This document is a solicitation (RFQ Number 191N6524Q0036) issued by the U.S. Embassy in New Delhi, India for the supply, installation, testing, and commissioning of a centralized 25TR energy-efficient HVAC system for the ACSA commissary. The solicitation requires the contractor to provide the HVAC equipment, installation, testing, and commissioning services. Proposals are due by 2:00 PM local time on May 6, 2024. The solicitation includes a firm-fixed-price contract type and details the statement of work, pricing, evaluation factors, and representations and certifications required from offerors. Key requirements include supplying VRV/VRF type outdoor units, ceiling-mounted cassette-type indoor units, centralized controls, copper piping, electrical work, and drain piping. The contractor must also comply with various safety and security requirements. Award will be made to the lowest priced, technically acceptable, responsible offeror.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-1449_191N6524Q0036 (1).pdf | ||
| Cover-letter_191N6524Q0036.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ NUMBER 191N6524Q0036
TABLE OF CONTENTS
SECTION 1 - THE SCHEDULE
• SF 1449 cover sheet
• Continuation To SF-1449, RFQ Number 191N6524Q0036, Prices, Block 23
• Continuation To SF-1449, RFQ Number 191N6524Q0036, Schedule Of Supplies/Services, Block 20 Description/Specifications/Work Statement
• Attachment 1 to Description/Specifications/Statement of Work, Government Furnished
Property
SECTION 2 - CONTRACT CLAUSES
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
SECTION 3 - SOLICITATION PROVISIONS
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part
SECTION 4 - EVALUATION FACTORS
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 5 - OFFEROR REPRESENTATIONS AND CERTIFICATIONS
• Offeror Representations and Certifications
• Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not
Prescribed in Part 12
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449
PRICES, BLOCK 23
I. SCOPE OF SERVICES
The Contractor shall deliver supply, installation, testing and commissioning of centralized energy efficient HVAC system of approximately capacity 25TR with control panels at ACSA commissary as per attached scope of work. to the U.S. Embassy, Chandragupta Marg, Chanakyapuri, New Delhi, 110021.
This is a Firm -Fixed price type of purchase order/contract.
The price listed below shall include all labor, materials, overhead, profit, and transportation necessary to deliver the required items to the American Embassy, Chandragupta Marg, Chanakyapuri, New Delhi, 110021.
All prices are in Indian Rupee or USD.
II. PRICING
Line
Item Description Unit Unit Price Est. Quantity* Total Price
Supply of centralized energy efficient HVAC system of approximately capacity 25TR with control panels at ACSA commissary as per attached scope of work. 1 LS
Installation, testing and commissioning 1 LS
03 Freight 1 LS
04 GST on commodity 1 LS
05 GST on freight 1 LS
Grand Total
Scope of work
STATEMENT OF WORK FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
CENTRALIZED HVAC SYSTEM AT ACSA COMMISSARY, AMERICAN EMBASSY, ENCLAVE
COMPOUD
1.0 General:
The US Embassy, New Delhi require to hire services of professional company for supply, installation, testing and commissioning of centralized energy efficient HVAC system of approximately capacity 25TR with control panels at ACSA commissary.
2.0 Detailed Description:
1. American Embassy require services for installation, testing and commissioning of centralized HVAC system inside the ACSA commissary consist of three portions covering total approx.
area 4350 sq feet with a ceiling height of 10’6” (10 feet and 6 inches).
2. Supply, install, test and commission appropriate HVAC system to provide about 25 TR air-conditioning (dual mode with heat pump) inside the space.
3. Outdoor units: Supply, install, test and commission multiple Condenser (outdoor) units of VRV/VRF type with environmentally friendly refrigerant like R410 or equivalent, for this project. These units should be compatible for local electrical power specs i.e. 220V/50 Hz or 380-415V / 50Hz. The contractor shall mount all condenser units on galvanized iron frame with minimum 6 inch above the ground preferably with drip tray. The condenser units should be installed at roof top. And contractor can see the exact location during the walkthrough.
Preferred make is Daikin/ Mitsubishi / Panasonic/Carrier.
4. Indoor units: Supply, install, test and commission multiple indoor units, ceiling mount cassette type with remote, inside the conditioned space. These units should be compatible for local electrical power specs i.e. 220V/50 Hz or 380-415V / 50Hz. The indoor units should have built in drip pan and preferably with drain pump, connected to the nearest drain. The indoor and outdoor units should be of same brand/make for compatibility. The contractor shall install the indoor units in such way that sufficient cooling is achieved inside the space.
We will prefer mounting of these units using vibration isolators tie rods.
5. Controller: The contractor shall provide a centralized control units (preferably HMI) to control all indoor or outdoor units. Controller should have programming capability of controlling or monitoring all indoor / outdoor units individually or in group of zones. We will prefer the centralized controller have provision to connect with BAS (building automation system) or fire alarm panels. We will also prefer if the control unit can send sms or email alerts.
6. Copper Piping and Interconnection: The contractor shall supply and install Refnet (also known as Y shaped copper fitting) and precision piping method (gas tight joint) for refrigerant pipe interconnection between outdoor AC unit and indoor AC units. The copper pipe should be supplied and installed as per A/C manufacturer specifications along with closed insulation having minimum R3 value. The copper pipe supplied and used shall be of make Maxflow/ Mandev or equivalent. The contractor shall perform the leak test of copper piping (using vacuum machine) for minimum overnight before charging the HVAC lines. The contractor shall provide necessary top up refrigerant quantity, as needed. The contractor shall supply and install metal angle support for copper piping as per site requirements and secure it with the appropriate fasters / anchors.
7. Electrical: The contractor shall supply and install separate weatherproof (IP65/67) power panel for the outdoor A/C units with electrical circuit breakers (MCCB), start panel, overload relays, copper bus bar, ON-OFF indicator, of suitable power rating as recommended by the manufactures of indoor / outdoor AC units. The electrical components shall be of make ABB/Schinder / L&T / Legrand or equivalent. The contractor shall supply and install manufacturer recommended PVC electrical cable for power connection to the indoor and outdoor units. PVC electrical cable should be of make Ploycab/ Havells / Finolex or equivalent. The contactor shall provide perforated metal cable tray (preferably GI) with cover for laying the electrical cable for outdoor units. The contractor shall use GI conduit with appropriate end connectors of suitable size for power connection to indoor units for straight and longer run, for smaller run contractor can use the flexible metal conduits along with appropriate end connectors, at the termination point. The contractor shall the test the power cable before final termination. The contractor will make a separate chemical earth pit if recommended by the manufacturer The earth pit will be made using ½” diameter solid copper rod of length 10 feet and having a value less than 10 ohms.
8. Drain piping: Contactor shall supply, install, and interconnect drip pan of all indoor units using rigid PVC pipe of minimum diameter 1 ¼ inch and 6 mm thickness of make Astrol/ Finolex/ Surya/Prakash or equivalent. The drain piping should be insulated using minimum 9mm thick nitrile rubber closed tube of Class “O” thermal insulation or make Armaflex / Aerocell or equivalent. There could be multiple drain piping base on the number of indoor units installed and all drain piping should be connected to the nearest drains.
9. Hardware: The contractor shall supply all kind of hardware like anchors, fasters, PVC fittings, copper piping fittings, electrical conduits end connectors, clamps, nut bolts, and other required hardware for completion of this project.
10. Warranty: Minimum one year warranty for entire system and multiple year warranty for the key components like PCB and compressors.
11. The contractor shall provide the single line diagram along with all O&M (Operation and Maintenance) manuals for indoor and outdoor units. The contractor will provide user and maintenance training to the technicians after completion of commissioning.
12. Timeline: The contractor shall complete the entire work in total 20 working days from the date of NTP (notice to proceed), in 2 or 3 phases. The contactor might have to work along with other contractors or workers to finish overall project on time.
13. The contractor shall provide all type of tools, machinery, or equipment for this project.
Embassy will provide electrical power and water required during the installation.
3.0 Safety at work site:
Contractor:
Work Site Address:
Contractor Safety Officer Name:
Signature for Acceptance by the contractor:
Safety standards to be followed at construction and renovation sites AHA – Activity
Hazard Analysis
1. The contractor must document in the bid for the work how the control of each hazard will be implemented and maintained during the project by submission of a safety plan and activity hazard analysis (AHA) for high hazard activities. The POSHO or qualified Post representative must review the contractor's proposal and provide feedback to the responsible project manager and Contracting Officer prior to acceptance of the bid.
2. Any situation where in the work in progress can pose a threat to the user of work area in emergency, contractor shall ensure proper barricading (sturdy enough for the purpose) to avoid any risk.
General
1. All workers on the work site must wear shoes. No worker with flip flops will be allowed to work at site.
2. All the workers should wear full clothes. No half pants and other non- appropriate clothing (Loincloth) will be accepted.
3. Debris/ trash accumulated on the site should be removed at a regular interval (if possible, on daily basis) so that it should not pose any trip hazard.
4. Employee exposed to hazards created by different works environment shall be protected by personal protective equipment. Appropriate protective clothing for any operation varies with the size, nature, and location of work to be performed.
5. In extreme hot conditions drinking water must be made available to the worker and working duration in exposed conditions should be scheduled accordingly.
6. It is the responsibility of the contractor to make all the PPE Kits (Personal
Protective Equipment) available per the requirement of the work site and as directed by the COR. Any mishap due to negligence on the part of the contractor will be entirely contractor’s responsibility.
PPE Kit should comprise of the underlisted:
1. Protective Safety gloves - cut resistance, puncture resistance, and abrasion resistance. Each glove should have a separate rating for each. In construction, rated gloves for vibration reduction, protection from heat and flames and heat degradation resistance are required to be ensured.
2. Hearing protection-Ear plugs and Earmuffs. (For over 85 decibels)
3. Full face shields when cutting, grinding, or chipping.
4. Chemical splash goggles/safety eyewear – when working with chemicals.
5. Respiratory protection - air-purifying respirator or a supplied air respirator.
6. Fall protection equipment when working above 6 feet.
7. High-Visibility Safety Apparel- Specific protective clothing such as welding leathers when welding or FR clothing when working with live electric (high visibility shirts with ANSI 107-2020 standard).
8. Hard Helmets - protecting against falling objects and blunt forces.
9. Safety Harness - when working at above 6 feet of height.
10. Safety Work boots/shoes – ASTM F2413-18 and ASTM F3445-21 for EH and
SR standards with an impact and compression resistance rating of 75.
Machinist / Welding Jobs
1. Hot work permit is required to be filled for each hot work to be performed on USG site.
2. Contractor shall follow attached standards regarding different type of welding to be done on the site.
3. All workers who are arc welding must use a full-face shield with #10 or darker lenses. No worker will be allowed to arc weld with sunglasses, no matter how https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fehs.princeton.edu%2Fnode%2F291&data=05%7C01%7CPathakS%40state.gov%7C4c2085af29cb4e9fac4508db9a51e6c3%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638273448770416882%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=x6Bhw1Sg%2BYjwJFrFIVWVeh7NT%2BP4022emdFMqb5zjA0%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fehs.princeton.edu%2Fnode%2F294&data=05%7C01%7CPathakS%40state.gov%7C4c2085af29cb4e9fac4508db9a51e6c3%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638273448770573093%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=EoxbGV31SzdBQUAKhsZ5mtlWnQ0BGVa0USgr9lU38TM%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fehs.princeton.edu%2Fnode%2F289&data=05%7C01%7CPathakS%40state.gov%7C4c2085af29cb4e9fac4508db9a51e6c3%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638273448770573093%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=6EdZAElh9VYNNd8VSLk5%2BHuz886jcfs6N8fFclK%2B%2Fkw%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fehs.princeton.edu%2Fnode%2F289&data=05%7C01%7CPathakS%40state.gov%7C4c2085af29cb4e9fac4508db9a51e6c3%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638273448770573093%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=6EdZAElh9VYNNd8VSLk5%2BHuz886jcfs6N8fFclK%2B%2Fkw%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fehs.princeton.edu%2Fnode%2F295&data=05%7C01%7CPathakS%40state.gov%7C4c2085af29cb4e9fac4508db9a51e6c3%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638273448770573093%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=GHHfbguZCipALy5ss%2BE6hJSaq824nWUs86uQUXI3tog%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fehs.princeton.edu%2Fnode%2F300&data=05%7C01%7CPathakS%40state.gov%7C4c2085af29cb4e9fac4508db9a51e6c3%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638273448770573093%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=JqEdCIg%2F1OoJ1vNYHEvQaUs%2BaGPl4gY6azYKuoxZPoQ%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fgocodes.com%2Fpersonal-protective-equipment-list%2F%23Hard_Helmets&data=05%7C01%7CPathakS%40state.gov%7C4c2085af29cb4e9fac4508db9a51e6c3%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638273448770573093%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=VUMKfHf5jvyg9K%2FbouN364VErRTeqENflJYSoe3P7WQ%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fgocodes.com%2Fpersonal-protective-equipment-list%2F%23Safety_Harness&data=05%7C01%7CPathakS%40state.gov%7C4c2085af29cb4e9fac4508db9a51e6c3%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638273448770573093%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=M3o6VlnGf44d8g6GzfuQ4MAe1aqg9qMqTSSvrgR6IcE%3D&reserved=0 dark the lenses.
4. All the workers working on grinding and sanding job should have approved face masks and goggles for face and eye protection.
5. Workers handling the heavy metallic material should have appropriate gloves and safety shoes as per the job requirement.
6. Lifting and shifting of the heavy material to be done with the help of appropriate machines.
7. Compressed gas cylinder shall be properly marked and should always be kept in standing positing with guard against fall.
8. Hoses connected to the cylinder should be in good condition.
9. In case Arc welding is done inside the premises proper ventilation should be arranged in the vicinity.
10. Contractor should use welding shield during the work to protect the people around against any potential vision hazard.
11. Always keep an approved fire extinguisher near the site of welding.
12. Workers working with metal sheets must wear appropriate gloves to avoid any cuts on the hands or mishap on the site.
13. Electrical connections for the welding set and the grounding for the same shall be done properly to the satisfaction of the embassy electrician. Please refer electrical section in the document.
Ladders Safety
1. Contractor will use aluminum or fiber glass ladders for all purposes. Wooden ladders are not allowed on the site.
2. Proper ladder for a specific job should be used (for example fiber glass ladders for electrical work etc.).
3. Damaged ladders or ladders with missing supports, shoes etc., should not be used on the site.
4. Height of the ladder should be at least two feet above the required height for the work.
Electrical
1. All the equipment / machines to be used for the execution of the job should be properly grounded.
2. All the extension boards to be used at the site should have proper earthing.
3. All connections to any of the outlets should be through three pin plug. Direct connection of wires in not allowed on the site.
4. Damaged wiring/ cabling for the machines / tools to be used at site are not acceptable. The extension cord or wire with the machines should be one core.
5. Electricians working on the site should wear shoes with rubber soles and should use rubber gloves during execution of the work.
6. Any heavy equipment to be plugged in for the work should be done under supervision of the embassy electrician. Contractor on his own should not plug in heavy equipment.
7. No taped joint or undersize wiring is allowed at the site for the work.
Carpentry
1. Carpenters should have dust mask to protect them from the potential hazard from saw dust. In case sanding machine is used at the site the machine should have proper guards and operator should have suitable PPE (personal protective equipment) with them. For e.g. safety goggles, safety shoes, gloves etc.
2. All the wood to be used at the site should be properly stacked at one side. It should not be scattered around and pose a threat for a trip hazard.
3. Entire site should be kept clean from the saw dust at the end of the day.
4. Carpenter shall use machine guards if at all machines are used at the site.
5. All the care should be taken to protect the flooring against any kind of potential damage.
6. All the drill machines or other electrical tools to be used at the site should be properly grounded and wired.
7. Contractor should use proper tools and tackles for the execution of the work at site.
8. Nails and other sharp material which can pose a threat of accident should not be scattered on the site.
Fire
1. Contractor shall provide and place fire extinguishers as per the requirement of the site (as recommended by the COR).
2. No flammable material should be kept inside the premises at any given point of time.
Lock Out / Tag Out
1. Lock out devices should be used during the testing of the electrical points and wiring.
Confined spaces
1. If at all contractor has to work in a confined space he should contact the COR before proceeding with the work. Contractor should arrange all the equipment as instructed by the COR to accomplish the job in a safe manner.
Hearing Protection
1. Contractor should assure that all the workers working in noisy surroundings should wear earmuffs or other approved devices.
Height Protection
1. Any work to be carried out over and above 8’-0” needs a sturdy metal pipe scaffolding to carry out that work. Ladder or any other arrangement needs a preapproval from COR to be implemented on the site.
2. Work at height- Scaffolding inspection to be ensured.
DOSAR 652.236-70 - Additional Safety Measures (Oct 2017)
In addition to the safety/accident prevention requirements of FAR 52.236-13, Accident Prevention Alternate I, the contractor shall comply with the following additional safety measures.
(a) High risk activities. If the project contains any of the following high-risk activities, the contractor shall follow the section in the latest edition, as of the date of the solicitation, of the U.S. Army Corps of Engineers Safety and Health manual, EM 385-1-1, that corresponds to the high-risk activity.
Before work may proceed, the contractor must obtain approval from the COR of the written safety plan required by FAR 52.236-13, Accident Prevention Alternate I (see paragraph (f) of this clause), containing specific hazard mitigation and control techniques.
(1) Scaffolding.
(2) Work at heights above 1.8 meters.
(3) Trenching or other excavation greater than one (1) meter in depth.
(4) Earth-moving equipment and other large vehicles.
(5) Cranes and rigging.
(6) Welding or cutting and other hot work.
(7) Partial or total demolition of a structure.
(8) Temporary wiring, use of portable electric tools, or other recognized electrical hazards.
Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits; other electrical hazards may also require the use of a GFCI.
(9) Work in confined spaces (limited exits, potential for oxygen less than 19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.).
(10) Hazardous materials - a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive, or unstable, or any operations, which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.; or
(11) Hazardous noise levels as required in EM 385-1 Section 5B or local standards if more restrictive.
(b) Safety and health requirements. The contractor and all subcontractors shall comply with the latest edition of the U.S. Army Corps of Engineers Safety and Health manual EM 385-1-1, or OSHA 29 CFR part 1910 or 1926 if no EM 385-1-1 requirements are applicable, and the accepted contractor's written safety program.
(c) Mishap reporting. The contractor is required to report immediately all mishaps to the COR and the contracting officer. A “mishap” is any event causing injury, disease or illness, death, material loss or property damage, or incident causing environmental contamination. The mishap reporting requirement shall include fires, explosions, hazardous materials contamination, and other similar incidents that may threaten people, property, and equipment.
(d) Records. The contractor shall maintain an accurate record on all mishaps incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft of property, materials, supplies, or equipment. The contractor shall report this data in the manner prescribed by the contracting officer.
(e) Subcontracts. The contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
(f) Written program. The plan required by paragraph (f) (1) of the clause entitled “Accident Prevention Alternate I” shall be known as the Site Safety and Health Plan (SSHP) and shall address any activities listed in paragraph (a) of this clause, or as otherwise required by the contracting officer/COR.
(1) The SSHP shall be submitted at least 10 working days prior to commencing any activity at the site.
(2) The plan must address developing activity hazard analyses (AHAs) for specific tasks. The AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. Work shall not begin until the AHA for the work activity has been accepted by the COR and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives.
(3) The names of the Competent/Qualified Person(s) required for a particular activity (for example, excavations, scaffolding, fall protection, other activities as specified by EM 385-1-1) shall be identified and included in the AHA. Proof of their competency/qualification shall be submitted to the contracting officer or COR for acceptance prior to the start of that work activity. The AHA shall be reviewed and modified as necessary to address changing site conditions, operations, or change of competent/qualified person(s).
(End of clause) For any further clarification please contact POSHO (Post Occupational Safety and Health Officer) at # 011-24198280 OR APOSHO Ms. Vidushi Sharma at 011-24198714.
CONTINUATION TO SF-1449
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
I Supply and installation of centralized energy efficient HVAC system of approximately capacity
25TR with control panels at ACSA commissary as per attached scope of work.
II. DELIVERY LOCATION AND TIME
A. The Contractor shall deliver all ordered items to the. The address is:
American Embassy, Shantipath, Chanakyapuri, Delhi 110021
B. The Contractor shall deliver all items not later than 30 days after date of contract award.
C. Any Contractor personnel involved with the delivery of the items shall comply with standard U.S. Embassy regulations for receiving supplies. The Contracting Officer's
Representative (COR) will be responsible for instructing contractor personnel at the time deliveries are made. Prior notice of at least 3 days in advance.
QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
This plan provides an effective method to promote satisfactory contractor performance. The
QASP provides a method for the Contracting Officer's Representative (COR) to monitor
Contractor performance, advise the Contractor of unsatisfactory performance, and notify the
Contracting Officer of continued unsatisfactory performance. The Contractor, not the
Government, is responsible for management and quality control to meet the terms of the contract.
The role of the Government is to monitor quality to ensure that contract standards are achieved.
Performance Objective Scope of Work Para Performance Threshold
Services.
Performs all furnish and delivery services set forth in the scope of work.
1. thru 19.
All required services are performed and no more than one customer complaint is received per month.
SECTION 2 - CONTRACT CLAUSES
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
(NOV 2021) IS INCORPORATED BY REFERENCE. (SEE SF-1449,
BLOCK 27A)
Instructions for 52.212-5
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES
(SEP 2023)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or
Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L.
115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR
2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN
2020), with Alternate I (NOV 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV
2021) ( 41 U.S.C. 3509)).
https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/4655 https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment
Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the
American Recovery and Reinvestment Act of 2009.)
__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN
2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
__ (5) [Reserved].
__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (8) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of
Division R of Pub. L. 117-328).
_X_ (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment. (NOV 2021) ( 31 U.S.C. 6101 note).
__ (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility
Matters (OCT 2018) ( 41 U.S.C. 2313).
__ (11) [Reserved].
__ (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022)
( 15 U.S.C. 657a).
__ (13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns
(OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)
( 15 U.S.C. 657a).
__ (14) [Reserved]
__ (15)
(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-6.
__ (16)
(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-7.
https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://www.acquisition.gov/far/part-52#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_7
__ (17) 52.219-8, Utilization of Small Business Concerns (SEP 2023) ( 15 U.S.C. 637(d)(2) and
(3)).
__ (18)
(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) ( 15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (NOV 2016) of 52.219-9.
__ (iii) Alternate II (NOV 2016) of 52.219-9.
__ (iv) Alternate III (JUN 2020) of 52.219-9.
__ (v) Alternate IV (SEP 2023) of 52.219-9.
__ (19)
(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) ( 15 U.S.C. 644(r)).
__ (ii) Alternate I (MAR 2020) of 52.219-13.
__ (20) 52.219-14, Limitations on Subcontracting (OCT 2022) ( 15 U.S.C. 637s).
__ (21) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP
2021) ( 15 U.S.C. 637(d)(4)(F)(i)).
__ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT
2022) ( 15 U.S.C. 657f).
__ (23)
(i) 52.219-28, Post Award Small Business Program Rerepresentation (SEP
2023)( 15 U.S.C. 632(a)(2)).
__ (ii) Alternate I (MAR 2020) of 52.219-28.
__ (24) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically
Disadvantaged Women-Owned Small Business Concerns (OCT 2022) ( 15 U.S.C. 637(m)).
__ (25) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small
Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022)
( 15 U.S.C. 637(m)).
__ (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR
2020) ( 15 U.S.C. 644(r)).
https://www.acquisition.gov/far/part-52#FAR_52_219_8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_14 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_16 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_27 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm
__ (27) 52.219-33, Nonmanufacturer Rule (SEP 2021) ( 15U.S.C. 637(a)(17)).
__ (28) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).
__ (29) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (DEC
2022) (E.O.13126).
__ (30) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
__ (31)
(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).
__ (ii) Alternate I (FEB 1999) of 52.222-26.
__ (32)
(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212).
__ (ii) Alternate I (JUL 2014) of 52.222-35.
__ (33)
(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793).
__ (ii) Alternate I (JUL 2014) of 52.222-36.
__ (34) 52.222-37, Employment Reports on Veterans (JUN 2020) ( 38 U.S.C. 4212).
__ (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations
Act (DEC 2010) (E.O. 13496).
__ (36)
(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) ( 22 U.S.C. chapter 78 and E.O.
13627).
__ (ii) Alternate I (MAR 2015) of 52.222-50 ( 22 U.S.C. chapter 78 and E.O. 13627).
__ (37) 52.222-54, Employment Eligibility Verification (MAY 2022) (Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
__ (38) https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_19 https://www.acquisition.gov/far/part-52#FAR_52_222_21 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_35 https://www.acquisition.gov/far/part-52#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_36 https://www.acquisition.gov/far/part-52#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_40 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_54 https://www.acquisition.gov/far/part-22#FAR_22_1803
(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items
(May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (MAY 2008) of 52.223-9 ( 42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (39) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (Jun 2016) (E.O. 13693).
__ (40) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and
Air Conditioners (JUN 2016) (E.O. 13693).
__ (41)
(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (OCT 2015) of 52.223-13.
__ (42)
(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and
13514).
__ (ii) Alternate I (Jun2014) of 52.223-14.
__ (43) 52.223-15, Energy Efficiency in Energy-
Consuming Products (MAY 2020) ( 42 U.S.C. 8259b).
__ (44)
(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT
2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (JUN 2014) of 52.223-16.
__ (45) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN
2020) (E.O. 13513).
__ (46) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
__ (47) 52.223-21, Foams (Jun2016) (E.O. 13693).
__ (48) https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_11 https://www.acquisition.gov/far/part-52#FAR_52_223_12 https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_15 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_18 https://www.acquisition.gov/far/part-52#FAR_52_223_20 https://www.acquisition.gov/far/part-52#FAR_52_223_21
(i) 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).
__ (ii) Alternate I (JAN 2017) of 52.224-3.
__ (49)
(i) 52.225-1, Buy American-Supplies (OCT 2022) ( 41 U.S.C. chapter 83).
__ (ii) Alternate I (OCT 2022) of 52.225-1.
__ (50)
(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (DEC 2022) ( 19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29
(sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I [Reserved].
__ (iii) Alternate II (DEC 2022) of 52.225-3.
__ (iv) Alternate III (JAN 2021) of 52.225-3.
__ (v) Alternate IV (Oct 2022) of 52.225-3.
__ (51) 52.225-5, Trade Agreements (DEC 2022) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
__ (52) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the
Treasury).
__ (53) 52.225-26, Contractors Performing Private Security Functions Outside the United
States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for
Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
__ (54) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007)
( 42 U.S.C. 5150).
__ (55) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area
(Nov2007) ( 42 U.S.C. 5150).
__ (56) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
__ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial
Services (NOV 2021) ( 41 U.S.C. 4505, 10 U.S.C. 3805).
https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_225_1 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_225_1 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.govinfo.gov/link/uscode/19/3301 https://www.govinfo.gov/link/uscode/19/3301 https://www.govinfo.gov/link/uscode/19/2112 https://www.govinfo.gov/link/uscode/19/3805 https://www.govinfo.gov/link/uscode/19/4001 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_225_13 https://www.acquisition.gov/far/part-52#FAR_52_225_26 https://www.acquisition.gov/far/part-52#FAR_52_226_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_226_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_229_12 https://www.acquisition.gov/far/part-52#FAR_52_232_29 https://www.govinfo.gov/link/uscode/10/3805
__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial
Services (NOV 2021) ( 41 U.S.C. 4505, 10 U.S.C. 3805).
_X_ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award
Management (OCT2018) ( 31 U.S.C. 3332).
__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award
Management (Jul 2013) ( 31 U.S.C. 3332).
__ (61) 52.232-36, Payment by Third Party (MAY 2014) ( 31 U.S.C. 3332).
__ (62) 52.239-1, Privacy or Security Safeguards (AUG 1996) ( 5 U.S.C. 552a).
__ (63) 52.242-5, Payments to Small Business Subcontractors (JAN
2017) ( 15 U.S.C. 637(d)(13)).
__ (64)
(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) ( 46
U.S.C. 55305 and 10 U.S.C. 2631).
__ (ii) Alternate I (APR 2003) of 52.247-64.
__ (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
__ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) ( 41 U.S.C. chapter67).
__ (2) 52.222-42, Statement of Equivalent Rates for Federal
Hires (MAY 2014) ( 29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (Multiple Year and Option Contracts) (AUG
2018) ( 29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).
https://www.acquisition.gov/far/part-52#FAR_52_232_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/3805 https://www.acquisition.gov/far/part-52#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_232_34 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_232_36 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_239_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_242_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.govinfo.gov/content/pkg/USCODE-2019-title46/html/USCODE-2019-title46-subtitleV-partD-chap553-subchapI-sec55305.htm https://www.govinfo.gov/content/pkg/USCODE-2019-title46/html/USCODE-2019-title46-subtitleV-partD-chap553-subchapI-sec55305.htm http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.acquisition.gov/far/part-52#FAR_52_222_41 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_42 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_43 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_44
__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to
Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements
(May 2014) ( 41 U.S.C. chapter 67).
__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to
Contracts for Certain Services-Requirements (MAY 2014) ( 41 U.S.C. chapter 67).
__ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN
2022).
__ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020)
( 42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the
Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor
Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the
Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .