Solicitation attachments for FA8117-20-R-0018.pdf

PDF 1 MB Posted

Attached to
Repair of B-1 Torque Motors
Solicitation number
FA8117-20-R-0018
Issued by

View the file

Other files

File Type Posted
FA8117-20-R-0018-0001 RFP Extension 15 June 1200 PM CDT.pdf PDF
FA8117-20-R-0018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Motor, Torque

E. CONTRACT / PR NO.

FD20302000445

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility (CAV) Reporting

3. SUBTITLE

CFM End Item Reporting

4. AUTHORITY

DI-MGMT-81838

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

See Block 16

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

Seee Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 07 FEB 2020DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 5: Contract Reference: PWS and CAV AF Reporting Requirements Document.

2. Block 4: All reporting shall be submitted in the English Language.

3. Blocks 10, 11, 12, 13:

a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.

b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.

c. Data shall be current within 24 hours of the last End Item maintenance occurrence.

4. Blocks 7, 8, 14:

a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.

b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.

c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address: jeremy.marshall.5@us.af.mil

5. Block 14 Distribution, b. COPIES, Final, for entire duration of contract and/or all of contract.

COORDINATORS:

Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 13 FEB 2020

See Block 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

13 FEB 2020

I. APPROVED BY

//DIGITALLY SIGNED//

TATE.ANTHONY.DON.1124023900

424 SCMS / GUBAB 405-739-2266 / 339-2266

J. DATE

13 FEB 2020

Page 1 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Mar 2020

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Motor, Torque

E. CONTRACT / PR NO.

FD20302000445

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM Production Monthly Status Report

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 07 FEB 2020DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reporting shall be submitted in the English Language.

b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

2. Blocks 10, 11, 12, 13:

a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.

b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS).

c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".

3. Block 9:

a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN.

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.

2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:

jeremy.marshall.5@us.af.mil

See Block 16 0 1 0

0 1 015. TOTAL

Page 2 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Mar 2020

5. Block 14 Distribution, b. COPIES, Final, for entire duration of contract and/or all of contract.

COORDINATORS:

Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 13 FEB 2020

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

13 FEB 2020

I. APPROVED BY

//DIGITALLY SIGNED//

TATE.ANTHONY.DON.1124023900

424 SCMS / GUBAB 405-739-2266 / 339-2266

J. DATE

13 FEB 2020

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Motor, Torque

E. CONTRACT / PR NO.

FD20302000445

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

Annual Government Property Physical

4. AUTHORITY

DI-MGMT-80441C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ANNLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 07 FEB 2020DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reports shall be submitted in the English Language.

2. Blocks 10, 11, 12, 13:

a. This report will be provided annually. Reporting Period is one year.

b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.

c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.

3. Block 9:

a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN.

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.

Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:

jeremy.marshall.5@us.af.mil

5. Block 14 Distribution, b. COPIES, Final, for entire duration of contract and/or all of contract.

See Block 16 0 1 0

0 1 015. TOTAL

Page 3 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Mar 2020

COORDINATORS:

Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 13 FEB 2020

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

13 FEB 2020

I. APPROVED BY

//DIGITALLY SIGNED//

TATE.ANTHONY.DON.1124023900

424 SCMS / GUBAB 405-739-2266 / 339-2266

J. DATE

13 FEB 2020

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Motor, Torque

E. CONTRACT / PR NO.

FD20302000445

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Teardown Deficiency Report

3. SUBTITLE

TDR

4. AUTHORITY

DI-PSSS-81534A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 01 OCT 2019DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN.

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.

Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.

BLOCKS 10, 11, 12, and 13: To be negotiated upon government's request.

Block 14 Distribution, b. COPIES, Final, for entire duration of contract and/or all of contract.

COORDINATORS:

Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 13 FEB 2020

422 SCMS/GUME

3001 Staff Drive, Annex 4, Suite 1AF1 92B Tinker AFB, OK 73145-3033 Attention : Jeremy P. Marshall

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

13 FEB 2020

I. APPROVED BY

//DIGITALLY SIGNED//

TATE.ANTHONY.DON.1124023900

424 SCMS / GUBAB 405-739-2266 / 339-2266

J. DATE

13 FEB 2020

Page 4 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Mar 2020

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Motor, Torque

E. CONTRACT / PR NO.

FD20302000445

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan (CPP)

3. SUBTITLE

CPP

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 07 FEB 2020DATE:

Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN.

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.

Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award. (FA8117)

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

Block 14 Distribution, b. COPIES, Final, for entire duration of contract and/or all of contract.

DID Requirements NOT Tailored

Delivery CANNOT Be Deferred

COORDINATORS:

Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 13 FEB 2020

422 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

13 FEB 2020

I. APPROVED BY

//DIGITALLY SIGNED//

TATE.ANTHONY.DON.1124023900

424 SCMS / GUBAB 405-739-2266 / 339-2266

J. DATE

13 FEB 2020

Page 5 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Mar 2020

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Motor, Torque

E. CONTRACT / PR NO.

FD20302000445

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Production Surge Plan

3. SUBTITLE

Capability Analysis Plan (CAP)

4. AUTHORITY

DI-MGMT-80969

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 07 FEB 2020DATE:

In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.

Block 9: Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 422 SCMS/GUEA.

Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award.

This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.

This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.

5. Block 14 Distribution, b. COPIES, Final, for entire duration of contract and/or all of contract.

COORDINATORS:

Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 13 FEB 2020

422 SCMS/GUME

3001 Staff Drive, Annex 4, Suite 1AF192B Tinker AFB, OK 73145-3033 Attention: Jeremy P. Marshall

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

13 FEB 2020

I. APPROVED BY

//DIGITALLY SIGNED//

TATE.ANTHONY.DON.1124023900

424 SCMS / GUBAB 405-739-2266 / 339-2266

J. DATE

13 FEB 2020

Page 6 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Mar 2020

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Motor, Torque

E. CONTRACT / PR NO.

FD20302000445

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Quality Deficiency Report

3. SUBTITLE

N/A

4. AUTHORITY

DI-QCIC-80736

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASGEN

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Generated

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 07 FEB 2020DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 422 SCMS/GUEA, Tinker Air Force Base, Oklahoma (14 January 2020).

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.

Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.

BLOCKS 10, 11, 12, and 13: As defined by TO 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF Form 368.

BLOCK 14: E- mail copies to addressees per attached Distribution Matrix.

Block 14 Distribution, b. COPIES, Final, for entire duration of contract and/or all of contract.

FOB: ORIGIN

COORDINATORS:

Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 13 FEB 2020

422 SCMS/GUME 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

13 FEB 2020

I. APPROVED BY

//DIGITALLY SIGNED//

TATE.ANTHONY.DON.1124023900

424 SCMS / GUBAB 405-739-2266 / 339-2266

J. DATE

13 FEB 2020

Page 7 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Mar 2020

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Motor, Torque

E. CONTRACT / PR NO.

FD20302000445

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Engineering Change Proposal (ECP)

3. SUBTITLE

N/A

4. AUTHORITY

DI-SESS-80639D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 01 OCT 2019DATE:

Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN.

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.

Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.

Contractor's format is acceptable.

Block 14 Distribution, b. COPIES, Final, for entire duration of contract and/or all of contract.

COORDINATORS:

Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 13 FEB 2020

422 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73115-3033

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

13 FEB 2020

I. APPROVED BY

//DIGITALLY SIGNED//

TATE.ANTHONY.DON.1124023900

424 SCMS / GUBAB 405-739-2266 / 339-2266

J. DATE

13 FEB 2020

Page 8 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Mar 2020

DATA ITEM DESCRIPTION

Title: GOVERNMENT PROPERTY INVENTORY REPORT

Number: DI-MGMT-80441C Approval Date: 20171101 AMSC Number: 9865 Limitation:

DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2017-059 Applicable Forms: None

Use/Relationship: This report enables the contractor to periodically provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.

This DID is applicable to all contracts where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.

This DID contains the format and content preparation instructions for the data deliverable resulting from the work task described in the solicitation.

This DID supersedes DI-MGMT-80441B.

Requirements:

1. Format. The report shall be electronic .xls or .xlsx compatible.

2. Content. The report shall contain the following columns/data fields:

A. Contract Number B. Manufacturer CAGE Code (if known) C. Item Name D. Item Description E. Manufacturer Name F. Manufacturer Part Number G. Manufacturer Model Number H. Material Control Number (MCN) (if applicable) I. Serial Number J. National Stock Number (NSN) K. Quantity L. Unit of Measure M. Unit Acquisition Cost N. Location O. Sub Location (if applicable) P. Unique Item Identifier (as registered in the IUID Registry) Q. Type of Government Property (i.e., Government Furnished Property (GFP) or

Contractor Acquired Property (CAP) R. Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling

(ST))

Source: https://assist.dla.mil -- Downloaded: 2018-05-22T20:41Z Check the source to verify that this is the current version before use.

DI-MGMT-80441C

S. Posting Reference T. Date of Transaction / Date of Acquisition U. Date Placed in Service V. Date of Last Physical Inventory W. Condition Code

END OF DI-MGMT-80441C

Source: https://assist.dla.mil -- Downloaded: 2018-05-22T20:41Z

Title: ENGINEERING CHANGE PROPOSAL (ECP)

Number: DI-SESS-80639D Approval Date: 20150407

AMSC Number: N9521 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: NM Project Number: SESS-2015-011

Applicable Forms: DD Form 1692, Engineering Change Proposal (ECP)

Use/relationship: An Engineering Change Proposal (ECP) provides the documentation in which the engineering change is described and how the proposed change will be implemented.

a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in paragraph 3.3.1 (1) of EIA-649-1 and the principles of EIA-649.

b. This DID may be used in conjunction with DI-SESS-80642, Notice of Revision (NOR). A requirement for

NORs should be contractually imposed in conjunction with this DID.

c. This DID supersedes DI-CMAN-80639C and DI-SESS-81880.

d. Copies of these standards are available online at http://www.sae.org or from SAE International, 400

Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 (inside USA and Canada) or 724-776-4970

(outside USA).

e. An electronic version of DD Form 1692, Engineering Change Proposal (ECP), is available online at http://www.dtic.mil/whs/directives/forms/index.htm.

Requirements:

1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The ECP shall be in one of the following formats:

a. DD Form 1692, Engineering Change Proposal (ECP),

b. The schema required by the Acquirer’s Integrated Digital Environment (IDE), or

c. The Supplier’s preferred format.

3. Content. The ECP shall contain all the information in DD Form 1692.

End of DI-SESS-80639D

Source: https://assist.dla.mil -- Downloaded: 2015-05-19T14:32Z http://www.sae.org/ http://www.dtic.mil/whs/directives/forms/index.htm

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z

Title: TEARDOWN DEFICIENCY REPORT

Number: DI-PSSS-81534A Approved Date: 20160608 AMSC Number: F9670 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFLCMC/EZSC) Project Number: PSSS-2015-024 Applicable Forms: N/A Use/Relationship: The Teardown Deficiency Report provides a factual narrative analysis of a deficiency which has been noted on equipment.

a. This Data Item Description (DID) is applicable when contractors are responsible for maintaining custodial records for government property being repaired.

b. This DID contains the format, content and intended use information for the data deliverable resulting from the work task described in the solicitation.

c. This DID supersedes DI-ALSS-81534.

Requirements:

1. Reference documents. None.

2. Format. The Teardown Deficiency Report shall be in the contactor’s format.

3. Content. This report shall include an analysis of the deficiency which includes cause of failure, recommended corrective action and recommendations for actions to prevent recurrence of the failure/deficiency, and the applicable category of the failure defined as follows:

a. Workmanship and non-conformance. Any deficiency (e.g., physical, chemical, electrical, functional) noted in materiel which is attributed to non-conformance to applicable specifications, drawing, standards, or Technical Order (TO); or workmanship during manufacture, repair modification or maintenance.

b. Material failure. The failure of an end item which was attributable to neither the repair nor the manufacturing process, but was due to an unpredictable failure of an internal component or sub-assembly.

c. No defect found/could not duplicate: Investigation of the exhibit revealed no deficiency.

Equipment conforms to specifications and TO standards and procedures.

d. Technical data, deficiency: Technical data (including TOs, drawings, and work specifications) was deficient or inadequate so as to cause the deficiency/failure on the item.

e. Field induced deficiency. Deficiency confirmed by the investigation to have been caused by operator error, i.e., wrong voltage applied, misaligned, maladjusted, mishandling, or not used for intended purpose.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Source: https://assist.dla.mil -- Downloaded: 2016-06-27T17:52Z

DI-PSSS-81534A

f. Maintenance deficiency. An unfavorable characteristic of an item that impedes the accomplishment of maintenance operations which results in excessive maintenance operations and/or in excessive maintenance man-hour consumption.

g. Design deficiency. A condition that limits or prevents the use of material for purpose intended or required where the material meets all other specifications.

h. Handling or shipping deficiency. A deficiency induced by improper handling or shipping, i.e., improper packaging, which prohibits the use for intended purpose.

i. Packaging specifications inadequate - not complied with. Unsatisfactory conditions including item damage resulting from improper packaging.

End of DI-PSSS-81534A.

Source: https://assist.dla.mil -- Downloaded: 2016-06-27T17:52Z

TITLE: COUNTERFEIT PREVENTION PLAN

Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:

DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A

Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.

a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.

b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).

c. This DID is related to “As Designed” and “As Built” Parts List.

d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).

1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:

a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.

b. Procurement practices and internal processes used for exceptions to buying from

OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.

c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.

d. Training/certification program for receiving inspectors.

e. Process to verify counterfeit.

DI-MISC-81832

- 2 -

f. Processes to identify, store, and report counterfeit parts.

g. Process to ensure subcontracts contain the following requirements (As a minimum):

(1) Requirements to procure only from Original Equipment Manufacturer

(OEM) or OEM franchised distributors

(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained

(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain

(4) Training/certification program for receiving inspectors

(5) Process to verify counterfeit

(6) Processes to identify, store, and report counterfeit parts.

(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)

h. Self-audit of internal processes.

i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.

j. Notification Procedure:

(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.

(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.

Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.

DI-MISC-81832

- 3 -

(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:

a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information

b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence

c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)

d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests

e. List of company products affected

(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)

(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.

(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team

END OF DI-MISC-81832

Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT

Number: DI-PSSS-81995 Approved Date: 20150904 AMSC Number: 9576 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID may be used on any depot level maintenance contract.

Requirements:

1. Format. This report shall be provided in the format of Table I.

2. Content. The report shall consist of two parts and contain the following information:

a. Part I:

(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.

(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.

(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.

(4) Block 3, Contract number and Program or Weapon System supported.

(5) Block 4, Government item manager or technical Point of Contact.

(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.

(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.

(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:42Z

DI-PSSS-81995

(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.

(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.

(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.

(12) Block G, Reparables inducted into repair during report month.

(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.

(14) Block I, Quantity produced. The quantity produced during the month.

(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.

(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.

(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.

(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.

(19) Block N, Report date. Enter date of report.

b. Part II, Production problems. Report shall be in narrative format and only required if:

(1) Previous reports production forecast was not shipped.

(2) Current forecast does not equal contract scheduled quantity.

(3) Contract anticipates a problem in the near future.

TABLE I. Contract Depot Maintenance (CDM) Production Report format.

CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT Month and As-Of Date

(YYYYMMDD)

Part I

1. ISSUED BY: 2. CONTRACTOR AND ACTIVITY ADDRESS CODE 3. CONTRACT NUMBER/PRGM/WS 4. GOVERNMENT ITEM MANAGER OR TECHNICAL POC

DURING REPORT PERIOD/TOTAL TO DATE

A.

ITEM

IDENTIFICATION

B.

DELIVERY/

CALL NUMBER

C.

CONTRACT

LINE ITEM

(CLIN)

D.

DOCUMENT/

VOUCHER

NUMBER

E.

QTY ON

CONTRACT

OR

DO/CALL

F.

REPARABLES

RECEIVED

G.

QTY

IND TO

WORK

H.

REPS ON

HAND

I.

QTY

PROD

J.

SERVICEABLES

SHIPPED

K.

SERV ON

HAND

L.

QTY

CONDEMNED

M.

FORECAST PROD

N.

REPORT DATE

FSC NIIN

1 2 1 2 3 1 2 1 2 1 2

Part II, Production Summary

End of DI-PSSS-81995.

Title: COMMERCIAL ASSET VISIBILITY (CAV) REPORTING

Number: DI-MGMT-81838 Approval Date: 20110914 AMSC Number: N9211 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: SA/WSS 071.02 Applicable Forms: N/A

Use/relationship:

The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors. CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement, as delineated in the contract.

1. Format. The CAV System transactions are processed via the World Wide Web. Input formats and methodology are defined in the Contract Statement of Work.

2. Content. The Contractor reporting shall contain the following transactions, status code changes and report types, as described in the Contract Statement of Work:

A. Receipt of Asset

1) On Contract

2) Not on Contract

3) Procurement

4) "A" Condition

5) Rotable Pool

6) Loaned Asset

B. Inductions C. Items Awaiting Parts D. Re-inductions E. Completions F. Shipments

Source: http://assist.dla.mil -- Downloaded: 2019-05-06T18:27Z

DI-MGMT-81838

G. Bulk Shipments H. Proof of Shipment I. Items that are Beyond Economic Repair (BER) J. Survey/Scrap Items K. Reversals L. Report of Discrepancies M. Print DD Form 1348's N. Print Material Movement Documents O. Print CAV Inventory Labels P. Print Item Action Reports Q. Print Repair History Reports R. Print Condition Code Reports S. Print Awaiting Parts Report T. Print Proof of Shipment Reports U. Perform Item Maintenance V. Print Report of Discrepancies (RODs) W. Add and Delete Carriers

3. End of DI-MGMT-81838.

Source: http://assist.dla.mil -- Downloaded: 2019-05-06T18:27Z

PACKAGING REQUIREMENTS

PURCHASE INSTRUMENT NUMBER: FD20302000445-00 VERSION: 2

MIL-STD 129 REVISION: R MIL-STD 2073-1 REVISION: E

THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES RESULTING IN SHIPMENTS WORLDWIDE (DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES). WOODEN LUMBER, WOODEN

PALLET AND PACKAGING/CONTAINER STATEMENT:

ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES" (ISPM)NO.15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."

PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:

AAC MIL Long Line Packaging MIL B

ITEM(S):

6105012328318NT 6105012328319NT 6105DTH20002E 6105OAH20000D 6105OAH20000E

CODED DATA:

QUP ICQ

PRES

METH CD

PRES

MTL

WRAP

MTL

CUSH

DUNN CT

UNIT

CONT

INT

CONT UCL

SPEC

MKG

UNIT PACK

WEIGHT

UNIT PACK

LENGTH

UNIT PACK

WIDTH

UNIT PACK

DEPTH

UNIT PACK

CUBE OPI

1 AAA GX 1 00 K3 NB B NS 00 B 39 1.00 9.3 6.3 3.0 0.101 M

ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:

SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:

VENDOR PACKAGING INSTRUCTIONS:

Military Packaging and Marking Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.

Shipping Container Marking Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.

ORGANIZATION / OFFICE SYMBOL:

406 SCMS / GULAA

PACKAGING SPECIALIST:

Strain, Verlisher M

PHONE NUMBER:

405-582-9761 / 852-9761

SIGNATURE:

//SIGNED//Strain, Verlisher M

DATE:

20069 - 09 MAR 2020

Page 1 of 1AFMC 158 Version 2Generated by PRPS using Jasper Reports on 12 Mar 2020

5 Nov 2019 i

AIR FORCE SUSTAINMENT CENTER

TINKER AIR FORCE BASE, OKLAHOMA 73145

Performance Work Statement (PWS)

TYPE OF WORK: Repair of Torque Motor

PURCHASE REQUEST: FD2030-20-00445

REVISION: 00 DATE: 20190920

PREPARED BY:

Frank Deitchman

422 SCMS/GUMB

TINKER AFB, OK. 73145-3031

DSN 852-5247

ii

REVISION SHEET

Note: All revisions to the contents of this PWS will now be listed on this Revision Sheet. The original content of this PWS will not be removed, but will be superseded or added to by the paragraph revisions shown on this page.

Revision Date Paragraph Paragraph is added or revised to read as follows:

iii

PREFACE SHEET

END ITEM RECEIVED AS END ITEM TO BE DELIVERED AS

END

ITEM NO

NATIONAL STOCK

NO(S)

PART NO(S) NATIONAL STOCK

NO(S)

PARTS NO(S)

0001 6105-01-232-8318 8541W32G700 6105-01-232-8318 8541W32G700 0002 6105-01-232-8319 8541W32G701 6105-01-232-8319 8541W32G701 iv

Table of Contents

REVISION SHEET ii

PREFACE SHEET iii

1 DESCRIPTION OF SERVICES/GENERAL INFORMATION 1

1.1 PURPOSE 1

1.2 QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS 1

1.3 OBSOLESCENCE STATEMENT 2

1.4 CONDEMNATION CANDIDATES 3

1.5 SUPPORT EQUIPMENT (SE), INCLUDING SPECIAL TOOLS (ST) AND SPECIAL TEST

EQUIPMENT (STE) 3

1.6 NUCLEAR HARDNESS REQUIREMENT 4

1.7 CONFIGURATION MANAGEMENT 4

1.8 PARTS CONTROL PROGRAM 5

1.9 COUNTERFEIT PREVENTION PLAN (CPP). 5

1.10 LEAD (Pb) FREE ELECTRONICS 8

1.11 CONTRACTOR IDENTIFICATION 8

1.12 GENERAL WORK REQUIREMENTS 8

1.13 SPECIFIC WORK REQUIREMENTS 9

1.14 SPECIAL REQUIREMENTS 12

1.15 SAFETY AND HEALTH REQUIREMENTS 12

1.16 PRODUCTION SURGE PLAN 13

1.17 MISSION ESSENTIAL SERVICES 14

1.18 DELIVERY SCHEDULE 14

1.19 INFORMATION REQUESTS 14

1.20 REPORTING REQUIREMENTS 14

2 SERVICE SUMMARY 15

2.1 SERVICE SUMMARY 16

3 GOVERNMENT PROPERTY 18

3.1 GOVERNMENT FURNISHED MATERIAL, EQUIPMENT, AND PROPERTY 18

3.2 DISPOSITION OF GOVERNMENT PROPERTY 18

3.3 REPORTING LOSS OF GOVERNMENT PROPERTY 19

3.4 DISCREPANCIES INCIDENT TO SHIPMENT 20

v

APPENDIX A – Definitions 21

APPENDIX B – Applicable Documents, Technical Orders, Directives, and Technical Guidance 25

APPENDIX C – Contractor Full-Time Equivalent Reporting 28

APPENDIX D – Data Item Description (DID) List 29

APPENDIX E – Category of Repair Descriptions 37

APPENDIX F CAVAF CFM Reporting Requirements 39

1 DESCRIPTION OF SERVICES/GENERAL INFORMATION

1.1 PURPOSE

1.1.1 The purpose of the Performance Work Statement (PWS) is to define the repair requirements for the items specified on the Preface Sheet of this PWS. The Contractor is responsible for having the repair capabilities to include appropriate technical data, repair documents, and license agreements, required to accomplish this repair. The Contractor is responsible for the scheduled delivery of a quality product.

1.2 QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS

1.2.1 The Contractor shall establish, document, and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. Each end-item identified to the Government shall be inspected and delivered to the Government as serviceable asset. The quality system shall be in accordance with contract requirements.

1.2.2 The Contractor shall assist the Defense Contract Management Agency (DCMA) investigation of all Deficiency Reports (DRs) submitted against reportedly defective items repaired by the Contractor to determine the root cause for deficiencies reported by the customer. The Contractor shall ensure each DR is processed in accordance with (IAW) T.O. 00-35D-54, USAF Deficiency Reporting and Investigating System, and investigation results reported IAW Data Item Description (DID) DI-QCIC-80736 within thirty (30) calendar days after receipt of a DR and/or (DID) DI-PSSS- 81534A within seven (7) calendar days of end of first reporting period. When the Contractor receives a DR, quality deficiency report (QDR) or teardown deficiency report (TDR), the Contractor shall ensure DRs include: Analysis of data to determine extent and cause of deficiencies, analysis of trends in processes or performance of work to prevent recurrence, and introduction of required improvement, corrections, and monitoring of the effectiveness of corrective action taken. Timely correction and reporting of defects found and corrective action to prevent repeated discrepancies shall be an integral part of the Contractor’s procedures.

Corrective action will extend to the performance of all subcontractors. When defective trends begin to develop or when the specific cause(s) of defects that render a product unserviceable cannot be identified and corrected without an evaluation of an exhibit, such exhibit(s) shall be requested by the Contractor for purposes of investigation.

1.2.3 The Contractor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .