ATTACHMENT 3 – Part 1
General Site Layout and Single Line Diagram of Brishna Kot Substation
BUS PT 1
QSK-60
511 518
A2-SWITCHGEAR
512 513 MTU-2
B2-SWITCHGEAR
BUS PT 2
PURCHASER SUPPLIED
EQUIPMENTS
TR4
2RX1CX185mm²
12/20 KV
TYPE-N2XSY
BUS PT 3
A1-SWITCHGEAR
B1-SWITCHGEAR
2RX1CX300 mm² 12/20 KV
TYPE-N2XSY
(SUB CONTRACTOR
SUPPLIED CABLE)
BUS PT 4
TR2
TO 110KV SUBSTATION
(DWG NO:
042246-KDBK-E7100)
TR1
2RX1CX185 mm²
12/20 KV
TYPE-N2XSY
2RX1CX300 mm² 12/20 KV
TYPE-N2XSY
(SUB CONTRACTOR
SUPPLIED CABLE)
519 KTA-50
MTU-1 516 514
PURCHASER SUPPLIED
EQUIPMENTS
PURCHASER SUPPLIED
EQUIPMENTS
PURCHASER SUPPLIED
EQUIPMENTS
AUX.
TRANSFORMER-2
2RX1CX300 mm² 12/20 KV
TYPE-N2XSY
(SUB CONTRACTOR
SUPPLIED CABLE)
OVERHEAD
BUSHING
CONNECTION
OVERHEAD
BUSHING
CONNECTION
OVERHEAD
BUSHING
CONNECTION
TO 110KV SUBSTATION
(DWG NO:
042246-KDBK-E7100)
TO 110KV SUBSTATION
(DWG NO:
042246-KDBK-E7100)
S P
A R
E
1RX1CX185mm²
12/20 KV
TYPE-N2XSY
2RX1CX185mm²
12/20 KV
TYPE-N2XSY
1RX1CX185mm²
12/20 KV
TYPE-N2XSY
2RX1CX185mm²
12/20 KV
TYPE-N2XSY
M T
U
A
U X
T
R
S P
A R
E
REV.2
2RX1CX300 mm²
12/20 KV
TYPE-N2XSY
2RX1CX300 mm²
12/20 KV
TYPE-N2XSY
TR3
PURCHASER SUPPLIED
EQUIPMENTS
2RX1CX300 mm² 12/20 KV
TYPE-N2XSY
(SUB CONTRACTOR
SUPPLIED CABLE)
OVERHEAD
BUSHING
CONNECTION
TO 110KV SUBSTATION
(DWG NO:
042246-KDBK-E7100)
FUTURE SCOPE
AUX.
TRANSFORMER-1
EXISTING
AUX TRANSFORMER
315kVA 20/0.4kV
1RX1CX185mm²
12/20 KV
TYPE-N2XSY
1RX1CX70mm²
12/20 KV
TYPE-N2XSY
PURCHASER SUPPLIED
EQUIPMENTS
PURCHASER SUPPLIED
EQUIPMENTS
PURCHASER SUPPLIED
EQUIPMENTS
A
1 2 3 4 5 6 7 8
B
C
D
E
F
B
C
D
E
F
2 3 4 5 6 7 81
Modified by Modified Date REV Modification
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT
KANDAHAR HELMAND POWER PROJECT
REVISION INFORMATION REV DATE DWN DES CHK APP
SINGLE LINE DIAGRAM FOR 20KV SYSTEM
042246-KDBK-E7100
N.T.S 29/08/2014
FINAL DRAWING
michael.hajny Cloudy
MTU
AUX
TR.
michael.hajny Callout Feeder "MTU Aux Tr." does not go to the aux power transformer at diesel plant MTU. This Feeder "MTU Aux Tr" is not used.
michael.hajny Cloudy
KTA-50
michael.hajny Callout Feeder "KTA-50" is connected to the non-operational KTA50 diesel power plant.
michael.hajny Callout 250kVA michael.hajny Callout 250kVA michael.hajny Callout This 110/20kV transformer is at thet Breshna Kot Substation, but it is not wired into the substation. There are no circuit breakers for it, and there is no 110kV line for this transformer.
Mohammad.Yunas Rectangle
Mohammad.Yunas Callout
MTU1&MTU2
20kV Switchgear
Mohammad.Yunas
Mohammad.Yunas Callout MTU- Aux. Transformer michael.hajny Text Box This is the schematic for the MTU diesel power plant at Kandahar.
michael.hajny Cloudy michael.hajny Cloudy
Cloudy
Text Box This is at the MTU diesel power plant switchgear.
PAD
20 KV
STRUCITRE
O
PE
N C
H A
N N
EL
D
R A
IN
EX
IS
TI
N
G D
R A
IN
P O
LE
P
O
LE
P O
LE
P
O
LE
FO
O
T
PA
TH
FO
O T
PA
TH
GUARD
TOWER
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
FU
EL
T A
N K
O
LD
X
FM
R
P O
LE
PAD
CONC.
10000 5000 12500 7000 10000 7980 14700
75860
M
T
S
W
I
D
E
S
U B
S T
A T
I
N
R
A
D
1.936
F-519 F-518
F-511 F-512
F-513
F-514
F-516
FU
EL
T
AN
K
LEGEND:
110KV LINES
EXISTING 20KV FEEDER POLE
110KV NEW STRUCTURE
A
1 2 3 4 5 6 7 8
B
C
D
E
F
A
B
C
D
E
F
2 3 4 5 6 7 81
Modified by Modified Date REV Modification
ISLAMIC REPUBLIC OF AFGHANISTAN
and
UNITED STATES AGENCY FOR
INTERNATIONAL DEVELOPMENT
KANDAHAR HELMAND POWER PROJECT
REVISION INFORMATION REV DATE DWN DES CHK APP
GENERAL SITE LAYOUT
042246-KDBK-E7507
1:400 25/08/14
NOTES:
20KV UG FEEDER
GENERAL NOTES:
REFERENCE DRAWINGS
FOUNDATION AND CABLE TRENCH LAYOUT
CONTROL PANEL ARRANGEMENT INSIDE CONTROL ROOM BUILDING
DWG NUMBER
042246-KDBK-E7506
042246-KDBK-E7504
GENERAL ARRANGEMENT FOR 110/20KV BRESHNAKOT SUBSTATION
042246-KDBK-E7500
4. FOR ACTUAL SIZE / NUMBER / LOCATION OF CABLE TRENCHES, DUCTS, PULL
PITS AND PVC CONDUITS, REFER GENERAL ARRANGEMENT FOR 110/20KV
BRESHNAKOT SUBSTATION:DWG No.042246-KDBK-E7500", "CABLE TRENCH
LAYOUT INSIDE CONTROL BUILDING: DWG No. 042246-KDBK-E7505" WHICH TAKES
PRECEDENCE OVER OTHER DRAWINGS.
3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE OTHER RELEVANT
ARCHITECTURAL, STRUCTURAL, MECHANICAL AND CIVIL DRAWINGS AND ALL
RELEVANT SECTIONS OF THE SPECIFICATION BEFORE CONSTRUCTION
2. DO NOT SCALE FROM THE DRAWINGS
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
AREA USE PLAN
042246-KDBK-C7904
F - FEEDER
ABBREVIATIONS:-
TX- TRANSFORMER
QSK- GENERATOR SETS
MTU- GENERATOR SETS
BB- BUSBAR
KTA- GENERATOR SETS
C&P- CONTROL AND PROTECTION
CH- CHARGER
PLC- PROGRAMMABLE LOGIC CONTROLLER
MET- METERING PANEL
MK- MARSHALLING KIOSKS
1.CABLE ROUTING FOR 20KV OUTGOING FEEDERS WITH CABLE TRENCH DETAILS
SHALL BE SUBMITTED SEPARATELY WITH THE DRAWING NO.042246-KDBK-C7605
2.DETAILS OF THE FEEDERS GOING TO POLES AND THE CORRECT LOCATION OF
POLES SHALL BE SHOWN IN THE DRAWING NO.042246-KDBK-C7605.
3.FINAL STRUCTURE DESIGN AND LOCATION OF 110KV TOWERS SHALL BE PROVIDED
LATER.
**4. MODIFIED ACCORDING TO DRAWING AS PER " GENERAL ARRANGEMENT FOR
110/20KV BRESHNAKOT SUBSTATION "-042246-KDBK-E7500 (REV-1) DATE:07.05.2012
ISSUED FOR DISTRIBUTION
FINAL DRAWING
20KV SWITCHGEAR
FEEDERS
20KV SWITCHGEAR
FEEDERS
110kV OLD
SWITCH YARD
110kV NEW
SWITCH YARD
KTA-50
QSK-60
MTU
Mohammad.Yunas Rectangle
Mohammad.Yunas Rectangle
Mohammad.Yunas Rectangle