0011418084-0001
PROJECT NO : WG-156-8J & ED-26-8J
PROJECT TITLE: Indefinite Delivery Indefinite Quantity (IDIQ) Roofing - The ordering period is one tw elve (12) months base w ith tw o (2) tw elve (12) months option periods.
PROJECT LOCATION: Fort Stew art and Hunter Army Airf ield, Georgia.
SET ASIDE: 100% Hubzone.
NAICS CODE: 238160
SIZE STANDARD: $16,500,000.00
MAGNITUDE OF CONSTRUCTION PROJECT: $5,000,000.00 - $10,000,000.00
SITE VISIT: NO SITE VISIT for this requirement.
DUE DATE FOR ALL QUESTIONS: Wednesday, 8 April 2020 @ 1:00p.m EST BONDS: Offer Guarantee is required.
* Instructions for the preparation of proposals are located in Section L. Faxed or email proposal w ill not be accepted.
TATJANA M. FISHER 912-767-3747
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
03-Apr-2020
(RFP)
(IFB)
X
CALL:
ROOFING
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Task Orders
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________24 Apr 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC - FORT STEWART
976 WILLIAM H. WILSON AVE SUITE 100
FORT STEWART GA 31314
W9124M
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
WG156-8J & ED-26-8J
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: (912)767-8420 TEL: FAX:
W9124M20R0006 254
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section A - Solicitation/Contract Form
TABLE OF CONTENTS
SECTION A –Table of Contents
TABLE OF CONTENTS
PART I – THE SCHEDULE
• SECTION A – Solicitation/Contract Form
• SECTION B – Supplies or Services and Prices/Costs
• SECTION C – Descriptions/Specifications/Statement of Work
• SECTION D – Packaging and Marking
• SECTION E – Inspection and Acceptance
• SECTION F – Description and Performance
• SECTION G – Contract Administration Data
• SECTION H – Special Contract Requirements
PART II – CONTRACT CLAUSES
SECTION I – Contract Clauses
PART III – LIST OF DOCUMENTS, EXIBITS AND OTHER ATTACHMENTS
SECTION J – List of Exhibits, Attachments, and Appendices
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors or
Respondents SECTION L – Instructions, Conditions, and Notice to Offerors SECTION M – Evaluation Factors for Award
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job IDIQ Roofing - Base Year
FFP
10 Apr 2020 - 09 Mar 2021 - WILLCHANGE PERIOD OF PERFORMANCE
AFTER FINAL APPROVAL - DON'T KNOW TRUE DATE
The Contractor shall furnish all labor ,materials & equipment ,to provide roofing repair and replacement as described in the general Statement of work, Task Order statement of work,drawings and specifications in support of Fort Stewart and Hunter Army Airfield, GA.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011418084-0001
PSC CD: Y1JZ
NET AMT
1001 1 Job OPTION IDIQ Roofing - 1st Option Year
FFP
10 Apr 2021 - 09 March 2022 WILLCHANGE PERIOD OF PERFORMANCE AFTER FINAL APPROVAL AND BEFORE UPLOADING TO beta.sam.gov The Contractor shall furnish all labor ,materials & equipment , to provide roofing repair and replacement as described in the general statement of work , task order statement of work, drawings and speciifications in support of Fort Stewart and Hunter Army Airfield , GA.
FOB: Destination
2001 1 Job OPTION IDIQ Roofing - 2nd Option Year
FFP
10 Apr 2022 - 09 March 2023 WILLCHANGE PERIOD OF PERFORMANCE AFTER FINAL APPROVAL AND BEFORE UPLOADING TO beta.sam.gov The Contractor shall furnish all labor ,materials & equipment , to provide roofing repair and replacement as described in the general statement of work , task order statement of work, drawings and speciifications in support of Fort Stewart and Hunter Army Airfield , GA.
FOB: Destination
BID PRICE SCHEDULE
Base Year
ITEM DESCRIPTION Quantity UNIT U/P Amount 0001 Provide and install roof hatch, 36" x 30" 10 EA 0002 Provide and install gypsum deck plank 2" 1340 SF 0003 Demolition of gypsum deck, 2" 1340 SF 0004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized
2340 SF
0005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized
2340 SF
0006 Provide and install 3"x16 gauge open-type metal deck, galvanized
2340 SF
0007 Demolition of 3"x16 gauge open-type metal deck, galvanized 2340 SF
0008 Provide and install sheet metal patch, .020 galvanized 1140 SF
0009 Demolition of lumber up 2x10 2000 BF 0010 Provide and install lumber, treated up to 2x10 2000 BF 0011 Provide and install cant strips, treated 4 X 4, cut diagonally 2660 LF
0012 Demolition of cant strips 2660 LF 0013 Provide and install CDX plywood sheathing up to 3/4" 16000 SF
0014 Demolition of CDX plywood sheathing up to 3/4" 16000 SF 0015 Provide and install exterior trim, pine, corner board, 1x4 400 LF
0016 Demolition of exterior trim, pine, corner board, 1x4 400 LF
0017 Provide and install exterior trim, pine, corner board, 1x6 400 LF
0018 Demolition of exterior trim, pine, corner board, 1x6 400 LF
0019 Provide and install exterior trim, pine, fascia, 1x6 400 LF 0020 Demolition of exterior trim, pine, fascia, 1x6 400 LF 0021 Provide and install exterior trim, pine, fascia, 1x8 400 LF 0022 Demolition of exterior trim, pine, fascia, 1x8 400 LF 0023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11
2000 SF
0024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11
2000 SF
0025 Provide and install fiberglass flexible insulation 6" kraft faced 2000 SF
0026 Demolition of fiberglass flexible insulation 6" kraft faced 2000 SF
0027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11
2000 SF
0028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11
2000 SF
0029 Provide and install fiberglass flexible insulation 6" foil side R19
2000 SF
0030 Demolition of fiberglass flexible insulation 6" foil side, R19 2000 SF
0031 Provide and install flexible fiberglass insulation, 9" foil side, R30
2000 SF
0032 Demolition of 9" flexible fiberglass insulation, foil side, R30 2000 SF
0033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11
2000 SF
0034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11
2000 SF
0035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19
2000 SF
0036 Demolition of fiberglass flexible insulation 6" unfaced batt insulation, R19
2000 SF
0037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30
2000 SF
0038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30
2000 SF
0039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia
1000 SF
0040 Demolition of soffit, perforated or solid, and fascia 1000 SF
0041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78
1340 SF
0042 Demolition of rigid board insulation, up to 2" 2000 SF 0043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56
2000 SF
0044 Demolition of rigid board insulation, wood fiber, up to 1" 540 SF
0045 Demolition of rigid board insulation wood fiber, up to 2' 270 SF
0046 Provide and install rigid board insulation, 1" Perlite, R2.78 60000 SF
0047 Demolition of rigid board insulation, Perlite, up to 2" 60000 SF
0048 Demolition of rigid board insulation, perlite, up to 1" 60000 SF
0049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14
60000 SF
0050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29
60000 SF
0051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate
660 BF
0052 Demolition of rigid insulation, up to 1" polyisocyanurate 660 SF
0053 Demolition of rigid insulation, up to 2" polyisocyanurate 40000 SF
0054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed
260 SQ
0055 Add 1 layer #15 felt for low/steep slope 260 SQ 0056 Demolition of asphalt shingles 23340 SF 0057 Provide and install glass roofing felt 34 SQ 0058 Provide and install glass roofing felt, mopped 34 SQ
0059 Provide and install organic roofing felt 34 SQ 0060 Provide and install organic roofing felt, mopped 6 SQ 0061 Install pitch pockets 140 EA 0062 Demolition of 3 ply built up roof with gravel 4000 SF 0063 Demolition of 3 ply built up roof with smooth surface 9340 SF
0064 Demolition of 4 ply built up roof with gravel 5340 SF 0065 Demolition of shingle, felt or roll roofing 340 SQ 0066 Demolition of gravel ballast 1340 CY 0067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies
14 SQ
0068 Demolition of 3 plies glass fiber felt 6 SQ 0069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations
6 SQ
0070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered
26 SQ
0071 Demolition of single ply roofing 5000 SF 0072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered
26 SQ
0073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached
26 SQ
0074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered
26 SQ
0075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered
26 SQ
0076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached
26 SQ
0077 Provide and install #15 organic felt, nailed to deck 340 SF
0078 Provide and install #15 organic felt, spot mopped to deck 3340 SF
0079 Provide and install #15 organic felt, fully mopped to deck 3340 SF
0080 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
9340 SF
0081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
9340 SF
0082 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty
9340 SF
0083 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty
9340 SF
0084 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty
9340 SF
0085 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced
10000 SF
0086 Demolition of modified bitumen roofing 1060 SF 0087 Demolition of thermoplastic roofing system 60 SQ 0088 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached
60 SQ
0089 Provide and install concrete pavers 2x2x1 1/2" 6 EA 0090 Remove and replace screws and new neoprene washers 3000 EA
0091 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system
13340 SF
0092 Framing system, light gage structural, 4 and 12 pitch 13340 SF
0093 Framing system, Sub-purlins, metal, 4" wide, 16 gage 460 LF
0094 Metal roof system, fascia, (Same as roof panels) 2600 SF 0095 Metal roof system, Perforated soffit panel, steel painted 2600 SF
0096 Provide and install ridge cap 1860 SF 0097 Demolition of ridge cap 1860 SF 0098 Demolition of PVC pipe flashing 120 EA 0099 Provide and install PVC pipe flashing, 90 mil thick, up to 4" diameter pipe
120 EA
0100 Demolition of copper flashing 34 SF 0101 Demolition of aluminum flashing 2340 SF 0102 Provide and install aluminum flashing, .032" thick 2340 SF 0103 Provide and install up to 4" diameter plumbing vent flashing 134 EA
0104 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish
234 LF
0105 Provide and install stainless steel flashing, .015" thick 260 SF
0106 Demolition of stainless steel flashing 260 SF
0107 Provide and install stainless steel flashing T-Section waterstop, 22 gauge
150 SF
0108 Provide and install stainless steel scupper outlets 10x10x4" 6 EA
0109 Demolition of scupper outlets 14 EA 0110 Provide and install stainless steel scupper outlets 22x14x4" 4 EA
0111 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered
4 EA
0112 Provide and install stainless steel flashing drip edge, 5" girth 260 LF
0113 Provide and install stainless steel flashing drip edge, 8" girth 26 LF
0114 Provide demolition of steel fascia 260 SF 0115 Demolition of gutters and downspouts 1340 LF 0116 Provide and install downspouts .024 aluminum, 3x4", enameled
260 LF
0117 Provide and install downspouts .025 aluminum, 4"x5" enameled
260 LF
0118 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel
260 LF
0119 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted
460 LF
0120 Provide and install gutter .027 thick 5" box type aluminum gutter
200 LF
0121 Provide and install gutter .032" thick 5" box type aluminum gutter, enamel painted
460 LF
0122 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter
134 LF
0123 Provide and install gutter 28 gauge 5" galvanized steel painted
134 LF
0124 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted
1000 LF
0125 Demolition of cast iron boots 12 EA 0126 Provide and install cast iron roof drainage boots 12 EA 0127 Provide and install metal equipment curb, painted up to
48"x48"
80 EA
0128 Demolition of metal equipment curb, painted up to 48"x48" 80 SF
0129 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish
1340 LF
0130 Demolition of gravel stops 1340 LF
0131 Provide and install coping cap, .050 aluminum, painted 1660 SF
0132 Remove and replace roof drains 44 EA 0133 Remove and reset curb and equipment, no electrical work included
30 EA
0134 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets
30 EA
0135 Remove and install mushroom vents 6 EA 0136 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen
1660 SF
0137 Gable louver, aluminum, painted, large with insect screen 20 EA
0138 Remove and reinstall ventilator 6 EA 0139 Provide continuous low profile ridge ventilator 20 EA 0140 Remove and reset ridge vent 6 EA 0141 Provide and install aluminum ridge vent, painted 60 LF 0142 Demolition of ridge vent 60 LF 0143 Demolition of soffit vents 60 LF 0144 Provide and install up to 3" aluminum soffit vent, mill or enamel finish
60 LF
0145 Provide and install under eave aluminum vent, mill finish 30 EA
0146 Demolition of eave vents 30 EA 0147 Provide and install expansion joint cover, roof to roof, aluminum
114 LF
0148 Provide and install expansion joint cover, roof to wall, aluminum
114 LF
0149 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick
500 LF
0150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick
20 LF
0151 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.
1000 SF
0152 Demolition of suspension system without lath, with channels 1000 SF
0153 Demolition of drywall 1000 SF
0154 Provide for ceiling installation. Add to cost of gypsum wallboard
60 SF
0155 Provide for ceiling over 8' in height. Add to cost of gypsum board
60 SF
0156 Provide and install gypsum wallboard 5/8" drywall, taped and finished
1000 SF
0157 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels
1000 SF
0158 Demolition of acoustical ceiling panels 1000 SF 0159 Pressure wash metal roof 30000 SF 0160 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat
2334 SF
0161 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint. Painting task includes protective work
260 SF
0162 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work
660 SF
0163 Provide individual tests for asbestos containing material.
Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer
5 EA
0164 Provide removal of asbestos containing roofing material;
built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.
20 SQ
0165 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestos abatement contractor.
334 SF
0166 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.
60 SF
0167 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer
14 EA
0168 Demolish pvc piping, up to 2" 26 LF 0169 Provide and install up to 2" pvc piping, schedule 40, include fittings
26 LF
0170 Extend galvanized plumbing vents, (3' to 7') 6 EA 0171 Extend hot flue stacks to 12" dia. (5' to 7') 4 EA 0172 Remove from roof air handler, refrigerant lines and reinstall 2 EA
0173 Extend duct work, insulated aluminum 50 LF 0174 Remove/reinstall lightning Protection System up to 25 points 25 EA
0175 Remove/reinstall LPS up to 100 points 75 EA 0176 Non-prepriced items LS 0177 Lightning Protection System. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection. Up to 100 points.
75 EA
SUBTOTAL FORT STEWART, BASE PERIOD (TOTAL OF LINE ITEMS 0001 THROUGH 0177)
IDIQ ROOFING, FORT STEWART, GEORGIA
Option Year 1
1001 Provide and install roof hatch, 36" x 30" 10 EA 1002 Provide and install gypsum deck plank 2" 1340 SF 1003 Demolition of gypsum deck, 2" 1340 SF 1004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized
2340 SF
1005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized
2340 SF
1006 Provide and install 3"x16 gauge open-type metal deck, galvanized
2340 SF
1007 Demolition of 3"x16 gauge open-type metal deck, galvanized 2340 SF
1008 Provide and install sheet metal patch, .020 galvanized 1140 SF
1009 Demolition of lumber up 2x10 2000 BF 1010 Provide and install lumber, treated up to 2x10 2000 BF 1011 Provide and install cant strips, treated 4 X 4, cut diagonally 2660 LF
1012 Demolition of cant strips 2660 LF 1013 Provide and install CDX plywood sheathing up to 3/4" 16000 SF
1014 Demolition of CDX plywood sheathing up to 3/4" 16000 SF 1015 Provide and install exterior trim, pine, corner board, 1x4 400 LF
1016 Demolition of exterior trim, pine, corner board, 1x4 400 LF
1017 Provide and install exterior trim, pine, corner board, 1x6 400 LF
1018 Demolition of exterior trim, pine, corner board, 1x6 400 LF
1019 Provide and install exterior trim, pine, fascia, 1x6 400 LF 1020 Demolition of exterior trim, pine, fascia, 1x6 400 LF 1021 Provide and install exterior trim, pine, fascia, 1x8 400 LF 1022 Demolition of exterior trim, pine, fascia, 1x8 400 LF 1023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11
2000 SF
1024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11
2000 SF
1025 Provide and install fiberglass flexible insulation 6" kraft faced 2000 SF
1026 Demolition of fiberglass flexible insulation 6" kraft faced 2000 SF
1027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11
2000 SF
1028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11
2000 SF
1029 Provide and install fiberglass flexible insulation 6" foil side R19
1030 Demolition of fiberglass flexible insulation 6" foil side, R19 2000 SF
1031 Provide and install flexible fiberglass insulation, 9" foil side, R30
2000 SF
1032 Demolition of 9" flexible fiberglass insulation, foil side, R30 2000 SF
1033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11
2000 SF
1034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11
2000 SF
1035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19
2000 SF
1036 Demolition of fiberglass flexible insulation 6" unfaced batt insulation, R19
2000 SF
1037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30
2000 SF
1038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30
2000 SF
1039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia
1000 SF
1040 Demolition of soffit, perforated or solid, and fascia 1000 SF
1041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78
1340 SF
1042 Demolition of rigid board insulation, up to 2" 2000 SF 1043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56
2000 SF
1044 Demolition of rigid board insulation, wood fiber, up to 1" 540 SF
1045 Demolition of rigid board insulation wood fiber, up to 2' 270 SF
1046 Provide and install rigid board insulation, 1" Perlite, R2.78 60000 SF
1047 Demolition of rigid board insulation, Perlite, up to 2" 60000 SF
1048 Demolition of rigid board insulation, perlite, up to 1" 60000 SF
1049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14
60000 SF
1050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29
60000 SF
1051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate
660 BF
1052 Demolition of rigid insulation, up to 1" polyisocyanurate 660 SF
1053 Demolition of rigid insulation, up to 2" polyisocyanurate 40000 SF
1054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed
260 SQ
1055 Add 1 layer #15 felt for low/steep slope 260 SQ 1056 Demolition of asphalt shingles 23340 SF 1057 Provide and install glass roofing felt 34 SQ 1058 Provide and install glass roofing felt, mopped 34 SQ 1059 Provide and install organic roofing felt 34 SQ 1060 Provide and install organic roofing felt, mopped 6 SQ 1061 Install pitch pockets 140 EA 1062 Demolition of 3 ply built up roof with gravel 4000 SF 1063 Demolition of 3 ply built up roof with smooth surface 9340 SF
1064 Demolition of 4 ply built up roof with gravel 5340 SF 1065 Demolition of shingle, felt or roll roofing 340 SQ 1066 Demolition of gravel ballast 1340 CY 1067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies
14 SQ
1068 Demolition of 3 plies glass fiber felt 6 SQ 1069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations
6 SQ
1070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered
26 SQ
1071 Demolition of single ply roofing 5000 SF 1072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered
26 SQ
1073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached
26 SQ
1074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered
26 SQ
1075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered
26 SQ
1076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached
26 SQ
1077 Provide and install #15 organic felt, nailed to deck 340 SF
1078 Provide and install #15 organic felt, spot mopped to deck 3340 SF
1079 Provide and install #15 organic felt, fully mopped to deck 3340 SF
1080 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
9340 SF
1081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
9340 SF
1082 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty
9340 SF
1083 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty
9340 SF
1084 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty
9340 SF
1085 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced
10000 SF
1086 Demolition of modified bitumen roofing 1060 SF 1087 Demolition of thermoplastic roofing system 60 SQ 1088 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached
60 SQ
1089 Provide and install concrete pavers 2x2x1 1/2" 6 EA 1090 Remove and replace screws and new neoprene washers 3000 EA
1091 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system
13340 SF
1092 Framing system, light gage structural, 4 and 12 pitch 13340 SF
1093 Framing system, Sub-purlins, metal, 4" wide, 16 gage 460 LF
1094 Metal roof system, fascia, (Same as roof panels) 2600 SF 1095 Metal roof system, Perforated soffit panel, steel painted 2600 SF
1096 Provide and install ridge cap 1860 SF 1097 Demolition of ridge cap 1860 SF 1098 Demolition of PVC pipe flashing 120 EA
1099 Provide and install PVC pipe flashing, 90 mil thick, up to 4" diameter pipe
120 EA
1100 Demolition of copper flashing 34 SF 1101 Demolition of aluminum flashing 2340 SF 1102 Provide and install aluminum flashing, .032" thick 2340 SF 1103 Provide and install up to 4" diameter plumbing vent flashing 134 EA
1104 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish
234 LF
1105 Provide and install stainless steel flashing, .015" thick 260 SF
1106 Demolition of stainless steel flashing 260 SF 1107 Provide and install stainless steel flashing T-Section waterstop, 22 gauge
150 SF
1108 Provide and install stainless steel scupper outlets 10x10x4" 6 EA
1109 Demolition of scupper outlets 14 EA 1110 Provide and install stainless steel scupper outlets 22x14x4" 4 EA
1111 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered
4 EA
1112 Provide and install stainless steel flashing drip edge, 5" girth 260 LF
1113 Provide and install stainless steel flashing drip edge, 8" girth 26 LF
1114 Provide demolition of steel fascia 260 SF 1115 Demolition of gutters and downspouts 1340 LF 1116 Provide and install downspouts .024 aluminum, 3x4", enameled
260 LF
1117 Provide and install downspouts .025 aluminum, 4"x5" enameled
260 LF
1118 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel
260 LF
1119 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted
460 LF
1120 Provide and install gutter .027 thick 5" box type aluminum gutter
200 LF
1121 Provide and install gutter .032" thick 5" box type aluminum gutter, enamel painted
460 LF
1122 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter
134 LF
1123 Provide and install gutter 28 gauge 5" galvanized steel painted
134 LF
1124 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted
1000 LF
1125 Demolition of cast iron boots 12 EA 1126 Provide and install cast iron roof drainage boots 12 EA 1127 Provide and install metal equipment curb, painted up to
48"x48"
80 EA
1128 Demolition of metal equipment curb, painted up to 48"x48" 80 SF
1129 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish
1340 LF
1130 Demolition of gravel stops 1340 LF 1131 Provide and install coping cap, .050 aluminum, painted 1660 SF
1132 Remove and replace roof drains 44 EA 1133 Remove and reset curb and equipment, no electrical work included
30 EA
1134 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets
30 EA
1135 Remove and install mushroom vents 6 EA 1136 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen
1660 SF
1137 Gable louver, aluminum, painted, large with insect screen 20 EA
1138 Remove and reinstall ventilator 6 EA 1139 Provide continuous low profile ridge ventilator 20 EA 1140 Remove and reset ridge vent 6 EA 1141 Provide and install aluminum ridge vent, painted 60 LF 1142 Demolition of ridge vent 60 LF 1143 Demolition of soffit vents 60 LF 1144 Provide and install up to 3" aluminum soffit vent, mill or enamel finish
60 LF
1145 Provide and install under eave aluminum vent, mill finish 30 EA
1146 Demolition of eave vents 30 EA 1147 Provide and install expansion joint cover, roof to roof, aluminum
114 LF
1148 Provide and install expansion joint cover, roof to wall, aluminum
114 LF
1149 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick
500 LF
1150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick
20 LF
1151 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.
1000 SF
1152 Demolition of suspension system without lath, with channels 1000 SF
1153 Demolition of drywall 1000 SF 1154 Provide for ceiling installation. Add to cost of gypsum wallboard
60 SF
1155 Provide for ceiling over 8' in height. Add to cost of gypsum board
60 SF
1156 Provide and install gypsum wallboard 5/8" drywall, taped and finished
1000 SF
1157 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels
1000 SF
1158 Demolition of acoustical ceiling panels 1000 SF 1159 Pressure wash metal roof 30000 SF 1160 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat
2334 SF
1161 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint. Painting task includes protective work
260 SF
1162 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work
660 SF
1163 Provide individual tests for asbestos containing material.
Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer
5 EA
1164 Provide removal of asbestos containing roofing material;
built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.
20 SQ
1165 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestos abatement contractor.
334 SF
1166 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.
60 SF
1167 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer
14 EA
1168 Demolish pvc piping, up to 2" 26 LF 1169 Provide and install up to 2" pvc piping, schedule 40, include fittings
26 LF
1170 Extend galvanized plumbing vents, (3' to 7') 6 EA 1171 Extend hot flue stacks to 12" dia. (5' to 7') 4 EA 1172 Remove from roof air handler, refrigerant lines and reinstall 2 EA
1173 Extend duct work, insulated aluminum 50 LF 1174 Remove/reinstall lightning Protection System up to 25 points 25 EA
1175 Remove/reinstall LPS up to 100 points 75 EA 1176 Non-prepriced items LS 1177 Lightning Protection System. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection. Up to 100 points.
SUBTOTAL FORT STEWART, 1ST YEAR OPTION PERIOD (TOTAL OF LINE ITEMS 1001 THROUGH 1177)
Option Year 2
2001 Provide and install roof hatch, 36" x 30" 10 EA 2002 Provide and install gypsum deck plank 2" 1340 SF 2003 Demolition of gypsum deck, 2" 1340 SF 2004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized
2340 SF
2005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized
2340 SF
2006 Provide and install 3"x16 gauge open-type metal deck, galvanized
2340 SF
2007 Demolition of 3"x16 gauge open-type metal deck, galvanized 2340 SF
2008 Provide and install sheet metal patch, .020 galvanized 1140 SF
2009 Demolition of lumber up 2x10 2000 BF 2010 Provide and install lumber, treated up to 2x10 2000 BF 2011 Provide and install cant strips, treated 4 X 4, cut diagonally 2660 LF
2012 Demolition of cant strips 2660 LF 2013 Provide and install CDX plywood sheathing up to 3/4" 16000 SF
2014 Demolition of CDX plywood sheathing up to 3/4" 16000 SF 2015 Provide and install exterior trim, pine, corner board, 1x4 400 LF
2016 Demolition of exterior trim, pine, corner board, 1x4 400 LF
2017 Provide and install exterior trim, pine, corner board, 1x6 400 LF
2018 Demolition of exterior trim, pine, corner board, 1x6 400 LF
2019 Provide and install exterior trim, pine, fascia, 1x6 400 LF 2020 Demolition of exterior trim, pine, fascia, 1x6 400 LF 2021 Provide and install exterior trim, pine, fascia, 1x8 400 LF 2022 Demolition of exterior trim, pine, fascia, 1x8 400 LF
2023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11
2000 SF
2024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11
2000 SF
2025 Provide and install fiberglass flexible insulation 6" kraft faced 2000 SF
2026 Demolition of fiberglass flexible insulation 6" kraft faced 2000 SF
2027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11
2000 SF
2028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11
2000 SF
2029 Provide and install fiberglass flexible insulation 6" foil side R19
2000 SF
2030 Demolition of fiberglass flexible insulation 6" foil side, R19 2000 SF
2031 Provide and install flexible fiberglass insulation, 9" foil side, R30
2000 SF
2032 Demolition of 9" flexible fiberglass insulation, foil side, R30 2000 SF
2033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11
2000 SF
2034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11
2000 SF
2035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19
2000 SF
2036 Demolition of fiberglass flexible insulation 6" unfaced batt insulation, R19
2000 SF
2037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30
2000 SF
2038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30
2000 SF
2039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia
1000 SF
2040 Demolition of soffit, perforated or solid, and fascia 1000 SF
2041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78
1340 SF
2042 Demolition of rigid board insulation, up to 2" 2000 SF 2043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56
2044 Demolition of rigid board insulation, wood fiber, up to 1" 540 SF
2045 Demolition of rigid board insulation wood fiber, up to 2' 270 SF
2046 Provide and install rigid board insulation, 1" Perlite, R2.78 60000 SF
2047 Demolition of rigid board insulation, Perlite, up to 2" 60000 SF
2048 Demolition of rigid board insulation, perlite, up to 1" 60000 SF
2049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14
60000 SF
2050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29
60000 SF
2051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate
660 BF
2052 Demolition of rigid insulation, up to 1" polyisocyanurate 660 SF
2053 Demolition of rigid insulation, up to 2" polyisocyanurate 40000 SF
2054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed
260 SQ
2055 Add 1 layer #15 felt for low/steep slope 260 SQ 2056 Demolition of asphalt shingles 23340 SF 2057 Provide and install glass roofing felt 34 SQ 2058 Provide and install glass roofing felt, mopped 34 SQ 2059 Provide and install organic roofing felt 34 SQ 2060 Provide and install organic roofing felt, mopped 6 SQ 2061 Install pitch pockets 140 EA 2062 Demolition of 3 ply built up roof with gravel 4000 SF 2063 Demolition of 3 ply built up roof with smooth surface 9340 SF
2064 Demolition of 4 ply built up roof with gravel 5340 SF 2065 Demolition of shingle, felt or roll roofing 340 SQ 2066 Demolition of gravel ballast 1340 CY 2067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies
14 SQ
2068 Demolition of 3 plies glass fiber felt 6 SQ 2069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations
6 SQ
2070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered
26 SQ
2071 Demolition of single ply roofing 5000 SF 2072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered
26 SQ
2073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached
26 SQ
2074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered
26 SQ
2075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered
26 SQ
2076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached
26 SQ
2077 Provide and install #15 organic felt, nailed to deck 340 SF
2078 Provide and install #15 organic felt, spot mopped to deck 3340 SF
2079 Provide and install #15 organic felt, fully mopped to deck 3340 SF
2080 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
9340 SF
2081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
9340 SF
2082 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty
9340 SF
2083 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty
9340 SF
2084 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty
9340 SF
2085 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced
10000 SF
2086 Demolition of modified bitumen roofing 1060 SF 2087 Demolition of thermoplastic roofing system 60 SQ 2088 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached
60 SQ
2089 Provide and install concrete pavers 2x2x1 1/2" 6 EA
2090 Remove and replace screws and new neoprene washers 3000 EA
2091 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system
13340 SF
2092 Framing system, light gage structural, 4 and 12 pitch 13340 SF
2093 Framing system, Sub-purlins, metal, 4" wide, 16 gage 460 LF
2094 Metal roof system, fascia, (Same as roof panels) 2600 SF 2095 Metal roof system, Perforated soffit panel, steel painted 2600 SF
2096 Provide and install ridge cap 1860 SF 2097 Demolition of ridge cap 1860 SF 2098 Demolition of PVC pipe flashing 120 EA 2099 Provide and install PVC pipe flashing, 90 mil thick, up to 4" diameter pipe
120 EA
2100 Demolition of copper flashing 34 SF 2101 Demolition of aluminum flashing 2340 SF 2102 Provide and install aluminum flashing, .032" thick 2340 SF 2103 Provide and install up to 4" diameter plumbing vent flashing 134 EA
2104 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish
234 LF
2105 Provide and install stainless steel flashing, .015" thick 260 SF
2106 Demolition of stainless steel flashing 260 SF 2107 Provide and install stainless steel flashing T-Section waterstop, 22 gauge
150 SF
2108 Provide and install stainless steel scupper outlets 10x10x4" 6 EA
2109 Demolition of scupper outlets 14 EA 2110 Provide and install stainless steel scupper outlets 22x14x4" 4 EA
2111 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered
4 EA
2112 Provide and install stainless steel flashing drip edge, 5" girth 260 LF
2113 Provide and install stainless steel flashing drip edge, 8" girth 26 LF
2114 Provide demolition of steel fascia 260 SF 2115 Demolition of gutters and downspouts 1340 LF 2116 Provide and install downspouts .024 aluminum, 3x4", enameled
260 LF
2117 Provide and install downspouts .025 aluminum, 4"x5" enameled
260 LF
2118 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel
260 LF
2119 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted
460 LF
2120 Provide and install gutter .027 thick 5" box type aluminum gutter
200 LF
2121 Provide and install gutter .032" thick 5" box type aluminum gutter, enamel painted
460 LF
2122 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter
134 LF
2123 Provide and install gutter 28 gauge 5" galvanized steel painted
134 LF
2124 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted
1000 LF
2125 Demolition of cast iron boots 12 EA 2126 Provide and install cast iron roof drainage boots 12 EA 2127 Provide and install metal equipment curb, painted up to
48"x48"
80 EA
2128 Demolition of metal equipment curb, painted up to 48"x48" 80 SF
2129 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish
1340 LF
2130 Demolition of gravel stops 1340 LF 2131 Provide and install coping cap, .050 aluminum, painted 1660 SF
2132 Remove and replace roof drains 44 EA 2133 Remove and reset curb and equipment, no electrical work included
30 EA
2134 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets
30 EA
2135 Remove and install mushroom vents 6 EA 2136 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen
1660 SF
2137 Gable louver, aluminum, painted, large with insect screen 20 EA
2138 Remove and reinstall ventilator 6 EA 2139 Provide continuous low profile ridge ventilator 20 EA 2140 Remove and reset ridge vent 6 EA 2141 Provide and install aluminum ridge vent, painted 60 LF 2142 Demolition of ridge vent 60 LF 2143 Demolition of soffit vents 60 LF
2144 Provide and install up to 3" aluminum soffit vent, mill or enamel finish
60 LF
2145 Provide and install under eave aluminum vent, mill finish 30 EA
2146 Demolition of eave vents 30 EA 2147 Provide and install expansion joint cover, roof to roof, aluminum
114 LF
2148 Provide and install expansion joint cover, roof to wall, aluminum
114 LF
2149 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick
500 LF
2150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick
20 LF
2151 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.
1000 SF
2152 Demolition of suspension system without lath, with channels 1000 SF
2153 Demolition of drywall 1000 SF 2154 Provide for ceiling installation. Add to cost of gypsum wallboard
60 SF
2155 Provide for ceiling over 8' in height. Add to cost of gypsum board
60 SF
2156 Provide and install gypsum wallboard 5/8" drywall, taped and finished
1000 SF
2157 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels
1000 SF
2158 Demolition of acoustical ceiling panels 1000 SF 2159 Pressure wash metal roof 30000 SF 2160 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat
2334 SF
2161 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint. Painting task includes protective work
260 SF
2162 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work
660 SF
2163 Provide individual tests for asbestos containing material.
Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer
5 EA
2164 Provide removal of asbestos containing roofing material;
built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.
20 SQ
2165 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestos abatement contractor.
334 SF
2166 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.
60 SF
2167 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer
14 EA
2168 Demolish pvc piping, up to 2" 26 LF 2169 Provide and install up to 2" pvc piping, schedule 40, include fittings
26 LF
2170 Extend galvanized plumbing vents, (3' to 7') 6 EA 2171 Extend hot flue stacks to 12" dia.