This is a Request for Quotation (RFQ) issued by the U.S. Embassy in New Delhi for roof waterproofing services at Bhagwan Das Road Apartment #1-6. The solicitation RFQ Number 191N6526Q0030 seeks quotations for a one-year initial contract period with four optional one-year renewal periods. All prices must be quoted in Indian Rupees (INR) and include labor, materials, overhead, and profit. Quotations must be submitted electronically to Newdelhibids@state.gov by 1400 hours (Local India Time) on April 15, 2026, with a mandatory site visit scheduled for April 8, 2026 at 11:00 AM at 1-B.D. Road, New Delhi. The Government reserves the right to award to a single contractor or multiple contractors and will determine contractor responsibility by analyzing compliance with FAR 9.1 requirements, including adequate financial resources, ability to meet performance schedules, satisfactory business integrity, necessary organization and experience, and required equipment and facilities.

The scope of work requires complete roof waterproofing restoration for approximately 12,700 square feet, including removal of existing materials, RCC slab repairs, installation of bituminous membranes, insulation, drainage systems, and concrete pavers, with all work to be completed within 45 working days. The contractor must provide all labor, materials (except Government-supplied items including bitumen, form blocks, membrane, pavers, marble chips, insulation, and filter fabric), equipment, and supervision. Mandatory insurance requirements include General Liability (Rs. 100,000 per occurrence/Rs. 1,000,000 cumulative) and Workers' Compensation as required by host country law. The contractor must comply with extensive safety standards including Personal Protective Equipment requirements, COVID-19 precautions, and specific protocols for welding, electrical work, ladder safety, and confined spaces. A five-year warranty is required for all work performed, and the contractor must successfully complete a 48-hour flood test before final acceptance. The contract is subject to numerous Federal Acquisition Regulation clauses and Department of State provisions, including those addressing labor standards, equal opportunity, ethics, environmental compliance, and Iran sanctions prohibitions.

View the file

Other files

File Type Posted
QA sheet.xls XLS spreadsheet
SF1449 Cover Page.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBU - CONTRACTING AND ACQUISITIONS

TABLE OF CONTENTS

SECTION 1 - THE SCHEDULE

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number-191N6526Q0030, Prices, Block 23

• Continuation To SF-1449, RFQ Number-191N6526Q0030, Schedule Of

Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 to Description/Specifications/Performance Work Statement, Government Furnished Property

SECTION 2 - CONTRACT CLAUSES

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

SECTION 3 - SOLICITATION PROVISIONS

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 4 - EVALUATION FACTORS

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR

Provisions not Prescribed in Part 12

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

RFQ NUMBER-191N6526Q0030

PRICES, BLOCK 24

I. Scope of Services

A. The contractor shall furnish and deliver supply of chemicals & providing professional services for maintaining the water quality of the central air-condition system installed at the

Enclave Plant, located at the U.S. Embassy, New Delhi, India in accordance with the scope of work set forth herein.

B. The contract will be for a one-year period from the date of the contract award, with four one-year options to renew. The initial period of performance includes any transition period authorized under the contract.

C. The prices listed below shall include all labor, materials, overhead, profit, and transportation necessary to deliver the required items to the [X] American Embassy, New Delhi, India.

D. All prices are in INR [Indian Rupee]

SECTION - 1

II. PRICING

The Contractor shall complete all work, including furnishing all labor, material, equipment, and services required under this purchase order for the following firm fixed price and within the time specified. This price shall include all labor, materials, all insurance, overhead and profit.

Labor Charges (INR)

Material Cost (INR)

Transportation Charges, If applicable (INR)

Total Cost (including all labor, material, freight) INR

GST Charges if applicable

Grand Total Cost

A.1 GOODS AND SERVICES TAX (GST)

In order to enable the U.S. Government to claim GST refunds, the Contractor will include GST as a separate charge on the Invoice and as a separate line item.

Offeror, registered with GST authority, should submit a copy of GST registration certificate along with the offer. This is a mandatory requirement for evaluation purposes. Acceptability will be determined by assessing the offeror's compliance with the terms of the solicitation. The

The government will determine contractor responsibility by analyzing whether the apparent successful offeror complies with the requirements of FAR 9.1.

In order to enable the U.S. Government to claim GST refunds, the offeror shall indicate GST separately. The contractor shall furnish tax invoices in accordance with New Delhi GST regulations. GOI registered vendors must print the Embassy’s UID 0717USA00138UNS on the invoice otherwise their invoice shall be rejected by the Embassy.

52.216-27 Single or Multiple Awards (Oct 1995)

The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation.

(End of provision)

CONTINUATION TO SF-1449,

RFQ NUMBER 191N6526Q0030

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

STATEMENT OF WORKS

FOR

ROOF WATERPROOFING

AT

BHAGWANDAS ROAD APARTMENT # 1 to 6

1.0 BRIEF DESCRIPTION OF WORK:

1.1 The United States Embassy, New Delhi has a requirement to re-store roof waterproofing for Block # 1, Apartment # 1 to 6 at Bhagwan Das Road compound.

1.2 Contractors are advised to visit the site, verify measurements as mentioned in the

SOW.

1.3 Any ambiguity found later will be at the discretion of the contracting officer for any modification.

1.4 Complete waterproofing job shall be done by skilled/professional workers.

1.5 Project requires a qualified Roof Contractor to perform a restoration as per scope of work.

1.6 The contractor shall be given total 45 working days to complete this project.

2.0 GENERAL GUIDELINES

2.1 The Contractor shall provide all required labor, material (except the GFI), equipment, and supervision to complete the project.

2.2 Contractors are advised to conduct the site visit to understand the requirement and verify measurements.

2.3 Contractors are recommended to seek clarifications regarding this statement of work and site conditions at the time of walk through from the COR of this project.

2.4 The contractors can write unclear queries to the contracting office after the walk thru.

2.5 Embassy contracting office will consult with COR and respond to all the queries in writing before the due date of the submission of quotes.

2.6 Embassy expects professional craftsmanship and supervision from the bidders.

2.7 The timeline for this project is 45 calendar days.

2.8 The contractor must adhere to the safety mandates explained in this document,

2.9 The contractor and his/ her staff must wear Personnel Protective Equipment (PPE) while at embassy construction site. Contractor can add cost of PPE to the bid and must comply the PPE guidelines 100% at USG facilities. Contractor will be countable for the delay caused by non-compliance.

2.10 No work will be allowed to perform at USG construction sites without the PPEs and the contractor will be accountable for the delays caused due to the safety issues.

2.11 PPE includes steel toe shoes, protective goggles, hard hats, coveralls and COVID -19 protective masks.

2.12 The contractor shall include the cost of the PPEs and other logistical expenses to manage the safety and PPE guidelines while bidding.

2.13 The contractor will be held responsible and accountable for any deviations from the safety and PPE guidelines specified in this document.

2.14 All work shall be performed by skilled and competent crew.

2.15 The Contractor shall follow security and safety directions as mentioned in the statement of works and explained by the COR.

2.16 The Contractor shall submit the construction bar chart to the COR within 2 working days upon obtaining the letter to proceed from the contracting office.

2.17 The Contractor shall submit all the cut sheets / broachers and material samples for

COR approval before delivery of material at site.

2.18 All materials shall be delivered, hoisted on the exterior and stored as per space allotted.

2.19 Contractor shall dispose of all the debris from the site and keep the site clean and in workable condition throughout the project duration.

3.0 SCOPE OF WORK FOR ROOF WATERPROOFING OF 25-A/B/C PRITHVIRAJ ROAD (12700 sq.ft.)

3.1Remove existing marble chips, pavers, felt layers complete with insulation, vermiculite etc. and reach up to RCC slab. (app. 12700 sq. ft.) including servant quarter roof.

Contractor shall do necessary repair to the slab with recommended polymer mortar of SIKKA or Fosrock or equivalent makes.

After repair of RCC slab, provide a layer of form mortar layer mixed with waterproof compound (SIKKA LATEX) as per manufacturer instructions, to make slop towards drains on entire slab. The slop shall be maintained as 2% i.e.

2.5” for every 10’-0”.

After curing the mortar layer, provide and install a layer of bitumen primer, followed by layer of hot bitumen once dried. The bitumen shall be laid or spread @ 1.7 kg/sq. mt. Then install bituminous felt (two layers) over the 85/25-grade hot bitumen. The felt shall laid by touching the membrane and by heating the felt in accordance with manufacturer's recommendation to achieve continuous edge flow and complete bond. First layer of bitumen membrane shall be 4mm thick APP modified plastomeric bitumen non-woven polyster and the second membrane shall be 3mm thick. The terminated end of bitumen membrane shall be done as per site condition requirement.

Note : Embassy will provide all required quantity of bitumen and membrane/felt (both 3kg & 4kg) for this project.

Note: The longitudinal side of felt shall be overlap minimum 4 inches and end laps minimum 8 inches. All the gaps and overlaps/ joints shall be sealed with hot bitumen.

On top of second layer of felt a final coat of hot bitumen shall be done as per details and standards.

Above the final layer of bitumen, provide a layer of mortar with chicken wire mesh in between slop toward drain.

The slope shall be 2% towards rainwater drains and thickness of mortar shall be minimum 1” and any points.

Before the mortar is laid, contractor shall do the flood test (minimum 48 hrs.) of complete roof. 4” to 5” water shall be standing over the roof after placing the sand bags around to hold the water for 48 hours. Check for any leakage.

Contractor shall repair the leak, if any before proceeding for next

3.8 The contractor shall provide and lay 300-micron polythene sheet of transparent color over the mortar layer and also over Polystyrene Insulation.

3.9 Provide and Install PVC drain board, DRENTEX protect 50 of TEXSA/DELTA makes over and above the polythene sheet.

On top of draintex, provide and install 2” (50 mm) thick inter lockable Extruded Polystyrene Insulation. The insulation will be applied in parallel rows and all sides/end joints will be installed closely but not forced.

Over the insulation the contractor shall spread Filter Fabric all over the roof to cover the insulation.

Provide and install concrete pavers on top of filter fabric at every 4’-0” distance center to center. The space between pavers shall be filled with 1” thick marble chips or gravel.

Provide and install ALUMINUM flashing (14-gauge) at the edges, where felt terminated with necessary anchors and silicon. Aluminum flashing shall be as per parapet design.

3.15 Provide and install additional drain pipes (approx. Three). as per site requirements as per the slope at roof. The contractor shall provide drain cover (16”X16”X8”), made of stain-less steel bar and S/S screen/wire-mesh (10-gauge, stainless steel-316 grade) for all the drains so that no leaves can pass through.

4.0 Warranties and Flood Test

a) Contractor’s warranty: Furnish a written warranty agreeing to repair / replace defective installation and workmanship causing leakage of water, deterioration of materials and other failures of the installed system, sealants, painting, coatings, and related work on this project, to perform as required within the warranty period.

Warranty period is five years after date of the written final acceptance.

b) Flood Test : The contractor shall complete the flood test for recently waterproof roof. For testing at least 4” water to be filled and retained for 48 hours. Any leakage found shall be repaired appropriately.

5.0 Materials/Makes

Government Supplied Materials :

1. Required quantity of bitumen for entire project.

2. Form Blocks – 2” and 4” as per slope requirements

3. 3kg & 4kg bitumen membrane / felt.

4. Concrete Pavers

5. Marble Chips/Gravel

6. Extruded Polystyrene Insulation

7. Filter Fabric

Contractor provided materials :

1. Bituminous primer (STP)

2. Aluminum roof coating, as required.

3. Waterproof Compound- SIKKA LATEX, PENETRON

4. 300-micron polythene sheet

5. LPG bottle for heating bitumen.

6. Kettle with burner for melting bitumen

7. Cement for repair and mortar layering on top of membrane

8. Stone dust.

9. Drain Board

10. S/S Drain covers

11. Cement

12. Aluminum Flashing

The Contractor shall provide all remaining material to complete the job as per given scope of work.

Provide sample of the material for the approval from COR before using it in the project or before delivery of material at site.

Contractor shall use material of brands or make as given or equivalent quality material only.

6.0 SITE CLEANING

6.1 Contractor shall broom clean the entire site and the storage area after the completion of the project and on each day at close of business.

6.2 Contractor will paint the area of the exterior walls or other areas which will be affected during the project matching to existing paint.

7.0 CONTRACTOR’S RESPONSBILITY

7.1 The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all construction and other services furnished under this contract. The Contractor shall correct or revise any errors or deficiencies in its construction and other services without additional compensation,

7.2 The Contractor shall identify a Project Manager/Supervisor who shall be responsible for the overall management of this Contract. Project Manager shall be qualified and have the experience in same type of job.

7.3 The Contractor is responsible for safety and shall comply with all local labor laws, regulations, customs, and practices pertaining to labor, safety, and similar matters. The Contractor shall promptly report all accidents resulting in lost time, disabling, or fatal injuries to the COR.

7.4 . Embassy will provide water and power at site, but the Contractor shall be responsible for connection from the main source to project location.

7.5 All expenses towards mobilization at site and demobilization including bringing in equipment, workforce and materials, profit and overheads, dismantling the equipment, removal of debris, clearing the site etc. should be included in the rates quoted by the contractor. No separate payment on such expenses shall be entertained.

7.6 Contractor should keep the site clean and accessible to Embassy employees all time.

8.0 SAFETY

In addition to the attached Accidental prevention clause contractor will be responsible for

6.1 Any miss-happening at the site due to negligence in the safety measures.

6.2 Contractor will provide all Personal Protective Equipment for the workers as per the requirement of the site. Work will be stopped in case proper protection equipment are not find with the workers and lapse of the time will at the part of the contractor.

6.3 Contractor will make sure that all the arrangements for the work are working conditions are safe in all respect.

Under no circumstance Embassy will be held responsible for any incident happen on the site due to negligence of the contractor / worker.

9.0 General Notes

9.1 Once the project starts, it is contractor’s responsibility to secure the roof against any kind of seepage / leakage to the floors underneath. Any damage / seepage / leakage occurred to the slab or to the other parts of the building while project is in progress will be contractor’s responsibility and will repair the damages matching to existing.

9.2 Contractor will be responsible for the safety of all the existing wires running on the roof during demolition phase.

9.3 Contractor will provide all the material required to complete the job in satisfactory manner except

Embassy supply items.

9.4 Contractor shall provide and use LPG gas kettle for heating of bitumen. Contractor shall arrange for fire extinguishers while the gas cylinder is in use at the site. Under no circumstance wood will be allowed for heating the bitumen. In case of any miss-happening Embassy will not be responsible.

9.5 Contractor should arrange the visit of the professional in this field from manufacturer side time to time

(once or twice throughout the duration of the project) to supervise the project during work in progress.

9.6 One qualified technical supervisor from contractor side should always be present on the site. He should be able to speak and understand English language.

9.7 The contractor shall provide all necessary documents and duly fill the access form for entry to Embassy

Compound. The access request should be submitted 48 hours prior to the requirement.

9.8 All demolished material shall be removed from the site, unless otherwise specified, on daily basis. The contractor will be entirely responsible for the disposal of all the trash and debris and will be the only one to attend to any fine or penalty imposed by city authorities for improper disposal. The contractor shall take all necessary precaution/protection and approval from local authorities for disposal of debris.

9.8 Working Hours

• Working hours shall be 8.30 A.M. to 5.00P.M. Monday to Saturday. No work shall be done on

Sundays/holidays unless otherwise approved. Total 45 working days shall be given. No noisy work on

Saturdays.

SAFETY STANDARDS TO BE FOLLOWED AT CONSTRUCTION AND RENOVATION

SITES

Contractor:

Work Site Address:

Contractor Safety Officer Name:

Signature for Acceptance by the contractor:

Safety standards to be followed at construction and renovation sites AHA – Activity Hazard Analysis

1. The contractor must document in the bid for the work how the control of each hazard will be implemented and maintained during the project by submission of a safety plan and activity hazard analysis (AHA) for high hazard activities. The POSHO or qualified Post representative must review the contractor's proposal and provide feedback to the responsible project manager and Contracting Officer prior to acceptance of the bid.

2. Any situation where in the work in progress can pose a threat to the user of work area in emergency, contractor shall ensure proper barricading (sturdy enough for the purpose) to avoid any risk.

Covid 19 Precautions

1. Every worker on site shall wear a mask and gloves all the time.

2. Workers shall maintain social distancing – six feet - all the time.

3. Sanitize or wash your hands frequently.

4. No worker shall be in proximity with other worker for more than 10 minutes and that too with the mask and gloves on.

5. Contractor shall ensure temperature testing of all workers coming on site in the morning and randomly during entire day to make sure that no one is suffering from fever.

6. Any worker showing any symptoms of fever, cough and cold, body ache etc. shall not be allowed to work till he is been ruled out of being positive.

General

1. All workers on the work site must wear safety shoes on construction site. No worker with flip flops will be allowed to work at site.

2. All the workers should wear full clothes. No half pants and other non- appropriate clothing (Dhoti) will be accepted.

3. Malba / trash accumulated on the site should be removed at a regular interval (if possible on daily basis) so that it should not pose any trip hazard.

4. Employee exposed to hazards created by different works environment shall be protected by personal protective equipment. Appropriate protective clothing for any operation varies with the size, nature and location of work to be performed.

5. In extreme hot conditions drinking water must be made available to the worker and working duration in exposed conditions should be scheduled accordingly.

6. It is the responsibility of the contractor to made available all the PPE (Personal Protective

Equipment) as per the requirement of the work site and as directed by the COR. Any mishap due to negligence on the part of the contractor will be entirely contractor’s responsibility.

Machinist / Welding Jobs

1. Hot work permit is required to be filled for each hot work to be performed on USG site.

2. Contractor shall follow attached standards regarding different type of welding to be done on the site.

3. All workers who are arc welding must use a full face shield with #10 or darker lenses. No worker will be allowed to arc weld with sun glasses, no matter how dark the lenses.

4. All the workers working on grinding and sanding job should have approved face masks and goggles for face and eye protection.

5. Workers handling the heavy metallic material should have appropriate gloves and safety shoes as per the job requirement.

6. Lifting and shifting of the heavy material to be done with the help of appropriate machines.

7. Compressed gas cylinder shall be properly marked and should always be kept in standing positing with guard against fall.

8. Hoses connected to the cylinder should be in good condition.

9. In case Arc welding is done inside the premises proper ventilation should be arranged in the vicinity.

10. Contractor should use welding shield during the work to protect the people around against any potential vision hazard.

11. Always keep an approved fire extinguisher near the site of welding.

12. Workers working with metal sheets must wear appropriate gloves to avoid any cuts on the hands or mishap on the site.

13. Electrical connections for the welding set and the grounding for the same shall be done properly to the satisfaction of the embassy electrician. Please refer electrical section in the document.

Ladders Safety

1. Contractor will use aluminum or fiber glass ladders for all purposes. Wooden ladders are not allowed on the site.

2. Proper ladder for a specific job should be used (for example fiber glass ladders for electrical work etc.).

3. Damaged ladders or ladders with missing supports, shoes etc should not be used on the site.

4. Height of the ladder should be at least two feet above the required height for the work.

Electrical

1. All the equipment / machines to be used for the execution of the job should be properly grounded.

2. All the extension boards to be used at the site should have proper earthing.

3. All connections to any of the outlets should be through three pin plug. Direct connection of wires in not allowed on the site.

4. Damaged wiring/ cabling for the machines / tools to be used at site are not acceptable. The extension cord or wire with the machines should be one core.

5. Electricians working on the site should wear shoes with rubber soles and should use rubber gloves during execution of the work.

6. Any heavy equipment to be plugged in for the work should be done under supervision of the embassy electrician. Contractor on his own should not plug in heavy equipment.

7. No taped joint or undersize wiring is allowed at the site for the work.

Carpentry

1. Carpenters should have dust mask to protect them from the potential hazard from saw dust.

In case sanding machine is used at the site the machine should have proper guards and operator should have suitable PPE (personal protective equipment) with them. For e.g. safety goggles, safety shoes, gloves etc.

2. All the wood to be used at the site should be properly stacked at one side. It should not be scattered around and pose a threat for a trip hazard.

3. Entire site should be kept clean from the saw dust at the end of the day.

4. Carpenter shall use machine guards if at all machines are used at the site.

5. All the care should be taken to protect the flooring against any kind of potential damage.

6. All the drill machines or other electrical tools to be used at the site should be properly grounded and wired.

7. Contractor should use proper tools and tackles for the execution of the work at site.

8. Nails and other sharp material which can pose a threat of accident should not be scattered on the site.

Fire

1. Contractor shall provide and place fire extinguishers as per the requirement of the site (as recommended by the COR).

2. No flammable material should be kept inside the premises at any given point of time.

Lock Out / Tag Out

1. Lock out devices should be used during the testing of the electrical points and wiring.

Confined spaces

1. If at all contractor has to work in a confined space he should contact the COR before proceeding with the work. Contractor should arrange all the equipment as instructed by the COR to accomplish the job in a safe manner.

Hearing Protection

1. Contractor should assure that all the workers working in noisy surroundings should wear ear muffs or other approved devices.

Height Protection

1. Any work to be carried out over and above 8’-0” needs a sturdy metal pipe scaffolding to carry out that work. Ladder or any other arrangement needs to a preapproval from COR to be implemented on the site.

For any further clarification please contact POSHO (Post Occupational Safety and Health Officer) at # 011-24198136 OR APOSHO Ms. Vidushi Sharma at 011-24198714.

SECTION 2 - CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(NOV 2023) IS INCORPORATED BY REFERENCE. (SEE SF-1449,

BLOCK 27A)

CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE

ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or

Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further

Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services

Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L.

115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV

2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR

2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws

108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN

2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV

2021) (41 U.S.C. 3509)).

https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_233_3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 https://www.acquisition.gov/far/part-52#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_203_13

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and

Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C.

4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

X(5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract

Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

__ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-

117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery

Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

X (9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section

102 of Division R of Pub. L. 117-328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal

Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC

2023) ( Pub. L. 115–390, title II).

X (11)

(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—

Prohibition. (DEC 2023) ( Pub. L. 115–390, title II).

__ (ii) Alternate I (DEC 2023) of 52.204-30.

X (12) 52.209-6, Protecting the Government's Interest When Subcontracting With

Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025)

( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility

Matters (OCT 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022)

( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business

Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)

(15 U.S.C. 657a).

__ (17) [Reserved] https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/part-3#FAR_3_900 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://www.acquisition.gov/far/part-52#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/part-52#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/part-52#FAR_52_204_30 https://www.acquisition.gov/far/part-52#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/part-52#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_4

__ (18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (JAN

2025)( 15 U.S.C. 637(d)(2) and (3)).

__ (21)

(i) 52.219-9, Small Business Subcontracting Plan (JAN 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (NOV 2016) of 52.219-9.

__ (iii) Alternate II (NOV 2016) of 52.219-9.

__ (iv) Alternate III (JUN 2020) of 52.219-9.

__ (v) Alternate IV (JAN 2025) of 52.219-9.

__ (22)

(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (MAR 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP

2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled

Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program

(FEB 2024) (15 U.S.C. 657f).

__ (26)

(i) 52.219-28, Postaward Small Business Program Rerepresentation (JAN 2025)

(15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (MAR 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically

Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_14 https://www.acquisition.gov/far/part-52#FAR_52_219_16 https://www.acquisition.gov/far/part-52#FAR_52_219_27 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_29

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned

Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT

2022) (15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR

2020) ( 15 U.S.C. 644(r)).

__ (30) 52.219-33, Nonmanufacturer Rule (SEP 2021) ( 15 U.S.C. 637(a)(17)).

__ (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

__ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN

2025)( E.O. 13126).

__ (33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

__ (34)

(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

__ (ii) Alternate I (FEB 1999) of 52.222-26.

__ (35)

(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (JUL 2014) of 52.222-35.

__ (36)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN

2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (JUL 2014) of 52.222-36.

__ (37) 52.222-37, Employment Reports on Veterans (JUN 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations

Act (DEC 2010) (E.O. 13496).

X (39)

(i) 52.222-50, Combating Trafficking in Persons (OCT 2025) (22 U.S.C. chapter 78 and E.O. 13627).

__ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (JAN 2025) ( Executive Order

12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in

FAR 22.1803.)

https://www.acquisition.gov/far/part-52#FAR_52_219_30 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/part-52#FAR_52_222_21 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_35 https://www.acquisition.gov/far/part-52#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_36 https://www.acquisition.gov/far/part-52#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_40 https://www.acquisition.gov/far/part-52#FAR_52_222_50 https://www.acquisition.gov/far/part-52#FAR_52_222_50 https://www.acquisition.gov/far/part-52#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/part-22#FAR_22_1803

__ (41)

(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–

Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (MAY 2024) ( 42 U.S.C. 7671, et seq.).

__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (MAY 2024) ( 42 U.S.C. 7671, et seq.).

__ (44) 52.223-20, Aerosols (MAY 2024) ( 42 U.S.C. 7671, et seq.).

__ (45) 52.223-21, Foams (MAY 2024) ( 42 U.S.C. 7671, et seq.).

__ (46) 52.223-23, Sustainable Products and Services (MAY 2024) ( E.O. 14057, 7

U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47)

(i) 52.224-3 Privacy Training (JAN 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (JAN 2017) of 52.224-3.

__ (48)

(i) 52.225-1, Buy American-Supplies (OCT 2022) (41 U.S.C. chapter 83).

__ (ii) Alternate I (OCT 2022) of 52.225-1.

__ (49)

(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV

2023) ( 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19

U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-

302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (JAN 2025) of 52.225-3.

__ (iv) Alternate III (FEB 2024) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

https://www.acquisition.gov/far/part-52#FAR_52_223_9 https://www.acquisition.gov/far/part-52#FAR_52_223_9 https://www.acquisition.gov/far/part-52#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_223_23 https://www.federalregister.gov/executive-order/14057 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_224_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_225_1 https://www.acquisition.gov/far/part-52#FAR_52_225_1 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2112&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section4001&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim

X (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the

Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United

States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for

Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007)

(42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C. 5150).

X (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While

Driving (MAY 2024) ( E.O. 13513).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

X (57) 52.232-29, Terms for Financing of Purchases of Commercial

Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial

Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

X (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award

Management (OCT2018) ( 31 U.S.C. 3332).

X (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award

Management (Jul 2013) (31 U.S.C. 3332).

__ (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

__ (62) 52.239-1, Privacy or Security Safeguards (AUG 1996) ( 5 U.S.C. 552a).

X (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (NOV 2024) (Sections 1821-1826, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).

__ (64) 52.242-5, Payments to Small Business Subcontractors (JAN

2017) (15 U.S.C. 637(d)(13)).

__ (65)

(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV

2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631).

__ (ii) Alternate I (APR 2003) of 52.247-64.

__ (iii) Alternate II (NOV 2021) of 52.247-64.

https://www.acquisition.gov/far/part-52#FAR_52_225_13 https://www.acquisition.gov/far/part-52#FAR_52_225_26 https://www.acquisition.gov/far/part-52#FAR_52_226_4 https://www.acquisition.gov/far/part-52#FAR_52_226_5 https://www.acquisition.gov/far/part-52#FAR_52_226_8 https://www.federalregister.gov/executive-order/13513 https://www.acquisition.gov/far/part-52#FAR_52_229_12 https://www.acquisition.gov/far/part-52#FAR_52_232_29 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_232_30 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_232_34 https://www.acquisition.gov/far/part-52#FAR_52_232_36 https://www.acquisition.gov/far/part-52#FAR_52_239_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_240_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section3901&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_242_5 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section55305&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_247_64

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: N/A

__ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter67).

__ (2) 52.222-42, Statement of Equivalent Rates for Federal

Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price

Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and

41 U.S.C. chapter 67).

__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price

Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements

(May 2014) (41 U.S.C. chapter 67).

__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

__ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order

14026 (JAN 2022).

__ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O.

13706).

__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020)

(42 U.S.C. 1792).

__ (10) 52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to Prevent Human Trafficking (JAN 2025) ( 49 U.S.C. 40118(g)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the

Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor

Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after https://www.acquisition.gov/far/part-52#FAR_52_222_41 https://www.acquisition.gov/far/part-52#FAR_52_222_42 https://www.acquisition.gov/far/part-52#FAR_52_222_43 https://www.acquisition.gov/far/part-52#FAR_52_222_44 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section206&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_51 https://www.acquisition.gov/far/part-52#FAR_52_222_53 https://www.acquisition.gov/far/part-52#FAR_52_222_55 https://www.acquisition.gov/far/part-52#FAR_52_222_62 https://www.acquisition.gov/far/part-52#FAR_52_226_6 https://www.acquisition.gov/far/part-52#FAR_52_247_69 https://www.govinfo.gov/link/uscode/49/40118 https://www.acquisition.gov/far/part-2#FAR_2_101 https://www.acquisition.gov/far/part-52#FAR_52_215_2 https://www.acquisition.gov/far/part-4#FAR_Subpart_4_7 any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the

Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV

2021) (41 U.S.C. 3509).

(ii) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C.

4712).

(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further

Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iv) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services

Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L.

115-91).

(v) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(vi) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section

102 of Division R of Pub. L. 117-328).

(vii)

(A) 52.204–30, Federal Acquisition…