 2065 Demolition of shingle, felt or roll roofing 340 SQ 2066 Demolition of gravel ballast 1340 CY 2067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies

14 SQ

2068 Demolition of 3 plies glass fiber felt 6 SQ 2069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations

6 SQ

2070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered

26 SQ

2071 Demolition of single ply roofing 5000 SF 2072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered

26 SQ

2073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached

26 SQ

2074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered

26 SQ

2075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered

26 SQ

2076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached

26 SQ

2077 Provide and install #15 organic felt, nailed to deck 340 SF

2078 Provide and install #15 organic felt, spot mopped to deck 3340 SF

2079 Provide and install #15 organic felt, fully mopped to deck 3340 SF

2080 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

9340 SF

2081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

9340 SF

2082 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty

9340 SF

2083 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty

9340 SF

2084 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty

9340 SF

2085 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced

10000 SF

2086 Demolition of modified bitumen roofing 1060 SF 2087 Demolition of thermoplastic roofing system 60 SQ 2088 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached

60 SQ

2089 Provide and install concrete pavers 2x2x1 1/2" 6 EA

2090 Remove and replace screws and new neoprene washers 3000 EA

2091 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system

13340 SF

2092 Framing system, light gage structural, 4 and 12 pitch 13340 SF

2093 Framing system, Sub-purlins, metal, 4" wide, 16 gage 460 LF

2094 Metal roof system, fascia, (Same as roof panels) 2600 SF 2095 Metal roof system, Perforated soffit panel, steel painted 2600 SF

2096 Provide and install ridge cap 1860 SF 2097 Demolition of ridge cap 1860 SF 2098 Demolition of PVC pipe flashing 120 EA 2099 Provide and install PVC pipe flashing, 90 mil thick, up to 4" diameter pipe

120 EA

2100 Demolition of copper flashing 34 SF 2101 Demolition of aluminum flashing 2340 SF 2102 Provide and install aluminum flashing, .032" thick 2340 SF 2103 Provide and install up to 4" diameter plumbing vent flashing 134 EA

2104 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish

234 LF

2105 Provide and install stainless steel flashing, .015" thick 260 SF

2106 Demolition of stainless steel flashing 260 SF 2107 Provide and install stainless steel flashing T-Section waterstop, 22 gauge

150 SF

2108 Provide and install stainless steel scupper outlets 10x10x4" 6 EA

2109 Demolition of scupper outlets 14 EA 2110 Provide and install stainless steel scupper outlets 22x14x4" 4 EA

2111 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered

4 EA

2112 Provide and install stainless steel flashing drip edge, 5" girth 260 LF

2113 Provide and install stainless steel flashing drip edge, 8" girth 26 LF

2114 Provide demolition of steel fascia 260 SF 2115 Demolition of gutters and downspouts 1340 LF 2116 Provide and install downspouts .024 aluminum, 3x4", enameled

260 LF

2117 Provide and install downspouts .025 aluminum, 4"x5" enameled

260 LF

2118 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel

260 LF

2119 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted

460 LF

2120 Provide and install gutter .027 thick 5" box type aluminum gutter

200 LF

2121 Provide and install gutter .032" thick 5" box type aluminum gutter, enamel painted

460 LF

2122 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter

134 LF

2123 Provide and install gutter 28 gauge 5" galvanized steel painted

134 LF

2124 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted

1000 LF

2125 Demolition of cast iron boots 12 EA 2126 Provide and install cast iron roof drainage boots 12 EA 2127 Provide and install metal equipment curb, painted up to

48"x48"

80 EA

2128 Demolition of metal equipment curb, painted up to 48"x48" 80 SF

2129 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish

1340 LF

2130 Demolition of gravel stops 1340 LF 2131 Provide and install coping cap, .050 aluminum, painted 1660 SF

2132 Remove and replace roof drains 44 EA 2133 Remove and reset curb and equipment, no electrical work included

30 EA

2134 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets

30 EA

2135 Remove and install mushroom vents 6 EA 2136 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen

1660 SF

2137 Gable louver, aluminum, painted, large with insect screen 20 EA

2138 Remove and reinstall ventilator 6 EA 2139 Provide continuous low profile ridge ventilator 20 EA 2140 Remove and reset ridge vent 6 EA 2141 Provide and install aluminum ridge vent, painted 60 LF 2142 Demolition of ridge vent 60 LF 2143 Demolition of soffit vents 60 LF

2144 Provide and install up to 3" aluminum soffit vent, mill or enamel finish

60 LF

2145 Provide and install under eave aluminum vent, mill finish 30 EA

2146 Demolition of eave vents 30 EA 2147 Provide and install expansion joint cover, roof to roof, aluminum

114 LF

2148 Provide and install expansion joint cover, roof to wall, aluminum

114 LF

2149 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick

500 LF

2150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick

20 LF

2151 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.

1000 SF

2152 Demolition of suspension system without lath, with channels 1000 SF

2153 Demolition of drywall 1000 SF 2154 Provide for ceiling installation. Add to cost of gypsum wallboard

60 SF

2155 Provide for ceiling over 8' in height. Add to cost of gypsum board

60 SF

2156 Provide and install gypsum wallboard 5/8" drywall, taped and finished

1000 SF

2157 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels

1000 SF

2158 Demolition of acoustical ceiling panels 1000 SF 2159 Pressure wash metal roof 30000 SF 2160 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat

2334 SF

2161 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint. Painting task includes protective work

260 SF

2162 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work

660 SF

2163 Provide individual tests for asbestos containing material.

Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer

5 EA

2164 Provide removal of asbestos containing roofing material;

built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.

20 SQ

2165 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestos abatement contractor.

334 SF

2166 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.

60 SF

2167 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer

14 EA

2168 Demolish pvc piping, up to 2" 26 LF 2169 Provide and install up to 2" pvc piping, schedule 40, include fittings

26 LF

2170 Extend galvanized plumbing vents, (3' to 7') 6 EA 2171 Extend hot flue stacks to 12" dia.