Solicitation.docx
DOCX document 19 KB Posted
- Attached to
- Bridgman Crystal Growth System Federal contract opportunity
- Solicitation number
- 1333ND20QNB640161
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend - Specifications.docx | DOCX document | |
| Provisions and Clauses.docx | DOCX document | |
| Specifications.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS/SOLICITATION 1333ND20QNB640161
Bridgman Crystal Growth System
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6- Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a separate written solicitation document will not be issued. This solicitation is being issued under the authority of FAR Part 13, Simplified Acquisition Procedures.
This solicitation is a Request for Quotations (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2020-04, effective 01/15/2020.
The associated North American Industrial Classification System (NAICS) code for this procurement is 333994 with a small business size standard of 500 employees. This acquisition will be competed as a Total Small Business Set-aside.
The National Institute of Standards and Technology’s (NIST) Materials Science and Engineering Division (MSED) is expanding facilities for fabrication of novel electronic materials to be provided to NIST Standards and Metrology Programs and other external collaborators from academia and industry. Therefore, MSED is developing growth of two-dimensional crystals from melts via Bridgman and direct solidification methods.
To meet mission requirements, MSED requires a crystal growth system that allows growing of single-crystalline ingots via the vertical Bridgman method. The principle of this method is a slow translation of an ampoule with a pre-synthesized melted material through a decreasing temperature gradient inside a furnace to form a single crystal during solidification. The system must comprise a vertical two-zone furnace equipped with a temperature controller, and a mechanical translation mechanism mounted on a floor stand.
The line item shall be in accordance with the following:
Line Item: Delivery of One Bridgman Crystal Growth System, in accordance with the specifications document, inclusive of F.O.B Destination Shipping, and Warranty.
Delivery The Bridgman Crystal Growth System must be delivered within 90 days of the award date. The items shall be shipped F.O.B Destination to:
The National Institute for Standards and Technology (NIST) Building 301, Loading Dock Attention: Sergiy Kryluk, 223/B112
FOB DESTINATION MEANS: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery.
EVALUATION CRITERIA
The Government intends to award a purchaser order resulting from this solicitation to the responsible Quoter whose quotation, conforming to the solicitation is the lowest priced, technically acceptable quotation.
Technically acceptable means that the Contractor provides a Bridgman system, meeting the requirements in the specifications document, and the requirements of the line item. If a Contractor does not indicate how its proposed system meets certain minimum requirement, NIST will determine it does not.
Price will be evaluated to determine the total price is consistent with the technical portion of the quotation and is a fair and reasonable overall price to the Government.
REQUIRED SUBMISSIONS
Contractors shall submit the following:
1. For the purpose of evaluating Technical Capability – Documentation including system requirements that confirms the Contractor has demonstrated the ability to deliver the requirements of the Bridgman system. Contractors shall include a copy of the quoted system’s manufacturer’s specifications, and Bridgman Crystal Growth Technical Drawings.
2. All equipment must be new. Used or remanufactured equipment will not be considered for award. Contractors shall provide a Firm-Fixed price quotation for the following line item:
Line Item 0001, Firm-Fixed Price: Delivery of one Bridgman system, meeting all requirements in accordance with the specifications document, inclusive of F.O.B destination shipping, and Warranty. $__________________total firm-fixed price.
3. A complete version of all required solicitation provisions (see attached provisions/clauses document – required submissions highlighted in blue).
4. If the contractor objects to any of the terms and conditions contained in this solicitation, the contract shall state, “The terms and conditions in this solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following.” [Contractor shall list exception(s) and rationale for the exception(s)].
It is the sole responsibility of the contractor to identify in their quote any exceptions to the terms and conditions of the solicitation. If the contractor does not include such a statement, the submission of a quotation in response to this solicitation will be regarded as the contractor’s acceptance of the Government’s terms and conditions for inclusion into the resultant purchase order.
5. Quoters shall provide an active DUNS# for the System for Award Management (SAM) registration. Quoters must have an active registration at www.SAM.Gov to submit a quotation.
Please note that this procurement IS NOT being conducted under the GSA Federal Supply Schedule (FSS) program or another Government-Wide Area Contract (GWAC). If a contractor submits a quotation based upon an FSS or GWAC contract, the Government will accept the quoted price. However, the terms and conditions stated herein will be included in any resultant Purchase Order, not the terms and conditions of the contractor’s FSS or GWAC contract, and the statement required above shall be included in the quotation;
DUE DATE FOR QUOTATIONS
E-mail quotations are required. All quotations must be submitted via e-mail to Tish Walker, Contract Specialist at latish.walker@nist.gov Submission must be received not later than 1:00 p.m. Eastern Time on Friday March 18, 2020. A quotation shall be considered received when it is received in the electronic inbox of Tish Walker, not later than the date and time identified herein.
All questions regarding this notice must be submitted via e-mail to latish.walker@nist.gov one week prior to the expiration of the solicitation. Questions submitted after this date may not be addressed by the Government prior to the quotation submission deadline.
PROVISIONS AND CLAUSES:
The clauses and provisions applicable to this solicitation can be found under Applicable Clauses & Provisions. The full text of a FAR provision or clause may be accessed electronically at https://farsite.hill.af.mil or www.acquisition.gov/far. The full text of a CAR provision or clause may be accessed electronically at https://farsite.hill.af.mil or http://www.osec.doc.gov/oam/acquistion_management/policy/.
ATTACHMENTS:
The following attachments apply to this solicitation:
1. Specifications Document
2. Applicable Clauses & Provisions
File details come from the government source that posted it. Updated .