BRESHNA KOT POWER PROJECT
world
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT ORGINAL
PGS-BKP-R001
02.06.13
NTS
ELECTRICAL DRAWING SCHEDULEA
B C D E F
09.18.12AMENDED TO LINE UP WITH THE DRAWING LIST JP JP MW JF
05.04.12 JP JP MW JF
10.27.1290% SUBMITTAL JF JF PD JF
11.04.12DRAWING REVISION UPDATED JF JF PD JF
02.06.13"AS BUILT" 100% SUBMITTAL JF JF PD JF
Conformed to Construction "As Builts" 03-24-2013
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT 05.04.12ORGINAL JP
PGS-BKP-R001
02.06.13
NTS
MECHANICAL DRAWING SCHEDULEJP MW JFA
B C D E F
09.18.12AMENDED TO LINE UP WITH THE DRAWING LIST JP JP MW JF
10.27.1290% SUBMITTAL JF JF PD JF
11.04.12DRAWING REVISION UPDATED JF JF PD JF
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT 12.05.11ORGINAL JP
PGS-BKP-R001
02.06.13
NTS
STRUCTURAL DRAWING SCHEDULEJP PD JFA
B C D E F
10.21.12DRAWING REVISION AND TITLE BLOCK UPDATED, 90% SUBMITTAL JP JP PD JF
10.27.12SHEET UPDATED, 90%SUBMITTAL JP JP PD JF
11.04.12DRAWING REVISION UPDATED JF JF PD JF
ORGINAL
PGS-BKP-R002
NTS
OVERALL POWER ARRANGEMENTA
B C D E F
BRESHNA KOT POWER PROJECT
world
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT 12.05.11 JP
02.04.13
JP PD JF
05.04.12PGS WORKING SITE RE-ARRANGEMENT JP JP PD JF
10.21.1290% SUBMITTAL JP JP PD JF
11.04.12DRAWING UPDATED, 90% SUBMITTAL JP JP PD JF
02.04.13"AS BUILT" 100% SUBMITTAL JP JP PD JF
MTU GENERATOR AREA
KTA50 GENERATOR AREA
Bench Mark Building
Fence
Wall
Generator
Diesel Tank Container
Green Area Trash
Bower
Electric Pole Road
Tree
Door
Guard Tower Guard Post Concrete
Concrete Wall Water Tank Sewer Manhole Electric Manhole Water Manhole Water Pump Diesel Pump
Pipe Electric Pipe
Sewer Pipe
Water Tap
Culvert Pole
G
SWR
E
W
DP
LEGEND
BENCH MARK POINTS
Easting
757057.360
757009.867
757063.078
757012.934
756994.605
756948.931
Northing
3502547.510
3502554.386
3502477.503
3502471.586
3502485.956
3502553.669
Elevation
1018.873
1017.144
1016.310
1016.379
1016.627
1017.075
Description
BM1
BM2
BM6
BM7
BM8
BM9
BM10 756978.443 3502573.919 1017.410
CONT-MJR
CONT-MNR
Mechanic Mechanic
Note:
Contour Minor Interval at 0.2 m
Contour Major Interval at 1 m
All Dimensions are in Meter
All Coordinates are in WGS-84 41N
Area Of Boundary: 21,363 sq.m 2.136 hectares
Trash Pet HoleElectric
Box Diesel Pipe
BRESHNA KOT POWER PROJECT
world
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT 12.05.11ORGINAL JP
PGS-BKP-R003
02.04.13
NTS
NEW GENERAL SITE LAYOUTJP PD JFA
B C D E F
05.04.12PGS WORKING SITE RE-ARRANGEMENT JP JP PD JF
10.21.1290% SUBMITTAL JP JP PD JF
11.04.12DRAWING UPDATED, 90% SUBMITTAL JP JP PD JF
02.04.13"AS BUILT" 100% SUBMITTAL JP JP PD JF
MTU GENERATOR AREA
KTA50 GENERATOR AREA
ORGINAL
PGS-BKP-R004
NTS
3D SITE ARRANGEMENTA
B C D E F
BRESHNA KOT POWER PROJECT
world
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT
PGS WORKING SITE RE-ARRANGEMENT
12.05.11
05.04.12 JP
JP
JP
JP
PD
PD
JF
JF
01.28.13
90% SUBMITTAL 10.21.12 JP JP PD JF
FUEL DELIVERY AREA UPDATED - 90% SUBMITTAL 11.04.12 JP JP PD JF
"AS BUILT" 100% SUBMITTAL 01.28.13 JP JP PD JF
50N
51N
50N
51N
50N
51N
50N
51N
50N
51N
50N
51N
50N
51N
50N
51N
50n
51n
67 67n 67 67n 67 67n 67 67n
7171717171
67 67n
50N
51N
50N
51N
2559 59
51N
50N
67N
67 67n 67 67n
12.05.11ORGINAL JP
PGS-BKP-E001
03.08.13
NTS
MV MAIN DISTRIBUTION SCHEMATIC JP PD JFA
B C D E F
BRESHNA KOT POWER PROJECT
world
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT
12.30.11NER REMOVED,ANSI NUMBERS UPDATED JP JP PD JF
SCOPE CHANGE SLD UPDATED NOW 7 GENSETS
AMENDED AS PER CLIENT COMMENTS
90% SUBMITTAL
JP JP PD JF
JP JP PD JF
JP JP PD JF
09.08.12 09.30.12 10.27.12
"AS BUILT" 100% SUBMITTAL JP JP PD JF03.08.13
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT
PGS-BKP-E002
03.08.13
NTS
LV MAIN DISTRIBUTION SCHEMATICB
12.05.11CONSTRUCTION DRAWINGS ZZ AK AK CM
C
06.07.12FOR APPROVAL NB AK AK CM
D 09.13.12CHANGES DUE TO CONTRACT MODIFICATIONS V3, REMOVED LOAD AND REMOVE REDUNDANT PANELS JF AK AK CM
E 09.21.12CABLE SIZE CHANGED, CHANGE GROUNDING FOR MAIN MDB AND ADD IN SYMBOL FOR GROUND. JF AK AK
CM
F
09.23.12AMENDED AS PER CLIENT COMMENTS JF AK AK CM
A
10.27.12 90% SUBMITTAL JF AK AK CM
G 03.08.13"AS BUILT" 100% SUBMITTAL JF AK AK CM
12.05.11ORGINAL JP JP RJ JFA
B C D E F
BRESHNA KOT POWER PROJECT
world
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT
PGS-BKP-E003
02.04.13
1:75
GENERAL TRENCHING ARRANGEMENT05.04.12RE-ARRANGEMENT OF GENERAL FOUNDATION LAY-OUT JP JP RJ JF
REVISED TO INCORPORATE COMMENTS, 90% SUBMITTAL 10.27.12 JP JP RJ JF
CUTOUTS UPDATED, FUEL PAD SIZE REDUCED, TRENCH ADJUSTED - 90% SUBMITTAL 11.04.12 JP JP RJ JF
"AS BUILT" 100% SUBMITTAL 02.04.13 JP JP RJ JF
01.27.13ORGINAL JP
PGS-BKP-E040
01.29.13
1:50
GENERAL EARTHING ARRANGEMENT - KTA50 GENERATORJP JF JFA
B C D E F
BRESHNA KOT POWER PROJECT
world
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT
01.29.13"AS BUILT" 100% SUBMITTAL JP JP JF JF
SWITCHGEAR CONTAINER PLAN VIEW
SIDE SECTION VIEW CONTAINER
Door 1 Door 2
OFF ON
ABB
ABB
ABB
ABB
ABB
ABB
ABB
OFF ON
02.04.13ORGINAL JP
PGS-BKP-E041
03.08.13
NTS
SWITCHGEAR PANEL ARRANGEMENTJP PD JFA
B C D E F
BRESHNA KOT POWER PROJECT
world
BLACK & VEATCH
Building a of Difference.
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT
J01 J02 J03 J04 J05 J06 J07 J08 J09 J10
S M
D B
MDB-GY
S M
D B
03.08.13"AS-BUILT" 100% SUBMITTAL JP JP PD JF
BATTERY
| PGS-BKP-R001 ELECTRICAL DRAWING |
| PGS-BKP-R001 MECHANICAL DRAWING |
| PGS-BKP-R001 STRUCTURAL DRAWING |
| PGS-BKP-R002 |
| PGS-BKP-R003 |
| PGS-BKP-R004 |
| PGS-BKP-E001 |
| PGS-BKP-E002 |
| PGS-BKP-E003 |
| PGS-BKP-E004 |
| PGS-BKP-E005 |
| PGS-BKP-E006 |
| PGS-BKP-E007 |
| PGS-BKP-E008 |
| PGS-BKP-E009 |
| PGS-BKP-E010 |
| PGS-BKP-E011 |
| PGS-BKP-E012 |
| PGS-BKP-E013 |
| PGS-BKP-E014 |
| PGS-BKP-E015 |
| PGS-BKP-E017 |
| PGS-BKP-E018 |
| PGS-BKP-E019 |
| PGS-BKP-E020 |
| PGS-BKP-E022 |
| PGS-BKP-E023 |
| PGS-BKP-E024 |
| PGS-BKP-E025 |
| PGS-BKP-E026 |
| PGS-BKP-E027 |
| PGS-BKP-E028 |
| PGS-BKP-E029 |
| PGS-BKP-E030 |
| PGS-BKP-E031 |
| PGS-BKP-E032 |
| PGS-BKP-E033 |
| PGS-BKP-E034 |
| PGS-BKP-E035 |
| PGS-BKP-E036 |
| PGS-BKP-E037 |
| PGS-BKP-E038 |
| PGS-BKP-E039 |
| PGS-BKP-E040 |
| PGS-BKP-E041 |
| PGS-BKP-M001 |
| PGS-BKP-M002 |
| PGS-BKP-M003 |
| PGS-BKP-M004 |
| PGS-BKP-M005 |
| PGS-BKP-M006 |
| PGS-BKP-M007 |
| PGS-BKP-M008 |
| PGS-BKP-M009 |
| PGS-BKP-M010 |
| PGS-BKP-M011 |
| PGS-BKP-M013 |
| PGS-BKP-M015 |
| PGS-BKP-M016 |
| PGS-BKP-M017 |
| PGS-BKP-M018 |
| PGS-BKP-M019 |
| PGS-BKP-M020 |
| PGS-BKP-M021 |
| PGS-BKP-M022 |
| PGS-BKP-M023 |
| PGS-BKP-M024 |
| PGS-BKP-M025 |
| PGS-BKP-M026 |
| PGS-BKP-M027 |
| PGS-BKP-M028 |
| PGS-BKP-M029 |
| PGS-BKP-M030 |
| PGS-BKP-S001 |
| PGS-BKP-S002 |
| PGS-BKP-S003 |
| PGS-BKP-S004 |
| PGS-BKP-S005 |
| PGS-BKP-S006 |
| PGS-BKP-S007 |
| PGS-BKP-S008 |
| PGS-BKP-S009 |
| PGS-BKP-S010 |
| PGS-BKP-S011 |
| PGS-BKP-S012 |
| PGS-BKP-S018 |
| PGS-BKP-S013 |
| PGS-BKP-S014 |
| PGS-BKP-S019 |
| PGS-BKP-S015 |
| PGS-BKP-S016 |
| PGS-BKP-S020 |
| PGS-BKP-S017 |
| PGS-BKP-S021 |
| PGS-BKP-S027 |
| PGS-BKP-S028 |
| PGS-BKP-S029 |
| PGS-BKP-S030 |
| PGS-BKP-S031 |
| PGS-BKP-S032 |
| PGS-BKP-S033 |
| CLIN_1.5_KDEG_Completion_Report_(ESM)_Volume_10.pdf |
| PGS-BKP-R001 ELECTRICAL DRAWING |
| PGS-BKP-R001 MECHANICAL DRAWING |
| PGS-BKP-R001 STRUCTURAL DRAWING |
| PGS-BKP-R002 |
| PGS-BKP-R003 |
| PGS-BKP-R004 |
| PGS-BKP-E001 |
| PGS-BKP-E002 |
| PGS-BKP-E003 |
| PGS-BKP-E004 |
| PGS-BKP-E005 |
| PGS-BKP-E006 |
| PGS-BKP-E007 |
| PGS-BKP-E008 |
| PGS-BKP-E009 |
| PGS-BKP-E010 |
| PGS-BKP-E011 |
| PGS-BKP-E012 |
| PGS-BKP-E013 |
| PGS-BKP-E014 |
| PGS-BKP-E015 |
| PGS-BKP-E017 |
| PGS-BKP-E018 |
| PGS-BKP-E019 |
| PGS-BKP-E020 |
| PGS-BKP-E022 |
| PGS-BKP-E023 |
| PGS-BKP-E024 |
| PGS-BKP-E025 |
| PGS-BKP-E026 |
| PGS-BKP-E027 |
| PGS-BKP-E028 |
| PGS-BKP-E029 |
| PGS-BKP-E030 |
| PGS-BKP-E031 |
| PGS-BKP-E032 |
| PGS-BKP-E033 |
| PGS-BKP-E034 |
| PGS-BKP-E035 |
| PGS-BKP-E036 |
| PGS-BKP-E037 |
| PGS-BKP-E038 |
| PGS-BKP-E039 |
| PGS-BKP-E040 |
| PGS-BKP-E041 |
| PGS-BKP-M001 |
| PGS-BKP-M002 |
| PGS-BKP-M003 |
| PGS-BKP-M004 |
| PGS-BKP-M005 |
| PGS-BKP-M006 |
| PGS-BKP-M007 |
| PGS-BKP-M008 |
| PGS-BKP-M009 |
| PGS-BKP-M010 |
| PGS-BKP-M011 |
| PGS-BKP-M013 |
| PGS-BKP-M015 |
| PGS-BKP-M016 |
| PGS-BKP-M017 |
| PGS-BKP-M018 |
| PGS-BKP-M019 |
| PGS-BKP-M020 |
| PGS-BKP-M021 |
| PGS-BKP-M022 |
| PGS-BKP-M023 |
| PGS-BKP-M024 |
| PGS-BKP-M025 |
| PGS-BKP-M026 |
| PGS-BKP-M027 |
| PGS-BKP-M028 |
| PGS-BKP-M029 |
| PGS-BKP-M030 |
| PGS-BKP-S001 |
| PGS-BKP-S002 |
| PGS-BKP-S003 |
| PGS-BKP-S004 |
| PGS-BKP-S005 |
| PGS-BKP-S006 |
| PGS-BKP-S007 |
| PGS-BKP-S008 |
| PGS-BKP-S009 |
| PGS-BKP-S010 |
| PGS-BKP-S011 |
| PGS-BKP-S012 |
| PGS-BKP-S018 |
| PGS-BKP-S013 |
| PGS-BKP-S014 |
| PGS-BKP-S019 |
| PGS-BKP-S015 |
| PGS-BKP-S016 |
| PGS-BKP-S020 |
| PGS-BKP-S017 |
| PGS-BKP-S021 |
| PGS-BKP-S027 |
| PGS-BKP-S028 |
| PGS-BKP-S029 |
| PGS-BKP-S030 |
| PGS-BKP-S031 |
| PGS-BKP-S032 |
| PGS-BKP-S033 |
File details come from the government source that posted it. Updated .