GROUSE CREEK ROAD MAINTENANCE. IDAHO PANHANDLE NATIONAL FOREST
Solicitation number
1240BD26Q0033
Issued by

About this file

Solicitation Summary: Grouse Creek Road Maintenance

This is a Request for Proposal (RFP) for road maintenance services at the Grouse Creek Road (Road 280) on the Sandpoint Ranger District of Idaho Panhandle National Forest in Bonner County, Idaho. The USDA Forest Service is soliciting a firm-fixed-price contract to perform maintenance and repair work including ditch-shoulder excavation/repair (1 mile lump sum), culvert cleaning (7 each), and haul/place 24-inch rip rap culvert armor (174 cubic yards). Work must commence within 10 calendar days of notice to proceed and be completed by August 15, 2026. The solicitation is set aside for small businesses (100% set-aside), with NAICS code 115310. Technical submission requirements include demonstrated ability to meet schedule requirements and detailed explanation of any requirements that cannot be accomplished. Quotes must be submitted by April 22, 2022, at 2:00 PM PDST using the provided SF-1449 form and Schedule of Items; quotes submitted after the deadline will not be accepted. Evaluation criteria are technical approach, price, and past performance; award will be made to the highest technically rated offeror provided price is fair and reasonable and past performance is acceptable. The contract incorporates FAR clauses including Service Contract Labor Standards (with WG-8 Step 2 wage rate of $34.72), Paid Sick Leave Under Executive Order 13706, System for Award Management maintenance, convict labor prohibitions, equal opportunity provisions, fire control requirements, and anti-discrimination and diversity compliance certifications. Contractors must provide Idaho workers' compensation insurance verification prior to award and maintain weed-free equipment, comply with OSHA and fire safety requirements, and submit daily activity logs and past performance information from the last four similar contracts.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

40BD

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 2

0292 CODE 16. ADMINISTERED BYCODE

X

X

X

115310

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR40BD

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

04/22/2026 1400 PD

04/06/2026

509-423-2224JORGE SOMOZA

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1240BD26Q0033

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 2 1154993OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

SANDPOINT ID 83864

1602 ONTARIO

SANDPOINT RANGER DISTRICT

USDA FOREST SERVICE

15. DELIVER TO

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$11.5

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

USDA-FS CSA NORTHWEST 2

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Delivery: 08/15/2025 Period of Performance: 05/01/2026 to 08/15/2026

0001 Grouse Creek Road maintenance.

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

JORGE A. SOMOZA

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

EMAIL:________________________________________

SAM UEID:________________________________________

SCHEDULE OF ITEMS

IDAHO PANHANDLE NATIONAL FORESTS SANDPOINT RANGER DISTRICT

PROJECT TITLE: Grouser Creek Road Repair Solicitation 1240BD26Q0033

Schedule Notes:

Submit pricing for all items.

Award of this solicitation will result in Firm-fixed Price contract at Idaho Panhandle National Forests, The Government is in need of road maintenance services maintenance and functionality of ditch lines and water diversion structures, and removal of rocks, limbs and other debris from the road prism while maintaining vegetation that serves to prevent or moderate erosion from runoff. The services covered in this contract include the furnishing of all labor equipment, supervision, transportation, operating supplies, and incidentals necessary to perform road maintenance on roads specified herein, in compliance with the terms, specifications, conditions, and provisions of this solicitation.

The work site is located on Sandpoint Ranger District of Idaho Panhandle National Forest.

Maps may be requested from the respective Ranger District Offices:

Technical Point of Contact Sandpoint Ranger Districts Kyle Lee, (208) 755-5950 kyle.lee@usda.gov

Contracting Point of Contact Jorge Somoza at (509) 423-2224 or email jorge.somoza@usda.gov

Submit your quote by 22 April 2022 by 2:00 PM PDST. Any quote received after 2:00 pm on that day is late and it won’t be accepted.

The start of the work is right by Grouse Creek Falls on NR-280. Direction to the star of work is from the city of Sandpoint, ID take US-95 N via the ramp to US-2 E/Bonners Ferry/Canada proceed for 10.8 miles then turn right onto NF-280/Samuels Rd and drive for 3.0 miles and then turn left onto Grouse Creek Rd/NF-280 and drive for 5.8 miles to Grouse Creek Falls.

Work Item Road # Pay Unit Estimated quantity

Unit Unit price total

Ditch- shoulder excavation/repair

280 Miles 1 LS $ $

Culvert cleaning 280 Each 7 Each $ $ Haul/place 24” rip rap culvert armor

280 Cubic yard

174 Each $ $

Total $ mailto:kyle.lee@usda.gov mailto:jorge.somoza@usda.gov

GROUSE CREEK ROAD MAINTENANCE

Solicitation Number 1240BD26Q0033

Federal Acquisition Regulation (FAR) and United States Department of Aquiculture Acquisition Regulation (AGAR) Clauses and Provisions

The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.

Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-2 Clauses Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)

☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)

☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)

The following clauses are applicable if checked: You can either leave all clauses and check the boxes of the ones that apply or delete the clauses that do not apply. If you delete lines, you will need to right-click on the box and select “remove content control” before it will delete.

☐ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☐ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☐ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

☐ 52.204-91 Contractor identification (Nov 2025) ☐ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☐ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025)

☐ Alternate I (Mar 2020).

☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)

☐ Alternate III (Nov 2025) of 52.219-9.

☐ Alternate IV (Nov 2025) of 52.219-9

☐ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025) ☐ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☐ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☐ 52.222-35 Equal Opportunity for Veterans (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-36 ☐ 52.222-37 Employment Reports on Veterans (Nov 2025) ☐ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☒ 52.222-41 Service Contract Labor Standards (Aug 2018) ☒ 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

This Statement is for Information Only:

It is not a Wage Determination

Employee Class Monetary Wage -- Fringe Benefits WG- 8 Step 2 Non- Supervisory $34.72

☐ 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) ☐ 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) ☐ 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014)

☐ 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (Nov 2025) ☐ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

☐ Alternate I (May 2008) of 52.223-9 ☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Nov 2025) ☐ 52.223-23 Sustainable Products and Services ☐ 52.224-3 Privacy Training (Jan 2017)

☐ Alternate I (Jan 2017) of 52.224-3 ☐ 52.225-1 Buy American-Supplies (Nov 2025)

☐ Alternate I (Oct 2022) of 52.225-1 ☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025)

☐ Alternate II (Nov 2025) of 52.225-3.

☐ Alternate III (Nov 2025) of 52.225-3.

☐ Alternate IV (Oct 2022) of 52.225-3

☐ 52.225-5 Trade Agreements (Nov 2023) ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020) ☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) ☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) ☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services (Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☐ 52.240-92 Security Requirements (Nov 2025)

☐ Alternate II (Nov 2025) of 52.240-92 ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (No 2025) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025)

☐ Alternate I (Apr 2023) of 52.247-64.

☐ Alternate II (Nov 2021) of 52.247-64

Other Applicable Clauses

52.217-8 Option to Extend Services (Nov 1999) 30 calendar days prior to contract expiration

AGAR Clauses

452.204–70 Modification for Contract Closeout (Nov 2025)

(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (Contracting Officer) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The Contracting Officer shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(b) Upon contract closeout for contracts utilizing SAP: if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation.

The contractor will receive a copy of the modification and will be required to provide a signature.

(The Contracting Officer may also request a “Contractor Release of Claims” be completed by the contractor, although not required for contracts and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 60 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(c) Upon contract closeout for contracts utilizing anything other than cost reimbursement, if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and a ‘‘Contractor Release of Claims’’ and will be required to provide a signature on both forms. If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 120 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(End of Clause)

452.222-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec 2025)

(a) By entering into this contract, the Contractor certifies that:

(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.

(2) Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution, and the Contractor and any subcontractor or teaming partner will not do so for the duration of the contract.

(b) If the Contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the Contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The Contractor affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the Contractor is not eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.

(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.

(e) Submission of a knowing false statement relating to Contractor’s compliance with the above requirements and/or eligibility for the contract may subject the Contractor to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.

(f) The Contractor must include the provisions of this clause in all subcontract solicitations.

(g) Failure on the part of the Contractor or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate this contract for default.

(End of Clause)

Title Pages

1. Performance Work Statement 11

2. Project Maps 2 Page No Description 1 Idaho Panhandle National Forest 1 2 Grouse Creek Repair Map 1

3. DOL Wage Decision No. ID 1995-0228 4

4. Past and Current Contract Information 1

1.0 PERFORMANCE WORK STATEMENT ROAD MAINTENANCE

Idaho Panhandle National Forests Sandpoint Ranger Districts

Bonner County in Idaho

1.1 Scope of Contract. Award of this solicitation will result in Firm-fixed Price contract at Idaho Panhandle National Forests, The Government is in need of road maintenance services maintenance and functionality of ditch lines and water diversion structures, and removal of rocks, limbs and other debris from the road prism while maintaining vegetation that serves to prevent or moderate erosion from runoff. The services covered in this contract include the furnishing of all labor equipment, supervision, transportation, operating supplies, and incidentals necessary to perform road maintenance on roads specified herein, in compliance with the terms, specifications, conditions, and provisions of this solicitation. This work will include, clearing debris from ditches, minor road repair, and other related work necessary to meet the objectives.

Cleaning culvert catch basins and inlets/outlets, ditches, slides and other similar maintenance items. The equipment used to perform this work shall meet safety standards and shall be in good mechanical condition.

1.2 Work Objective. Successful, quality performance will result in clearing debris from ditches, minor road repair and other related work necessary to meet objectives.

1.3 Location and Description.

1.31 The work site is located on Sandpoint Ranger District of Idaho Panhandle National Forest. Maps may be requested from the respective Ranger District Offices:

Idaho Pandhandle National Forests.

Sandpoint Ranger Districts Kyle Lee, (208) 755-5950 kyle.lee@usda.gov

The start of the work is right by Grouse Creek Falls on NR-280. Direction to the star of work is from the city of Sandpoint, ID take US-95 N via the ramp to US-2 E/Bonners Ferry/Canada proceed for 10.8 miles then turn right onto NF-280/Samuels Rd and drive for 3.0 miles and then turn left onto Grouse Creek Rd/NF-280 and drive for 5.8 miles to Grouse Creek Falls. Work starts at mile point 5.2

2. CONTRACTOR WORK REQUIREMENTS

2.1 Moving of Equipment and Supplies. The moving of equipment and supplies to the job site and between job sites shall be the contractor's responsibility and is incidental to Pay Items as shown in the Schedule of Items and no separate payment shall be made.

2.2 Replacement of Equipment. Contractor shall provide quality equipment capable of safely performing the work under the terms of the contract. All repairs are the total responsibility of the Contractor.

2.3 Equipment Performance Standards. Contractor shall make equipment available for inspection and approval before use.

The Contractor must satisfy all applicable OSHA and DOT requirements or certifications for the operation of offered equipment. There will be no obligation to make payment for any equipment delivered that does not meet the Technical Specifications. Equipment provided to conduct work must meet or exceed the following minimum specifications:

(a) End loader/Backhoe

(1) Minimum 55 SAE net horsepower

(2) Minimum 1 cubic yard loader bucket.

(3) Backhoe bucket must be a minimum of 18 inches wide and have a reach of at least 12 feet

(4) ROPS rollover protection

(5) *Year of manufacture - 2000 or newer

(b) End Dump Truck

(1) Shall measure minimum of 12 cubic yards capacity

(2) Meet all safety standards as set by the State of Idaho and shall be licensed to haul designated materials within the State of Idaho

(3) End dump with latching tailgate and removable tailgate

(4) *Year of manufacture - 2000 or newer

(10) Backup warning device

(11) 50 percent of original tread depth on tires, with available spare on truck

(12) * 2000 model or newer

(d) Vibratory Roller

(1) Drum shall measure be 54 inches wide

(2) Minium 35 SAE net horsepower

(e) Packer/Roller

(1) Packer Roller attached directly to Grader Ripper Bar

(2) Minimum of 10 smooth roller tires mounted to Independent Walk Beams

(3) Minimum packing width = 75”

(4) Minimum weight of 3,000 pounds *2000 model or newer on all equipment or upon approval of the Contracting Officer.

2.4 Pollution and Erosion Control. During all operations under this contract, the Contractor shall exercise reasonable measures to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored and collected in a sanitary manner and disposed of in a State approved sanitary landfill.

Oil from crankcases or gear boxes, equipment waste or spilled or excess fuel shall be placed in containers and removed from the work site and disposed of as approved and required by Federal, State and Local laws.

Equipment uses for operations in close proximity to streams or bodies of water will be required to meet more stringent requirements regarding seals and fittings that prevent the leaking of hydraulic fluids, lubricants and fuels. Failure to comply will result in immediate rejection of equipment.

2.5.5 - Sections of roads constructed without roadside ditch shall be uniformly insloped or outsloped the entire width of the roadbed. The inslope or outslope grade shall be a minimum of 2 percent and a maximum of 4 percent unless staked otherwise on the ground.

2.5.6 - Existing drainage dips shall be cleaned and the outslope grade restored to equal or exceed the gradient of the road.

2.5.7 - Sections of roads constructed with a roadside ditch shall be bladed and reshaped to maintain crown at centerline of the roadbed, or insloped except on curves where crown is omitted. Road cross section shall slope uniformly both ways from crown apex to shoulders at a minimum blade of 2 percent and a maximum blade of 4 percent.

2.5.8 - At the conclusion of the grading and shaping operations the roadbed shall be smoothed and dressed to produce a uniform grade and cross section and a surface free of hollows, depressions, and projections above the adjacent roadbed surface. No berm or ridge or any material shall be left along either shoulder of the roadbed unless directed by the COR.

Compacting. Operate rollers and compact as specified: Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases. Make at least three complete passes.

2.6 Drainage Facilities - Cleaning and Repair

2.6.1 - Wood, rocks, and other debris shall be removed from roadside drainage ditches to provide unobstructed flow of water and disposed of on the jobsite as directed by the Contracting Officer's Representative. The backslope of the ditch shall not be undercut by ditch cleaning operations;

and the slope to road shoulder shall be maintained at an approximate ratio of 1V:2H from the bottom of the ditch to the edge of the roadbed. Roadside ditches shall not be excavated to a depth of greater than 2 feet below roadbed grade. Typical depth of roadside drainage ditches below roadbed is one foot. Existing ditch dikes shall be restored, reshaped, and compacted as needed for effective drainage through culverts.

2.6.2 - On aggregate-surfaced roads, material may be bladed across the road provided it is not deposited in ruts, washes, or chuckholes in the road surface. Such material shall be side cast on stable fill slopes or natural ground out of streambeds, streams, or other waterways. No side casting will be permitted on roads paralleling streams where the ground slope from the outside road shoulder to the stream edge is steeper than 1V:2H. On roads without aggregate surfacing, surface soil with rocks less than 3 inches in greatest dimension may be spread evenly over the adjacent roadbed.

2.7 Maintenance of Traffic and Use of Warning Devices. The Contractor shall provide, erect, and maintain all necessary traffic control and devices for the protection of the work and public safety. The traffic control includes areas where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All traffic control methods and devices shall conform with the current edition of the Manual Uniform Traffic Control Devices for Streets and Highways (MUTCD), published by the Federal Highway Administration and applicable safety codes.

2.8 Removal of Obstructions. All fallen trees, limbs, brush, small slides or debris in the Travel way or road ditch line shall be removed and scattered outside the travel way and ditch line.

2.9 Damage to Structures. The Contractor shall be held liable and is responsible for any damage caused by his/her personnel or equipment to any existing traffic loops, cattle guards, culverts, signs, and riprap protecting culvert inlets or fill slopes. Repair to these structures shall be at the Contractor's expense. Traffic loops will be marked on the ground with lath and fluorescent pink ribbon.

2.10 Soil Moisture – Retention of Fines. Contractor is responsible to ensure that performance does not reduce the level of fines in the road surface. Therefore, operations may be suspended when soil moisture conditions are not favorable for obtaining a satisfactory result. Suitable moisture conditions are determined to be in excess of five (5) percent and less than 25 percent by weight unless otherwise authorized by the COR.

3.0 ACCEPTANCE REQUIREMENTS

3.1 Inspection and Acceptance

The Contractor shall assure performance meets contract specifications, in accordance with FAR 52.212-4 Contract Terms and Conditions-Commercial Items prior to requesting the Government to inspect for payment or acceptance. Upon completion of a road, or segment of road not less than 5 miles in length, the Contractor shall notify the COR in writing to set a mutually agreed upon date for inspection of completed work. The Government will inspect completed sections of road within 3 business days (i.e. Monday – Friday, excluding Holidays) following Contractor’s notification of completion of the work.

3.2 Acceptance. Acceptance of the work under the contract will be made after steps above have been taken and the COR has made the determination of satisfactory compliance with the specifications. For acceptance purposes, complete segments as defined above, or an entire road if shorter in length, shall be satisfactorily completed before acceptance will be made.

Acceptance will not be made for segments broken by unacceptable portions of work.

3.3 Rework and Reinspection After Rework. When inspection indicates the performance objectives were not met, the work will be deemed unacceptable and payment will not be made until the Contractor has corrected the deficiencies. Inspections after rework will be made in the same manner as the first inspection. The Contractor may be charged for actual costs incurred by the Government for inspection of rework.

4. DELIVERIES OR PERFORMANCE

4.1 Work may be accomplished during daylight hours (one-half hour before sunrise to one-half after sunset). The Government may restrict operations on weekends or Holidays of expected high use.

4.1.1 The Government reserves the right to specify the sequence in which the work is performed.

4. 2 Additional Deliveries or Performance Requirements. Non-operating Damages. When the Government is providing water for the road grading operation, it is the responsibility of the Contractor to notify the COR or Inspector if the grader is inoperative or the operator is unavailable. This notification shall be provided at least 12 hours prior to commencement of the subsequent grading operation. Failure to effect the notification stated above may result in the Contractor being assessed actual damages to the Government, including, but not limited to, all costs incurred in preparation of the road surface, as well as the COR’s and/or Inspectors salaries, per diem, and vehicle use.

5. Measurement.

5.2. Measurement. Accepted work will be measured in miles to the nearest tenth mile along the centerline of the roadway cross section, and shall include only those roads or road portions which are ordered under the contract and completed to satisfactorily meet the contract objectives.

Measurement will be by a distance measuring instrument mounted in a Forest Service vehicle.

The measuring device will be checked for accuracy and calibrated as necessary on a section of road that has been carefully measured with a surveyor's chain. NOTE: Parking areas, turnouts, and approach road connections are considered as incidental to the main roads and shall not be measured separately. Mileage measurement includes all work on both sides of the road, regardless of the number of passes made to accomplish the work. A daily activity log has been provided in the attachments for contractor use in recording work activity.

Contractor shall submit Activity Report to COR as required.

5.2.1 Hourly Work Method of Measurement. An hour consists of 60 minutes of actual operation of equipment on authorized Government work. Moving of equipment under its own power, when so ordered by the Contracting Officer, will constitute authorized work.

Nonproductive time such as, but not restricted to, lack of operating supplies or being stuck, or moving and loading time of equipment and specified accessories, shall not constitute "actual operation". When working on the hourly portion of the contract, the government may furnish a "Service" activity/inactivity vehicle motion clock recorder and an inspector to record the contractor’s hourly operational time.

5.2.1.1 Record of Work. The government will maintain a daily written record for each piece of equipment showing:

Contract and Task Order number and work sub-item number applicable to the equipment.

Name of Contractor and Operator.

Hours of operation authorized to nearest quarter hour.

Hour of actual operation on regular work.

Authorized hours of operation lost and reason.

This daily record can be documented on a shift ticket. The Operator performing the work or Designated Representative and the COR or Inspector shall sign the daily record each day. The daily record will be used to reconcile the contractor’s proper invoice for payment. Appropriate Government surveillance of contractor performance is required for ALL hourly work to give reasonable assurance that efficient methods and effective cost controls are being used.

Landscape Preservation

(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.). Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

Equipment Rental. This work consists of furnishing and operating equipment for work ordered by the CO not otherwise provided for under the contract. This work shall be authorized in advance by the Government and there is no guarantee that any hourly work will be ordered.

Make equipment a available for inspection and approval before use. Furnish and operate equipment with such auxiliary attachments, oilers, etc., as are usually needed for efficient operation of the equipment. Keep the equipment in good repair and operating condition. Daily written records, such as shift tickets to record the number of unit-hours of operation are required to be signed and submitted with invoices.

Do not measure time for moving equipment between project work sites. Do not measure nonoperable equipment or equipment dependent upon another piece of non-operable equipment.

Payment. The working rate specified in the Schedule of Items shall be paid for all hours of actual operation of equipment on authorized work. Only quantities approved by the CO shall be accepted under this contract. The accepted quantities will be paid at the contract price per unit of measurement for the Rental Equipment pay item listed in the schedule of items. Payment will be full compensation for the work done and accepted. The Government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in the contract unit prices.

Weed Free Equipment

In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.

The following is considered proof of weed-free equipment:

The Contractor will be required to clean all equipment prior to entry on the project area.

This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of equipment shall be treated the same as the initial move-in. Prior to initial move-in of all equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed time and location.

Safety. Contractors shall comply with OSHA regulations and provide employees a work environment that is sanitary and not hazardous, which includes providing personal protective equipment. Contractors must maintain a health and safety plan and an accident prevention program, which includes frequent and regular inspections of the project site, materials, and equipment. Contractors are responsible for risk management regarding contractor/employee and public safety, which include experience of operator to handle road and terrain conditions, getting to the worksite, traffic control, and coordination with other users

Loss, Damage, or Destruction. Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment. All claims arising under this clause shall be submitted to the Contracting Officer.

Contractor Performance Assessment Reporting System (FEB 2011)

(a) General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System (CPARS).

(b) Contact Information. The name and email address of the Contractor Representative will be required for each Task Order.

(c) Assessment. Upon completion of the work associated with the contract/delivery orders, an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for completion of the evaluation. The email will be from: webptsmh@navy.mil

Fire Control

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, mailto:webptsmh@navy.mil supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area. An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved hand tool of a type appropriate in the contract area, such as shovel, pulaski, or

ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multi position engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester.

Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Power saws. For each power saw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

Any fueling or refueling of a power saw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; power saw shall be moved at least 10 feet from place of fueling before starting.

(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

(i)All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(12) Pump and Trailer or Truck. During Stage II fire restrictions the following shall be required:

The Contractor shall provide at a location satisfactory to the Contracting Officer, a serviceable truck or trailer, equipped with a fire fighting tanker unit to be kept ready for instant use for suppressing forest fires. The unit shall consist of a tank of not less than 100-gallon capacity which shall be mounted to a live hose reel with a minimum of 100 feet of hose not less than (3/4) inch INSIDE diameter of non-collapsible (booster) hose with combination nozzle. Hose shall be connected to the water supply.

The tank shall be attached to the chassis frame or to a structurally sound flat bed in such a way to withstand pitch, roll and yaw of the load during on and off road operation of the unit without damaging the tank or other chassis components.

The pump may be an auxiliary powered pump or a power take-off pump with discharge capacity of a minimum 10 gallons per minute at 100 P.S.I. pressure. All pumps shall have a discharge pressure gauge. If the pump is of the positive displacement type, a bypass or pressure relief valve shall be provided. The pump as mounted shall be capable of drafting water from a source located 10 vertical feet below the pump head through the required 20 feet of suction hose. A portable pump capable of filling a 100 gallon tank in 10 minutes or less may be substituted in order to meet the fill time requirements.

Each Pump and Trailer or Truck unit shall have an additional fitting for 250 feet of ¾ inch garden type hose (capable of withstanding the required pressure), two ¾ inch gated wyes, and 4 hose nozzles of the shut-off type, adjustable for straight stream, spray, or fog.

A fire extinguisher, multi-purpose 2A 10BC that is securely mounted to the trailer or truck and accessible by the operator shall be required. The fire extinguisher shall have a current annual inspection tag and the annual maintenance tag in regards to a 6 year annual inspection and every 12 years regarding a hydro test on all dry powder, metal fire extinguishers.

Tools, adapters, accessories and fuel necessary to operate the pump and trailer or truck shall be provided. If a trailer is used, the proper tow hitch shall require a 2 inch ball, a serviceable vehicle and shall be located at point satisfactory to the Contracting Officer. Fill sites shall be identified prior to use, and equipment shall be field tested in the presence of an inspector.

(13) Burning. Before starting any open burning, the Contractor shall comply with the following:

(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

(ii) Obtain a burning permit from the District Ranger.

(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

STATE OF IDAHO'S NOTICE TO OFFEROR Idaho Workers Compensation Law

1. Prior to award of any contract subject to Idaho Workers' Compensation Laws, the contractor must provide (1) evidence that they have the required workers' compensation coverage or, (2) documentation from the State of Idaho exempting the contractor from such coverage.

2. Contractors should obtain and complete a State of Idaho Certificate of Verification of Workers' Compensation Insurance as documentation of insurance coverage or exemption. These certificates may be obtained from and returned to the Employee Compliance Division of the Idaho Industrial Commission at the following offices:

1221 Ironwood Drive, Suite 100 317 Main Street 1070 Hiline, Suite 300 Coeur d'Alene, ID 83815 Boise, ID 83720 Pocatello, ID 83201

(208) 769-1565 (208) 334-6029 (208) 236-6366

FAX NO. (208) 769-1465 1-(800) 950-2110 FAX NO. (208) 236-6050

FAX NO. (208) 334-5145

3. This certificate of verification shall be fully executed by the contractor and signed by the Industrial Commission Compliance Officer prior to award of the contract.

Grouse Creek Repair Map

���������������������� �!"�!#� $������� %���!#��%&!�������������������
�����
��������������������������������������������������������������������������

� ��+�"% �!"��!�,�)--./(''0 %"��1������++2���������� �3�2�!"�!#�����������������3�2�!"��!�,�44 � ��+�"% �!"2��� % �� #��%2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .