Solicitation Addendum 1_119-07012025-2 Janitorial services final with map.pdf

PDF 4 MB Posted

Attached to
Roberson Community College RFP Janitorial Services
Solicitation number
119-119-07012025-2
Issued by
Robeson County, Pine Knoll Shores Town, North Carolina

About this file

Solicitation Addendum 1 for Robeson Community College Janitorial Services

This solicitation addendum for RFP 119-07012025-2 provides clarifications and responses to vendor questions regarding comprehensive janitorial services for Robeson Community College (RCC). The solicitation covers all-inclusive janitorial services for approximately 215,856 cumulative square feet across nineteen main campus buildings and four off-site locations in North Carolina, including the COMTech Site, A.S. Thomas Center & The Barbering School, Emergency Training Grounds, and Green Grove. The original proposal submission deadline was November 17, 2026, at 2:00 p.m. ET, with an optional site visit held on November 2, 2026, and written questions addressed by November 9, 2026. RCC intends to make a single award but reserves the right to make separate awards by location or line item. The contract term is three years from the effective date of contract execution, with work commencing within ten business days of final contract execution. RCC is currently served by ABM under a five-month interim contract expiring February 2027 at $40,220.00 per month.

Vendors must provide all-inclusive pricing on Attachment A, including daily, weekly, and monthly cleaning costs, equipment and supplies, emergency services, and major maintenance such as carpet cleaning and floor waxing. Pricing may be submitted separately for each of the three contract years, and vendors may request temporary tariff surcharges with supporting documentation. The addendum clarifies that RCC does not require prevailing wage rates, living wage rates, or specific employee benefits; vendors must comply with applicable federal and state employment laws. Vendors must maintain an on-site supervisor conducting daily walkthroughs and twice-weekly inspections with RCC management, hold monthly contract manager meetings, and provide 24-hour emergency availability with four-hour response times during business hours. Emergency and weekend event janitorial services are priced at the RCC-approved hourly rate of $35.00 per hour, with emergency services typically occurring one to two times annually and weekend events generally occurring monthly. The vendor is responsible for supplying all cleaning equipment and materials, including germicidal cleaners, floor care products, paper products, soap, and trash liners, while RCC provides disposable gloves and other cleaning personal protective equipment. No prevailing wage, performance bonds, or bid bonds are required at proposal submission, though RCC reserves the right to require a performance bond during the contract term under specified circumstances.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Addendum 1

FAILURE TO RETURN THIS BID ADDENDUM IN ACCORDANCE WITH INSTRUCTIONS MAY SUBJECT

YOUR BID TO REJECTION ON THE AFFECTED ITEM(S):

Solicitation Number: 119-07012025-2

Project Title: Janitorial Services

Solicitation Opening Date and Time: November 17, 2026 at 2:00 PM ET

Addendum Date: November 9, 2026

Addendum Description/Purpose: This addendum is issued to provide answers to questions from vendors regarding this RFP 119-07012025-2.

Solicitation Contact: JoAnn Bowman, Purchasing jbowman@robeson.edu

Q1. Was the 2025 solicitation awarded, and is this rebid the same size and scope? Was the prior solicitation not awarded due to pricing; what substantive changes were made to scope, locations, or requirements since the earlier solicitation?

A1. No. The 2025 solicitation was not awarded. This solicitation is a rebid.

Q2. Who currently provides janitorial services, is the work outsourced, and how long has the provider served RCC?

Please identify the current contract number and expiration date, if applicable.

A2. ABM is currently providing janitorial services under a five-month interim contract following the expiration of the previous contract. Expires February 2027 at $40,220.00 per month.

Q3. Does RCC intend to award one janitorial services contract covering all locations, or does RCC reserve the right to make separate awards by location or line item?

A3. Section 3.1 of the RFP states that RCC intends to make a single award but reserves the right to make separate awards for individual line items.

Q4. What are current FTE staffing levels, minimum daily labor hours, required shift coverage, and rules for rotating personnel among sites; how are off-site staffing, travel between locations, and any site-visit statements about day/evening staffing to be handled?

A4. Attachment H requires the vendor to propose day and evening crews sufficient to cover absences; no minimum shift staffing is specified. Normal shifts are 7 a.m.–4 p.m. and 3 p.m.–11 p.m., Monday–Friday. There is not a minimum staffing level required per shift. Each Vendor will decide the appropriate staffing level to meet the contractual requirements. The required shifts listed are correct. The offsite locations will follow the daytime schedule, 0700- 1600.Supervisor should make daily walkthroughs on main campus daily and once a week at offsite locations.

Business Services PO Box 1420 Lumberton, NC 28359 910.272.3536 mailto:jbowman@robeson.edu

Q5. Must a supervisor be present at each location, and must daily/twice-weekly joint walkthroughs cover every site;

clarify whether daily supervisor walkthroughs also apply to every off-site location

A5. Attachment H requires an onsite supervisor to conduct daily walkthroughs of all areas and twice-weekly walkthroughs with RCC's Contract Manager; the vendor's Contract Manager visits onsite three days monthly or as determined by RCC.

Q6. Will responses be released before the site visit?

A6. No. The optional site visit was November 2, 2026; written Q&A responses are scheduled for November 9, 2026, by 5 p.m.

Q7. Can vendors prepare QA and Site Quality Analysis reports using documented client inspections? Is a template or client-issued report required?

A7. The vendor may prepare its own quality assurance and site quality analysis reports using documented inspection records and service performance. There is no required report template. Reports shall address the applicable requirements outlined in Section 6.5 of the RFP. RCC's Contract Administrator may request modifications to the monthly inspection report format.

Q8. May a vendor rely on a named subcontractor's experience, three references, and QA reports? Can multiple contracts collectively demonstrate comparable scale?

A8. Sections 4.3 and 4.4 of the RFP establish the vendor experience and reference requirements. Vendors must provide at least three (3) references from different companies for services of similar size and scope. The RFP does not specifically authorize substituting a subcontractor's experience, references, or quality assurance reports for those of the proposing vendor, nor does it establish that multiple smaller contracts may be combined to demonstrate comparable experience.

Vendors should submit documentation demonstrating their qualifications and relevant experience in accordance with the RFP requirements.

Q9. What subcontractor approval process, timing, scope/qualification disclosures, and separate forms are required?

A9. No work may be subcontracted without prior written State consent. Proposed subcontractors' names, qualifications, and experience must accompany the bid; the prime remains fully responsible.

Q10. What insurance types, limits and endorsements apply, and must subcontractors carry separate coverage?

A10. Section 4.9 selects the default insurance coverage tier for contracts exceeding $1,000,000 under the incorporated General Terms and Conditions. Consult those terms for exact coverages/limits and confirm any subcontractor-specific requirements; do not invent limits.

Q11. Are bid, performance, or payment bonds or other guarantees required; under what conditions and amounts?

A11. Bid bonds, performance bonds, and payment bonds are not required at the time of proposal submission. However, RCC reserves the right to require a performance bond or alternative performance guarantee during the contract term under the circumstances specified in Attachment H.

Q12. Confirm correct total: 215,856 vs. 214,536 square feet; identify omitted buildings and whether Building 10 is included. For the Emergency Training Grounds, identify each building or space and cleanable square footage; is Building 16 the only space; confirm the A.S. Thomas/Barbering areas and the buildings or spaces included at each location

A12. RCC will provide a campus map identifying all buildings included in the janitorial services contract, along with the applicable square footage for each building, including the Emergency Training Grounds with this addendum. Building 10 is not included. Building 16 at the Emergency Training Grounds is the only cleanable square footage area.

Q13. Provide available cleanable square footage by building/floor type, room and restroom counts, and any excluded areas. Provide serviceable square footage by flooring material (carpet, vinyl, wood, tile, concrete and other types);

identify LVT flooring square footage, floor plans, excluded spaces, and Green Grove restroom areas

A13. A floor plan for each building will be attached, which has the square footage listed. Each restroom is shown on the floor plans. There is not a floor plan for Green Grove. The majority of our buildings have LVT, and carpet flooring.

Buildings 3, 4, 5, 8, 13, and 19 have some or all LVP as flooring. Building 17 has a combination of LVP, carpet, and ceramic tile.

Q14. Is exterior window cleaning included in the scope of services? If so, identify locations, approximate quantities, frequency, and access requirements.

A14. Exterior window cleaning is not included in the scope of work, Attachment H: Specifications and Scope of Work, section 16.

Q15. How should daily/weekly unit costs be entered (per building, square foot or combined), and how do they relate to monthly/annual totals?

A15. Section 4.1 requires an all-inclusive total price and completion of Attachment A.

Q16. Define one occurrence of carpet cleaning and floor stripping/waxing; identify serviceable areas, estimated quantities and evaluation basis; is weekly scrubbing/buffing required and included in the monthly general cleaning price? Are stripping/waxing and carpet extraction separately authorized and billed at per-occurrence rates, with two annual occurrences used solely for evaluation?

A16. Attachment H states carpet cleaning and floor stripping/waxing are each assumed twice for evaluation (July/August and December/January), with no guaranteed quantities, and must be scheduled with the Contract Manager. Weekly floor scrubbing and buffing are not included in the monthly general cleaning price.

Q17. For scheduled floor maintenance, who is responsible for moving and replacing furniture and equipment, and is this included in the proposed floor-care rate?

A17. The vendor is responsible for moving and replacing furniture, this is included in the proposed floor-care rate.

Q18. Define emergency/weekend event occurrence, expected annual frequency, duration, crew, callout fees, arrival time and approval authority. Can emergency and weekend-event services be priced by hourly rate rather than fixed per occurrence; clarify required response times and site-visit statements concerning special events

A18. Emergency after-hours janitorial services are infrequent, typically occurring one to two times annually. Weekend events generally occur once per month, with some months requiring services for two events. Janitorial services are typically scheduled for four hours per event. The current approved hourly rate for janitorial services associated with these events is $35.00 per hour, as established by RCC's event contract and approved by the Board of Trustees. The Director of Campus Operations will coordinate and schedule weekend event janitorial services directly with the contractor's supervisor.

Q19. Confirm cleaning windows and access times for all off-site locations, especially Green Grove and Emergency Training Grounds; confirm whether twice-weekly off-site cleaning is required and reconcile any different frequencies discussed at the site visit

A19. Attachment H provides specific requirements for Green Grove and the Emergency Training Grounds, including surfaces being dry before 8 a.m. Cleaning is required daily for all offsite locations, the same as main campus. Business hours are 8:00 am- 5:00 pm hours for the offsite campuses.

Q20. May before-8:00-a.m. cleaning/drying requirements be satisfied the previous evening?

A20. Yes. The 2nd shift personnel, 1500-2300 may satisfy early morning requirements, such as the floors are to be dry by 8:00 am at the Emergency Training Grounds. This will need to be scheduled with the Director of Campus Operations.

Q21. Which holiday calendar controls and what service is required during weather closures, breaks and other campus closures?

A21. Attachment H requires Monday–Friday coverage, including summer breaks and RCC four-day workweeks.

Custodians are not required onsite on State holidays, although buildings remain accessible to complete scope work.

Weather-closure procedures need Facilities clarification. In the event of a weather related closure, no one is permitted on campus, this includes janitorial staff.

Q22. Consumables, Dispensers, and PPE: Can RCC provide historical usage quantities for restroom consumables (paper products, soap, trash liners, and sanitizer), along with restroom and fixture counts? Additionally, please clarify the requirements for dispenser installation, replacement, and maintenance, including approved products, and confirm responsibility for purchasing and replenishing gloves and other PPE; identify available custodial closets, utility sinks, storage arrangements, and chemical dilution system requirements

A22. Attachment H assigns cleaning materials, equipment, dispensers and restroom consumables (including paper towels, toilet tissue, soap, Gojo and liners) to the vendor. It assigns disposable gloves and other cleaning PPE to the hiring agency. For clarification, the vendor is responsible for supplying all equipment necessary to provide cleaning services to include but not all inclusive; vacuum cleaners, mops, mop buckets, brooms, floor machines, carpet cleaners etc... Supplies; germicidal cleaner, floor care products, window cleaner, dusting clothes and the like, toilet paper, hand towels, soap for dispensers, GoJo cleaner, sanitary containers, soap dispensers were needed, stripper, wax, trashcan liners, etc...

Q23. Must prices remain fixed for three years? If adjustments are allowed, how are they approved and shown by year?

A23. Vendors may submit separate pricing for each of the three contract years using the pricing sheet provided in Attachment A of the RFP. All proposed pricing must be included in the original cost proposal.

Q24. Confirm invoicing frequency, payment terms, inspection approval and treatment of undisputed charges when part of an invoice is disputed.

A24. Invoices shall be submitted monthly. Payment will be processed in accordance with RCC's standard payment procedures, subject to inspection and approval of services rendered. Any billing discrepancies or disputed charges will be addressed on a case-by-case basis as they occur.

Q25. Are prevailing/living wage, benefits or other special labor standards applicable?

A25. No. RCC does not require specific prevailing wage rates, living wage rates, or employee benefit packages under this solicitation. Vendors are responsible for complying with all applicable federal and state employment laws.

Q26. What start date, transition period and joint initial condition assessment are anticipated; confirm the anticipated award date and whether a pre-contract walkthrough or joint condition assessment will occur.

A26. The initial term begins upon final contract execution and work begins within 10 business days unless otherwise agreed in writing.

Q27. If facilities require initial restorative cleaning, is it included in regular pricing or separately authorized; clarify whether moving or replacing furnishings for initial restorative cleaning is included or separately authorized

A27. Initial restorative cleaning is not included in the regular pricing. If needed, this will be priced separately. If we deem the quoted price is excessive, RCC reserves the right to outsource restorative cleaning.

Q28. Are financial statements/audits required beyond the financial condition certification, especially if no recent audit exists?

A28. Section 4.2 requires a completed Certification of Financial Condition. The reviewed section does not require an audited financial statement.

Q29. Can RCC disclose the bid prices submitted in the previous solicitation?

A29. No. In accordance with guidance received from the North Carolina Division of Purchase and Contract (P&C), bid pricing from a canceled solicitation that has been reissued remains confidential until an award is made under the current solicitation. Therefore, pricing submitted under the previous solicitation will not be disclosed at this time.

Q30. Are dedicated porter services required? If so, specify locations, staffing, days and hours of coverage.

A30. The RFP already requires daytime custodial coverage from 7:00 a.m. to 4:00 p.m., Monday through Friday. Vendors are responsible for proposing adequate staffing to meet the cleaning requirements outlined in the RFP.

Solicitation Addendum 1

File details come from the government source that posted it. Updated .