About this file
This document is a Solicitation for a Portable Toilet Rental contract opportunity with the U.S. Coast Guard. The Coast Guard requires the rental of (2) Construction Lift Unit portable toilets with hand sanitizer for a one-year period of performance from 7/15/2024 to 7/14/2025. The toilets must be delivered by 7/20/2024 and cleaned weekly during normal working hours. Bidders are asked to provide pricing for the base rental, 12 additional weekly cleanings as needed, and optional weekly or monthly rental extensions. This is a competitive solicitation seeking the lowest priced, technically acceptable offer, evaluated solely on price and responsibility factors. All responsible sources may submit a quote, which must be received by 7/25/2024 at 9:00 AM Eastern. Payment will be made by government purchase order on a net 30-day basis after delivery and acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOLICITATION ATTACHMENT FAR CLAUSES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Portable Toilet Rental SOW In accordance with PR 2124404Y61A3799002
Overview: The CG Yard needs Portable Toilets to place at various locations during major overhaul projects. CGC Horsley will require (2) Construction Lift Units that can be lifted by overhead crane on and off the ship.
POC: Keith Hare 410-636-7603
| Line Items: | 1) Construction Lift Unit with Hand Sanitizer (2) Total | |
| 2) Additional Cleaning each week IF required |
Contractor shall provide and maintain the above line items IAW the following requirements:
A) Contractor shall deliver line item to the Yard IAW DMR.
B) Contractor shall call POC to verify date, time and location of delivery. Yard may at its desertion change date of delivery.
C) Upon delivery, contractor/delivery person shall meet with POC to ensure line item is delivered to proper location.
D) Contractor/delivery person shall have POC sign an invoice that references the PO # to acknowledge delivery.
E) Contractor shall clean line item weekly. Cleaning shall include emptying waste and renewing fluid and wiping the interior of the unit.
F) Hand sanitizer and toilet paper shall be refilled weekly.
G) POC shall call contractor when line item is no longer needed and ready to be picked up.
H) Contractor shall pick up line item within 72 hours of pick up call.
Period of Performance: 7/15/24 – 7/14/25
Portable Toilet units are required to be delivered NLT 7/20/24, unless instructed otherwise by the POC.
The contractor is responsible for picking up all containers after the Period of Performance has ended.
For bidding purposes, Line Item 2 shall be bid for (12) additional weekly cleanings.
Line Item 2 shall only be billed if contractor is called in to clean the units in addition to the original weekly requirement.