This document contains details for a forthcoming federal solicitation seeking elevator modernization services. The General Services Administration's Public Buildings Service in Region 7 intends to issue a Request for Proposal to modernize four passenger and one freight elevator at the Shreveport Federal Courthouse in Louisiana, with an estimated construction cost between $1 million and $5 million. This is a 100% small business set-aside defined under NAICS code 238290. Interested parties should attend an optional site visit on April 11th, with the solicitation closing on April 27th. The solicitation and any amendments will be posted to SAM.gov. Questions must be submitted in writing. Firms must be registered in SAM and have completed online representations and certifications.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waste Diversion Plan
: +christopher.clever@gsa.gov +walter.tersch@gsa.gov
(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.
-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.
-Christopher Clever - PCBL That's correct.
| -Jake Begnaud - WPIDBB | Project Waste Management Plan | Submittal Type: | Waste Diversion Plan (Anticipated): | Waste Diversion Report (Final) : | |||
| The general info in these gray cells replicates onto the Report tabs. | |||||||
| Project Name: | ECC (estimated construction cost): | Project Manager: | ePM/ePMX Project # : | ||||
| Project Short Description: | PM email or phone: | gBUILD Project # : | |||||
| Building Number: | Service Center / Field Office: | Budget Activity: | (list all applicable) | RWA # : |
Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)
| Material* | |||||
| (see weight conversion factors below) | Diversion Method | Target Diversion Rate for each material, by weight | |||
| (Change to actual target(s) as needed) | Diverted (lbs) | Landfilled (lbs) | Total C&D material weight (Diverted + Landfilled) (lbs) | Diversion |
Rate
| Reuse* | Recycle or Compost | Donation | ||||||
| Asphalt | 50% | 0 | 0 | 0 | n/a | |||
| Brick, Masonry, and Tile | 50% | 0 | 0 | 0 | n/a | |||
| Cardboard | 50% | 0 | 0 | 0 | n/a | |||
| Carpet, including Padding | 50% | 0 | 0 | 0 | n/a | |||
| Ceiling tile | 50% | 0 | 0 | 0 | n/a | |||
| Concrete | 50% | 0 | 0 | 0 | n/a | |||
| Drywall/ sheetrock (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Metals | 50% | 0 | 0 | 0 | n/a | |||
| Painted wood, drywall, or plywood | 50% | 0 | 0 | 0 | n/a | |||
| Reusable items | 50% | 0 | 0 | 0 | n/a | |||
| Roofing | 50% | 0 | 0 | 0 | n/a | |||
| Soil, Rock, Land Clearing Debris | 50% | 0 | 0 | 0 | n/a | |||
| Wood (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Total**: | 0 | 0 | 0 | n/a |
| Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse. | |||
| Item | Reuse Onsite | Reuse Offsite | Off-Site Recipient or Salvage/ Deconstruction Company |
| Volume-to-Weight Conversion Factor Reference Table |
| If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal. |
| Asphalt paving: 1 cubic yard = 773 lbs | Dirt or sand: 1 cubic yard = 929 lbs |
| Asphalt or composite roof shingles: 1 cubic yard = 731 lbs | Fiberglass insulation, loose: 1 cubic yard = 17 lbs |
| Brick, laid flat: 1 flat square foot = 20 lbs | Mixed (composite) C&D material: 1 cubic yard = 417 lbs |
| Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs) | Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs |
| Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbs | Rock, crushed: 1 cubic yard = 2,570 lbs |
| Concrete: 1 cubic yard = 860 lbs | Wood: 1 cubic yard = 169 lbs |
| *Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint. |
| **At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics. |