Solicitation Attachment 2 Profilometer Cost Breakout Sheet.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Profilometer Terrain Measurement System Federal contract opportunity
Solicitation number
W91CRB-26-R-A015
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This is a Cost Breakout Sheet template for a Profilometer Terrain Measurement System solicitation. The spreadsheet is designed for contractors to submit pricing information in a structured format with two primary pricing categories: a total price for the system at threshold level requirements and an itemized price breakout showing only the cost difference between threshold and objective level requirements. Contractors must price out 20 specific objective-level requirements identified as REQ-PM-01, REQ-PM-04, REQ-PM-07, REQ-SR-03 through REQ-SR-21 (with some gaps), and REQ-DR-02, REQ-DR-04, REQ-DR-06, and REQ-DR-07.

The template itself contains no pre-filled values, serving as a blank pricing submission tool for the Aberdeen Test Center's procurement of a highly mobile off-road terrain measurement system. The system will comprise a rugged prime mover vehicle and integrated data collection hardware and software, including micro-terrain measurement instrumentation and an Inertial Navigation System. Contractors responding to solicitation W91CRB-26-R-A015 issued by the Department of the Army Materiel Command, Army Contracting Command at Aberdeen Proving Ground must use this cost breakout sheet format to clearly differentiate between baseline threshold pricing and incremental objective-level pricing.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Breakout Sheet

Total Price for System$ - 0
Total Price for Threshold RequirementThis line will be your total Price of Threshold level Requirement
Price Breakout for Objective level requirementOnly Price out difference between threshold and objective difference requirement for the listed Objective REQs identified in the list below.
REQ-PM-01
REQ-PM-04
REQ-PM-07
REQ-SR-03
REQ-SR-04
REQ-SR-05
REQ-SR-07
REQ-SR-09
REQ-SR-10
REQ-SR-12
REQ-SR-13
REQ-SR-14
REQ-SR-17
REQ-SR-18
REQ-SR-19
REQ-SR-21
REQ-DR-02
REQ-DR-04
REQ-DR-06
REQ-DR-07

File details come from the government source that posted it. Updated .