Solicitation_26_CTRAIL_Signals_1_Addendum_1_Final_10.14.26.pdf

PDF 749 KB Posted

Attached to
Project 0301-0154 NHL Signal Equipment Request for Proposals
Solicitation number
26-CTRAIL-SIGNALS1
Issued by
Fairfield County, Connecticut

About this file

This addendum to Solicitation 26-CTRAIL-SIGNALS-1 from the Connecticut Department of Transportation (CTDOT) addresses questions and modifications to the Request for Proposals for furnishing pre-wired signal houses and cases for the New Haven Rail Line between Norwalk and Bridgeport, Connecticut. The addendum, dated October 14, 2026, clarifies technical specifications, design requirements, training deliverables, and network architecture for a vital microprocessor-based signaling system. Key clarifications include confirmation that the contractor is not required to provide enclosure placement plans but must provide weight calculations and lifting procedures; that Professional Engineer signatures are required for Hardware Designs and Routings but not Software Designs; that environmental testing is not anticipated; that the contractor will furnish Wayside Interface Units, Remote Telemetry Units, and Base Control Modules; and that the PTC network is non-redundant with a single network switch at each location rather than redundant switches. The addendum also specifies that equipment maintenance training requires 80 total trainees (10 personnel per session across 8 sessions), that design routings must achieve a 21 trains-per-hour headway capacity, and that warranty periods span two years from final acceptance issuance as stated in Contract Article 15.4. Responses to 22 numbered questions address technical specifications in Part II of the RFP, procurement requirements, and contractual terms.

The addendum confirms that contractors may propose alternative approaches to train detection in block track circuits between interlockings, subject to CTDOT evaluation during Technical Proposal review. CTDOT will not negotiate provisions mandated by state or federal law, including those in Schedule E (State of Connecticut Required Provisions), Schedule F (FTA Required Provisions), and Schedule G (Title VI Contractor Assurances), though clarifying revisions to contract language may be considered at contract finalization. The document incorporates comprehensive FTA Required Provisions applicable to federally-assisted contracts, including DBE participation requirements, civil rights compliance, debarment and suspension certifications, environmental standards, wage and hour protections, and intellectual property restrictions. No explicit set-asides for small businesses, women-owned businesses, or other categories are identified in this addendum. The technical specifications section revises Section 8.2.8 to clarify that double-size vital relays shall have eight front/back dependent contacts and four front and two back contacts. All other terms and conditions of the original RFP remain unchanged.

View the file

Other files

File Type Posted
26-CTRAIL-SIGNALS1_Nov_2_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_27_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_13_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_9_26_solicitation_doc.pdf PDF
20260812_03010154_CTDOT_NHL_Signal_Contract Drawings_PartIII.pdf PDF
26-CTRAIL-SIGNALS1_Aug_14_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_3_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Aug_13_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_26_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_11_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_12_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_19_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_2026-007COLCHESTER_v2_Oct_7_26.pdf PDF
26-CTRAIL-SIGNALS1_Nov_18_26_solicitation_doc.pdf PDF
20260812_03010154_CTDOT_NHL_Signal_Equipment_Tech_Specs_PartII.pdf PDF
26-CTRAIL-SIGNALS1_Nov_10_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_25_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_20_26_solicitation_doc.pdf PDF
20260812_DOT03010154_CTDOT_Definitions_RFP_Part VI.pdf PDF
26-CTRAIL-SIGNALS1_Nov_4_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_17_26_solicitation_doc.pdf PDF
20260812_DOT03010154_CTDOT_PWS_Proposal_Price_Sheet_RFP_Part V.pdf PDF
20260812_03010154_CTDOT_NHL_Signal_Equipment_Contract_PartIV.pdf PDF
26-CTRAIL-SIGNALS1_Nov_6_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_5_26_solicitation_doc.pdf PDF
26-CTRAIL-SIGNALS1_Nov_24_26_solicitation_doc.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM DATE: October 14,2026

ADDENDUM #1

REQUEST FOR PROPOSALS

FURNISHING PRE-WIRED SIGNAL HOUSES AND CASES FOR THE NEW HAVEN RAIL

LINE NORWALK, CT TO BRIDGEPORT, CT

SOLICITATION 26-CTRAIL-SIGNALS-1

DESCRIPTION OF CHANGES

Addendum No. 1 includes the following:

• Responses to Questions

• Part II Technical Specifications Section 8.2.8 revised to correct typographical error

• Schedule F as Referenced in Draft Contract RFP Part IV Posted to Contract Source

All other terms and conditions of the RFP remain the same.

Solicitation 26-CTRAIL-SIGNALS 1

Responses to Questions

Question RFP Question Response

Number Reference

Part II

Document section 2.3.28

Page: 16

Should the contractor provide an Enclosure Placement

Plan?

The following section states that houses and cases that will be installed by a separate Installation Project Team contracted by CTDOT. Document section: 1.2.5. Page: 8

Enclosure placement plans showing field features are not required. The Contractor shall provide weight calculations, all lifting, pick points, rigging, and lifting procedures.

Part II

Document section: 2.3.51.l.

Page: 21

Should the contractor provide weight calculations, include all lifting, pick points and placement procedures. Drawings including proper rigging, crane requirements and required hardware?

The following section states that houses and cases that will be installed by a separate Installation Project Team contracted by CTDOT.

Document section: 1.2.5

Page: 8

The Contractor shall provide weight calculations, all lifting, pick points, rigging, and lifting procedures.

CTDOT's installation project team will be responsible for crane requirements and specific placement procedures for field installation.

Part II

Document section: 2.1.4

Page: 9

"The 100%, As-Shipped, and As-In-Service drawings for each location shall be signed and sealed by a Connecticut

Professional Engineer."

Does this reequipment apply to Hardware Designs, Software Designs, and Routings (Control Lines)?

This requirement applies to drawings for Hardware

Designs and Routings (Control Lines). This requirement does not apply to Software Designs.

Part II

Document section: A.5.

Page: 292

Are environmental test records required? Environmental testing referred to in Appendix A Section

A.5 is not anticipated for this Contract.

Part II

Document section:

309.C.5.x

Page: 42

Please provide latest Apparatus tabulation. The Part II Document section cited in this question

(309.C.5.x) does not exist. Possible typo. The listing of pre-wired cases, houses, equipment and racks is provided in Section 3.3.13

Part II

Document section: 7.11

Page: 104

Should the contractor furnish; Wayside Interface Units, Remote Telemetry Units, and Base Control Modules or only proved discrete vital I/O points for the Railroad to connect to?

Yes, the Contractor will furnish the Wayside Interface

Units, Remote Telemetry Units, and Base Control

Modules.

Part II

Document section: network

"redundant"

Page: n/a

The contract specification consistently refers to all of the networks as “redundant” with “no single point of failure”.

However, the contract drawings indicate that the PTC network typical only has one single network switch.

a.Is this in error or is this an exception?

b.Do the RTUs and the WIU have dual NIC ports?

Contractor, at present, presumes that the RTUs and the WIU have dual NIC ports and that the PTC network requires redundant network switches.

The PTC network is not a redundant network, thus only one network switch is needed. MNR PTC maintains a

Radio Communication package and an RFB (Railroad

Fiberoptic Backbone) as the communications link between the vital signal system and PTC through an

Ethernet L3 Switch.

a. This not an error and is MNR practice.

b. The RTU has two analog parts and four RS232 Data

Ports. The WIU has two Ethernet Ports.

Part II

Document section: network

"redundant"

Page: n/a

The contract specification consistently refers to all of the networks as “redundant” with “no single point of failure”.

However, the contract drawings indicate that the non-vital microprocessor is connected to only one single network switch which is connected to the adjoining location via one single network (BVN). This is a single point of failure.

a.Is this in error or is this an exception?

b.Should there be two network switches at each Bridge location?

Contractor, at present, presumes that the non-vital microprocessor should be connected to 2 ea. redundant network switches.

MNR utilizes zoned networks for the vital processors.

As an example, on a four track railroad, Track 3 and

Track 4 would reside in their own zone/vital-processor.

Tracks 1 and 2 would share a vital-processor. The communication link to the RTC/Dispatchers Office rides on a North or South Communication Line, but only one line is hot at any time. This system utilizes one network switch connecting to the North and South

Communication Lines

a. This is not an error.

b. No, the setup for a Bridge location is similar to that of an interlocking.

With regard to the number of network switches, please refer to the Microprocessor Block Diagram drawings for each location for information concerning the number and arrangement of network switches

Part II

Document section: 20.1.14

Page: 207

“# Of Sessions”.

Does this mean number of iterations?

# of Sessions refers to the number of individual classes to be conducted.

Part II

Document section: 20.1.14

Page: 207

For Equipment maintenance training, the number of

Supervisory Personnel and Field Technicians is listed as

“10,” with the number of sessions (iterations?) as “8.”

Does that mean the number of Supervisory Personnel and

Field Technicians to train is 80?

Yes.

Part II

Document section: 22.1.9

Page: 240

“The document shall define, but not be limited to, all software variables, operations, timers, formats, functions, inputs, outputs and components.”

Will software instruction need to be project-specific as opposed to general?

Section 22.1.9 describes a documentation requirement

"Definition Document" and does not mention software instruction (training). Training is described in Section

20.0. Section 20.1.9 confirms that the overall training

curriculum shal be based on Contract specific hardware and software systems.

Part II

Document section:

"Contractor to provide

STAGE X Routing Plans"

Page: 64, 65, 66

Can rules to design routings for both passenger and freight trains be made available? For example:

a.Is train length used in any calculations, such as the timer when downgrading from code 75 to code 0?

b.Are there cases where both passenger and freight trains have to reach the speed associated with the code when downgrading before a different lower code is requested? For example, when using timers in the next block.

c.Using code 120/120 keeps the freight at a lower speed potentially and shortens control lines. Are there rules/ instructions for when or where code 120/120 should be used?

MNR Braking is based on Point of Mass.

A. No, MNR Passenger Train calculations do not include a maximum car count, Freight Train calculations follow suit, but operationally are limited to maximum car count. B. No, MNR signal design does not require speed compliance within the braking sequence cab code down grades, so long as the total braking distance meets MNR's Braking

Chart. What is required is a minimum of 1108 ft. of Zero

Cab Code be provided in advance of the stop signal.

C. No, MNR 120/120 is defined simply as proceed not exceeding 80mph for passenger trains and not exceeding 30mph for other trains.

Part II

Document section:

"Contractor to provide

STAGE X Routing Plans"

Page: 64, 65, 66

Is Track geometry available in electronic format? If this question is referring to the geometry information shown on the Block Plan / Track Chart, then yes, these

CAD files will be provided to the successful proposer.

Part II

Document section:

"Contractor to provide

STAGE X Routing Plans"

Page: 64, 65, 66

For Routing/ Control lines, does the contractor need to provide other documentation in addition to Routing/ control lines drawings.

No, but if questions arise, the contractor may be asked at that point to show the assumptions and resulting calculations for the control line or code change times for example.

Part II

Document section:

"Contractor to provide

STAGE X Routing Plans"

Page: 64, 65, 66

Is there a maximum headway that needs to be satisfied? The design headway within the limits of this project on the New Haven Line is 21 trains per hour per track for the Final Routings provided in the bid documents. The

Contractor's Routing Design for any of the individual

Stages should achieve this capacity. If the Contractor's

Routing Design for any portion of the project cannot comply with the above, the Contractor should notify and request CTDOT approval.

Part II

Document section:

"Contractor to provide

STAGE X Routing Plans"

Page: 64, 65, 66

Are existing routing plans available for review? The existing in service routing plans will not be made available during the proposal phase. They will be made available to the successful proposer after NTP.

Part II

Document section:

"Contractor to provide

STAGE X Routing Plans"

Page: 64, 65, 66

RFP mentions that the contractor is responsible for conditions not addressed in the Routings provided. Are there any specific conditions the contractor should consider?

The conditions are those of the stage a specific set of routings are prepared to address. In other words stage

2 is for the conditions/routings for the second phase of the project and so on.

Part IV

Can CDOT confirm that the bidder will have the opportunity to negotiate contract commercial terms before award.

While the scope of the phrase "commercial terms" used in the question is not defined, CTDOT answers as best it can as follows. CTDOT may consider and agree to clarifying revisions to the contract language at the time of contract finalization with the selected proposer.

CTDOT will not negotiate provisions required by applicable State or Federal law, such as those attached to the draft Contract at Schedule E (State of

Connecticut Required Provisions), Schedule F (FTA

Required Provisions) and Schedule G (Title VI

Contractor Assurances).

Part II

Document Section:

2.1.5/2.2.3

Section 2.1.5/2.2.3 requires the Contractor’s engineering procedures and manufacturing facilities to be ISO

9001:2015 certified. On similar rail transit projects, including MTS in San Diego, ISO certification has typically applied to the third-party manufacturer responsible for fabrication of the signal enclosures, while the systems integrator’s engineering, assembly, wiring, integration, and testing activities are governed by project-specific quality requirements. This Contract establishes a comprehensive

Contract Quality Plan for the systems integrator, including written quality procedures, design and document control, Inspection & Test Plans, Software Quality Assurance and

Verification & Validation, nonconformance and corrective-action procedures, internal quality audits, and CTDOT monitoring, inspection, testing, and audit rights. The proposed signal house manufacturer will be ISO 9001 certified. The Proposer respectfully requests that the ISO

9001 certification requirement apply to the signal house manufacturer only, while the systems integrator’s work be governed by the Contract Quality Plan and associated inspection, testing, audit, and quality-control requirements established by the Contract Documents.

As called for in Part II Sections 2.1.5 and 2.2.3, the

Contractor's engineering and manufacturing facilities shall be ISO 9001:2015 certified.

Part II

Document Section:

7.11.2

The Electrologixs platform from KB Signaling features integrated ACSES WIU functionality, eliminating the need for external WIU. The Electro logic’s WIU application is logically and physically isolated from the interlocking executive and application software. As such, the ACSES application parameters can be modified, tested, and upgraded without impacting the vital and non-vital interlocking application, thus eliminating the need for a standalone WIU. To minimize design, configuration, and material costs, would CT DOT consider an Integrated WIU solution as equivalent to the standalone WIU configuration called out in the Tech spec Part II section 7.11.2?

WIU's shall be furnished as called for in Section 7.11.2

21 None

Electrified Electro Code is a service proven and reliable track circuit technology utilized throughout the North East

Corridor. When deployed with ElectrologiXS VMIS and integrated WIU, electrified Electro Code can replace conventional steady energy track circuits for train detection, while maintaining line speed traffic tumbledown through conventional line circuits or fiber optic network. In addition, the electro Code protocol can provide track-based traffic tumbledown to maintain operation during communications outages. Would CT DOT consider Electrified Electro Code with redundant traffic control as an alternative proposal to provide train detection in block track circuits between interlockings?

Proposers may offer alternative approaches to providing train detection in block track circuits between interlockings. CTDOT will consider such alternatives during evaluation of Technical Proposals.

None

Would you confirm the duration of the warranty period and where it's referenced in the specifications? Where in the specifications is it stated when warranty starts?

The warranty period is provided in the Contract (Part IV of the RFP) Article 15.4. The warranty period is 2 years from issuance of final acceptance of any signal house or signal case. Please also refer to Article 8.0 Acceptance for additional information.

Technical Specification for Furnishing Pre-Wired Signal Houses and Cases for the New Haven Line - Norwalk, CT to Bridgeport, CT

CP-244 to CP-257 Solicitation No. 26-CTRAIL-SIGNALS-1

8.2.6 All commonly used vital relays shall have a minimum of six (6) front/back dependent contacts.

8.2.7 Vital relay contact assignments for final design shall be such that each vital relay-repeater combination shall have at least one (1) spare dependent front/heel/back contact, or one (1) spare independent heel/front and one (1) spare independent heel/back contact.

8.2.8 Vital relays with greater than six (6) stacks of contacts shall be used to reduce or eliminate repeater relays when required. The standard contact arrangement for these double size relays shall be eight (8) front/back dependent, four (2) front and two (2) back contacts.

8.2.9 Relays (except time-element) with a nominal operating voltage of 12V shall operate continuously and successfully without resultant damage within a voltage range of 7 to 21 volts inclusive, applied to their operating coils.

8.2.10 All relays shall be biased-neutral relays, except where application requires that they not be biased.

8.2.11 Contacts must be clearly viewed from the front of the relay without distortion.

8.2.12 Vital relay repeaters shall not be wired in multiple.

8.2.13 Plug boards for plug-in relays shall include unique indexing plate or pins and shall be equipped with self-retained contacts, which are removable by use of relay manufacturer's tool. The method of connecting a maximum of two (2) wires to contact shall be submitted to the Engineer for approval. The plug board shall be designed so that the self-retained contact has a direct connection with the relay coil and contact prongs.

8.2.14 The Contractor shall perform factory tests on all vital relays for all mechanical and electrical performance characteristics, including pick-up and drop-away values and contact resistance. Records of all vital relays, showing serial numbers, test date and test values shall be retained by the Contractor and furnished to the Engineer. Relay testing shall be performed prior to the factory test. Relays used for the factory test shall be reinstalled in the same position that they were in during the factory test, in the field by Metro-North.

8.2.15 Biased Neutral Relays

gegli Text Box (4) gegli Line

April 2026

Exhibit

FEDERAL TRANSIT ADMINISTRATION (FTA)

Required Contract Provisions

(Non-Construction)

1. Definitions

2. No Federal Government Obligations to Third Parties (Use of Disclaimer)

3. False or Fraudulent Statements or Claims-Civil and Criminal Fraud

4. Access to Records and Reports

5. Changes to Federal Requirements

6. Termination Clauses

7. Civil Rights (Title VI, ADA, EEO except Special DOL EEO clause for construction projects)

8. Disadvantaged Business Enterprises (DBEs)

9. Incorporation of FTA Terms

10. Debarment and Suspension

11. Resolution of Disputes, Breaches, or Other Litigation

12. Lobbying

13. Clean Air

14. Clean Water

15. Patent and Intellectual Property Rights

16. Notification of Federal Participation for States

17. Notice to FTA and U.S. DOT Inspector General of information related to Fraud, Waste, Abuse or

Other Legal Matters

18. Safe Operation of Motor Vehicles

19. Prohibition on Covered Telecommunications

20. Federal Tax Liability and Recent Federal Convictions

21. Solid Wastes (Recovered Materials)

22. Domestic Preferences for Procurement

23. Cargo Preference

24. Fly America

25. Contract work hours/safety standards for Awards not involving construction

26. Transit Employee Protective Provisions

27. Charter Service

28. School Bus Operations

29. Motor Carrier Safety

30. Drug and Alcohol Testing

31. Energy Conservation

32. Buy America Requirements

33. Environmental Protections

34. Rolling Stock Purchases

35. Bus Testing

36. Compliance with National ITS Architecture Policy

37. National Transit Database

38. Trafficking in Persons

39. FTA Certifications

1. DEFINITIONS

For purposes of this document, the following terms shall have the meaning as set forth below:

1. Award

The Scope of Work that FTA has approved when FTA agreed to provide federal assistance.

2. Amendment

A formal change or addition made to a contract to incorporate new requirements or resolve issues that arise after the contract award.

3. Code of Federal Regulations (CFR)

The codification of the rules and regulations published in the Federal Register by the executive departments and agencies of the federal government of the United States.

4. Disadvantaged Business Enterprise (DBE)

A for-profit small business that is at least 51% owned by one or more socially and economically disadvantaged individuals who also control the firm’s management and daily operations. The DBE program aims to ensure fair participation for disadvantaged businesses in U.S. transportation contracts and applies to recipients of FTA funds.

5. Debarment

An administrative action that excludes individuals or entities from participating in federal contracts or programs.

6. Department of Labor (USDOL)

Agency responsible for the administration and enforcement of federal laws governing occupational safety and health, and wage and hour standards.

7. Environmental Protection Agency (EPA)

An agency of the United States government that sets and enforces national pollution control standards.

8. Federal Transit Administration (FTA)

An operating administration of the Department of Transportation (USDOT).

9. Fiscal Year

Refers to the “federal fiscal year” which begins on October 1 of each calendar year and ends on September 30 of the next calendar year.

10. Intellectual Property

A set of exclusive rights to protect intangible creations of the mind, including patents, copyrights, trademarks and trade secrets.

11. Local Government Authority

Includes a political subdivision of a state, an authority of at least one state or political subdivision of a state, an Indian Tribe, and a public corporation, board or commission established under the laws of a state.

12. Master Agreement (MA)

A comprehensive agreement between FTA and Recipient that outlines the terms and conditions for FTA projects, including definitions, compliance requirements and specific provisions related to federal assistance and implementation of the agreement. CTDOT is subject to the terms of the MA, one of which is to ensure that contractors and subcontractors abide by its terms. MA 34 is dated November 26, 2025.

13. Project

The public transportation improvement activities eligible for federal assistance in an application to FTA and/or in an FTA Award.

14. Public Transportation

Regular, continuing shared-ride surface transportation services that are open to the general public or open to a segment of the general public defined by age, disability, or low income, and has the same meaning as

“transit” or “mass transportation”. It does not include intercity passenger rail transportation provided by

Amtrak or its successor, intercity bus service, charter bus service, school bus services, sightseeing service, courtesy shuttle for patrons of one or more specific establishments, or intra-terminal or intra-facility shuttle services.

15. Recipient

A non-federal entity that receives a federal award directly from a federal awarding agency to carry out an activity under a federal program, e.g. CTDOT.

16. Recovered Materials

Waste materials and by-products that are recovered or diverted from solid waste, including materials not commonly reused within an original manufacturing process, and previously unused components.

17. Scope of Work

The purpose of the grant agreement and the activities and approaches required to carry out a project.

18. Subrecipient

Any entity or person that receives federal assistance provided by an FTA Recipient directly, instead of FTA directly, and does not include a Third Party Contractor, Third Party Subcontractor or Lessee.

19. Third Party Agreement or Contract

A legal instrument by which a Recipient or Subrecipient purchase property or services needed to carry out the

Grant Agreement.

20. Third Party Participant

Each participant in the Recipient’s project except for FTA and the Recipient, whose work is supported with

FTA funding.

21. Underlying Agreement

The terms and conditions that govern the procurement process under the FTA, including the rights and responsibilities of the federal government, the Recipient, and any third party participants involved in the

Agreement to ensure that the procurement process is conducted fairly and transparently.

2. NO GOVERNMENT OBLIGATION TO THIRD PARTIES

Applicability to Contracts

Applicable to all contracts.

Flow Down

All contract tiers

No Federal Government Obligation to Third Parties

(1)The Recipient and contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation or award of the underlying contract, absent the express written consent by the Federal Government, the Federal

Government is not a party to this contract and shall not be subject to any obligations or liabilities to the Recipient, contractor, or any other party (whether or not a party to that contract) pertaining to any matter resulting from the underlying contract.

(2) The Contractor agrees to include the above clause in each subcontract financed in whole or in part with Federal assistance provided by FTA. It is further agreed that the clause shall not be modified, except to identify the subcontractor who will be subject to its provisions.

3. PROGRAM FRAUD AND FALSE OR FRAUDULENT

STATEMENTS AND RELATED ACTS

31 U.S.C. 3801 et seq.

49 CFR Part 31 18 U.S.C. 1001

49 U.S.C. 5307

These requirements are applicable to all contracts.

Flow Down

These requirements flow down to contractors and subcontractors who make, present, or submit covered claims and statements.

Program Fraud and False or Fraudulent Statements or Related Acts.

(1) The Contractor acknowledges that the provisions of the Program Fraud Civil

Remedies Act of 1986, as amended, 31 U.S.C. § 3801 et seq. and U.S. DOT regulations, "Program Fraud Civil Remedies," 49 CFR Part 31, apply to its actions pertaining to this

Project. Upon execution of the underlying contract, the Contractor certifies or affirms the truthfulness and accuracy of any statement it has made, it makes, it may make, or causes to be made, pertaining to the underlying contract or the FTA assisted project for which this contract work is being performed. In addition to other penalties that may be applicable, the

Contractor further acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification, the Federal Government reserves the right to impose the penalties of the Program Fraud Civil Remedies Act of 1986 on the

Contractor to the extent the Federal Government deems appropriate.

(2)The Contractor also acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification to the Federal Government under a contract connected with a project that is financed in whole or in part with Federal assistance originally awarded by FTA under the authority of 49 U.S.C. chapter 53, the

Government reserves the right to impose the penalties of 18 U.S.C. § 1001 and 49 U.S.C. §

5323(1) on the Contractor, to the extent the Federal Government deems appropriate.

(3) The Contractor agrees to include the above two clauses in each subcontract financed in whole or in part with Federal assistance provided by FTA. It is further agreed that the clauses shall not be modified, except to identify the subcontractor who will be subject to the provisions.

4. ACCESS TO RECORDS AND REPORTS

49 U.S.C. 5325(g)

2 CFR § § 200.334, 200.337

The record keeping and access requirements extend to all third-party contractors and their contracts at every tier and subrecipients and their subcontracts at every tier.

Access to Records

a. Record Retention. The Contractor will retain and will require its subcontractors of all tiers to retain, complete and readily accessible records related in whole or in part to the contract, including, but not limited to, data, documents, reports, statistics, sub-agreements, leases, subcontracts, arrangements, other third-party agreements of any type, and supporting materials related to those records.

b. Retention Period. The Contractor agrees to comply with the record retention requirements in accordance with 2 CFR § 200.334. The Contractor shall maintain all books, records, accounts and reports required under this Contract for a period of at not less than three (3) years after the date of termination or expiration of this Contract, except in the event of litigation or settlement of claims arising from the performance of this Contract, in which case records shall be maintained until the disposition of all such litigation, appeals, claims or exceptions related thereto.

c. Access to Records. The Contractor agrees to provide sufficient access to FTA and its contractors to inspect and audit records and information, including such records and information the contractor or its subcontractors may regard as confidential or proprietary, related to performance of this contract in accordance with 2 CFR § 200.337.

d. Access to the Sites of Performance. The Contractor agrees to permit FTA and its contractors access to the sites of performance under this contract in accordance with 2 CFR §

200.337

5. CHANGES TO FEDERAL REQUIREMENTS

MA 34 §3(i)(6)

The Federal Changes requirement flows down appropriately to each applicable changed requirement.

Federal Changes - Federal requirements that apply to the Recipient or the FTA Award, the accompanying Underlying Agreement, and any Amendments thereto may change due to changes in federal law, regulation, other requirements, or guidance, or changes in the

Recipient’s underlying agreement including any information incorporated by reference and made part of that underlying agreement; and applicable changes to those federal requirements will apply to each third-party agreement and parties thereto at any tier. contractor's failure to so comply shall constitute a material breach of this contract.

6, TERMINATION CLAUSES

2 CFR § 200.339

2 CFR part 200, Appendix II (B)

All contracts in excess of $10,000 shall contain applicable provisions, as outlined below, for termination by the Recipient.

For all contracts in excess of $10,000, the termination clause extends to all third-party contractors and their contracts at every tier and subrecipients and their subcontracts at every tier.

a. Termination for Convenience (General Provision) The Recipient may terminate this contract, in whole or in part, at any time by written notice to the Contractor when it is in the

Government's best interest. The contractor shall be paid its costs, including contract close-out costs, and profit on work performed up to the time of termination. The Contractor shall promptly submit its termination claim to Recipient to be paid the Contractor. If the Contractor has any property in its possession belonging to the Recipient, the Contractor will account for the same and dispose of it in the manner the Recipient directs.

b. Termination for Default [Breach or Cause] (General Provision) If the Contractor does not deliver supplies in accordance with the contract delivery schedule, or, if the contract is for services, the Contractor fails to perform in the manner called for in the contract, or if the Contractor fails to comply with any other provisions of the contract, the

Recipient may terminate this contract for default. Termination shall be affected by serving a notice of termination on the contractor setting forth the manner in which the Contractor is in default. The contractor will only be paid the contract price for supplies delivered and accepted, or services performed in accordance with the manner of performance set forth in the contract.

If it is later determined by the Recipient that the Contractor had an excusable reason for not performing, such as a strike, fire, or flood, events which are not the fault of or are beyond the control of the Contractor, the Recipient, after setting up a new delivery of performance schedule, may allow the Contractor to continue work, or treat the termination as a termination for convenience.

c. Opportunity to Cure (General Provision) The Recipient in its sole discretion may, in the case of a termination for breach or default, allow the Contractor [an appropriately short period of time] in which to cure the defect. In such case, the notice of termination will state the time period in which cure is permitted and other appropriate conditions

If Contractor fails to remedy to Recipient's satisfaction the breach or default of any of the terms, covenants, or conditions of this Contract within [ten (10) days] after receipt by

Contractor of written notice from Recipient setting forth the nature of said breach or default, Recipient shall have the right to terminate the Contract without any further obligation to Contractor. Any such termination for default shall not in any way operate to preclude Recipient from also pursuing all available remedies against Contractor and its sureties for said breach or default.

d. Waiver of Remedies for any Breach In the event that Recipient elects to waive its remedies for any breach by Contractor of any covenant, term or condition of this Contract, such waiver by Recipient shall not limit Recipient's remedies for any succeeding breach of that or of any other term, covenant, or condition of this Contract.

e. Termination for Convenience (Professional or Transit Service Contracts) The

Recipient, by written notice, may terminate this contract, in whole or in part, when it is in the Government's interest. If this contract is terminated, the Recipient shall be liable only for payment under the payment provisions of this contract for services rendered before the effective date of termination.

f. Termination for Default (Supplies and Service) If the Contractor fails to deliver supplies or to perform the services within the time specified in this contract or any extension or if the Contractor fails to comply with any other provisions of this contract, the Recipient may terminate this contract for default. The Recipient shall terminate by delivering to the

Contractor a Notice of Termination specifying the nature of the default. The Contractor will only be paid the contract price for supplies delivered and accepted, or services performed in accordance with the manner or performance set forth in this contract.

If, after termination for failure to fulfill contract obligations, it is determined that the

Contractor was not in default, the rights and obligations of the parties shall be the same as if the termination had been issued for the convenience of the Recipient.

g. Termination for Default (Transportation Services) If the Contractor fails to pick up the commodities or to perform the services, including delivery services, within the time specified in this contract or any extension or if the Contractor fails to comply with any other provisions of this contract, the Recipient may terminate this contract for default. The

Recipient shall terminate by delivering to the Contractor a Notice of Termination specifying the nature of default. The Contractor will only be paid the contract price for services performed in accordance with the manner of performance set forth in this contract.

If this contract is terminated while the Contractor has possession of Recipient goods, the

Contractor shall, upon direction of the Recipient, protect and preserve the goods until surrendered to the Recipient or its agent. The Contractor and Recipient shall agree on payment for the preservation and protection of goods. Failure to agree on an amount will be resolved under the Dispute clause.

h. Termination for Default (Applicable to Construction) If the Contractor refuses or fails to prosecute the work or any separable part, with the diligence that will ensure its completion within the time specified in this contract or any extension or fails to complete the work within this time, or if the Contractor fails to comply with any other provisions of this contract, the Recipient may terminate this contract for default. The Recipient shall terminate by delivering to the Contractor a Notice of Termination specifying the nature of the default. In this event, the Recipient may take over the work and complete it by contract or otherwise, and may take possession of and use any materials, appliances, and plant on the work site necessary for completing the work. The Contractor and its sureties shall be liable for any damage to the Recipient resulting from the Contractor's refusal or failure to complete the work within specified time, whether or not the Contractor's right to proceed with the work is terminated. This liability includes any increased costs incurred by the

Recipient in completing the work.

The Contractor's right to proceed shall not be terminated nor the Contractor charged with damages under this clause if:

1. the delay in completing the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include acts of God, acts of the Recipient, acts of another Contractor in the performance of a contract with the Recipient, epidemics, quarantine restrictions, strikes, freight embargoes;

and

2. the contractor, within [10] days from the beginning of any delay, notifies the Recipient in writing of the causes of delay. If in the judgment of the Recipient, the delay is excusable, the time for completing the work shall be extended. The judgment of the

Recipient shall be final and conclusive on the parties, but subject to appeal under the

Disputes clauses.

If, after termination of the Contractor's right to proceed, it is determined that the Contractor was not in default, or that the delay was excusable, the rights and obligations of the parties will be the same as if the termination had been issued for the convenience of the Recipient.

i. Termination for Convenience or Default (Applicable to Architect and Engineering services) The Recipient may terminate this contract in whole or in part, for the Recipient's convenience or because of the failure of the Contractor to fulfill the contract obligations. The

Recipient shall terminate by delivering to the Contractor a Notice of Termination specifying the nature, extent, and effective date of the termination. Upon receipt of the notice, the

Contractor shall (1) immediately discontinue all services affected (unless the notice directs otherwise), and (2) deliver to the Contracting Officer all data, drawings, specifications, reports, estimates, summaries, and other information and materials accumulated in performing this contract, whether completed or in process. Recipient has a royalty-free, nonexclusive, and irrevocable license to reproduce, publish or otherwise use, all such data, drawings, specifications, reports, estimates, summaries, and other information and materials.

If the termination is for the convenience of the Recipient, the Contracting Officer shall make an equitable adjustment in the contract price but shall allow no anticipated profit on unperformed services.

If the termination is for failure of the Contractor to fulfill the contract obligations, the

Recipient may complete the work by contact or otherwise and the Contractor shall be liable for any additional cost incurred by the Recipient.

j. Termination for Convenience of Default (Applicable to Cost-Type Contracts) The

Recipient may terminate this contract, or any portion of it, by serving a notice or termination on the Contractor. The notice shall state whether the termination is for convenience of the

Recipient or for the default of the Contractor. If the termination is for default, the notice shall state the manner in which the contractor has failed to perform the requirements of the contract. The Contractor shall account for any property in its possession paid for from funds received from the Recipient, or property supplied to the Contractor by the Recipient. If the termination is for default, the Recipient may fix the fee, if the contract provides for a fee, to be paid the contractor in proportion to the value, if any, of work performed up to the time of termination. The Contractor shall promptly submit its termination claim to the Recipient and the parties shall negotiate the termination settlement to be paid the Contractor.

If the termination is for the convenience of the Recipient, the Contractor shall be paid its contract close-out costs, and a fee, if the contract provided for payment of a fee, in proportion to the work performed up to the time of termination.

If, after serving a notice of termination for default, the Recipient determines that the

Contractor has an excusable reason for not performing, such as strike, fire, flood, events which are not the fault of and are beyond the control of the contractor, the Recipient, after setting up a new work schedule, may allow the Contractor to continue work, or treat the termination as a termination for convenience.

7. CIVIL RIGHTS REQUIREMENTS

42 U.S.C. § 2000d, 49 CFR Part 21, 49 U.S.C. Chapter 53

42 U.S.C. § 6101et seq., 42 U.S.C. § 12101 et seq.

42 U.S.C. § 12132, 49 U.S.C. § 5332

29 CFR Part 1630, 41 CFR Parts 60 et seq.

42 U.S.C. § 2000e, 20 U.S.C. § 1681 et seq, 49 CFR Part 25, 45 CFR part 90

29 U.S.C. § 621 et seq, 29 CFR Part 1625,” 29 CFR Part 1625, 49 U.S.C. § 5323(h) (3), 29 U.S.C. § 794, 42 U.S.C. § 4151 et seq, MA 34 §12

The Civil Rights Requirements apply to all contracts.

The following Civil Rights laws and regulations apply to all contract tiers.

A. General Nondiscrimination Provisions

1. Title VI of the Civil Rights Act. The contractor and any subcontractor agree to comply with the requirements of (i) Title VI of the Civil Rights Act of 1964, as amended, 42 U.S.C. 2000d et seq.

which prohibits discrimination on the basis of race, color or national origin under any program or activity receiving Federal financial assistance, (ii) U. S. DOT regulation, “Nondiscrimination in

Federally Assisted Programs of the Department of Transportation—Effectuation of Title VI of the Civil Rights Act of 1964,” 49 CFR Part 21 and (iii) any implementing requirement FTA may issue (i.e. USDOT Order No. 1050.2A)

2. Nondiscrimination in Federal Public Transportation Programs. A person may not be excluded from participating in, denied a benefit of, or discriminated against under a project, program, or activity receiving FTA financial assistance because of race, color, religion, national origin, sex, disability, or age. 49 U.S.C. 5332(b). This anti-discrimination provision also applies to employment and business opportunities and is in addition to Title VI of the Civil Rights Act of

1964. 49 U.S.C. 5332(f).

B. Federal Equal Employment Opportunity (EEO) Requirements. These include, but are not limited to:

1. Equal Employment Opportunity. In accordance with Title VII of the Civil Rights

Act, as amended, 42 U.S.C. § 2000e et seq., Title I of the Americans with Disabilities

Act of 1990, as amended, 42 U.S.C. §§ 12101, et seq.; and Federal transit laws at 49

U.S.C. § 5332, the Contractor agrees not to discriminate in its employment practices on the basis of race, color, religion, national origin, or sex (including pregnancy status, sexual orientation, and gender identity). In addition, the Contractor agrees to comply with any implementing requirements FTA may issue.

2. Age. In accordance with (a) the Age Discrimination in Employment Act (ADEA), 29 U.S.C. §§ 621- 634, and the U.S. Equal Employment Opportunity Commission

(EEOC) implementing regulations, “Age Discrimination in Employment Act,” 29 CFR part 1625; and (b) the Age Discrimination Act of1974, as amended, 42 U.S.C. § 6101 et seq., and the U.S. Health and Human Services implementing regulations, “Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal

Financial Assistance,” 45 CFR part 90, and (c) Federal transit law at 49 U.S.C. § 5332, the Contractor agrees to refrain from discrimination against individuals on the basis of age. In addition, the Contractor agrees to comply with any Implementing requirements

FTA may issue.

3. Disabilities. The Contractor agrees that it will not discriminate against individuals on the basis of disability, in accordance with the following federal prohibitions against discrimination based on disability:

(i) Section 504 of the Rehabilitation Act of 1973, as amended, 29 U.S.C. § 794, which prohibits discrimination based on disability in the administration of federally assisted

Programs, Projects, or activities;

(ii) The Americans with Disabilities Act of 1990 (ADA), as amended, 42 U.S.C. §

12101, et seq., which requires that accessible public facilities and services be made available to individuals with disabilities:

(iii) The Architectural Barriers Act of 1968, as amended, 42 U.S.C. § 4151, et seq., which requires that buildings and public accommodations be accessible to individuals with disabilities;

(iv) Federal transit law, specifically 49 U.S.C. § 5332, which now includes disability as a prohibited basis for discrimination; and

(v) Other applicable federal laws, regulations, and requirements pertaining to access for individuals with disabilities.

In addition, the Contractor agrees to comply with any implementing requirements FTA may issue.

C. Federal Law and Public Policy Requirements. The Contractor shall ensure that Federal funding is expended in full accordance with the U.S. Constitution, Federal Law, and statutory and public policy requirements: including, but not limited to, those protecting free speech, religious liberty, public welfare, the environment, and prohibiting discrimination.

8. DISADVANTAGED BUSINESS ENTERPRISES (DBEs)

49 CFR Part 26

Applicability

The DBE program applies to all USDOT-assisted contracting activities.

A formal clause such as that below must be included in all contracts above the micro-purchase level. A clause providing whether or not, and to what extent, DBE participation has been established for a contract must flow down to subcontracts.

Disadvantaged Business Enterprises

This contract is subject to the requirements of Title 49, Code of Federal Regulations, Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial

Assistance Programs. As such, Disadvantaged Business Enterprises (“DBE’s”), as defined herein and in the Federal regulations published at 49 CFR part 26, shall have an equal opportunity to participate in USDOT-assisted contracts.

a. The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this DOT-assisted contract. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as Recipient deems appropriate, which may include, but is not limited to:

(1) Withholding monthly progress payments;

(2) Assessing sanctions;

(3) Liquidated damages; and/or

(4) Disqualifying the contractor from future bidding as non-responsible. 49 CFR §26.13(b).

b. Each subcontract the Contractor signs with a subcontractor must include the assurance as set forth in paragraph a. above. (see 49 CFR 26.13(b)).

9. INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS

FTA Circular 4220.1G

The incorporation of FTA terms applies to all contracts.

The incorporation of FTA terms has unlimited flow down.

The provisions within include, in part, certain Standard Terms and Conditions required under the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for

Federal Awards (2 CFR § 200), whether or not expressly set forth in the preceding contract provisions. All contractual provisions required by DOT, detailed in 2 CFR § 200 or as amended by 2 CFR § 1201, or the most recent version of FTA Circular 4220.1 are hereby incorporated by reference. Anything to the contrary herein notwithstanding, all mandated terms shall be deemed to control in the event of a conflict with other provisions contained in this Contract. The Contractor shall not perform any act, fail to perform any act, or refuse to comply with any request which would cause a violation of the FTA terms and conditions.

10. GOVERNMENT-WIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT)

2 CFR 180.200 – 180.225, 2 CFR 180.300, 2 CFR 180.970, 2 CFR Part 1200.220, Appendix II (H) of 2 CFR 1200, MA 34 §§4(h) and 39(b)

Applicability

All non-procurement contracts, as defined in 2 CFR §180.970 (including, but not limited to grants, cooperative agreements, scholarships, contracts of assistance, loans, subsidies, insurances, and payments for specified uses) and excepting those non-procurement transactions listed under 2 CFR §180.215.

Flow Down

All contracts of $25,000 or more at any tier, and to all contracts for federally required audit services at any tier irrespective of the contract amount, and to contracts that must be approved by an FTA official at any tier irrespective of the contract amount.

The Contractor shall comply and facilitate compliance with the requirements of the U.S. Office of Management and Budget “Guidelines to Agencies on Governmentwide Debarment and

Suspension (Non-procurement),” 2 CFR part 180, subpart C, as supplemented by U.S. DOT regulations, “Non-procurement Suspension and Debarment,” 2 CFR part 1200. As such, the

Contractor verifies that its principals, affiliates, and subcontractors are eligible to participate in this federally funded contract and are not presently declared by any Federal department or agency to be:

a) Debarred from participation in any federally assisted Award;

b) Suspended from participation in any federally assisted Award;

c) Proposed for debarment from participation in any federally assisted Award;

d) Declared ineligible to participate in any federally assisted Award;

e) Voluntarily excluded from participation in any federally assisted Award; or

f) Disqualified from participation in any federally assisted Award.

Failure to comply with suspension and debarment requirements may result in the termination of this contract or agreement.

The Contractor agrees to include a provision requiring such compliance in its lower tier covered transactions.

11. RESOLUTION OF DISPUTES, BREACHES AND OTHER LITIGATION

49 CFR Part 18; FTA Circular 4220.1G

All contracts in excess of $250,000 shall contain provisions or conditions which will allow for administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms and provide for such sanctions and penalties as may be appropriate. This may include provisions for bonding, penalties for late or inadequate performance, retained earnings, liquidated damages or other appropriate measures.

Applies to all contract tiers.

Disputes - Disputes arising in the performance of this contract which are not resolved by agreement of the parties shall be decided in writing by the Recipient’s authorized representative . This decision shall be final and conclusive unless within [ten (10)] days from the date of receipt of its copy, the Contractor mails or otherwise furnishes a written appeal to the Recipient’s authorized representative. In connection with any such appeal, the

Contractor shall be afforded an opportunity to be heard and to offer evidence in support of its position. The decision of the Recipient’s authorized representative shall be binding upon the Contractor and the Contractor shall abide by the decision.

Performance During Dispute - Unless otherwise directed by Recipient, Contractor shall continue performance under this contract while matters in dispute are being resolved.

Claims for Damages - Should either party to the contract suffer injury or damage to person or property because of any act or omission of the party or of any of his employees, agents or others for whose acts he is legally liable, a claim for damages therefor shall be made in writing to such other party within a reasonable time after the first observance of such injury of damage.

Remedies - Unless this contract provides otherwise, all claims, counterclaims, disputes and other matters in question between the Recipient and the Contractor arising out of or relating to this agreement or its breach will be decided by arbitration if the parties mutually agree, or in a court of competent…