This document is a Statement of Work (SOW) for a federal contract opportunity for Emergency Generator Foundation Repair and Reinforcement at U.S. Coast Guard Station Bayfield in Bayfield, Wisconsin.

The key details are:

  • The U.S. Coast Guard is seeking a qualified contractor to raise, level, and reinforce the concrete pad and adjacent asphalt area for the station's emergency generator. This includes disconnecting and reconnecting any utility services as needed.
  • The contractor must provide all labor, materials, and equipment necessary to complete the work, which has an estimated period of performance not to exceed 45 calendar days.
  • The contractor will be required to closely coordinate all work with the Contracting Officer's Technical Representative to minimize disruption to station personnel and operations. Safety and access requirements are specified.
  • A warranty of at least one year is required to prevent further settling of the generator pad and surrounding area.
  • The applicable NAICS code is 238110 (Poured Concrete Foundation and Structure Contractors) with a small business size standard of $19.0M.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Homeland Security United States Coast Guard

Station Bayfield

SCOPE OF WORK

U.S. Coast Guard Station Bayfield, WI

For Emergency Generator Foundation Repair and Reinforcement

Point of Contact (POC) Joshua T. Reynolds

(409) 682-3939 Joshua.T.Reynolds@uscg.mil

Site Address 209 S First St.

Bayfield, WI 54814 mailto:Joshua.T.Reynolds@uscg.mil

Solicitation 70Z03024QCLEV0118 USCG Station Bayfield Emergency Generator Foundation Repair

PAGE 2/10

1.0 GENERAL

United States Coast Guard (USCG) Station Bayfield is planning to enter negotiations with a contractor. The USCG is seeking a qualified contractor to raise and support units’ emergency generator foundation pad as well as a roughly 18 sq/ft patch of asphalt adjacent to generator pad. Prior to submitting a quote, it is mandatory to examine the SOW and it is highly recommended to visit the facility to take field evaluations and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Bayfield.

1.1 BACKGROUND

The unit’s emergency generator is located on the back side of the unit’s building. Its approximate weight is approximately 250 lbs. The emergency generator sits on a concrete pad measuring 54 in long, 40 in wide, 4 in thickness. The generator has flexible metal piping for natural gas. The area on one corner closest to the parking lot side has sagged a visible amount and proposes a serious risk to the stability of the generator mounting platform as well as the emergency generator itself.

The raising/leveling of the generator pad as well as the surrounding asphalt of the parking lot and the reinforcement of the generator mounting pad to prevent further settling is required to ensure stability of the emergency generator.

1.2 SCOPE

1. Contractor shall furnish all labor, materials, equipment, and appliances as necessary to raise/level generator mounting pad and asphalt area adjacent to generator and to reinforce generator pad in such a way as to prevent further settling of generator pad.

2. The asphalt area mentioned measures approximately 3ft by 6ft and is located directly adjacent to concrete generator pad. The generator mounting pad itself is placed on top of asphalt parking lot.

3. The contractor shall closely coordinate all work with the Contracting Officer’s Technical Representative (COTR) to keep disturbances to personnel and operation to a minimum.

4. The contractor is required to always have a qualified supervisor on the job any time work is being performed. The qualified supervisor must service as a point of contact for the COTR in maintaining the work specification requirements, scheduling, inspections, and maintaining safety standards. The supervisor must be able to speak and understand English.

5. The Contractor must ensure Government employees have access to rear security locked door located centerline on the south side of the building in the file://hqnas/SHARED/G-A/G-ACS/CAAT%20Team/TOOLBOX/SCOPE%20PARAGRAPHS.doc

PAGE 3/10

event of emergency egress. If at any point this egress route will be blocked due to the nature of the work, the contractor will coordinate with station OOD for timeline on egress route availability.

6. The Contractor will conduct work as to limit downtime of unit’s emergency generator. If Contractor must take unit’s emergency generator offline due to work, a 72-hour notice must be given to and approved by unit’s COTR.

7. Contractor may add additional concrete to unit’s generator pad to assist with the distribution of generator weight as well as to prevent further settling of the surrounding area as mentioned above. If it is determined more concrete is needed, the details will be discussed with COTR to confirm it will not interfere or cause problems for station personnel or other facilities.

8. Government personnel are not expected to interfere with Contractor’s work or halt work unless a specifically unsafe condition is found or observed by a member at the unit. If an unsafe condition is found, COTR shall notify Contracting personnel’s supervisor and the unsafe condition must be corrected before work resumes. Unsafe conditions include but are not limited to- not using proper PPE as defined by OSHA Regulations, utilizing tools not in good working condition with all guards and safeties in place as designed by manufacture, or not abiding by safe work practices set forth in OSHA regulations.

9. The Contractor shall give the COTR a 72 hour advance prior notice to the completion of the above SOW so that the COTR may conduct the final inspection.

10. The contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris. The Contractor is expected to remove all debris and waste in a timely fashion as to not impact either Government operations or unit’s public image.

11. Contractor is responsible for the disconnecting and re-connecting of any utility services to the generator if needed for the project, including but not limited to electrical, and natural gas. In the event utilities are disconnected the contractor will reconnect and ensure there are no gas leaks or electrical faults.

1.3 OBJECTIVE

Unit requires the lifting/leveling of both the generator mounting pad as well as an approximate area of the asphalt parking lot adjacent to the generator approximately 3ft x 6ft from base of generator foundation. Unit also requires reinforcement work to ensure the future stability of the parking lot and generator mounting pad.

1.4 WARRANTY

PAGE 4/10

Unit requires a warranty on all work to prevent further settling of generator pad and surrounding area for a minimum period of one (1) year.

1.5 SUBMITTALS

Contractor is required to submit all safety data sheets (SDS) to the COTR for any chemicals brought onto the facility.

Contractor is required to provide documentation of intended plan to raise, level, and support generator mounting pad and adjacent area to Unit’s POC upon arrival.

2.0 CONTRACTOR PERSONNEL

Contractor shall provide a list of names to the Coast Guard POC for access to the base. Contractor may alter list of names as needed but must provide updated list to Unit’s POC before beginning of work as required.

All Contractor personnel shall present ID to the OOD/JOOD at the entrance to the base. All contractor personnel must always keep their form of ID with them while on base.

2.1 QUALIFIED PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.

2.2 CONTINUITY OF SUPPORT

The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.

2.3 EMPLOYEE CONDUCT

Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

PAGE 5/10

2.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

3.0 PERIOD OF PERFORMANCE

The period of performance for this contract shall not exceed 45 calendar days from the date of award, unless otherwise approved by the contracting officer.

3.1 PLACE OF PERFORMANCE

The primary place of performance will be:

U. S. Coast Guard STATION BAYFIELD

209 S. 1ST ST

BAYFIELD, WI 54814

3.2 HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 7:00 am and 6:00 pm CST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. In the event Contractor personnel must work outside of the above specified work hours, the contractor will coordinate with onsite Coast Guard Rep

4.0 GOVERNMENT FURNISHED RESOURCES

The Government will supply 120v AC power and onsite cold water via a residential style water spigot.

5.0 CONTRACTOR FURNISHED PROPERTY

The Contractor shall furnish all facilities, materials, equipment, and services necessary to fulfill the requirements of this contract.

6.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

PAGE 6/10

The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

The Contractor shall have 10 business days to make corrections and redeliver.

7.0 ENCLOSED PROJECT PICTURES

Generator pad/ asphalt overview

PAGE 7/10

PAGE 8/10

Utilities connections( Electrical)

Utilities connections (Gas)

PAGE 9/10

Asphault sinking

PAGE 10/10