20260812_DOT03010154_CTDOT_PWS_Proposal_Price_Sheet_RFP_Part V.pdf
PDF 22 KB Posted
- Solicitation number
- 26-CTRAIL-SIGNALS1
- Issued by
- Fairfield County, Connecticut
About this file
This is a Price Proposal Form for the Connecticut Department of Transportation (CTDOT) solicitation 26-CTRAIL-SIGNALS-1, which seeks new pre-wired signal equipment for a portion of the New Haven Line from Norwalk, Connecticut to Bridgeport, Connecticut. The proposal form itemizes 44 line items covering signal equipment installations at multiple locations, including CP-244, CP-255, CP-256, and CP-257 installations with associated components such as LED cases, bridge indication panels, and communication interface lines (CIL). Additional deliverables include training, network test sets, reliability backup equipment, portable diagnostic systems, ruggedized equipment, remote diagnostic systems, and remote diagnostic workstations as specified in various contract sections. The price proposal schedule will establish the total contract amount for all work required to complete the project, with milestone payments to be made according to the Contract Schedule D Payment Summary. CTDOT reserves the right to modify the sequence of deliveries with reasonable notice at no change to the contract price.
All pricing must be submitted in both numerical figures and words, with the price stated in words governing in case of discrepancy. Each line item price must include all labor, materials, equipment, overhead, and any additional costs necessary to complete the described work activity. The total contract amount encompasses all work required to complete the contract, including any items not specifically listed on the proposal form. The form includes three note references for additional clarification, though the specific content of these notes is not provided in the document excerpt. Contractors are required to provide a comprehensive total contract amount in words on the form to establish the binding price for all deliverables and services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item
No.
Item Description Price
1 CP-244 LOCATION A $
2 CP-244 LOCATION B LED CASE $
3 CP-244 BRIDGE INDICATION PANEL $
4 CP-244 CIL $
5 TCML-449 $
6 ML-455 $
7 TCML-463 $
8 TCML-471 $
9 ML-474 $
10 CP-248 (EXISTING CIL) $
11 ML-497 $
12 TCML-504 $
13 ML-506 $
14 TCML-515 $
15 TCML-522 $
16 ML-525 $
17 TCML-532 $
18 TCML-539 $
19 ML-543 $
20 TCML-547 $
21 CP-255 LOCATION A $
22 CP-255 LOCATION B $
23 CP-255 CIL $
24 CP-255 LOCATION C $
25 CP-255 LOCATION D $
26 CP-256 CIL $
27 CP-256 BRIDGE INDICATION PANEL $
28 CP-256 LOCATION C $
29 CP-257 LOCATION A $
30 CP-257 LOCATION B $
31 CP-257 LOCATION C $
32 CP-257 LOCATION D $
33 CP-257 CIL $
34 CP-257 LOCATION E $
35 CP-257 LOCATION F $
36 CP-257 LOCATION G $
37 CP-257 LOCATION H $
38 TRAINING (SPEC SECTION 20.0) $
SOLICITATION 26-CTRAIL-SIGNALS-1 PART 5 PRICE PROPOSAL FORM
Item
No.
Item Description Price
39 NETWORK TEST SETS (SPEC SECTION 21.11) $
40 RELIABILITY BACKUP EQUIMENT $
41 PORTABLE DIAGNOSTIC SYSTEM TEST SET $
42 RUGGEDIZED EQUIPMENT (SPEC SECTION 21.12) $
43 REMOTE DIAGNOSTIC SYSTEM (SPEC SECTION 11.0) $
44 REMOTE DIAGNOSTIC WORKSTATIONS $
NOTE 1
NOTE 2
NOTE 3 Note: CTDOT reserves the right, and the Contractor shall be provided reasonable notice, to modify the sequence of the deliveries based upon CTDOT's future requirements at no change to the contract price.
In case of discrepancy, the price stated in words shall govern, unless it is apparent from the
Proposal Data (as determined by CTDOT) that the Price expressed in figures is the actual price proposed. The price for each work description and the extended price shall include all labor, material, equipment, overhead and any additional costs necessary to complete the described activity of work.
TOTAL CONTRACT AMOUNT (IN WORDS)
This schedule will be used to establish the Total Contract Amount for all work. All work required to complete the Contract shall be included in the Total Contract Amount stated above regardless of whether a particular item of work is specifically listed or not. Milestone Payments will be made in accordance with the Contract Schedule D Payment Summary.