Solicitation Amendment N6449826Q50030001 SF 30.pdf

PDF 627 KB Posted

Attached to
NFPC Sand Disposal
Solicitation number
N6449826Q50030001
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a sand removal service at the Naval Foundry and Propeller Center in Philadelphia, PA. The contract requires a contractor to remove approximately 252 tons of dry silica bulk sand from two vaults measuring 240" x 120" x 120", with each vault containing approximately 126 tons of sand. The work must be performed in compliance with OSHA standards for respirable crystalline silica, and the contractor is responsible for providing all necessary equipment, safety gear, and personnel to complete the job safely.

The contract is a one-year firm fixed price (FFP) agreement, with specific requirements including escorted site access, vehicle and personnel inspections, and adherence to strict security protocols. The work location is the Naval Foundry & Propeller Center at 1701 Kitty Hawk Ave in the Philadelphia Navy Yard, with work hours from 0730 to 1800 Monday through Friday. Contractors must complete environmental management system awareness training, follow specific safety guidelines, and ensure all waste is properly disposed of through the Commander, Navy Region Mid-Atlantic environmental agency. The amendment includes a Sand Analysis results attachment to help determine proper disposal methods.

View the file

Other files

File Type Posted
Attachment 1 Sand Analysis results.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section C - Description/Specifications/Statement of Work

Miscellaneous text in this section has been modified to:

Statement OF Work For

Sand Removal

The Naval Foundry and Propeller Center

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy's ships, submarines, military watercraft and unmanned vehicles.

This requirement is for Naval Foundry and Propeller Center (NFPC) who is responsible for the design, manufacture, and repair propellers for the US Navy.

1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied

1.0.3 Government/Contractor Relationship

1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.

1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

N6449826Q50030001

1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

1.0.4 Employee Relationship :

1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.

1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship.

Accordingly, entitlements and benefits applicable to such relationships do not apply.

1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.

1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section.

The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.

1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:

(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,

(ii) Countermand any communication regarded as a violation,

(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or

(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

1.1 BACKGROUND

The Naval Foundry and Propeller Center (NFPC) located in Philadelphia, PA currently have approximately 252 Ton of sand that require removal from current location inside two vaults. Prior to, current automatic sand silo system, dating back twenty-plus years, the foundry utilized a sand vault system. Bulk transportation would connect to the externally mounted elbows east of the center, roll up doors and pump the sand into the two vaults.

Foundry personnel manually shoveled the sand from the vaults into totes. The totes would travel down an overhead trolley rail to the awaiting molding operation area. In order for the Naval Foundry to re-purpose the two vaults, sand removal is required.

1.2 SCOPE OF WORK

The contractor shall remove dry silica bulk sand from two (2) vaults measuring approximately 240'' Length x 120'' Width x 120'' Height. This material is considered hazardous material. Based on engineering calculations, each vault/container contains approximately 126 tons of sand. To protect employees from air born particles exposure entering their lungs it's preferable for the vendor to remove the sand by way of vacuum truck to eliminate the amount of air born silica sand particles within the facility's air however any means necessary is acceptable if the equipment can fit into the vault doorway, 4 ft wide by 7ft tall. NFPC request for the vendor to properly haul away in accordance with para 3.5.

In regard to the handing of dry silica sand precautions must be taken to prevent employee exposure of airborne concentrations exceeding the permissible exposure limit noted in the OSHA standards. To mitigate hazards to NFPC personnel work must be conducted under the requirements of the following OSHA standards that are listed on https://www.osha.gov:

- 1910.1053 - Respirable crystalline silica https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.1053

- 1926.1153 - Respirable crystalline silica https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1153

This is a one (1) year contract. The CLIN structure shall be the following:

CLIN 0001-Dry Silica Sand Removal Service--Firm Fixed Price (FFP)

N6449826Q50030001 https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.1053 https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1153

2.0 APPLICABLE DOCUMENTS

Sand Analysis PDF

3.0 REQUIREMENTS

3.1 Prior to execution of any work, the contractor shall read and adhere to OSHA employee safety standards.

The contractor shall be responsible for providing fully qualified personnel with confined space training as detailed in the Occupational Safety and Health Administration CFR 1910.146, 29 CFR 1926, CFR1910.53, and

CFR1926.1153

3.1.1 A vacuum truck will be able to get within 75 ft. of the designated area. Contractors shall be aware; at least one of the two vaults contains feline feces and according to our environmental engineering personnel is safe to dispose of. The vendor is responsible for all aspects of standard OSHA safety practices.

3.1.2 The contractor shall be aware that the storage vaults are in a work zone, if nearby NFPC employees need to be removed for this process, please discuss this with the foundry supervisor ahead of visit. Foundry work hours are 6:30am - 3pm.

3.2. The contractor is responsible for all equipment needed to remove sand from the two-area vault areas.

3.2.1 The contractor shall provide lighting; the 240" Length x 120" Width x 120" Height vaults do not contain any form of lighting.

3.3.1 The contractor is responsible for employee safety and shall provide the appropriate personal protective equipment, tools and personnel safety equipment, additional required hardware, and consumable supplies for the duration of the project. If needed, please discuss with NFPC beforehand water supply, electricity and lighting.

3.3.2 The contractor shall meet with the NFPC area supervisor and/or safety specialist prior to the start of each work shift to:

- Identify the workers assigned to perform work on site so that we can provide the correct number of escorts

- All workers must complete vetting and badging prior to arrival to site

- Identify and resolve hazards and discrepancies associated with this contract

- Identify and resolve disputes interpreting the requirements identified by this contract in Section 2.0.

- Exchange hazard information and emergency procedures and responsibilities.

3.4 The contractor shall safely complete the removal of all silica sand and other debris located inside two (2) vaults that measure approximately 240" Length x 120" Width x 120" Height. The vaults are located at columns sub- A-10, 11, and 12 on the foundry's southern-most wall. Based on engineering calculations, each vault contains approximately 126 tons of sand. Vault doorway is approximately 4ft wide by 7ft tall.

3.5 The contractor is required to supply all dumpsters for disposal of all material and waste related to the project for the period of performance. All regulated waste (hazardous and residual) shall be managed and disposed of in accordance with federal, state and local regulations, and shall be manifested through the "Commander, Navy Region Mid-Atlantic" (CNRMA) environmental agency prior to removal from the site. The Commander, Navy Region Mid-Atlantic (CNRMA) environmental office number is 215-897-2035. Sand analysis is provided in section 2.0 so that the proper disposal can be determined by contractor. All Vehicle's entering NFPC gates for this project must complete vehicle inspection prior to entering the compound; each time they enter the compound. All drivers participating in this project shall be vetted and badged prior to driving onto site.

4.0 DATA REQUIREMENTS

N/A

5.0 SECURITY REQUIREMENTS

5.1 The contractor shall be escorted onto the site, observed while they perform the work, and escorted off the site.

5.2 Escorted visit. Escorted visits are required for any person who is not assigned to NNSY/NFPC and/or does not have a valid security clearance. Visitors will be escorted at all time by an NFPC employee and no exposure to any classified open storage areas or material. Requests for escorted access must be submitted 5 working days prior to arrival. If it is service or maintenance that needs to be done or an emergency the request needs to be submitted immediately in order to allow for ample time for proper vetting of individual/individuals requesting access.

The requesting NFPC code/shop will coordinate the visit and security code 1123 will verify two forms of Government issued identification. The responsible code shall provide escort during the contractor's visit.

Acceptable documents include:

US Birth Certificate (original) US Voters registration US Passport (Home Land security), Transportation Workers Identification Credential (TWIC) Naturalization paperwork Driver's License Social Security Card

Installation Access for Visitors/Contractors

All visitors/contractors having a valid purpose for access shall submit a completed and signed Form 5512/1 to their identified Government sponsor 14 working days prior to the date of their required visit.

The entire document shall be completed and form dated/signed by the visitor/contractor.

Visitor/Contractor shall retain a copy of the form 5512/1 to present on the first day at the installation.

The visitor/contractor shall communicate all on-site day to day schedules and schedule changes to the NFPC base sponsor to be submitted to code 1123 in a detailed security plan.

Note: It is critical that start/end dates/work hours are identified, accurate, and short term visitors/contractors are not granted extended or after-hours access if not required Reporting to PNY-A for the first time.

Visitor/Contractor Responsibility

Visitor/Contractor shall report to the location designated by their sponsor (Security Office or other designated location, Pass and ID office) or if operating a Commercial Vehicle requiring inspection; to the Vehicle Inspection Station.

Visitor/Contractor shall present their completed and signed 5512/1.

The Sentry or Security Assistant shall verify vetting is cleared and issue the appropriate passes. If visitor /contractor has not completed the 5512/1 their access will be delayed until they correct the form.

Code 1123 will review request and when acceptable notify requesting NFPC code/shop to arrange visit.

5.3 Contractor Vehicle Parking: (OPNAV 5530.14E) All contractor commercial vehicles must be visually inspected at Lot 753 prior to entry into any NFPC buildings and are subject to random inspections anywhere on the compound. Vehicles must clearly display an authorized company sign or logo including a company phone number. Vehicles must only be allowed in the compound for transportation of contractors' tools, parts, and materials to and from the work site with the exception of MILCON scope projects. Vehicles must be registered to the company and not to an individual. Parking of POV's is available at Lot 753, which is approximately one mile from the work site. Contractor shall ensure that their vehicles, including delivery trucks, have valid and current vehicle registration and insurance upon arrival to NFPC. Non-valid and outdated or missing vehicle registration and insurance shall result in denied facility access requiring the Contractor to reschedule delivery immediately at the contractor's expense. Delivery drivers must present two forms of Government issued identification.

5.4 PEDs (Portable Electronic Devices) are not allowed in areas where work is being performed.

Should the Contractor require a laptop, tablet or other similar device on-site to fulfill the Scope of Work, the Contractor must complete an asset authorization form for each device and submit the devices to code 109 for inspection and approval prior to site access. The laptops cannot have camera capabilities. Procedures regarding laptop access are subject to change.

PEDs (Portable Electronic Devices) are PROHIBITED:

In Restricted Areas (Open Storage Confidential Areas, Secure Rooms, Vaults, etc.) and any location (office, trailer, shop, work area, etc.) where NAVSEA business is conducted.

PEDs are permitted in Personally Owned Vehicles parked outside of the Controlled Access Area. (General parking lots across the street.)

Cell Phones/Smart Watches/Fitness Bands/ Wireless Headsets and Speakers are permitted in outside areas of the CAA and where Naval Sea Systems Command (NAVSEA) business of a sensitive nature is NOT conducted.

Cell Phones, Smart Watches, Fitness Bands or Wireless Headsets and Speakers are prohibited in the OSC Areas.

PEDs are PROHIBITED in Secure Rooms (regardless of where any of these areas are located), and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is carried on.

Cellphone lockers/boxes will be placed at the entrance to facilities, or as close to the entrance as possible in order to facilitate this policy.

********CAA-Controlled Access Area is anywhere within the fence line********

5.5. The contractor shall adhere to the facility/base access guidance per the following website:

https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system/faqs.html

5.6. The contractor shall ensure that only contractor employees who meet the security requirements stated below perform under this contract at the Government site (e.g. delivery drivers and passengers, etc.). The contractor shall propose and maintain a list of employees whom meet these requirements and be willing to submit this list to the Government, along with the necessary documentation to prove they meet them (e.g. the results of a contractor conducted background check, etc.), for the Government's security vetting, to include any Government background check, and approval. Once vetted and approved, a list of approved contractor employees must be maintained for the entire period of performance of the contract (i.e. propose new employees, replace existing employees or provide updates to existing employees' records, as necessary). A minimum of two employees, primary and backup, should be cleared by the Government to perform the necessary functions under this contract (e.g. proposed drivers of a delivery vehicle) throughout the entire period of performance of the contract.

Contractors must have the ability to be granted access by ensuring current documentation is available at the submission of their proposal to allow background checks for any proposed driver and passenger under the following criteria:

Felony conviction of any type within 10 years, or felony arrest that has not been adjudicated yet (includes "deferred findings").

Misdemeanor conviction or on-base arrest within 5 years, for any of the following types of crimes (includes "deferred findings"): Crimes of violence, sexual assault, larceny, drugs, or a habitual offender.

On the Sex Offender Registry.

Is barred from any Navy installation.

If a contractor's employee is denied entry at delivery due to inaccurate or outdated personal and/or vehicle documentation, the Government is absolved of any costs accrued as a result of the denial and the contractor is still pledged to fulfill the contract requirements. Failure to fulfill the contract requirement may result in a termination for default pursuant to FAR 49.4.

5.7 OPERATIONS SECURITY (OPSEC)

The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure.

NFPC's Critical Information List, (CIL) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NFPC approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NFPC Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NFPC CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) ) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency.

CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.

Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.

NFPC's CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NFPC Public Release Authority for review.

Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss /compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NFPC Security Division (Code 1123).

Questions concerning these requirements shall be directed to the PCO, and the COR who will forward the request to the NFPC Security Division (Code 1123).

5.8 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED

INFORMATION (CUI)

All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.

6.0 PLACE OF PERFORMANCE

6.1.1 Performance will take place at:

Naval Foundry & Propeller Center

1701 Kitty Hawk Ave

Building 20

Philadelphia Navy Yard

Philadelphia, PA 19112

Shipping Receiving Hours of Operation - M/F 0730-1400

6.1.2 Government will provide : N/A

6.1.3 The specific location(s) will be provided at time of award of the

Contract. The Contractor shall provide a list of employees who require access to these areas, including standard security clearance information for each person, to the Contracting Officer Representative (COR) no later than three business days after the date of award. The work space provided to the Contractor personnel shall be identified by the Awardee, with appropriate signage listing the company name and individual Contractor employee name.

6.1.4 Access to Government buildings at the Naval Foundry and Propeller Center Philadelphia Division is from 0730 to 1800 Monday through Friday, except Federal holidays. Normal work hours are from 0730 to 1800, Monday through Friday. Contractor employees shall be under Government oversight at all times.

Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employee(s) are performing work under this Contract. Contractor personnel are not allowed to access any Government buildings at NSWCPD outside the hours of 0730 to 1800 without the express approval of the Procuring Contracting Officer (PCO).

6.1.5 Reserved

6.1.6 Early Dismissal and Closure of Government Facilities

6.1.6.1 When a Government facility is closed and/or early dismissal of

Federal employees is directed due to severe weather, security threat, or a facility related problem that prevents personnel from working, onsite Contractor personnel regularly assigned to work at that facility should follow the same reporting and/or departure directions given to Government personnel. The Contractor shall not direct charge to the contract for time off, but shall follow its own company policies regarding leave. Non-essential Contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal and during periods of inclement weather, onsite Contractors should monitor radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

6.1.6.2 When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site Contractors will continue working established work hours or take leave in accordance with parent company policy. Those Contractors who take leave shall not direct charge the non-working hours to the Contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, and closings in accordance with the FAR, applicable cost accounting standards, and company policy. Contractors shall follow their disclosed charging practices during the Contract period of performance, and shall not follow any verbal directions to the contrary. The PCO will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy.

6.1.7 The contractor shall ensure that each contractor employee who will be resident at NSWCPD completes the Environmental Management System (EMS) Awareness training within 30 days of commencing performance at NSWCPD. This document is available at: https://navsea.navy.deps.mil/wc /pnbc-code10/Safety/default.aspx

6.1.8 In accordance with C-223-W002, ON-SITE SAFETY REQUIREMENTS (NAVSEA), the contractor shall certify by e-mail to Paul Breeden (paul.breeden.civ@us.navy.mil) that on-site employees have read the "Philadelphia Division Environmental Policy and Commitment" and taken the EMS Awareness training within 30 days of commencing performance at NSWCPD. The e-mail shall include the employee name, work site, and contract number.

7.0 TRAVEL

N/A

8.0 GOVERNMENT FURNISHED PROPERTY

N/A

9.0 GOVERNMENT FURNISHED INFORMATION

N/A

11.0 Counterfeit Material Prevention

N/A

N6449826Q50030001 https://navsea.navy.deps.mil/wc/pnbc-code10/Safety/default.aspx https://navsea.navy.deps.mil/wc/pnbc-code10/Safety/default.aspx

12.0 PERSONNEL

N/A

13.0 NSWCPD Electronic Cost Reporting and Financial Tracking (eCRAFT) System

N/A

14.0 SPECIAL REQUIREMENTS

N/A

Section J - List of Attachments

The following attachments were added:

Attachment 1 Sand Analysis results

IDCode: J
Page: 1
Pages: 14
AmendNo: 0001
EffDate: 17 Nov 2025
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N64498
AdmCode:
IssuedBy: NSWC PHILADELPHIA DIV

5001 S BROAD STREET, PHILADELPHIA PA 19112-1403

PHILADELPHIA, PA 19112-1403

UNITED STATES

DAVID TORRES, Email: david.torres22.civ@us.navy.mil Telephone: 215-205-4482 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N6449826Q5003
SolDate: 06 Nov 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to update the Statement of Work (SOW).
ContNameTitle:
CoNameTitle: John LaMotta
ContDate:
CODate: 17 Nov 2025

File details come from the government source that posted it. Updated .