This document is a solicitation for the Shasta Drilling federal contract opportunity. It is a firm fixed-price contract for drilling and instrumented Becker Penetration Testing (iBPT) investigations to support a liquefaction triggering analysis of the Shasta Dam embankment materials.
The scope of work involves coordinating with an iBPT contractor to perform Becker drilling and iBPT measurements at four borehole locations around the Left Wing Dam of the Shasta Dam. The contractor must provide a Becker drill rig, drilling equipment, and complete the boreholes once the investigations are concluded. The work must be completed between June 1, 2024 and December 31, 2024. Payment will be made after the work is completed and certified. The contractor must be state licensed, demonstrate prior experience with Becker drilling and the iBPT system, and comply with Reclamation's safety and health standards. The government will provide access to the site, drilling water, and technical oversight through a Contracting Officer's Representative.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_8__Selected_borehole_logs_from_historical_explorations_at_site_(DH-18-301__DH-18-302)_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
0009910106 CODE 16. ADMINISTERED BYCODE
X
X
X
238910
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED OR
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
05/08/2024
0000000000Kelly Cook (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIME
05/22/2024 1700 ED
b. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140R8124Q0065
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 700040652930OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
See Schedule
15. DELIVER TO
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$19
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
DELIVER TO:
Bureau of Reclamation-DO Building 56, Dock S6, Rm 1950 6th Avenue & Kipling Street Denver Federal Center Denver CO 80225-0007 US
THIS IS A FIRM FIXED PRICE CONTRACT FOR SHASTA
DRILLING.
Delivery: 12/31/2024
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Rodney Johnson
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
140R8124Q0065 Page 1 of 70
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
00010 1 AU
Period of Performance: 06/01/2024 to 12/31/2024
Shasta Drilling
Product/Service Code: H999
Product/Service Description: OTHER
QC/TEST/INSPECT- MISCELLANEOUS
SEE ATTACHED DOCUMENTATION FOR SPECIFICATIONS OF
THE REQUIREMENTS.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
140R8124Q0065 Page 2 of 70
PERFORMANCE WORK STATEMENT
Shasta Dam Issue Evaluation: Becker Drilling in Support of iBPT Investigations
01/31/2024
1.0. Introduction. The Bureau of Reclamation (Reclamation) is a water management agency with 600 dams in the 17 western states. We are known best for construction of dams, power plants, and canals, including Hoover Dam on the Colorado River and Grand Coulee Dam on the Columbia River. Reclamation is the largest wholesaler of water in the country and second largest producer of hydroelectric power in the western US. Reclamation is organized into six regions: California-Great Basin (CGB), Missouri Basin (MB), Lower Colorado Basin (LCB), Upper Colorado Basin (UCB), and Columbia-Pacific Northwest (CPN), and Arkansas-Rio Grande-Texas Gulf (ARGTG). The Technical Service Center (TSC) is located in Denver, CO, and provides technical expertise and support services to the regions, as needed.
1.1 Facility description. Shasta Dam and Powerplant are located on the Sacramento River, approximately 9 miles northwest of Redding, California, and are major features of the Central Valley Project. The dam was designed and constructed by the Bureau of Reclamation and was completed in 1945. Principal benefits of the reservoir include power generation, flood control, irrigation, recreation, and domestic water supply. The dam impounds a reservoir with a total volume of 4,552,000 acre-feet at the top of joint-use capacity at reservoir water surface elevation 1067.
Shasta Dam is a curved concrete gravity structure that has a structural height of 602 feet, a hydraulic height of approximately 480 feet (between reservoir water surface elevation 1067 and the original streambed at the axis of the dam), a crest width of 30 feet, and a crest length of 3,460 feet at crest elevation 1077.5. The downstream face of the dam slopes at 0.8H:1V; the upstream face of the dam is vertical. There are zoned earthfill embankments (wing dams) constructed on the upstream and downstream faces of both abutments to protect the contact with the dam concrete and the excavated foundation surface. The Left Wing Dam (LWD) is the location of work performance.
The LWD extends beyond the concrete dam to the left abutment and contains a concrete core wall and five embankment zones. The LWD upstream embankment face slopes at approximately 2.4H:1V and the downstream face slopes at approximately 2.5H:1V.
Based on limited construction documentation, the source of all embankment materials in the LWD is thought to be excavation spoils from the left abutment and dam foundation excavation (i.e., colluvium, residuum, and weathered bedrock).
1.2 Site geology. Shasta Dam is underlain by the Copley Formation, a sequence of volcanic rocks of Devonian age (410 - 360 million years ago), which have been metamorphosed. The product of this metamorphism is a rock type known as ophiolite, referred to as greenstone. Numerous andesite and diorite (and other igneous rock types) dikes have been intruded into the original and metamorphosed rock mass and have been mapped within the dam foundation. Although the foundation rock is hard and competent where fresh and unfractured, regional tectonics and weathering have disrupted its integrity. The altered greenstone has numerous seams consisting of
140R8124Q0065 Page 3 of 70 weathered joints, shears, and zones of altered or crushed rock. These features were described as ranging from hairline cracks to open seams, and from fractures with no displacement to faults with considerable displacement. Some joints display clean, sharp walls, while others display fractured material or are filled with soft, weathered material. Stained joints, mud seams, and clay gouge are noted on geologic maps. Zones of cataclasts up to several feet thick exist in the larger faults in the area, although no active large faults cross the dam foundation. Despite the presence of the faults and joints in the foundation for Shasta Dam, the foundation rock is generally hard, sound, and durable.
The embankment and foundation units that may be encountered in drilling through the upstream LWD are described as follows:
Zone 1 – Embankment material described in the original construction specifications as “Upstream rock fill graded to heavy rock at outer slope - from required excavation”. Rock on outer slope is riprap comprised of Slightly Weather Copley Greenstone. The coarse riprap on the outer shell of the upstream face will be excavated to create a drilling pad for the work.
Zone 2 – Embankment material consisting of Silty to Clayey Gravel with Sand and trace Cobbles, (GM-GC)sc to Silty to Clayey Sand with Gravel and trace Cobbles, (SM-SC)gc, as observed in prior explorations of the LWD. Zone 2 underlies Zone 1 in the work area and is described in the original construction specifications as “semi-pervious material from required excavation – rolled in 8-inch compacted layers”.
Zone 3 – Embankment material consisting of Silty to Clayey Gravel with Sand and trace Cobble, (GM-GC)sc to Clayey to Silty Sand with Gravel and trace Cobble, (SM-SC)gc, as observed in prior explorations of the LWD. Zone 3 generally contains smaller gravel and fewer cobble than Zone 2 and contains lifts of lean clay with varying amounts of sand and gravel. Zone 3 underlies Zone 2 in the work area and is described in design drawing 214-D-777 as "selected impervious material of clay, sand, and gravel mixed and rolled in 6-inch compacted layers”.
Copley Greenstone - A sequence of metamorphosed volcanic rocks of the Devonian period (419 - 359 Ma). The volcanic parent rocks are comprised of pillow lavas (basalt), volcanic breccias (agglomerate), andesite flows, and minor layers of tuff. These rocks have undergone low-grade or greenschist facies metamorphism, which has essentially fused clasts and matrix such that the strength of the body of rock is estimated to be uniform (not considering discontinuities). Tectonic forces have tilted the once horizontal sequence of rocks and produced extensive discontinuities, primarily joints, shears, and foliation. Tilted layers are evident on the right abutment of the dam and have an apparent dip direction toward the upstream.
140R8124Q0065 Page 4 of 70
Table 1. Description of Embankment Zones from Original Construction Specifications
Zone Material Type Maximum Size *
Lift Thickness Specified Compaction
1 Upstream Rockfill 1 yd3 3 feet None
2 Rock and Fines 5 inches 8 inches 12 Passes w/Tamping Roller
3 Clay, Sand and Gravel 5 inches 6 inches 12 Passes w/Tamping Roller
4 Rock and Clay 5 inches 6 inches 12 Passes w/Tamping Roller
5 Downstream Rockfill 1 yd3 3 feet None
* Per specifications; however, construction photographs suggest larger maximum particle sizes
2.0 Scope of Work: This work order involves the coordination of several groups to complete the required tasks. The tasks for which the awardee will be directly responsible are:
• Provide an AP-1000 drill rig and enough standard drill casing to advance the drill string at least 150 feet in each drill hole.
• Perform Becker drilling and instrumented Becker Penetration Testing (iBPT) with an integrated data collection system (iBPT equipment to be furnished and operated by the separate iBPT contractor) attached to the drill string.
• Complete boreholes once the investigations have been concluded.
These tasks will be performed in support of a liquefaction triggering analysis of the embankment materials at Shasta Dam. The awardee will work with an iBPT contractor (under separate contract) to integrate the iBPT platform into the Becker drilling set up and coordinate the testing of specific intervals with the driving of the Becker drill string. The awardee will also work with the Reclamation CGB Region geologist to identify the testing intervals of interest. The overall investigation schedule will be coordinated with the Reclamation TSC.
2.1 Investigation Program. The investigation shall be conducted at the locations shown in Figure 1 and to the depths indicated in Table 2, with all locations and depths approximate. The order in which the boreholes are investigated will be determined in coordination with the on-site CGB Region geologist. Some boreholes may need to be relocated in coordination with the CGB Region geologist.
2.1.1 Investigation Program Scope. The investigation program consists of four boreholes (IBH- 24-01 through IBH-24-04).
2.1.2. Site Access. Reclamation will pioneer roads as required, provide access to the site, ensure that Reclamation vehicles and equipment do not obstruct the awardee’s operations, and ensure that a staging area for the required equipment is available. Figures 2 and 3 show the approximate access route and geometry to be provided and potential staging areas. Access ramps to the drilling pads will consist of gravel surfacing on a bench approximately 15 to 16 feet wide and may have grades
140R8124Q0065 Page 5 of 70 as steep as approximately 20 degrees.
2.1.3 Testing Procedure. The iBPT measurements shall be performed from ground surface continuously along the entire length of each sounding interval to refusal at a depth approximately 5 feet below the Copley Greenstone bedrock contact. IBH-24-04 will be terminated at the top of mass concrete, if encountered. Table 2 shows a summary of each borehole.
2.1.4 Record Keeping. The awardee shall maintain a record of pertinent drilling notes and shall prepare a drilling summary daily. Blow counts, bounce chamber pressures, and other information relevant to the interpretation of soil strengths will be recorded by the iBPT contractor.
2.1.5 Borehole Completion. On completion of the iBPT soundings, the boreholes will be backfilled by the awardee to prevent collapse of the surrounding materials into the boreholes. This process will require that the iBPT instrumentation setup be removed from the drill string prior to hole completion. Boreholes will be backfilled with a Portland cement-bentonite slurry (or equivalent, as approved by the CGB Region Geologist).
2.1.6 Payment. Payment will be made after the work has been completed and certified, consistent with the bid amounts submitted by the awardee and any equitable adjustments that may apply.
Payment for re-drilling will be made if re-drilling is required as a result of site conditions.
2.2 Schedule. The provisional start date for the field investigations is June 1, 2024. A mutually agreed-upon start date will be identified once notice to proceed has been given. The awardee will be required to remain on site until all work required has been completed.
Table 2. Borehole Summary (See Figure 1 for locations - all descriptions are approximate)
Hole Number Approx. Top Elevation
(NAVD88)
Location Estimated Depth (ft) at Refusal*
Estimated Depth (ft) to Start of iBPT Soundings
Projected foundation unit at refusal
IBH-24-01 1060 Upstream Dam Face 140 0 Copley
Greenstone
IBH-24-02 1060 Upstream Dam Face 100 0 Copley
Greenstone
IBH-24-03 1060 Upstream Dam Face 85 0 Copley
Greenstone
IBH-24-04 1080.5 Crest 135/**100 0 Copley Greenstone/Mass Concrete
* Continue performing soundings until conditions for refusal are met which is defined as 1 foot advancement of the drive casing after 200 blows at maximum effort. Borings may be predrilled if refusal is met before the required depth is reached. To be determined in coordination with CGB Region Geologist and TSC staff
140R8124Q0065 Page 6 of 70
** If mass concrete is encountered. The top of mass concrete is estimated at Elevation 982.8
(NAVD88)
2.3 Becker Drilling and Testing Equipment
2.3.1 The Becker drilling equipment shall consist of a truck mounted Model AP1000 Becker Hammer drill rig manufactured by (Foremost) Drill Systems, Calgary, Alberta, Canada.
2.3.2 The rig shall be equipped with a Linkbelt (International Construction Equipment “ICE”) Model 180 Diesel Pile Hammer.
2.3.3 The hammer shall be equipped with a Pres Air rotary blower supercharger 500 Series, or equivalent connected to one or both inlet ports of the diesel pile hammer combustion chamber.
2.3.4 The Becker Hammer drill pipe outside diameter shall be 6 5/8 inches.
2.3.5 The iBPT soundings shall be advanced with a 6 5/8 inch outside diameter 8 tooth crowd-out, closed-end bit that meets iBPT specifications for the purpose of collecting blow counts to specified depths.
2.3.6 Drive shoes, Becker Hammer drill pipe and tooling that meet the specifications for iBPT testing shall be provided by the awardee.
2.3.7 A T fitting from the bounce chamber pressure gauge to allow connection to iBPT instrumentation shall be provided by the awardee. The hose between the bounce chamber and the energy monitor shall remain free of obstructions, including oil and other debris at all times. This unobstructed hose shall be maintained by blowing out the hose with compressed air or by other means prior to each Becker hole or as directed by Reclamation’s field representative.
2.3.8 The puller base shall be modified to allow for installation of a string gauge potentiometer.
2.3.9 The Becker drilling equipment shall be equipped for pull back testing devices supplied by the iBPT contractor.
3.0 Qualifications
3.1 The awardee must be State licensed.
3.2 The awardee must demonstrate prior field experience with Becker drilling operations on water retaining embankment structures.
3.3 The awardee must demonstrate prior field experience with the iBPT system.
140R8124Q0065 Page 7 of 70
4.0 Government-Furnished Equipment and Materials. The Government shall provide the awardee with access to the site, access to the drilling locations, and a practical source of drilling water.
5.0 Regulations/Policies. The awardee must comply with Reclamation’s Safety and Health Standards (RSHS). The awardee should review the applicable sections of the RSHS, which are available for download at: https://www.usbr.gov/ssle/safety/RSHS/rshs.html
6.0 Travel. The awardee shall use the appropriate government per diem rates as posted on www.gsa.gov/travel-resources. Travel expenses shall be approved in advance by the Contracting Officer (CO). See attached request form.
7.0 Government Vehicles. Employees of the awardee required to utilize Government vehicles (cars, trucks, heavy equipment, etc.) either as drivers or passengers shall be required to sign a “Hold Harmless” release. This includes Government-procured rental vehicles. The awardee shall use or rent their own vehicles whenever possible and practical. Signed releases are due to the Contracting Officer (CO) one day before use of a Government vehicle. See attached form.
Government vehicles are for official use only.
8.0. Security. Site access will need to be coordinated with the CGB Regional Geologist or their representative. Contact information will be provided at award.
8.1 Entry Into Secure Areas. The Project Manager or Contracting Officer’s Technical Representative (COTR) will assist with the awardee’s entry into secure areas and inform the awardee of security procedures. The awardee shall comply with all security procedures.
8.2 Sensitive Information. Reclamation has identified specific security sensitivity designations for information related to Reclamation facilities. All awardee produced and Government furnished information related to this contract is designated Official Use Only – SENSITIVE
(FOUO/SENSITIVE).
8.3 Employee Information. The awardee shall be required to supply Reclamation with the legal names and other personal information of employees who will be working under this contract.
Reclamation reserves the right to perform security checks on awardee employees.
9.0 Training. The awardee is responsible for all training for its employees except when training can only be provided by Reclamation. Requests for training by exception must be provided to and approved by the CO prior to the Government conducting training. The awardee shall sign a Hold Harmless Release for any training provided by the Government. See attached.
10.0 Deliverables. See Table 3, below.
140R8124Q0065 Page 8 of 70 http://www.gsa.gov/
10.1 The awardee will be required to submit daily drilling reports.
10.2 The awardee will be required to submit a draft drilling and testing summary report for Reclamation review. Allow up to 10 business days for Reclamation review and comment.
10.3 The awardee will be required to submit a final drilling and testing summary report.
Table 3. Deliverables summary.
PARA-
GRAPH
DELIVERABLE DUE FORMAT/DELIVERY
10.1 Daily Drilling Reports At the end of each
field day
1 electronic copy and 1 hard copy to Reclamation field representative
10.2 Draft Drilling and Testing
Summary Report for Reclamation review
10 business days after the completion of field investigation
1 electronic copy and 1 hard copy to Reclamation field representative
10.3 Final Drilling and Testing
Summary Report
10 business days after receiving
Reclamation review comments
1 electronic copy and 1 hard copy to Reclamation field representative
11.0 Quality of Performance. The attached Contractor Performance Report is provided for the awardee’s information. This report will be completed by the COTR at the end of the performance period. Performance quality shall be measured based on the criteria shown in Table 4.
140R8124Q0065 Page 9 of 70
Table 4. Performance quality criteria PARAGRAPH (in attachment)
PERFORMANCE OBJECTIVE PERFORMANCE GOAL
Quality Drilling work performed correctly. High resolution energy corrected penetration resistance data for the sounding intervals of interest.
Timeliness of Performance
Drilling work performed in a timely manner with minimal breakdowns and delays.
Drilling schedule should drive but not delay the overall drilling schedule.
Cost Control Minimal overruns or changes/modifications. Meet budget objectives.
Business Relations Professional Contractor/Client Relationship. Promote good communication.
Customer Satisfaction (End Users)
Work accomplished in accordance with Performance Work Statement.
Provide deliverables as described.
12.0 Identification of Contractor Employees. All contract personnel are required to identify themselves as contractors. When attending meetings, answering Government telephones, or working in other situations where their contractor status is not obvious to third parties, they must make their status known to avoid creating an impression that they are Government employees.
Attachments:
1. Hold Harmless Government Vehicle Release
2. Hold Harmless Training Release
3. Travel Request Form
4. Sample Contractor Performance Report
5. Figure 1 – Locations of proposed explorations
6. Figure 2 – Access Ramp
7. Figure 3 – Staging Areas
8. Selected borehole logs from historical explorations at site (DH-18-301, DH-18-302)
140R8124Q0065 Page 10 of 70
Attachment 1: Hold Harmless Government Vehicle Release
140R8124Q0065 Page 11 of 70
HOLD HARMLESS RELEASE
Use of Government Vehicles
At times during contract performance, contractor employees may be required to operate or ride in Government vehicles. Contractors may only operate or ride in Government vehicles when approved by the Contracting Officer and when in direct support of performance of work authorized under Contract
In accordance with the Department of Interior Motor Vehicle Management Handbook, contractors shall ensure their employees posses a valid state/international license for the class of vehicle being operated and be at least 18 years old, or the higher age at which persons in that jurisdiction may hold an unrestricted driver's license prior to operating or riding in a Government vehicle.
In consideration for receiving permission to operate or ride in Government vehicles I hereby release, waive, discharge and covenant not to sue the Federal Government, their officers, agents, servants, or employees (hereinafter referred to as releasees) from any and all liability, claims, demands, actions and causes of action whatsoever arising out of or related to any loss, damage, or injury, including death, that may be sustained by me, or any of the property belonging to me, whether caused by the negligence of the releasees, or otherwise, while operating or riding in Government vehicles.
The contractor shall provide copies of all employee liability/hold harmless agreements to the Contracting Officer upon request or as stated by the Contract.
Provisions/Clauses: As included in Contract ________________, the following clauses should be noted:
52.245-1 Government Property (June 2007) 52.228-5 Insurance -- Work on a Government Installation (Jan 1997) 52.228-10 Vehicular and General Public Liability Insurance (Apr 1984) 52.250-1 Indemnification Under Public Law 85-804 (Apr 1984) DOII 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996)
I agree to the terms and conditions for the use of Government vehicles as specified above.
Authorized Company Officer Employee
Printed Name Printed Name Title Title
140R8124Q0065 Page 12 of 70
Attachment 2: Hold Harmless Training Release
140R8124Q0065 Page 13 of 70
HOLD HARMLESS RELEASE
Government-Provided Training
At times during contract performance, contractor employees may be required to operate equipment or machinery that is unique to the Government and that requires training prior to operation. Contractors may only receive training from the Government when the equipment is unique to the Government and cannot be obtained through any other source; approved by the Contracting Officer; requested by the Government technical point of contact; and when operation is in direct support of the contract identified below. Upon receiving the appropriate training, the Contractor receiving the training is required to complete and sign the following release.
In consideration for receiving training on _________________________________________, I hereby release, waive, discharge and covenant not to sue the Federal Government, their officers, agents, servants, or employees (hereinafter referred to as releasees) from any and all liability, claims, demands, actions and causes of action whatsoever arising out of or related to any loss, damage, or injury, including death, that may be sustained by me, or any of the property belonging to me, whether caused by the negligence of the releasees, or otherwise, while operating the specified equipment or machinery.
Additionally, if I by accident or negligence, damage or destroy Government property, I or my employer, ________________________ shall be responsible for any expenses associated with those damages.
Therefore, the appropriate levels of liability insurance shall be required during the period of performance for contract ___________________________________.
The contractor shall provide proof of training to the Contracting Officer along with the original, signed copy of this employee liability/hold harmless agreement to the Contracting Officer upon request or as stated by the Contract.
Provisions/Clauses: As included in contract ________________, the following clauses should be noted:
52.245-1 Government Property (June 2007) 52.228-5 Insurance -- Work on a Government Installation (Jan 1997) 52.228-10 Vehicular and General Public Liability Insurance (Apr 1984) 52.250-1 Indemnification Under Public Law 85-804 (Apr 1984) DOII 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996)
I agree to the terms and conditions for receiving training on Government equipment and machinery as specified above.
Authorized Company Officer Employee
Printed Name Printed Name Title Title
140R8124Q0065 Page 14 of 70
Attachment 3: Travel Request Form
140R8124Q0065 Page 15 of 70
TRAVEL REQUEST
REQUEST TRAVEL TO:
DATES OF TRAVEL:
NAMES OF TRAVELERS:
PURPOSE OF TRIP:
ESTIMATED COSTS (ITEMIZE):
APPROVALS:
Contracting Officer’s Technical Representative (COTR)
Print Name
Signature Date
Contracting Officer
Print Name
Signature Date
Copy of signed form must accompany invoice.
140R8124Q0065 Page 16 of 70
Attachment 4: Sample Contractor Performance Report
140R8124Q0065 Page 17 of 70
CONTRACTOR PERFORMANCE REPORT
[ ]Final [ ] Interim Period - Report: From ___________________ To____________________
Contractor Name and Address;
(Identify Division)
2. Contract Number:__________________________
3. Contract Value (Base Plus Options):
4. Contract Award Date:
Contract Completion Date:
5. Type of Contract: (Check all that apply) - - [ ] FP [ ] FPI [ ] FP-EPA [ ]Award Fee [ ] CPFF - Completion [ ] CPFF - Term [ ] CPIF [ ]CPAF [ ] ID/IQ [ ] BOA [ ] Requirements [ ] Labor Hour [ ] T&M [ ] SBSA 8(a) [ ] SBIR [ ] Sealed Bid [ ] Negotiated [ ]Competitive [ ] Non-Competitive
6. Description of Requirement:
7. Ratings. Summarize contractor performance and circle in the column on the right the number which corresponds to the performance rating for each rating category. Please see page three for explanation of rating scale.
Quality
Drilling work performed correctly.
Comments
Timeliness Of Performance
Drilling work performed in a timely manner with minimal breakdowns and delays.
Comments
140R8124Q0065 Page 18 of 70
Cost Control
Minimal overruns or change/modifications
Comments
Business Relations
Professional Contractor/Client Relationship
Comments
Customer Satisfaction (End Users)
Work accomplished in accordance with Performance Work Statement
Comments
Mean Score (Add the ratings above and divide by number of areas rated)
140R8124Q0065 Page 19 of 70
140R8124Q0065 Page 20 of 70
Figure 1 (Attachment 5). Locations of proposed explorations
140R8124Q0065 Page 21 of 70
Figure 2 (Attachment 6). Access Ramp Location
140R8124Q0065 Page 22 of 70
Figure 3 (Attachment 7). Staging Area
140R8124Q0065 Page 23 of 70
Attachment 8. Selected borehole logs from historical explorations at site (DH-18-301, DH-18- 302)
140R8124Q0065 Page 24 of 70
Clauses
52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2023)
52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES - ALTERNATE I (NOVE 2021)
---Addendum to 52.212-4---
DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or
140R8124Q0065 Page 25 of 70 upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of Clause)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar
(End of clause)
DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE PROCESSING
PLATFORM (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
The Contractor shall also submit an electronic copy of the IPP invoice to kcook@usbr.gov and doinvoices@usbr.gov once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delays or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its
140R8124Q0065 Page 26 of 70 proposal or quotation.
(End of Local Clause)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND LIMITATIONS --
BUREAU OF RECLAMATION (MAY 2018)
a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term "technical direction" is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the
COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled "Changes;"
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify
140R8124Q0065 Page 27 of 70 the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled "Disputes."
(End of clause)
WBR 1452.223-81 Safety and Health -- Bureau of Reclamation (AUG 2021)
(a) The Contractor shall not require any person employed in the performance of this contract (including subcontracts) to work under conditions which are unsanitary, hazardous, or dangerous to the employee's health or safety.
(b) Contractor shall comply with the most current version of the Bureau of Reclamation Reclamation Safety and Health Standards (RSHS) and, if applicable, the requirements of the Accident Prevention Clause (FAR 52.236-13 ).
The RSHS manual shall be obtained at http://www.usbr.gov/ssle/safety/RSHS/rshs.html
(c) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part
1910 from the Occupational Safety and Health Administration, U.S. Department of Labor, www.osha.gov.
(d) In the event there is a conflict between the requirements contained in paragraphs (b) and (c) referenced herein, the more stringent requirement shall prevail.
(e) The Contractor shall submit a written proposed safety program as prescribed in the RSHS and the written specifications.
(f) The Contractor shall maintain an accurate record of, and shall report to the Contracting Officer (or authorized representative) in the manner prescribed by the Contracting Officer, all cases of death, occupational diseases, or traumatic injury to employees or the public involved, and property damage in accordance with the RSHS and OSHA guidelines.
(g) The rights and remedies of the Government provided in this clause are in addition to any other rights and remedies provided by law or under this contract.
(h) If the RSHS is updated or amended by Reclamation during the course of this contract, the contractor will be notified in writing. The contractor shall comply with the current RSHS immediately upon written notification. Should the contractor feel that the updated version of RSHS constitutes a substantive change to the contract, affecting price or time (or both), the contractor may request an equitable adjustment in the contract price. Any such requests shall include a price proposal submitted in compliance with Contract Clause WBR 1452.243-80, 140R8124Q0065 Page 28 of 70 https://www.acquisition.gov/far/part-52#FAR_52_236_13 http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.osha.gov
Modification Proposals - Bureau of Reclamation, and in sufficient detail to allow meaningful analysis of labor, equipment and material.
(End of clause)
--- End of Addendum to 52.212-4---
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
140R8124Q0065 Page 29 of 70
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).
[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
(4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
[X] (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
[ ] (6) [Reserved].
[X] (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section
743 of Div. C).
[ ] (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct
2016) (Pub. L. 111-117, section 743 of Div. C).
[ ] (9) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023)
(10) 52.204–28, Fe[ ]deral Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).
[ ] (11)(i) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).
(ii) Alternate[ ] I (Dec 2023) of 52.204–30.
[X] (12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101 note).
[ ] (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
[ ] (14) [Reserved] [ ] (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C. 657a).
[ ] (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct
2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
(17)[Reserve[ ]d]
[X] (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
140R8124Q0065 Page 30 of 70 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://www.govinfo.gov/link/uscode/41/4712 https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.govinfo.gov/link/plaw/115/public/390
[ ] (ii) Alternate I (Mar 2020) of 52.219-6.
[ ] (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
[ ] (ii) Alternate I (Mar 2020) of 52.219-7.
[ ](20) 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C. 637(d)(2) and (3)).
[ ] (21) (i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) (15 U.S.C. 637(d)(4)).
[ ] (ii) Alternate I (Nov 2016) of 52.219-9.
[ ] (iii) Alternate II (Nov 2016) of 52.219-9.
[ ] (iv) Alternate III (Jun 2020) of 52.219-9.
[ ] (v) Alternate IV (Sep 2023) of 52.219-9
[ ] (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
[ ] (ii) Alternate I (Mar 2020) of 52.219-13.
[ ](23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 637(a)(14))(Deviation OCT 2022).
[ ] (24) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).
[ ] (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-
Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).
[X] (26) (i) 52.219-28, Post Award Small Business Program Representation (Feb 2024) (15 U.S.C.
632(a)(2)).
[ ] (ii) Alternate I (MAR 2020) of 52.219-28.
[ ] (27) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged
Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).
[ ] (28) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small
Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).
[ ] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C.
644(r)).
[ ] (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15U.S.C. 637(a)(17)).
[X] (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
[ ] (32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (FEB 2024) (E.O.13126).
[X] (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
[X] (34) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
[ ] (ii) Alternate I (Feb 1999) of 52.222-26.
[X] (35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
[ ] (ii) Alternate I (Jul 2014) of 52.222-35.
[X] (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
[ ] (ii) Alternate I (Jul 2014) of 52.222-36.
[X] (37) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
[ ] (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec
2010) (E.O. 13496).
[ ] (39) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.
13627).
[ ] (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[X] (40) 52.222-54, Employment Eligibility Verification (May 2022). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in 22.1803.)
[ ] (41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ] (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ] (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).
140R8124Q0065 Page 31 of 70
[ ] (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).
[ ] (44) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
[ ] (ii) Alternate I (Oct 2015) of 52.223-13.
[ ] (45) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and
13514).
[ ] (ii) Alternate I (Jun 2014) of 52.223-14.
[ ] (46) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) (42 U.S.C. 8259b).
[ ] (47) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015)
(E.O.s 13423 and 13514).
[ ] (ii) Alternate I (Jun 2014) of 52.223-16.
[X] (48) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O. 13513).
[ ] (49) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).
[ ] (50) 52.223-21, Foams (Jun 2016) (E.O. 13693).
[ ] (51) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).
[ ] (ii) Alternate I (Jan 2017) of 52.224-3.
[ ] (52) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).
[ ] (53) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) (19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C.