MSP_RFP_SOL-306-14-000036_.pdf

PDF 5 MB Posted

Attached to
SOL-306-14-000010 - Monitoring Support Project (MSP)
Solicitation number
SOL-306-14-000010
Issued by

About this file

Solicitation - RFP-SOL-306-14-000010

View the file

Other files

File Type Posted
MSP_RFP_Amendment_03.pdf PDF
MSP_RFP_Amendment_02_-final.pdf PDF
MSP_-_Amendment_1.pdf PDF
RFP_MSP_SOL-306-14-000010.docx DOCX document
Attachment_J.21_-_Budget_Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAID AFGHANISTAN

FROM THE AMERICAN PEOPLE

U.S. Agency for International Development Great Massoud Road Tel: (202) 216-6288 Kabul Fax: (202) 216-6288 ext. 4162 Afghanistan http://www.usaid.gov/locations/asia_near_east/afghanistan

Date Posted: March 15, 2014

Cut-off Date for Questions: March 31, 2014

Closing Date: April 30, 2014

SUBJECT: Request for Proposals (RFP) SOL-306-14-000010

Monitoring Support Project (MSP) Indefinite-Quantity Contracts (IQCs)

Dear Potential Offerors:

The United States Government, represented by the United States Agency for International

Development in Afghanistan (USAID/Afghanistan), is pleased to release the attached Request for Proposals (RFP) for the Monitoring Support Project (MSP). MSP’s objective is to support the development activities in Afghanistan, as further described under the Description/Specifications, Section C of this RFP. U.S. and non-U.S. (including Afghan) for-profit firms and non-governmental organizations (NGOs) meeting USAID source and nationality geographic code

937 are eligible to submit proposals for this RFP.

USAID/Afghanistan OAA invites interested and qualified organizations to submit proposals in accordance with the requirements of this RFP. In the evaluation of proposals preference will be given to firms that illustrate a commitment to working with Afghan organizations. Work shall be delivered through Firm-Fixed-Price and Cost Plus Fixed Fee (Completion/Term) task orders under each IQC. Task orders will be awarded to IQC holders through a competitive, fair opportunity process.

To be responsive to a changing environment and be responsible stewards of taxpayer dollars, USAID/Afghanistan developed a Multi-Tiered Monitoring Strategy to collect and verify information. By gathering monitoring data from multiple monitoring actors, USAID/Afghanistan can triangulate results, and make informed decisions. All projects in the

USAID/Afghanistan portfolio will have a Monitoring Overview, a document articulating how it will employ this multi-tiered strategy. Tiered monitoring actors are:

o Tier 1: USG direct observation o Tier 2: Implementing Partner reporting o Tier 3: GIRoA and other donors o Tier 4: Civil society, local organizations, and beneficiaries o Tier 5: Independent Monitoring Contractors

The MSP, one of several independent monitoring mechanisms under Tier 5, will provide

USAID/Afghanistan with additional data on project implementation, allowing Mission staff, including Contracting and Agreement Officer’s Representatives (CORs/AORs), to make informed management decisions on the performance of their projects.

To achieve this objective, the MSP will provide USAID/Afghanistan with sufficient, accurate and verified information on the progress of projects in accordance with approved project work

Request for Proposals (RFP) SOL-306-14-000010

Monitoring Support Project (MSP) Indefinite-Quantity Contract plans and Performance Management Plans (PMPs). For this project, “sufficient information” means that Monitoring Support Project (MSP) contractors will provide USAID with verified information requested in project PMPs and the Mission PMP, which should allow USAID to make strategic decisions about the direction of its project portfolio. In this case, “accurate information” means that MSP contractors will, to the best of their abilities, ensure USAID receives data that reflect the reality in the field without bias or distortion. Lastly, “verified information” refers to the role the MSP contractors will play in corroborating information that

USAID other implementing partners provide through their normal monitoring and reporting functions. In addition to verification, the MSP contractors in some cases will be required to assess the quality of data collected and to confirm activity implementation.

The RFP outlines an IQC with three initial individual task orders that will cover only Component

1 and divide the requirement geographically: 1) the North; 2) the East; and 3) the South and the

West. Component 2 of the IQC will be set-aside for competition between U.S. Small

Businesses, with task orders to be released at a later date. Additional task orders may be issued under this IQC for the provision of additional services covered by Components 1 and 2 for other

U.S. Government agencies and/or development assistance donors.

USAID intends to award up to four IQCs as a result of this RFP. Of those, USAID anticipates awarding one IQC to Small Business concerns. IQC holders will be eligible to compete for task orders until the shared IQC ceiling is reached. USAID anticipates a shared ceiling of

US$170,000,000 for the combined amounts of task orders awarded to all IQC holders.

The statements of work of the IQCs and Task Orders may include elements of the respective successful Offerors’ proposals to fully reflect requirements of each IQC and/or Task Order.

Questions regarding this RFP must be submitted by email to the following address, by the date and time stated in this cover letter, to: kabulaidoaamailbox@usaid.gov.

If your organization decides to submit a proposal in response to this solicitation, it must be submitted by the designated date and time indicated in Block 9 of the RFP (Standard Form 33).

Proposals received after the closing date and time will be processed as late and handled in accordance with FAR 15.208.

Only electronic submissions will be accepted. Please note that the designated initial point of entry to the government infrastructure for proposal submissions is the USAID internet server.

Please pay careful attention to, and complete in full, RFP section K – Representations, Certifications, and Statements of Offerors. Offerors should also carefully consider section L –

Instructions to Offerors, and section M – Evaluation Factors for Award. Sections B through I of the solicitation will become the substantive part of the anticipated contract with blanks to be completed by the Contracting Officer upon award. Proposals must be signed by an official authorized to bind the Offeror’s organization.

Issuance of this solicitation does not in any way obligate the U.S. Government to award a contract nor does it commit the U.S. Government to pay for costs incurred in the preparation and mailto:kabulaidoaamailbox@usaid.gov submission of a proposal. Furthermore, the Government reserves the right to reject any and all offers, if such action is considered to be in the best interest of the U.S. Government.

We thank you for your interest in this important program and look forward to receiving your proposals.

Sincerely, /s/

Sonila Hysi

Supervisory Contracting Officer

USAID/Afghanistan

TBD

PROPOSALS ARE DUE ELECTRONICALLY TO THE ADDRESS SHOWN IN SECTION L

1. THIS CONTRACT IS A RATED ORDER RATING PAGE OF PAGES

UNDER DPAS (15 CFR 700)

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

9. Sealed offers in original and ___________________ copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in until local time _______________________ (Hour) (Date)

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All Offers are subject to all terms and conditions contained in this solicitation.

A. NAME B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS

AREA CODE NUMBER EXT.

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

A SOLICITATION/CONTRACT FORM I CONTRACT CLAUSES

B SUPPLIES OR SERVICES AND PRICES/COST PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

C DESCRIPTION/SPECS./WORK STATEMENT J LIST OF ATTACHMENTS

D PACKAGING AND MARKING PART IV - REPRESENTATIONS AND INSTRUCTIONS

E INSPECTION AND ACCEPTANCE

F DELIVERIES OR PERFORMANCE

G CONTRACT ADMINISTRATION DATA L INSTR., CONDS., AND NOTICES TO OFFERORS

H SPECIAL CONTRACT REQUIREMENTS M EVALUATION FACTORS FOR AWARD

K

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ___ _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT 10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

(See Section I, Clause No. 52-232-8)

14. ACKNOWLEDGEMENT OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE

(The offeror acknowledges receipt of amendments to the

SOLICITATION for Offerors and related documents numbered and dated:

CODE FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 15A. NAME AND

ADDRESS

OF OFFEROR

(Type or print)

15B. TELEPHONE NUMBER 17. SIGNATURE 18. OFFER DATE

AREA CODE NUMBER EXT.

15C. CHECK IF REMITTANCE ADDRESS IS DIFFERENT FROM

ABOVE - ENTER SUCH ADDRESS IN SCHEDULE

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 26 (4 copies unless otherwise specified)

10 U.S.C. 2304(a) ( ) 41 U.S.C. 253(c) ( )

24. ADMINISTERED BY (If other than Item 7) 25. PAYMENT WILL BE MADE BY CODE CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

(Signature of Contracting Officer)

(REV. 9-97)

10. FOR INFORMATION CALL: -

11. TABLE OF CONTENTS

STANDARD FORM 33

SOLICITATION OFFER AND AWARD

SOLICITATION

OFFER (Must be fully completed by offeror)

AWARD (To be completed by Government)

1 N/A 315

SOL-306-14-000010

X

03-15-2014 REQ-306-13-000158

Office of Acquisition and Assistance (OAA)

USAID/Afghanistan

APO AE 09806

12:00 PM Kabul

04-30-2014

Eric Strong

Supervisory Contracting Officer estrong@state.gov

See Attached Table of Contents

X 1

X 3-14

X 14-31

X 32

X 33

X 34-45

X 46-50

X 51-75

X 76-112

X 113

X 114-123

X 124-145

X 146-152

TABLE OF CONTENTS

Request for Proposals (RFP) SOL-306-14-000010 MONITORING SUPPORT PROJECT

Indefinite-Quantity Contract

PART I – THE SCHEDULE 7

SECTION B - SUPPLIES OR SERVICES AND PRICE/COST 7

B.1 PURPOSE 7

B.2 CONTRACT TYPE AND SERVICES 7

B.3 MINIMUM OBLIGATED AMOUNT 7

B.4 MAXIMUM CONTRACT CEILING 7

B.5 OBLIGATED AMOUNT, ESTIMATED COST, FIXED FEE 7

B.6 LABOR 8

B.7 OTHER DIRECT COST 9

B.8 INDIRECT COST (CPFF ONLY) 9

B.9 ADVANCE UNDERSTANDING ON CEILING ON INDIRECT COST RATES AND FINAL

PERFORMANCE FOR INDIRECT COST (CPFF ONLY) 10

B.10 TASK ORDER LIMITATIONS 11

B.11 CEILING ON FIXED FEE 11

B.12 LABOR CATEGORIES – UNBURDENED CEILING DAILY RATES 12

SECTION C – DESCRIPTION/ SPECIFICATIONS/ WORK STATEMENT 19

C.1 ACRONYMS AND DEFINITIONS 19

C.2 INTRODUCTION 21

C.3 BACKGROUND 21

C.4 TECHNICAL REQUIREMENTS AND COMPONENTS 21

C.5 RELATIONSHIP TO MISSION STRATEGIES AND RESULTS FRAMEWORK AND SUPPORT

TO REGIONAL PRIORITIES AND REQUIREMENTS 30

C.6 GUIDING PRINCIPLES AND SPECIAL CONSIDERATIONS 32

C.7 MONITORING AND EVALUATION 35

C.8 IMPLEMENTATION AND PROGRAM MANAGEMENT 35

SECTION D – PACKAGING AND MARKING 37

D.1 AIDAR 752.7009 MARKING (JAN 1993) 37

D.2 BRANDING, IMPLEMENTATION PLAN AND MARKING PLAN 37

SECTION E – INSPECTION AND ACCEPTANCE 38

E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE 38

E.2 INSPECTION AND ACCEPTANCE 38

E.3 RESPONSIBLE OFFICIAL 38

SECTION F – DELIVERIES OR PERFORMANCE 39

F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE 39

F.2 PERIOD OF PERFORMANCE 39

F.3 KEY PERSONNEL 39

F.4 DELIVERY SCHEDULE 40

F.5 PLACE OF PERFORMANCE 40

F.6 PERFORMANCE STANDARDS 40

F.7 REPORTS AND DELIVERABLES 41

F.8 ORDERING PROCEDURES 45

F.8.1 FAIR OPPORTUNITY 46

F.9 TASK ORDER AWARD CONTENT 49

F.10 TASK ORDER ADMINISTRATION 50

SECTION G – CONTRACT ADMINISTRATION DATA 51

G.1 752.7003 DOCUMENTATION FOR PAYMENT (NOV 1998) 51

G.2 PAYMENT AND VOUCHERS 52

G.3 ADMINSTRATIVE CONTRACTING OFFICER 52

G.4 CONTRACTING OFFICER'S REPRESENTATIVE (COR) 52

Request for Proposal (RFP) SOL-306-14-000010

MSP Indefinite-Quantity Contract

G.5 CONTRACTOR’S PRIMARY POINT OF CONTACT 53

G.6 PAYING OFFICE 53

G.7 ACCOUNTING AND APPROPRIATION DATA 53

G.8 CONTRACTOR'S PAYMENT ADDRESS 53

G.9 TECHNICAL DIRECTIONS / RELATIONSHIP WITH USAID 53

SECTION H – SPECIAL CONTRACT REQUIREMENTS 56

H.1 AIDAR 752.7004 EMERGENCY LOCATOR INFORMATION (JUL 1997) 56

H.2 AIDAR 752.228-3 WORKER’S COMPENSATION INSURANCE 56

H.3 INSURANCE AND SERVICES 56

H.4 AIDAR 752.7007 PERSONNEL COMPENSATION (JUL 2007) 57

H.5 AUTHORIZED GEOGRAPHIC CODE 58

H.6 LANGUAGE REQUIREMENTS 58

H.7 ADDITIONAL REQUIREMENTS FOR PERSONNEL COMPENSATION (CPFF Task orders) 58

H.8 AIDAR 752.231-71 SALARY SUPPLEMENTS FOR HOST GOVERNMENT (HG) EMPLOYEES

(OCT 1998) 60

H.9 RIGHT TO PROCURE FROM OTHER SOURCES 60

H.10 LOGISTIC SUPPORT 60

H.11 NONEXPENDABLE PROPERTY PURCHASES AND INFORMATION TECHNOLOGY

RESOURCES 60

H.12 752.7032 INTERNATIONAL TRAVEL APPROVAL AND NOTIFICATION REQUIREMENTS

(jAN 1990) 61

H.13 USAID DISABILITY POLICY (DEC 2004) 62

H.14 COMPLIANCE WITH SECTION 508 OF THE REHABILITATION ACT OF 1973, AS AMENDED

H.15 NONDISCRIMINATION (June 2012) 62

H.16 PROHIBITION OF ASSISTANCE TO DRUG TRAFFICKERS (ADS 206) 63

H.17 ENVIRONMENTAL CONSIDERATIONS 63

H.18 CONFIDENTIALITY AND OWNERSHIP OF INTELLECTUAL PROPERTY 64

H.19 GENDER REPORTING 64

H.20 FACILITIES USED FOR RELIGIOUS ACTIVITIES 64

H.21 DISCLOSURE OF INFORMATION (AIDAR) 64

H.22 ORGANIZATIONAL CONFLICTS OF INTEREST: PRECLUSION FROM IMPLEMENTATION

CONTRACT (DESIGN SERVICES) 65

H.23 ORGANIZATIONAL CONFLICTS OF INTEREST: PRECLUSION FROM FURNISHING

CERTAIN SERVICES AND RESTRICTION ON USE OF INFORMATION (INDEFINITE

DELIVERY, INDEFINITE QUANTITY) (EVALUATION SERVICES) 65

H.24 REPORTING OF FOREIGN TAXES (JULY 2007) 66

H.25 CONFERENCE PLANNING AND REQUIRED APPROVALS (AUGUST 2013) 67

H.26 SUB-AWARD REQUIREMENTS (MARCH 2012) 68

H.27 SUBCONTRACTING PLAN REPORT FOR INDIVIDUAL CONTRACTS 69

H.28 CONSENT TO SUBCONTRACTS 69

H.29 SECURITY CLEARANCE 69

H.30 ACCESS TO USAID FACILITIES AND USAID’S INFORMATION SYSTEMS (AUGUST 2013)

H.31 INFORMATION SYSTEM SECURITY 71

H.32 USAID-FINANCED THIRD-PARTY WEBSITES (AUGUST 2013) 72

H.33 EXECUTIVE ORDERS ON TERRORISM FINANCING 74

H.34 HOMELAND SECURITY PRESIDENTIAL DIRECTIVE-12 (HSPD-12) (SEP 2006) 74

H.35 STANDARDS OF CONDUCT -- IMPROPER BUSINESS PRACTICES 75

H.36 FRAUD REPORTING 75

H.37 SUBCONTRACTOR AND KEY INDIVIDUAL VETTING 76

H.39 SERIOUS INCIDENT REPORTING IN AFGHANISTAN (DECEMBER 2010) 79

H.40 DATABASE REPORTING REQUIREMENTS 80

PART II – CONTRACT CLAUSES 81

SECTION I – CONTRACT CLAUSES 81

I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE 81

I.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (JUL 2013) 84

I.3 52.216-18 ORDERING (OCT 1995) 85

I.4 52.216-19 ORDER LIMITATIONS (OCT 1995) 85

I.5 52.216-22 INDEFINITE QUANTITY (OCT 1995) 85

I.6 52.216-24 LIMITATION OF GOVERNMENT LIABILITY (APR 1984) 86

I.7 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) 86

I.8 52.219-13 NOTICE OF SET-ASIDE ORDERS (NOV 2011) 86

I.9 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009) 86

I.10 52.232-99 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEVIATION) (AUG 2012) 88

I.11 752.245-70 GOVERNMENT PROPERTY – USAID REPORTING REQUIREMENTS 89

I.12 52.245-1 GOVERNMENT PROPERTY (apr 2012) 90

I.13 752.202-1 DEFINITIONS (JAN 1990) 102

I.14 752.204-2 SECURITY REQUIREMENTS 104

I.15 752.209-71 ORGANIZATIONAL CONFLICTS OF INTEREST DISCOVERED AFTER AWARD

(JUN 1993) 104

I.16 752.211-70 LANGUAGE AND MEASUREMENT (JUN 1992) 104

I.17 752.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS AND SMALL DISADVANTAGED

BUSINESS CONCERNS 104

I.18 752.225-9 BUY AMERICAN ACT – TRADE AGREEMENTS ACT – BALANCE OF PAYMENTS

PROGRAM 105

I.19 752.225-70 SOURCE AND NATIONALITY REQUIREMENTS (FEB 2012) 105

I.20 752.228-7 INSURANCE – LIABILITY TO THIRD PERSONS 106

I.21 752.229-70 FEDERAL, STATE, AND LOCAL TAXES 106

I.22 752.242-70 PERIODIC PROGRESS REPORTS (OCT 2007) 106

I.23 752.245-71 TITLE AND CARE OF PROPERTY (APR 1984) 107

I.24 AIDAR 752.7005 SUBMISSION REQUIREMENTS FOR DEVELOPMENT EXPERIENCE

DOCUMENTS (SEP 2013) 107

I.25 752.7006 NOTICES (APR 1984) 109

I.26 752.7008 USE OF GOVERNMENT FACILITIES OR PERSONNEL (APR 1984) 109

I.27 752.7010 CONVERSION OF U.S. DOLLARS TO LOCAL CURRENCY (APR 1984) 109

I.28 752.7013 CONTRACTOR-MISSION RELATIONSHIPS (OCT 1989) 110

I.29 752.7015 USE OF POUCH FACILITIES (JUL 1997) 110

I.30 752.7025 APPROVALS (APR 1984) 111

I.31 752.7027 PERSONNEL (DEC 1990) 111

I.32 752.7029 POST PRIVILEGES (JUL 1993) 113

I.33 752.7031 LEAVE AND HOLIDAY (OCT 1989) 113

I.34 752.7033 PHYSICAL FITNESS (JUL 1997) 116

I.35 752.7034 ACKNOWLEDGMENT AND DISCLAIMER (DEC 1991) 117

I.36 752.7035 PUBLIC NOTICES (DEC 1991) 117

I.37 752.7101 VOLUNTARY POPULATION PLANNING ACTIVITIES (JUN 2008) 118

PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS 119

SECTION J – LIST OF ATTACHMENTS 119

PART IV – REPRESENTATIONS AND INSTRUCTIONS 120

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS 120

K.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE 120

K.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (jan 2014) 120

K.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) 123

K.4 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (MAY 2012)

K.5 52.230-7 PROPOSAL DISCLOSURE -- COST ACCOUNTING PRACTICE CHANGES (APR 2005)

K.6 INSURANCE - IMMUNITY FROM TORT LIABILITY 127

K.7 MENTOR-PROTÉGÉ PROGRAM – AIDAR 719.273, THE UNITED STATES AGENCY FOR

INTERNATIONAL DEVELOPMENT (USAID) MENTOR-PROTÉGÉ PROGRAM 127

K.8 AGREEMENT ON, OR EXCEPTIONS TO, TERMS AND CONDITIONS 127

K9 AUTHORIZED NEGOTIATORS 128

K.10 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER 128

K.11 SECURITY CLEARANCE CERTIFICATION 128

K.12 CONTRACTOR PURCHASING SYSTEM REVIEW 128

K.13 PROPERTY ADMINISTRATION SYSTEM REVIEW 128

K.14 SIGNATURE 128

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS (IQC) 130

L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) 130

L.2 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (JAN 2004) 130

L.3 52.216-1 TYPE OF CONTRACT (APR 1984) 134

L.4 52.216-27 SINGLE OR MULTIPLE AWARDS (OCT 1995) 134

L.5 52.233-2 SERVICE OF PROTEST (SEPT 2006) 134

L.6 GENERAL INSTRUCTIONS TO OFFERORS 135

L.7 DELIVERY INSTRUCTIONS 136

L.8 INSTRUCTIONS FOR THE PREPARATION OF THE TECHNICAL PROPOSAL 137

L.9 INSTRUCTIONS FOR THE PREPARATION OF THE COST/PRICE/BUSINESS PROPOSAL 144

L.10 OTHER REQUIREMENTS 151

L.11 LATE SUBMISSIONS 151

SECTION M - TECHNICAL EVALUATION CRITERIA 152

M.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) 152

M.2 GENERAL INFORMATION 152

M.3 TECHNICAL EVALUATION FACTORS/ CRITERIA 153

M.4 COST/BUSINESS EVALUATION CRITERIA 157

M.5 CONTRACTING WITH SMALL BUSINESS CONCERNS 157

M.6 SMALL BUSINESS SET-ASIDE 157

M.7 DETERMINATION OF COMPETITIVE RANGE 158

M.8 SOURCE SELECTION 158

ATTACHMENT J.1 – IDENTIFICATION OF PRINCIPAL GEOGRAPHIC CODE NUMBERS 159

ATTACHMENT J.2 - CONTRACTOR EMPLOYEE BIOGRAPHICAL DATA SHEET 160

ATTACHMENT J.3 - SF LLL - DISCLOSURE OF LOBBYING ACTIVITIES 161

ATTACHMENT J.4 - GUIDANCE FOR USAID-FUNDED COMMUNICATIONS PRODUCTS 162

ATTACHMENT J.5 - USAID SMALL BUSINESS SUBCONTRACTING PLAN TEMPLATE 167

ATTACHMENT J.6 - REGISTRATION AND TAX EXEMPTIONS IN AFGHANISTAN 178

ATTACHMENT J.7 - AFGHAN FIRST POLICY 186

ATTACHMENT J.8 - GUIDANCE IN DEVELOPING A SECURITY PLAN 190

ATTACHMENT J.9 - ELECTRONIC PAYMENTS HORTATORY LANGUAGE FOR ACQUISITION AND

ASSISTANCE SOLUTIONS 191

ATTACHMENT J.10 – REQUEST FOR TASK ORDER PROPOSALS ONE 193

SECTION B - SCHEDULE OF SERVICES 196

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 199

SECTION D – PACKAGING AND MARKING 205

SECTION E – INSPECTION AND ACCEPTANCE 208

SECTION F – DELIVERIES OR PERFORMANCE 209

SECTION G – CONTRACT ADMINISTRATION DATA 213

SECTION H – SPECIAL CONTRACT REQUIREMENTS 214

SECTION I – CONTRACT CLAUSES 215

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS 216

SECTION L – INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS 217

SECTION M – EVALUATION FACTORS FOR AWARD 226

ATTACHMENT J.11 – REQUEST FOR TASK ORDER PROPOSALS TWO 230

SECTION B - SCHEDULE OF SERVICES 233

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 236

SECTION D – PACKAGING AND MARKING 242

SECTION E – INSPECTION AND ACCEPTANCE 245

SECTION F – DELIVERIES OR PERFORMANCE 246

SECTION G – CONTRACT ADMINISTRATION DATA 250

SECTION H – SPECIAL CONTRACT REQUIREMENTS 252

SECTION I – CONTRACT CLAUSES 253

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS 254

SECTION L – INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS 255

SECTION M – EVALUATION FACTORS FOR AWARD 264

ATTACHMENT J.12 – REQUEST FOR TASK ORDER PROPOSALS THREE 269

SECTION B - SCHEDULE OF SERVICES 272

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 275

SECTION D – PACKAGING AND MARKING 282

SECTION E – INSPECTION AND ACCEPTANCE 285

SECTION F – DELIVERIES OR PERFORMANCE 286

SECTION G – CONTRACT ADMINISTRATION DATA 290

SECTION H – SPECIAL CONTRACT REQUIREMENTS 292

SECTION I –CONTRACT CLAUSES 293

SECTION K –REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS 294

SECTION L – INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS 295

SECTION M – EVALUATION FACTORS FOR AWARD 304

ATTACHMENT J.13 – KEY PERSONNEL SUMMARY TABLE 308

ATTACHMENT J.14: PAST PERFORMANCE REFERENCE SUMMARY TABLE 309

ATTACHMENT J.15: MSP ILLUSTRATIVE MOBILIZATION PLAN 310

ATTACHMENT J.16: ILLUSTRATIVE WORKPLAN 311

ATTACHMENT J.17: DESCRIPTION OF POTENTIAL MONITORING METHODS 312

ATTACHMENT J.18 - VERIFICATION AND MONITORING REPORT FORMAT 314

ATTACHMENT J.19: USAID PARTNER INFORMATION FORMAT 317

ATTACHMENT J.20 – SAMPLE COST/PRICE EVALUATION MATRIX FOR COMPONENT 2 OFFERORS

ATTACHMENT J.21: BUDGET SPREADSHEET 327

ATTACHMENT J.22: AFGHANISTAN MAP WHERE PROJECTS WORK 328

ATTACHMENT J.23: PROJECT LIST, ENVIRONMENTAL THRESHOLD DECISIONS (ETD) 329

ATTACHMENT J.24 – INITIAL ENVIRONMENTAL EXAMINATION 360

ATTACHMENT J.25 - DD 254 DEPARTMENT OF DEFENSE CONTRACT SECURITY CLASSIFICATION

SPECIFICATIONS 361

ATTACHMENT J.26 – AFGHAN INFO DATABASE SCREENSHOT 362

ATTACHMENT J.27 – LEVEL OF EFFORT TABLE 388

PART I – THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICE/COST

B.1 PURPOSE

The purpose of this contract is to provide services as specified in the statement of work (SOW) in Section C. USAID Task Order Contracting Officers (TOCO) will request the work through the issuance of task orders during the ordering period as specified in Section F of the contract.

Task orders will be awarded to IQC contract holders through a competitive, fair opportunity process.

B.2 CONTRACT TYPE AND SERVICES

This is a multiple-award Indefinite-Quantity Contract (IQC). The Government will issue task orders that are either Firm-Fixed-Price (FFP) or Cost-Plus-Fixed-Fee (CPFF) term or completion. The Government intends to make maximum use of FFP task orders or task orders that are FFP with some cost reimbursable line items. The Contractor must perform the work set forth in task orders at prices consistent with Section B of this contract. Cost-type task orders will indicate if they are completion or term form.

B.3 MINIMUM OBLIGATED AMOUNT

The basic contract includes an initial obligation of funds in the amount of $50,000 to cover the minimum order guarantee. USAID is required to order and the Contractor is required to furnish the minimum order amount of services.

Following this initial obligation, individual task orders will obligate funds to cover the work required under that task order. The obligated amount for each task order will be established by the TOCO. The initial obligation will be used as part of the funding for the initial task orders awarded under this contract.

B.4 MAXIMUM CONTRACT CEILING

This is a multiple award Indefinite Quantity Contract (IQC) with an overall ceiling price of U.S.

$170,000,000 ($170 million). The maximum aggregate dollar value of task orders awarded to all Contractors cannot exceed the contract ceiling. This ceiling is not being subdivided among the number of awardees, nor is it being multiplied by the number of awardees.

B.5 OBLIGATED AMOUNT, ESTIMATED COST, FIXED FEE

B.5.1 Obligated Amount

The basic contract includes an initial obligation of funds in the amount of $50,000 to cover the minimum order guarantee.

B.5.2 CPFF Task Orders

The Total Estimated Cost-Plus-Fixed-Fee (CPFF) term or completion for each task order must be negotiated in accordance with the terms of the IQC contract and must be appropriate for the

SOW defined in each Request for Task Order Proposal (RFTOP). In no event may the indirect rates or fixed fee for a task order exceed the ceilings set forth in Section B.9 and B.11 of this

IQC contract. The U.S. dollar costs must be limited to reasonable, allocable, and allowable costs determined in accordance with Federal Acquisition Regulation (FAR) 52.216-7, Allowable Cost and Payment, and FAR 52.216-8, Fixed Fee, FAR 31.3 and AIDAR 731.3 (for universities) and FAR 31.7 and AIDAR 731.7 (non profits).

B.5.3 Fixed Fee Payment

Depending on whether a CPFF task order issued under this contract is term or completion type, a reasonable portion of the Fixed Fee will be paid by USAID and specified in the schedule of each Task Order. The Fixed Fee payment schedule in each task order must be commensurate with progress made to justify payment, up to the total agreed amount of Fixed Fee. Because the clauses entitled "Allowable Cost and Payment" (FAR 52.216-7) and "Fixed Fee" (FAR 52.216-

8) are incorporated into this contract, the terms and conditions of these clauses apply after total payments of fixed fee reach eighty five percent (85%) of the total fixed fee.

B.5.4 FFP Task Orders

The Firm-Fixed Price for each task order will be negotiated based on the price to complete the work in its entirety. After acceptance of a FFP task order by the Contractor, the task order price will only be adjusted to reflect changes in scope or conditions governed by other clauses

(Changes, Differing Site Conditions, etc.).

Cost reimbursable line items may be allowed in Fixed Price task orders for elements of the task order that cannot be reasonably estimated.

B.6 LABOR

(a) Compensation: Compensation of personnel under this contract or any resulting subcontract must be in accordance with AIDAR 752.7007 Personnel Compensation (July 2007) and section

H.7 of the IQC.

(b) Salary Approval: Acceptance of the Contractor labor rates presented during IQC or task order negotiation does not constitute approval of final salary rates above the Contractor Salary

Threshold (CST). (ADS 302.3.6.10) All TOCOs will comply with the approval requirements in

ADS 302. See section H.7 for additional guidance on approvals.

(c) Labor Categories: The Contractor shall furnish personnel with the necessary education, training and/or relevant experience, as specified in the task orders to be issued under this contract. Task order proposals must justify proposed rates to the satisfaction of the TOCO.

(d) Locally Hired National Personnel or Other Non-U.S. Expatriates

(1) Third Country Nationals (TCNs) and Cooperating Country Nationals (CCNs) who are working in the United States or are legal residents of the United States at the time they are hired, must be extended benefits and subject to restrictions on the same basis as

U.S. citizens who work in the United States. The U.S. labor rates may be applied to

TCNs and CCNs conforming to this regulatory provision.

(2) Salaries for locally-hired personnel and other non-U.S. labor under this contract or any resulting subcontract must be in accordance with AIDAR 752.7007, Personnel

Compensation (July 2007) and Section H.7 of the IQC.

(3) Pursuant to AIDAR 722.18, the total compensation for locally hired CCN and TCN labor shall be consistent with the contractor’s established policies and procedures and the total mix of cash and non-cash payments shall not exceed, without Mission approval, the total, prevailing compensation paid to personnel performing comparable work in

Afghanistan.

B.7 OTHER DIRECT COST

(a) In addition to direct labor, other direct cost necessary for the performance of the work under task orders, such as travel and transportation, lodging and subsistence expenses, and allowances may be authorized by the task order.

(b) The Contracting Officer determines which other direct costs are allowable, allocable, and fair and reasonable in accordance with the applicable federal cost principles (i.e., FAR 31.2 and

AIDAR 731.2 for commercial (for profit) organizations or FAR 31.3 and AIDAR 731.3 for educational institutions, or FAR 31.7 and AIDAR 731.7 for other not-for-profit organizations).

For those other direct costs the TOCO authorizes, Contractors are allowed to recover applicable indirect costs on these costs, if doing so is part of the Contractor's usual accounting procedures, consistent with the applicable cost principles, and are included in the Contractor's Negotiated

Indirect Cost Rate Agreement.

B.8 INDIRECT COST (CPFF ONLY)

Pending establishment of revised provisional or final indirect cost rates, allowable indirect cost shall be reimbursed on the basis of the following negotiated provisional or predetermined rates and the appropriate bases:

Description Rate Base Type Period

[Rate 1 description to be inserted] ____% 1/ 1/ 1/

[Rate 2 Description to be inserted] ____% 2/ 2/ 2/

[Rate 3 Description to be inserted] ____% 3/ 3/ 3/

1/ Base of Application: [Basis of rate 1 to be inserted]

Type of Rate: [Rate 1 description to be inserted]

Period: [to be inserted]

Source: [to be inserted]

2/ Base of Application: [Basis of rate 2 to be inserted]

Type of Rate: [Rate 2 description to be inserted]

3/ Base of Application: [Basis of rate 3 to be inserted]

Type of Rate: [Rate 3 description to be inserted]

Contractors are allowed to recover applicable indirect cost (i.e., overhead, G&A, etc.) on other direct cost (ODCs) if it is part of the Contractor's usual accounting procedures, consistent with

FAR Part 31, and Negotiated Indirect Cost Rate Agreement (NICRA).

The Contractor will make no change in its established method of classifying or allocating indirect cost without the prior written approval of the Contracting Officer and OAA/CAS.

Reimbursement for indirect cost shall be at the final negotiated rates, but not in excess of the ceiling rates specified below.

The Government shall not be obligated to pay any additional amount on account of indirect cost above the ceiling rates established in the contract. This advance understanding shall not change any monetary ceiling, cost limitation, or obligation established in the contract.

B.9 ADVANCE UNDERSTANDING ON CEILING ON INDIRECT COST RATES

AND FINAL PERFORMANCE FOR INDIRECT COST (CPFF ONLY)

(a) For each of the Contractor's accounting periods during the term of this contract, the parties agree as follows:

(1) The distribution base for establishment of final [rate 1 description to be inserted] is

[to be inserted at award].

(2) The distribution base for establishment of final [rate 2 description to be inserted] is

(3) The distribution base for establishment of final [rate 3 description to be inserted] is

(b) The Contractor will make no change in its established method of classifying or allocating indirect cost without the prior written approval of the contracting officer.

(c) Reimbursement for indirect cost shall be at the final negotiated rates, but not in excess of the following ceiling rates:

Description 2014 2015 2016 2017 2018

[Rate 1 description to be inserted] __% ___% ___% ___% ___%

[Rate 2 description to be inserted] __% ___% ___% ___% ___%

[Rate 3 description to be inserted] __% ___% ___% ___% ___%

(d) The government shall not be obligated to pay any additional amount on account of indirect cost above the ceiling rates established in the contract. This advance understanding shall not change any monetary ceiling, cost limitation, or obligation established in the contract.

B.10 TASK ORDER LIMITATIONS

B.10(a) Cost-Plus-Fixed-Fee (CPFF) Task Orders. When issuing CPFF task orders, the

TOCO will state in the task order the total estimated cost plus fixed fee, which is the total amount of the task order and the maximum amount the Contractor may be paid without advance written approval of the Cognizant Contracting Officer.

B.10(b) Firm-Fixed-Price (FFP) Task Orders. When issuing FFP task orders, TOCOs must state in the task order the firm fixed price, which represents the total amount of the task order and the maximum price the contractor may be paid to perform the services, reports, or other deliverables in the task order. In the event a cost reimbursable line is included in a task order, said cost reimbursable line item shall be clearly stated and not included in the FFP.

B.10(c) Minimum Order. When USAID requires services or reports and other deliverables covered by this contract in a Task Order in the amount of less than $50,000, the Contractor is not obligated to accept an order to furnish those services or reports and other deliverables under this contract. However, if the Contractor agrees to furnish services or reports and other deliverables required by USAID in an amount of less than $50,000 and is awarded a Task Order to do so, the Contractor is required to provide these services and reports / deliverables in accordance with the contract's terms and conditions.

B.10(d) Maximum Order. When USAID requires services or reports and other deliverables covered by this contract in a Task Order amount of more than $50,000,000, the Contractor is not obligated to accept an order to furnish those services or reports and other deliverables under this contract. However, if the Contractor agrees to furnish services or reports and other deliverables required by USAID in excess of $50,000,000 and is awarded a Task Order to do so, the

Contractor is required to provide these services and reports / deliverables in accordance with the contract's terms and conditions.

B.10(e) Notwithstanding the above, if issuance of a task order to, and acceptance of a task order by, the Contractor would: (1) result in the Contractor (or its personnel or its subcontractors or their personnel) having an organizational conflict of interest for which restrictions would be placed on the Contractor's (or its personnel’s or its subcontractors’ or their personnel’s) future activities; or (2) violate the provisions of the Procurement Integrity legislation, i.e., Section 27 of the Office of Federal Procurement Policy Act (41 U.S.C. 423), as amended by Section 814 of

Pub. L. 101-189, the Contractor, after written notification to the Contracting Officer, is not obligated to furnish those services or reports and other deliverables under this contract, and

USAID may acquire the supplies or services from another source.

B.11 CEILING ON FIXED FEE

(a) For each CPFF task order issued under this IQC, the TOCO and the Contractor agree to negotiate a set dollar amount for fixed fee. In negotiating the fixed dollar amount for fee, the

TOCO must consider the policies and factors for establishing fee in FAR 15.404-4 as well as any applicable USAID policy on establishing a fixed fee amount. In no event, however, may the amount of fixed fee in any individual task order exceed (____) percent of the task order's estimated cost; excluding fee.

(b) For each CPFF task order issued under this IQC, the Contractor shall negotiate set dollar amounts for subcontractor fixed fees. In negotiating the fixed dollar amount for fee, the

Contractor shall consider the policies and factors for establishing fee in FAR 15.404-4 as well as any applicable USAID policy on establishing a fixed fee amount. In no event, however, may the amount of subcontractor fixed fee in any individual task order for (name subcontractor(s)) exceed (____) percent of the subcontractor's estimated cost, excluding fee.

(c) The fixed fee for any subcontractor not listed above, whether a new subcontractor approved by the IQC Contracting Officer or TOCO or included as a non-major subcontractor in the

Contractor’s original teaming arrangement, shall not exceed the prime Contractor’s fee ceiling.

B.12 LABOR CATEGORIES – UNBURDENED CEILING DAILY RATES

(Only applicable to CPFF task orders)

(a) The task order must include labor rates that are equal to or lower than the Ceiling Daily

Rates (CDRs) set forth below.

Each Ceiling Daily Rate (CDR) for personnel listed below is “unburdened” and must only include salary costs or consulting rates of the individual providing services. The CDR for personnel must not include additional costs including but not limited to: payroll costs (fringe benefits, FICA, etc.), indirect costs applicable to labor, or profit/fee.

The CDRs set forth below are fixed for the term of the IQC contract award and are for an eight hour day, and apply to all Subcontractors. If a new Subcontractor is proposed for a specific task order on other than a fixed-price basis, the CDRs set forth below will apply, and the subcontract is subject to consent by the TOCO.

Actual salaries for all personnel will be negotiated under task orders and final approval is provided by the TOCO. The ceiling rates presented below do not constitute approval of final salary rates above the Contractor Salary Threshold (CST) (see ADS 302.3.6.10.). All TOCOs must comply with the approval requirements in ADS 302.

(b) The single unburdened ceiling daily rate for each labor category in the table below represents the mid-level and senior-level rate in each labor category. Two unburdened ceiling daily rates for each labor category are included in the contract to provide more flexibility under task orders. If junior-level personnel are required under task orders, they must be proposed at rates below the mid-level unburdened ceiling daily rate.

[NOTE 1: The Unburdened Ceiling Daily Rates apply to any CPFF task order(s) that are awarded under this contract.]

[NOTE 2: The Unburdened Ceiling Daily Rates apply to prime Contractor, Subcontractor, TCNs, CCNs, and consultant salaries. For consultants that typically bill using a loaded rate, Contractors must propose any charges above the CDR separately and note in the budget narrative.]

[NOTE 3: The Unburdened Ceiling Daily Rates above do not apply to Firm-Fixed-Price (FFP)

Task Orders.]

THE TABLES BELOW ARE SEPARATED BY COMPONENT AND REPRESENT THE

LABOR MIX REQUIRED UNDER EACH. (SEE SECTION B.12.1 TABLE 1 FOR

COMPONENT 1 CDRs AND SECTION B.12.2 TABLE 2 FOR COMPONENT 2 CDRs).

B.12.1 LABOR CATEGORIES – COMPONENT ONE

Definition of labor categories:

1001 Chief of Party: The Chief of Party (COP) shall be responsible for the overall management and implementation of the task order and report directly to the USAID Contractor

Officer’s Representative. S/he shall supervise project implementation and ensure that the project meets stated goals and reporting requirements. The COP is also responsible for overall cost and budget management, oversight of technical work and compliance with the conditions of the task order, including sub-awards. The COP will confer regularly with USAID management on strategy in order to maximize impact, effectiveness and sustainability.

1002 DCOP Program Development, Finance, and Administration: The Deputy Chief of

Party (DCOP) will be responsible for day-to-day management of the task order, including work plans, staffing, and gathering information and data for reporting or analysis as required by the award. The DCOP will prepare reports and will provide recommendations on the direction of implementation to Chief of Party or USAID as needed. The DCOP is also responsible for overseeing and managing logistics in order to support implementation. The DCOP must also fulfill the role as Chief of Party when the Chief of Party is absent.

1003 Finance Manager: The Finance Manager will oversee the financial management and accounting of the task order. Responsibilities include maintaining and managing field office accounts in coordination with HQ and preparing and tracking budgets and expenditures. The finance manager reviews vouchers and payment requests, including proper back-up documentation to ensure financial compliance. S/he will also manage procurement of items under the task order in accordance with USAID rules and regulations and ensures timely payments to staff, consultants and vendors.

1004 Monitoring & Evaluation Specialist: The Monitoring and Evaluation Specialist will develop M&E plans, define project indicators, and collect and review monitoring data. S/he may contribute to performance and impact evaluations through questionnaire development, key

Category Labor Category CDR Mid CDR Senior

1001 Chief of Party, Senior Level $ $

1002 DCOP Prog. Development, Finance, Admin $ $

1003 Finance Manager $ $

1004 Monitoring and Evaluation Specialist $ $

1005 Information Management Specialist $ $

1006 Survey Design Specialist $ $

1007 IQC Manager $ $ informant in-depth interviewing, managing survey data collection, reviewing data, preparing datasets, analyzing quantitative or qualitative data, and report writing. The M&E specialist will interpret outcomes of implementation through data or other evidenced-based sources and provide program recommendations to the COP as needed. The M&E Specialist must reflect significant experience in the management of field monitoring, evaluation design, empirical and statistical analysis, environmental compliance, management of information systems, and working in challenging environments.

1005 Information Management Specialist: The Information Management (IM) Specialist will be responsible for regularly using the USAID Afghan Info database to download and manage project output data that will be used for verification and monitoring activities, for managing the upload of final verification and monitoring data back into the system, and for maintaining any monitoring data that is not stored in Afghan Info (e.g., personally identifiable information). The IM specialist will also assist the M&E team on collecting, housing and presenting data from surveys or from other monitoring methods. The IM specialist will also oversee technological applications for both internal and external project purposes.

1006 Survey Design Specialist: The Survey Design Specialist will support the M&E

Specialist by developing and implementing surveys to understand and improve program impacts. The Survey Design Specialist will be responsible for training enumerators and performing quality control on survey execution. S/he will work in conjunction with a local survey firm to develop and oversee a specified number of surveys that meet required parameters. These parameters may include but are not limited to: designated sample sizes, rapid development or deployment, or progressive data collection methods using technology.

1007 IQC Manager: Shall bear primary responsibility for technical aspects of contract performance, as well as procurement personnel, reporting, and other management related requirements of the contract. The labor and associated costs for the IQC manager will be included either as part of the Contractor’s indirect costs, or as a percentage of an individual position’s effort under task orders to the extent the functions are allocable to the particular task orders. The Contractor will clearly state in each Task Order proposal how it intends to allocate these central management costs.

Specifically, the IQC Manager shall:

Respond to task order requests, and provide central management and oversight of task orders under this award, working collaboratively and often with USAID central and field project managers, technical officers, Contracting Officers, and meet and consult regularly with the IQC COR.

Select, provide technical and administrative direction and guidance to, and place and support all technical experts carrying out technical requirements.

Report to USAID technical and contract personnel in accordance with USAID reporting requirements in Section F.

Ensure quality and control methods in a consistent and transparent manner for all contracted tasks and functions.

IQC Manager Qualifications Requirements:

Minimum of six (6) years of recent project management experience with a US

Government foreign affairs agency, international assistance organization, or non-governmental organization

Experience in community development, economic development, mediation/arbitration, conflict resolution, democracy and governance, international law, human rights activities, and/or political analysis.

Minimum of two (2) years of overseas field experience working in one or more developing countries undergoing political instability;

A minimum of two (2) years of supervisory experience (including but not limited to mentoring, training, and guiding staff).

Other Personnel Qualifications Requirements:

In order to perform the statement of work set forth in Section C, the Contractor must provide personnel that meet the minimum education and experience requirements set forth below. The minimum qualifications for mid-level and senior personnel are as follows and correspond to the

Unburdened Ceiling Daily Rates.

Level Academic

Degree *

Plus

Approximate

Years of

Relevant

Work

Experience

Including

Years of

Experience in

International

Development

Relevant

Regional

Experience

Relevant

Language

Fluency

Senior Ph.D. 8 As specified in the Task

Order

As specified in the Task

Order

As specified in the Task

Order

JD/ABD 10

MS/MA/MB 12

BS/BA 15

Less than a

Bachelors

Mid Ph.D. 4 As specified in the Task

Order

As specified in the Task

Order

As specified in the Task

Order

JD/ABD 5

MS/MA/MB 6

BS/BA 8

Less than a

Bachelors

*Highest degree obtained shall be related to work being performed.

**Relevant Work Experience is required for the levels indicated.

B.12.2 LABOR CATEGORIES – COMPONENT TWO

Category Labor Category CDR Mid CDR Senior

2001 Chief of Party $ $

Definition of labor categories:

2001 Chief of Party: The Chief of Party (COP) shall be responsible for the overall management and implementation of the task order and report directly to the USAID Contractor

Officer’s Representative. S/he shall supervise project implementation and ensure that the project meets stated goals and reporting requirements. The COP is also responsible for overall cost and budget management, oversight of technical work and compliance with the conditions of the task order, including sub-awards. The COP will confer regularly with USAID management on strategy in order to maximize impact, effectiveness and sustainability.

2002 DCOP Program Development, Finance, and Administration: The Deputy Chief of

Party (DCOP) will be responsible for day-to-day management of the Task Order, including work plans, staffing, and gathering information and data for reporting or analysis as required by the award. The DCOP will prepare reports and will provide recommendations on the direction of implementation to Chief of Party or USAID, as needed. The DCOP is also responsible for overseeing and managing logistics in order to support implementation of the task order. The

DCOP must also fulfill the role as Chief of Party when the Chief of Party is absent.

2003 Communications Manager: The Communication Manager will oversee the production and dissemination of public information about the activities and accomplishments of the project in order to contribute to the body of knowledge on development project monitoring in restrictive environments. The Communications Manager is responsible for collecting, investigating, managing and distributing information in a variety of mediums to disparate stakeholders.

2004 Finance Manager: The Finance Manager will oversee the financial management and accounting of the task order. Responsibilities include maintaining and managing field office accounts in coordination with HQ and preparing and tracking budgets and expenditures. The finance manager reviews vouchers and payment requests, including proper back-up documentation to ensure financial compliance. S/he will also manage procurement of items under the task order in accordance with USAID rules and regulations and ensures timely payments to staff, consultants and vendors.

2005 Knowledge Management Specialist: The Knowledge Management Specialist (KMS) will contribute to promoting sound KM practices at both the Mission and USAID/Washington levels through supporting the development of USAID’s Afghan Info system. S/he will be required to analyze and understand the full range of Afghan Info users, the various uses for this system (both current and future), and the system’s current level of functionality in meeting these uses. The KMS will then be responsible for proposing a sound approach for modifying Afghan

Info to meet users’ current and future needs related to project monitoring, which shall be based in established knowledge management best practices. S/he will also work with the software developers for Afghan Info (both in USAID and any that are hired under task orders) to work through the system requirements necessary to institute the KM changes to the system.

2002 DCOP Prog. Development, Finance, Admin $ $

2003 Communications Manager $ $

2004 Finance Manager $ $

2005 Knowledge Management Specialist $ $

2006 IQC Manager

2006 IQC Manager: Shall bear primary responsibility for technical aspects of contract performance, as well as procurement personnel, reporting, and other management related requirements of the contract. The labor and associated costs for the IQC manager will be included either as part of the Contractor’s indirect costs, or as a percentage of an individual position’s effort under task orders to the extent the functions are allocable to the particular task orders. The Contractor will clearly state in each Task Order proposal how it intends to allocate these central management costs.

IQC Manager Qualifications Requirements:

Minimum of six (6) years of recent project…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .