sole source J and A redacted.pdf
PDF 289 KB Posted
- Attached to
- Notice of Intent to Sole Source
- Solicitation number
- M6261325Q0010
- Issued by
-
United States Marine Corps
About this file
This document is a Justification for Other than Full and Open Competition for a FAR Part 13 Acquisition under the Simplified Acquisition Threshold. The procurement is for a Liquid Oxygen Pump (P/N 803263-001) for Station Cryogenics Liquid Oxygen/Nitrogen Generator (LONG) Retrofit Kit, specifically a LOX Pump for 1.5 TPD & 2.0 TPD ASU Plants. The replacement part (P/N 788910-002) is manufactured as a cartridge with no orderable parts and is uniquely produced by PCI gases for the Marine Corps.
The justification is based on "Only One Responsible Source" due to exclusive licensing agreements and unique equipment specifications. The LOX pump is no longer available from the original manufacturer, and the current pump needs to circulate liquid oxygen at temperatures as low as -300°F and fit precisely into the Marine Corps' equipment space. No alternative manufacturer makes LOX pumps of this size, and other manufacturers' pumps would be incompatible. The technical certification was signed by Kurt Blumenfeld on 18AUG2025, with a contracting officer signature dated 9/9/2025.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification for Other than Full and Open Competition - FAR Part 13 Acquisitions under the SAT
2. OTHER REASONS.
B. BRAND NAME
C. _URGENT AND COMPELLING. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required:
V. CERTIFICATIONS:
A. Technical/ Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate t the st of my knowledge and belief.
Kurt Blumenfeld 253-3220 Name (Printed)/ Phone#
18AUG2025
Date
B. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date
Vl.3 (28 June 2018) Page 2 of3
SSgt Rangel / 645-7642 9/9/2025
| 2025-09-09T10:14:46+0900 | |
| RANGEL CEBRERO.KEVIN.1547604519 |
File details come from the government source that posted it. Updated .