Solicitation 70Z03024QCLEV0118 - Questions and Answers (Release 1).pdf
PDF 122 KB Posted
- Attached to
- 70Z03024QCLEV0118 - U. S. Coast Guard Station Bayfield Emergency Generator Foundation Repair
- Solicitation number
- 70Z03024QCLEV0118
About this file
This document is a set of Questions and Answers related to Solicitation 70Z03024QCLEV0118 for Emergency Generator Foundation Repair at USCG Station Bayfield. The solicitation indicates that the Pre-conference meeting may be conducted virtually, and there is no expectation to remove, replace, or modify the existing concrete equipment pad, though additional concrete may be added if needed. The period of performance is not to exceed 45 calendar days from the date of award. The procurement is estimated to be less than $25,000 and falls under the NAICS code for Poured Concrete Foundation and Structure Contractors with a small business size standard of $19.0M. All relevant solicitation documents will be available for download from the website, and any amendments will be posted solely on SAM.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation 70Z03024QCLEV0118 - SF 1442.pdf | ||
| Request for Information.docx | DOCX document | |
| Reference Information Sheet.docx | DOCX document | |
| Solicitation 70Z03024QCLEV0118.docx | DOCX document | |
| Solicitation 70Z03024QCLEV0118 - Statement of Work.pdf | ||
| Solicitation 70Z03024QCLEV0118 - Wage determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Solicitation 70Z03024QCLEV0118
Release One (29 August 2024)
Q1: Could the Pre-conference referenced on Page 2 of Solicitation 70Z03024QCLEV0118 - Statement of Work be conducted virtually, or is an in-person meeting required?
A1: Yes, the Pre-conference meeting may be conducted virtually.
Q2: Is there an expectation to remove, replace, or modify the existing concrete equipment pad?
A2: No, there is no expectation to remove, replace, or modify the existing concrete equipment pad.
However, if it is determined during the work that additional concrete is needed to support the generator's weight or to prevent settling in the surrounding area, the contractor may add more concrete. Any such modifications will be discussed with the Contracting Officer's Technical Representative (COTR) to ensure they do not interfere with station personnel or other facilities.