Sole Source Justification Redacted.pdf

PDF 154 KB Posted

Attached to
Notice of Contract Award - Valve Overhaul
Solicitation number
N0018926PL131
Issued by

About this file

Justification for Sole Source Procurement

This document is a Justification for Sole Source procurement under simplified procedures (Simplified Procedures - MPT to < SAT) for Purchase Request V214226104EM99. The requiring activity is USS GUNSTON HALL (LSD-44), and the contracting office is NAVSUP Fleet Logistics Center, Norfolk Contracting Department Fleet Directorate. The sole source contractor is Moody Marine Service LLC (CAGE Code 11DX1), restricted based on urgency justification as no substitutes are available for the required services.

The contracted services involve overhaul of high and low pressure air reducers in AMR1 and AMR2, lube oil cooler valve overhaul for the main engines in MMR1 and MMR2, and setting the fuel oil back pressure regulating valve for NR2 SSDG. The estimated pricing for these services is $52,170 with a period of performance from 29 May 2026 to 01 June 2026. The document certifies that the information provided is complete and accurate, and that the circumstances justifying only one source being reasonably available apply to this contract action. The technical/requirements certification was signed on 04APR26 by authorized representatives of both the requiring activity and the contracting office.

View the file

Other files

File Type Posted
Urgency Justification Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information � See FAR 2.101 and 3.104

JUSTIFICATION FOR SOLE SOURCE

(Simplified Procedures - MPT to < SAT)

Purchase Request/Document number: _ V214226104EM99_______________________

The supplies or services described herein are being solicited on a sole source basis and competition is precluded in accordance with FAR 12.102(a) for reasons indicated below. There are no substitutes available for the supplies or services.

Restricted to the following source.

Service:

Contractor: Moody Marine Service LLC Cage Code: 11DX1

Supply:

Original Manufacturer Name:

Check here if obtaining product through authorized resellers of the manufacturer.

Description of the supplies or services required, the estimated price/cost, and required delivery date or period of performance.

OVERHAUL HIGH AND LOW PRESSURE AIR REDUCERS IN AMR1 AND AMR2, M AS WELL AS

THE LUBE OIL COOLER VALVES FOR THE MAIN ENGINES IN MMR1 AND MMR2. THE FUEL OIL

BACK PRESSURE REGULATING VALVE FOR NR2 SSDG NEEDS TO BE SET. ESTIMATED PRICING

FOR THIS SERVICE IS $52,170.

Period of Performance: 29 May 2026 � 01 June 2026

In conclusion, the requested supplies or services represent the minimum requirements of the government.

Describe in detail why only this source(s) can furnish the requirements to the exclusion of other sources.

Other information to support a sole source action:

Procurement is to be sole sourced based on urgency as per the accompanying urgency justification.

Source Selection Information � See FAR 2.101 and 3.104

TECHNICAL/REQUIREMENTS CERTIFICATION: V214226104EM99

I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS COMPLETE AND ACCURATE TO THE BEST OF

MY KNOWLEDGE. I UNDERSTAND THAT THE PROCESSING OF THIS SOLE SOURCE JUSTIFICATION

PRECLUDES THE USE OF FULL AND OPEN COMPETITION.

I HEREBY DETERMINE THAT THE CIRCUMSTANCES JUSTIFYING ONLY ONE SOURCE IS REASONABLY

AVAILABLE APPLIES TO THE CONTRACT ACTION.

04APR26

Signature Date

USS GUNSTON HALL (LSD-44)

Requiring Activity

Contracting Officer Signature Date

NAVSUP Fleet Logistics Center, Norfolk Contracting Department Fleet Directorate.

File details come from the government source that posted it. Updated .