Sole Source Justification_s 143051250074.pdf
PDF 331 KB Posted
- Attached to
- La Jolla Lab Seawater Services
- Solicitation number
- 1430510074
About this file
This document is a Single Source Determination using Simplified Acquisition Procedures for a seawater services contract. The National Oceanic and Atmospheric Administration (NOAA) Southwest Fisheries Science Center (SWFSC) intends to award a firm fixed-price purchase order to the University of California Regents (UCR) for continuous seawater flow to their La Jolla Laboratory. The service will provide 80 gallons per minute of seawater pumped from the Scripps Institution of Oceanography (SIO) pier intake, through the SWFSC experimental aquarium, and returned to the ocean via SIO's outfall, with an estimated annual cost of $185,011.20 covering the period from September 14, 2025 through September 13, 2026.
The justification for the sole source award is based on the unique infrastructure and historical relationship, with the seawater system infrastructure valued at $50 million and owned by UC Regents. The document notes that the SWFSC has been located on the SIO campus since the 1930s, and the Ground Lease specifically requires NOAA to pay UCR for seawater usage. The procurement is being conducted under Federal Acquisition Regulation (FAR) provisions that allow for single-source acquisitions when only one source can meet the agency's specialized requirements, with previous contracts with UCSD SIO dating back to 2016.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| La Jolla Seawater Service PWS Redacted 143051250074.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 2.0
Source Selection Information – see FAR 2.101 and 3.104
SINGLE SOURCE DETERMINATION USING
SIMPLIFIED ACQUISITION PROCEDURES (SAP)
FOR AN ACTION NOT EXCEEDING THE SIMPLIFIED ACQUISITION THRESHOLD
(AUTHORITY: FAR 13.106-1(b)(1))
143051-25-0074
1. Agency and contracting activity. Department of Commerce, NOAA Acquisition and Grants Office (AGO), National Marine Fisheries Service (NMFS), Southwest Fisheries Science Center (SWFSC), Operations and Management Division (O&M).
2. Description of supplies or services required to meet agency needs (including the estimated value). NOAA intends to award a purchase order with firm fixed price rates to the University of California Regents (UCR) to supply a continuous flow of seawater to the SWFSC La Jolla Laboratory.
The requirement is to provide a continuous flow of seawater to the SWFSC’s La Jolla Laboratory.
The seawater will be pumped from the intake at the end of the Scripps Institution of Oceanography (SIO) Pier, flow through the SWFSC experimental aquarium, and returned to the ocean via SIO’s seawater outfall. The expected flow is 80 gallons per minute at the rate of $0.44 with an estimated cost of $185,011.20 from September 14, 2025 through September 13, 2026. This will allow the SWFSC to accomplish its mission of conducting research on the conservation and management of living marine resources. All piping, valves, pumps and associated equipment are owned and maintained by SIO, with the exception of equipment on the premises of the SWFSC La Jolla Laboratory.
Estimated value is $185,011.20 for one year of seawater.
3. Identification of the single source or the brand name to be solicited.
University of California at San Diego 9500 Gilman Drive Scripps Institution of Oceanography, UC San Diego La Jolla, CA 92093
4. Supporting rationale. Only one source or brand name is reasonably available as detailed below:
Only one source is capable - FAR 8.405-6(a)(1)(i)(B) - Only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized.
The SWFSC La Jolla Laboratory is located on the campus of SIO, which is part of the University of California system, governed by the UCR. The SWFSC has maintained a presence on the SIO campus since the 1930’s. In 1964 a new federal laboratory was commissioned on the ocean bluff at the northern end of the campus that included an experimental aquarium and a flow-through seawater supply. The infrastructure (pumps, filters, pipes, valves, holding tanks) was installed at the time of construction and operation of the system was assumed by SIO. When the facility was jeopardized by erosion of the cliffs a ground lease was negotiated for land across the street where the current laboratory was built. Three of the four buildings that comprised the old laboratory were demolished, several improvements were made to bring the site into modern seismic and geo-hazard
143051-25-0074
Source Selection Information – see FAR 2.101 and 3.104 code compliance, and the facility was transferred to UCR.
NOAA and the UCR signed the Ground Lease for the land on which the new laboratory was built on 17 June 2009. Part of the new laboratory construction included an extension of the existing SIO seawater system to the new facility.
The Ground Lease (clause 2.6 and Attachment F) further specifies that NOAA will pay the UC Regents for seawater usage. The infrastructure to provide the seawater is in place and there is no other source.
Logical follow-on - FAR 8.405-6(a)(1)(i)(C) – In the interest of economy and efficiency, the new work is a logical follow-on to an original Federal Supply Schedule (FSS) order or BPA. The original order or BPA was placed in accordance with the applicable FSS ordering procedures.
The original order or BPA was not previously issued under sole-source or limited sources procedures. The NOAA SWFSC has had previous contracts with the UCSD SIO since 2016.
These are contracts AB133F16BA0045, 1305M321CNFFR0018, 1305M322CNFFR0041, 1305M323PNFFR0083 and 1305M324P0413.
The statutory authority permitting other than full and open competition is 41 U.S.C.253(c)(1) as implemented by the Federal Acquisition Regulation (FAR) Subpart 6.302-1 entitled, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.
□ 41 U.S.C. 1901, using SAP up to $7M as authorized by FAR 13.500(a) and implemented by FAR 13.501(a).
5. Market Research.
Market research is contained in the NOAA CAO Report “Independent Verification and Validation Of Scripps Institution of Oceanography Seawater System Evaluation and Billing Rates For NOAA facility at the Southwest Fisheries Science Center La Jolla, California” dated 28 March 2014.
The existing SIO seawater system is the only supplier capable of providing continuous flow-through seawater to the SWFSC La Jolla Laboratory. The infrastructure to provide the seawater, including intakes, pumps, piping, valves, filters, storage tanks, and control system is valued at $50 million and is owned by UC Regents. The costs to replace the structure with one owned by SWFSC and the time it would take to construct such a structure would have a significant negative impact on operations.
There are no other sources available to provide the SWFSC with seawater.
6. Technical/Requirements Representative Certification
I certify that this requirement constitutes the Government’s minimum needs and the supporting data provided herein is accurate and complete to the best of my knowledge and belief.
Date
Matthew Carriveau, Facility Operations Specialist Southwest Fisheries Science Center
143051-25-0074
Source Selection Information – see FAR 2.101 and 3.104
John Crofts, Deputy Science and Research Director Date Southwest Fisheries Science Center
7. Approval
This justification is accurate and complete to the best of my knowledge and belief.
Approve
Contracting Officer Date
| 2025-03-03T08:27:44-0800 | |
| CARRIVEAU.MATTHEW.DEAN.1374295213 |
| 2025-03-03T14:52:48-0800 | |
| CROFTS.JOHN.AARON.1249242388 |
| 2025-05-14T13:17:31-0400 | |
| TAULMAN.JENNA.LYNNETTE.1404219096 |
File details come from the government source that posted it. Updated .