SOL_EXH_F.7_405-25R0004309_SOW.pdf
PDF 16 MB Posted
- Attached to
- DPS HQ PT TRACK AND FIELD RENOVATIONS
- Solicitation number
- 405-25R0004309
- Issued by
- Travis County, Austin City, Texas
About this file
This file contains a comprehensive procurement package from the Texas Department of Public Safety (DPS) for renovating their PT Track and Field facility at their headquarters campus in Austin, Texas. The project includes installation of synthetic grass fields, synthetic running track, concrete sport court, metal pavilion, concrete retaining walls, potable water lines, security lighting, site grading, and drainage systems. Electronic bids are due by March 25, 2025 at 5:00 PM Central Time, with mandatory pre-bid site visits scheduled for March 4 and March 6, 2025 at 5805 N Lamar Blvd in Austin. The contract term runs from purchase order issuance through August 31, 2025, with possible twelve-month extensions. The scope includes six alternate bid items beyond the base bid requirements.
The procurement requires bidders to break down pricing into labor, materials, and overhead/profit components. There are significant HUB subcontracting requirements with goals ranging from 11.2% for heavy construction to 32.9% for special trade construction, requiring submission of a detailed HUB Subcontracting Plan. Performance and payment bonds are mandatory for contracts exceeding $100,000 and $25,000 respectively. The project requires compliance with prevailing wage rates and includes a 10% retainage on final payment. While no specific budget is provided, the extensive technical specifications and complex requirements suggest a significant capital investment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TXDPS Facilities Bureau
TEXAS DEPARTMENT OF PUBLIC SAFETY
Headquarters Campus PT Track & Field
The Texas Department of Public Safety (TXDPS) is requesting bid responses for renovating the PT field and track at the TXDPS Headquarters Campus in Austin, TX. See the attached scope of work, plans, and manual for more information.
Project Location:
Headquarters Campus PT Track & Field
5085 North Lamar Blvd.
Austin, Texas 78752
Department of Public Safety Contract Department of Public Safety Site Monitor: Contact:
Victoria Madero Victoria Madero
PH: 512-424-5546 PH: 512-424-5546
Victoria.Madero@dps.texas.gov Victoria.Madero@dps.texas.gov
NOTE: Building contacts will be identified to the bidders for the respective locations for site visits and future access.
Access times for each phase of construction must be scheduled ahead of actual work.
Table of Contents Section 1.0 SCOPE OF WORK
Exhibits:
Exhibit A DPS PT Track & Field Plans Exhibit B DPS Project Manual mailto:Victoria.Madero@dps.texas.gov mailto:Victoria.Madero@dps.texas.gov
SECTION 1.0 SCOPE OF WORK
1.01 SCOPE OF WORK
This section outlines the scope of work included to renovate the existing PT Track & Field. The contractor is responsible for including all means and methods necessary to complete this portion of the project. In general, the work includes, but is not limited to the following items:
1. See Plans Exhibit for complete understanding of demolition and construction scope. This list is generic in nature for major items and intended only to give an overview of general project scope.
a. Demolish existing track and equipment (except tires)
b. Reroute existing water line
c. Construct running track as detailed in the attached plans, Exhibit A
Refer to Exhibit B, DPS Project Manual, for scope of the project.
The contractor shall submit a project schedule with an anticipated completion date of 08/31/2025.
The contractor shall submit the project base bid and separate add alternate bids.
1.02 ADD ALTERNATES
1. Add Alternates 1-5:
a. See specs for Add Alternates 1-5 in Exhibit B, DPS Project Manual, section ALTERNATES 01 23 00
– ALTERNATES.
2. Add Alternate 6:
a. 12 CY (cubic yards) of dirt from the existing DPS PT field to be loaded and transported to the following address for DPS ceremonial purposes:
810 Co Rd 240, Florence, TX 76527
1.03 QUALITY CONTROL
1. The contractor is responsible for properly disposing of all debris, including trash or construction debris, associated with this project. Removal shall not utilize a TXDPS dumpster or equipment unless authorized by the TXDPS Building Manager.
2. TXDPS will identify an exterior staging area/ entry for use by the contractor. This temporary storage must be maintained in a neat orderly manner and restored to original condition upon completion.
3. Any container used as part of this contract is subject to inspection upon being located on the TXDPS property.
4. The contractor shall efficiently schedule all work to ensure work will be done in as few calendar days as possible for optimum installation to meet the manufacturer’s warranty requirements. All work shall be continuous to ensure the facility impact is minimal with limited disruptions. Every effort shall be made to
5. Eliminate downtime and get the TX DPS operations back in service as quickly and safely as possible. Once the bid award is made, the exact dates will be coordinated.
6. All work will be performed by qualified craft persons with a minimum of (3) three years of experience in the field. It shall be the contractor’s responsibility to provide only skilled qualified workers for this project.
7. The new work shall comply with the state and local ordinances.
1.04 PERFORMANCE REQUIREMENTS
1. All work shall be considered new unless otherwise indicated.
2. The Contractor shall check and verify all dimensions, notes, and conditions in the installation area on site before any construction work is started. All discrepancies shall be reported to TXDPS in writing. No extra charge of compensation will be allowed on account of any difference between actual measurements and measurements or dimensions supplied by TXDPS, either verbally or in written form.
3. The Contractor shall assume full responsibility for the accuracy, fit, and stability of all parts of the work.
4. All labor, materials, and installations must comply with the codes, rules, and regulations of local, state, and federal authorities having jurisdiction. Any discrepancy between the requirements of the plans, specifications, and said codes, rules, and regulations shall be immediately brought to the attention of the TXDPS Facilities Department in writing for resolution.
5. The Contractor shall provide all necessary protection of existing work and newly added work.
6. The Contractor shall be responsible for adequately bracing and protecting all work during construction against damage, breakage, collapse, distortion, and misalignment according to applicable codes and standards.
7. Working hours will be between 7:00 am and 5:00 pm during the week and during the weekend if necessary.
If additional time is necessary for the specified products, the schedule must be coordinated with TXDPS before any work begins.
8. The Contractor shall repair and restore to its original condition all work and items damaged as a result of building operations and shall leave the work completed to the true intent of the plans and specifications and to the satisfaction of TXDPS.
9. Any disturbance or damage to the existing building, site or utilities resulting from either directly or indirectly from the building operations shall be promptly repaired, restored or replaced to the satisfaction of TXDPS at no additional cost to TXDPS.
10. All materials and construction to be incorporated in the work shall be in strict accordance with the latest editions of IBC and shall conform to the standards and recommendations of the various trade institutes where applicable.
1.05 SCHEDULING
1. The contractor will, within 30 days of receipt of purchase order, supply the DPS contract monitor with a project schedule. This site is an active training facility. Schedules will be worked to cause the least disruption to the training in progress.
2. Prior approval must be received from local TXDPS staff if scheduled project tasks may impact regular TXDPS facility operational schedule.
1.06 SPECIAL CONSIDERATIONS
1. Even if it is not anticipated, the contractor may be required to shut down operations during the project for an unforeseen State of Texas emergency. In this event, the contractor will be required to finish any open work, secure the site staging area, and evacuate his personnel as safely but as quickly as possible from the property. Notification to return to work will be issued as soon as possible from authorized DPS personnel.
2. Propane tanks, gas cylinders, or other flammable/hazardous materials must be secured and stored in a safe, industry-acceptable manner when in use or when they are being stored for future use at this or any DPS facility. Storage locations and quantities are to be identified to the affected Building Manager for the duration of the contract.
3. Contractor vehicles used for the transport of personnel or materials shall be locked with the emergency brake set and the ignition key removed when left unattended. Parking or storage must be located only in approved areas determined by the local building manager. The Department of Public Safety shall not be responsible for damage by others to contract or Personal vehicles left on the project site. Any vehicle or equipment without an ignition key starter shall be rendered inoperable if left overnight. Also, any Vehicle or large equipment with a common industrial type of ignition source shall be rendered inoperable if left overnight. Security and safety of tools or equipment shall be the responsibility of the contractor during work and after regular business hours. Items such as ladders must be removed and secured prohibiting unauthorized access to the facility.
4. The facility shall not be left open by removal of any building component without prior knowledge of the DPS Building Manager. All removed openings are to be left secure with new products at the end of each workday or reasonably secured with 3/4” plywood or industry-standard plugs. Temporary fillers must be cut to size and screwed securely into the opening in the event new component material need to be altered if the first attempt fails to fit an opening.
5. Contractor will be required to provide operation demonstration to the identified staff for future maintenance needs along with other information on warranty, maintenance manuals or other related details. Warranty information is subject to approval by Department of Public Safety’s Legal Section. Counsel may advise as to the warranty details that are not in compliance to state law or must be changed not to violate agency policy.
6. Work will be performed in secure facilities in each Region. Contract work crews are subject to Background checks prior to allowing access to these facilities. This includes all workers associated with the contractor or their respective sub- contractors.
7. Documents will be provided to the primary contractor for distribution to their affected personnel or sub-contractors. The Department of Public Safety a Police organization and will make every effort to enforce applicable State of Texas, Federal and International laws. Persons with outstanding warrants shall be subject to immediate arrest. Persons with criminal histories may not be allowed in secure DPS facilities.
Nondisclosure statements may be required when working on or within certain DPS locations.
1.07 PRECONSTRUCTION CONFERENCE
1. A preconstruction conference will be held after award with TXDPS Staff to include the Project Manager, Electrician and Plumber, Contractor, and involved trades to discuss all aspects of the project. The Contractor's foreman or field representative will be required to attend this conference.
2. TXDPS shall reserve the right to require an alternate superintendent and/or foreman.
3. The preconstruction conference shall not be held until all specified submittals have been received, reviewed, and accepted by TXDPS’s Contact.
4. Delivery of materials and commencement of construction shall not proceed until the preconstruction conference is held. Delays in obtaining a complete set of submittals shall not extend the contracted completion date.
1.08 EMERGENCY RESPONSE
1. The Contractor shall provide TXDPS with after-hours (24 hour) emergency telephone numbers of the Contractor’s superintendent and foreman.
2. The Contractor must respond to emergency situations or calls within two (2) hours.
1.09 DEFINITIONS
1. TXDPS: Texas Department of Public Safety = Owner.
2. Contractor/Contractor: Primary party responsible for coordination of their own employees or their respective sub-contractor groups to complete the contract project to meet these specifications.
3. Installer/Applicator/Erector: Entity engaged by the Construction Manager as an employee, Subcontractor, or Sub- subcontractor to perform a particular construction operation, including installation, erection, application, and similar operations.
4. TXDPS Contact: The owner's primary representative for this project has the authority to communicate project details and accept or deny final installation completion.
5. TDLR-TAS: Texas Department of Licensing and Regulation – Texas Accessibility Standards.
1.10 WARRANTY
1. The installer shall furnish a single, written warranty covering 100% of the new material and labor costs, protecting the owner, for a period of one (1) year from the date of Substantial Completion.
2. In the event of component damage from the use of incompatible materials, or during installation, any accident, mishandling, improper transportation methods, or negligence on the part of the Contractor or Sub-Contractor forces, the Primary Contractor shall be responsible for the replacement at no cost to the
TXDPS.
3. Refer to specific sections of the specification for systems and product warranty requirements. Verify with the Manufacturer of proposed systems and products that specified warranty requirements are acceptable, without exception, prior to selecting materials for use on this project.
4. Submit a full Contractor's Guarantee of the Work to be free from defects in materials and workmanship upon Substantial Completion and prior to final payment. This Guarantee shall be for a period of one (1) year from the date of Substantial Completion and shall be signed by a Principal of the Contractor’s firm and sealed if a corporation.
5. If requested by the TXDPS Contact, submit a letter from the manufacturer acknowledging that the completed Work is acceptable and that the warranty remains in effect.
1.11 FINAL INSPECTION AND PAYMENT
1. Inspections: TXDPS, the Architect of Record, and a third party, where needed, will conduct inspections of the project to verify that work is generally in compliance with the project intent, Contract Documents, and specifications prior to issuing payments to the Contractor. Inspections will be done by the TXDPS Contact or designated representative and may be conducted at any time prior to payments and, at a minimum, prior to final payments to the Contractor.
2. Final Inspection: The Contractor and the TXDPS Contact or designated representative shall provide a comprehensive final inspection after completion of the project. All application errors shall be addressed and final punch list items completed prior to rendering any final payments.
EXHIBIT A
DPS PT Track & Field Plans
TEXAS DEPARTMENT OF PUBLIC SAFETY
5805 NORTH LAMAR BOULEVARD
AUSTIN, TEXAS 78752
TEXAS DEPARTMENT OF PUBLIC SAFETY
PT TRACK AND FIELD
SHEET INDEX
LANDSCAPE
G001 General Notes and Legends G002 Project Control Plan LX100 - LX102 Existing Conditions & Demo Plan LC100 - LC102 Construction Layout LC200 Overall Northing/Easting Layout LG100 - LG102 Grading Layout LP100 - LP102 Planting Layout LD500 - LD501 Landscape Details
CIVIL
CE101 Erosion Control Plan CH101 Storm Sewer Plan CU101 Utility Plan
STRUCTURAL
S-001 General Notes S-002 Abbreviations S-003 - S-004 Typical Foundation Details S-111 Foundation Plan
ELECTRICAL
E-001 Electrical Legends and Abbreviations
ES100 Electrical Site Plan
E-601 - E-602 Electrical Details and Schedules
MECHANICAL
M-111 Mechanical Floor Plan
LOCATION MAP
N.T.S. NORTH
APPROVED BY:
Victoria Madero, Project Manager Date
Jessica Warren, Facilities Director Date
100% CONSTRUCTION DOCUMENT SET
02/24/2025
BURNS ST.D
EN
SO
N
D R
S
HIST
E C
CT
TE
SA
ET
TA
I
RE
G
OF ET
X
R
LD
RE
CAANDS EP A
TY
F
OSTER SISCO
2 2 7 0
02/24/2025
General Notes and Legends
G001
SITE DEMOLITION GENERAL NOTES
CALL BEFORE YOU DIG: THE CONTRACTOR SHALL VERIFY THE LOCATION, SIZE AND
MATERIAL OF ALL UTILITIES THAT WILL BE AFFECTED BY CONSTRUCTION OPERATIONS PRIOR
TO BREAKING GROUND, DEMOLITION, OR CONSTRUCTION, THE CONTRACTOR SHALL
CONTACT ALL AFFECTED UTILITIES 48 HOURS PRIOR TO THE START OF DEMOLITION, THIS
INCLUDES, BUT IS NOT LIMITED TO CONTACTING THE APPROPRIATE ONE-CALL UTILITY
NOTIFICATION SERVICE, I.E. TEXAS811 (800) 344-8377
PREPARE THE PROJECT SITE AND DESIGNATED EASEMENTS FOR CONSTRUCTION
OPERATIONS BY REMOVING AND DISPOSING OF ALL OBSTRUCTIONS, WHEN REMOVAL OF
SUCH OBSTRUCTIONS IS NOT SPECIFICALLY SHOWN ON THE PLANS, IT SHALL BE
CONSIDERED INTEGRAL TO THE NEW CONSTRUCTION BID ITEM
PROTECT DESIGNATED FEATURES ON THE RIGHT OF WAY AND PRUNE TREES AND SHRUBS
AS DIRECTED. DO NOT PARK EQUIPMENT, SERVICE EQUIPMENT, STORE MATERIALS, OR
DISTURB THE ROOT AREA UNDER THE BRANCHES OF TREES DESIGNATED FOR
PRESERVATION
NOTIFY THE LANDSCAPE ARCHITECT IN WRITING WHEN ITEMS NOT SHOWN ON THE PLANS
AND NOT REASONABLY DETECTABLE (BURIED WITH NO OBVIOUS INDICATION OF PRESENCE)
ARE ENCOUNTERED AND REQUIRED TO BE REMOVED
REMOVE OBSTRUCTIONS NOT DESIGNATED FOR PRESERVATION TO A DEPTH OF 2 FEET
BELOW NATURAL GROUND IN AREAS RECEIVING EMBANKMENT (FILL), REMOVE
OBSTRUCTIONS TO A DEPTH OF 2 FEET BELOW THE EXCAVATION LEVEL IN AREAS TO BE
EXCAVATED (CUT), REMOVE OBSTRUCTIONS TO A DEPTH OF 1 FOOT BELOW NATURAL
GROUND IN ALL OTHER AREAS, AND CUT TREES AND STUMPS LEVEL WITH EXISTING GRADE,
UNLESS OTHERWISE SHOWN ON CONSTRUCTION DOCUMENTS; BACKFILL, COMPACT, AND
RESTORE AREAS WHERE OBSTRUCTIONS HAVE BEEN REMOVED WITH APPROVED FILL
MATERIAL
THE CONTRACTOR SHALL ACCEPT OWNERSHIP AND DISPOSE OF REMOVED MATERIALS AND
DEBRIS AT LOCATIONS OFF SITE IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL
REQUIREMENTS, UNLESS OTHERWISE SHOWN ON CONSTRUCTION DOCUMENTS
STOCKPILE MATERIALS DESIGNATED SALVAGEABLE AT DESIGNATED SITES WHEN SHOWN ON
THE PLANS OR AS DIRECTED; PREPARE STOCKPILE SITE BY REMOVING VEGETATION AND
TRASH AND BY PROVIDING FOR PROPER DRAINAGE; MATERIAL NOT DESIGNATED TO BE
SALVAGED WILL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF
IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS
EXCAVATE (CUT) AREAS AS SHOWN ON THE PLANS OR AS DIRECTED; REMOVE MATERIALS
ENCOUNTERED TO THE LINES, GRADES, AND TYPICAL SECTIONS SHOWN ON THE
CONSTRUCTION DOCUMENTS; ACCEPT OWNERSHIP OF UNSUITABLE OR EXCESS MATERIAL
AND DISPOSE OF MATERIAL IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL
REGULATIONS AT LOCATIONS OFF SITE; MAINTAIN DRAINAGE IN THE EXCAVATED AREA TO
AVOID DAMAGE TO AREAS OF CUT/FILL; CORRECT ANY DAMAGE TO THE SUBGRADE CAUSED
BY WEATHER AT NO ADDITIONAL COST
THE CONTRACTOR SHALL FURNISH APPROVED FILL MATERIAL CAPABLE OF FORMING A
STABLE EMBANKMENT FROM REQUIRED EXCAVATION IN THE AREAS SHOWN ON THE
CONSTRUCTION DOCUMENTS FROM APPROVED SOURCES OFF SITE
SALVAGE AND STOCKPILE THE EXISTING TOPSOIL IN ALL AREAS IN WHICH GRADE CHANGE
WILL OCCUR IN ORDER TO PROVIDE A MINIMUM 2 FOOT DEPTH IN ALL PLANTING AREAS; USE
EASILY CULTIVATED, FERTILE TOPSOIL THAT IS FREE FROM OBJECTIONABLE MATERIAL AND
RESISTS EROSION; SECURE ADDITIONAL TOPSOIL IF NECESSARY, FROM APPROVED
SOURCES
THE SCOPE OF WORK SHALL INCLUDE DISPOSAL OF ALL DEBRIS ASSOCIATED WITH
DEMOLITION AND CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL COORDINATION, INSPECTION, AND TESTING REQUIRED FOR LAWFUL DISPOSAL AS
REQUIRED BY THE OWNER, LOCAL AND STATE CODE
WHERE EXISTING UTILITIES AND/OR SERVICE LINES ARE CUT, BROKEN, OR DAMAGED, THE
CONTRACTOR SHALL REPAIR THE UTILITY OR SERVICE LINES WITH THE SAME MATERIAL AND
CONSTRUCTION OR BETTER UNLESS OTHERWISE NOTED ON THE CONSTRUCTION
DOCUMENTS AT NO ADDITIONAL COST
THE CONTRACTOR SHALL ASSUME THE RESPONSIBILITY OF FIELD VERIFICATION AND
PROTECTION OF EXISTING CONDITIONS AND UTILITIES, THE ACTUAL HORIZONTAL OR
VERTICAL LOCATION OF THE EXISTING UTILITIES SHALL NOT BE A BASIS FOR ADDITIONAL
COMPENSATION
THE CONTRACTOR SHALL NOT BEGIN DEMOLITION OPERATIONS UNTIL WRITTEN
CONFIRMATION FROM THE OWNER HAS BEEN RECEIVED VERIFYING THAT ALL ITEMS TO BE
SALVAGED BY THE OWNER HAVE BEEN REMOVED FROM THE SITE
ALL DAMAGES TO THE OWNER'S PROPERTY ON THE PROJECT SITE PRIOR TO SUBSTANTIAL
COMPLETION SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AS APPROVED BY
THE OWNER, AT NO ADDITIONAL COST
EXISTING PAVING TO BE REMOVED SHALL BE SAW-CUT, OR REMOVED TO THE NEAREST
JOINT TO CREATE CLEAN EDGES TO TIE INTO THE NEW CONSTRUCTION
DEMOLITION DIMENSIONS ARE APPROXIMATE AND SHALL BE FIELD VERIFIED BY THE
CONTRACTOR; ANY DISCREPANCIES SHALL BE REPORTED TO THE LANDSCAPE ARCHITECT
IMMEDIATELY FOR RESOLUTION
THE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF STORM WATER POLLUTION
PREVENTION, SITE DRAINAGE, DUST CONTROL, NOISE POLLUTION, TRAFFIC CONTROL,
SECURITY, FENCING, LIGHTING, PERMITTING, OR OTHER LOCAL OR STATE CODE
REQUIREMENTS REQUIRED FOR CONSTRUCTION OPERATIONS, UNLESS OTHERWISE SHOWN
ON CONSTRUCTION DOCUMENTS
CONTRACTOR IS RESPONSIBLE TO
CONTACT UTILITIES & ONE CALL SYSTEM
14 DAYS PRIOR TO DIGGING
ALL SECTIONS DIGTEST @ 1-800-344-8377
SITE / GRADING GENERAL NOTES
THE CONTRACTOR`S WORK SHALL INCLUDE REMOVAL AND PROPER LEGAL DISPOSAL OF
DEBRIS REQUIRED FOR INSTALLATION OF ALL IMPROVEMENTS, CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATION, INSPECTION, AND TESTING REQUIRED BY THE
OWNER AND/OR CITY
THE CONTRACTOR SHALL CONTACT ALL AFFECTED UTILITIES 48 HOURS PRIOR TO
CONSTRUCTION INCLUDING BUT NOT LIMITED TO DIG TESS AT 1-800-344-8377
THE CONTRACTOR SHALL ADOPT APPROPRIATE CONSTRUCTION SITE MANAGEMENT
PRACTICES TO PREVENT THE DISCHARGE OF OILS, GREASE, PAINTS, GASOLINE, AND
OTHER POLLUTANTS TO STORM WATER
DAMAGES TO EXISTING PROPERTY SHALL BE RESTORED BY THE CONTRACTOR TO THE
SAME CONDITION THAT EXISTED PRIOR TO CONSTRUCTION, THIS RESTORATION SHALL BE
PERFORMED AT NO COST TO THE OWNER AND IS SUBJECT TO THE OWNER`S APPROVAL
THE CONTRACTOR SHALL PERFORM THE GRADING WORK IN SUCH A MANNER SO AS TO
MINIMIZE THE IMPACT ON THE SITE
THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND GRADES, NEW OR EXISTING
PRIOR TO CONSTRUCTION, NOTIFY THE ENGINEER OF ANY DISCREPANCIES WITH
EXISTING OR NEW CONDITIONS. THE CONTRACTOR SHALL EMPLOY A LICENSED PUBLIC
SURVEYOR TO SET ALL GRADES, SPOT ELEVATIONS, FLOW LINES, ETC.
ALL UTILITIES MAY NOT BE SHOWN ON THE PLANS, IT SHALL BE THE CONTRACTORS
RESPONSIBILITY TO VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION, UTILITIES
DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE REPAIRED AT THE
CONTRACTOR`S EXPENSE
SHOULD ANY MODIFICATIONS BE REQUIRED TO THE PROPOSED SPOT GRADES DUE TO
CONDITIONS ENCOUNTERED IN THE FIELD , CONTACT THE LANDSCAPE ARCHITECT
IMMEDIATELY AND PRIOR TO MAKING ANY CHANGES
THE MAXIMUM CROSS-SLOPE ON AN ACCESSIBLE ROUTE SHALL BE 2.0%, INCLUDING
SIDEWALK; THE MAXIMUM LONGITUDINAL SLOPE ON AN ACCESSIBLE ROUTE SHALL BE
5.0%, INCLUDING SIDEWALK, THE CONTRACTOR SHALL PROVIDE A MAXIMUM 2% SLOPE IN
ACCESSIBLE PARKING SPACES IN ALL DIRECTIONS
CHANGES IN LEVEL UP TO 1/4-INCH MAY BE VERTICAL AND WITHOUT EDGE TREATMENT,
CHANGES IN LEVEL BETWEEN 1/4-INCH AND 1/2-INCH SHALL BE BEVELED WITH A SLOPE
NO GREATER THAN 1:2, CHANGES IN LEVEL GREATER THAN 1/2-INCH SHALL BE
ACCOMPLISHED BY MEANS OF A RAMP THAT COMPLIES WITH TEXAS ACCESSIBILITY
STANDARDS
NEW CONCRETE ADJACENT TO ENTRY DOORS SHALL BE INSTALLED FLUSH WITH THE
FINISH FLOOR ELEVATION ACROSS THE ENTIRE WIDTH OF THE DOOR BEFORE SLOPING
AWAY TO PROVIDE POSITIVE DRAINAGE
ALL EXCAVATION IS UNCLASSIFIED AND INCLUDES GRADING AND EXCAVATION TO
ELEVATIONS INDICATED, REGARDLESS OF CHARACTER OF MATERIALS AND
OBSTRUCTIONS ENCOUNTERED, INCLUDING ROCK OR OTHER HARD MATERIALS
ANY AREA DISTURBED BY THE CONTRACTOR OUTSIDE THE SPECIFIED LIMITS OF THE
PROJECT MUST BE REGRADED AND SEEDED AS SPECIFIED, NO ADDITIONAL PAYMENT
WILL BE MADE FOR THIS ADDITIONAL WORK
NO DEPRESSIONS, "BIRD BATHS", ETC. SHALL BE PERMITTED IN THE PAVING, SHOULD ANY
MODIFICATIONS TO THE PROPOSED GRADING BE REQUIRED TO ACHIEVE POSITIVE
DRAINAGE, CONTACT THE LANDSCAPE ARCHITECT IMMEDIATELY BEFORE MAKING THE
CHANGES
CONCRETE PAVING JOINTS SHALL BE CONSTRUCTED AS SHOWN ON THE PLANS AND
DETAILS, SEAL ALL JOINTS WITH SELF-LEVELLING SL1
CONTRACTOR SHALL STAKE HARDSCAPE IMPROVEMENTS AND NOTIFY LANDSCAPE
ARCHITECT PRIOR TO INSTALLATION FOR APPROVAL
ALL GRADES SHOWN ON GRADING PLAN ARE FINISH GRADE ELEVATIONS UNLESS
OTHERWISE NOTED ON THE PLANS
ALL PLANTING AREAS AND PAVING SHALL HAVE POSITIVE DRAINAGE AWAY FROM
BUILDING FOOTPRINT, FINISHED GRADES SHALL BE DEFINED AS TOP OF PAVING SURFACE
VALVE BOXES, CLEANOUTS, AND OTHER SITE FEATURES AFFECTED BY NEW SITE
IMPROVEMENTS SHALL BE RAISED/LOWERED TO MEET NEW FINISHED GRADES
ALL WORK SHALL MEET PLANS, SPECIFICATIONS, CURRENT LOCAL AND STATE CODES
NOTES
· ALL SPOT GRADES ARE FINISH GRADES UNLESS OTHERWISE
NOTED.
· TURFGRASS SLOPES ARE NOT TO EXCEED 25%..
THE EARTHWORK FOR THIS PROJECT IS A NECESSARY AND
INCIDENTAL PART OF THE WORK. IN THE CASE THAT THE
EARTHWORK DOES NOT BALANCE, THE CONTRACTOR IS
RESPONSIBLE FOR ANY ADDITIONAL COSTS ASSOCIATED WITH
HAUL OFF OR IMPORT. THE TOTAL COST SHALL BE INCLUDED IN THE
BID PROPOSAL AS A LUMP SUM. PAYMENT WILL NOT BE MADE ON A
UNIT PRICE BASIS OR BY ANY OTHER SEPARATE MEASURED
PAYMENT METHOD.
1. BASE BID SHALL INCLUDE ALL EARTHWORK NECESSARY TO
ESTABLISH THE FINISHED GRADES AS SHOWN ON THIS PLAN.
NO SEPARATE PAYMENT WILL BE MADE.
2. REFER TO SPECIFICATIONS FOR DISPOSAL OF EXCESS
MATERIAL.
3. CONTRACTOR SHALL STRIP, STOCKPILE AND RE-SPREAD A
MINIMUM OF 6" OF TOPSOIL IN ALL DISTURBED AREAS. IN AREAS
OF CUT, THE GRADE SHALL BE EXCAVATED TO 6" BELOW FINISH
GRADE, THEN TOPSOIL SHALL BE RE-SPREAD ABOVE THE SUB
GRADE ELEVATION.
4. CONTRACTOR TO MAINTAIN EXISTING FINISH GRADES AND
DRAINAGE DESIGN FOR THIS PROJECT AREA, AS DETAILED IN
THE SPECIFICATIONS.
5. IF NECESSARY TO CARRY OUT THE PROPOSED WORK, THE
TOPOGRAPHIC SURVEY FOR THIS PROJECT SHALL BE DONE BY
AN INDEPENDENT REGISTERED, LICENSED SURVEYOR
APPROVED BY THE OWNER. THE SURVEYS SHALL BE SIGNED
AND SEALED BY THE APPROVED SURVEYOR.
6. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
GRADES, NEW OR EXISTING PRIOR TO CONSTRUCTION, NOTIFY
THE PROJECT LANDSCAPE ARCHITECT OF ANY DISCREPANCIES
WITH EXISTING OR NEW CONDITIONS. THE CONTRACTOR SHALL
EMPLOY A LICENSED PUBLIC SURVEYOR TO SET ALL GRADES,
SPOT ELEVATIONS, FLOW LINES, ETC.
7. POSITIVE DRAINAGE SHALL BE MAINTAINED ON ALL SURFACE
AREAS WITHIN THE SCOPE OF THIS PROJECT. CONTRACTOR
SHOULD TAKE PRECAUTIONS NOT TO ALLOW ANY PONDING OF
WATER.
8. THE CONTRACTOR SHALL CONSTRUCT EARTHEN
EMBANKMENTS WITH SLOPES NO STEEPER THAN 3:1 AND
COMPACT SOIL TO 95% OF MAXIMUM DENSITY IN ACCORDANCE
WITH THE CITY OF AUSTIN STANDARD SPECIFICATIONS.
9. AREAS OF SOIL DISTURBANCE ARE LIMITED TO GRADING AND
IMPROVEMENTS SHOWN. ALL OTHER AREAS WILL NOT BE
DISTURBED.
DIRECTION OF FLOW
TOP OF PAVEMENT
TOP OF GRADE
TOP OF CURB
BOTTOM OF RAMP
TOP OF RAMP
MATCH EXISTING GRADE
TOP OF INLET
HIGH POINT
FLOW LINE
FINISH FLOOR ELEVATION
TP
TG
TC
BR
TR
MEG
TI
HP
FL
FFE
GRADING NOTES
GRADING LEGEND
509 EXISTING 1' CONTOUR
EXISTING 5' CONTOUR510
PROPERTY LINE
LOC LOC LIMITS OF CONSTRUCTION
509 PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR510
PROPOSED SPOT GRADE
EXISTING UTILITIES
CONTRACTOR MUST VERIFY LOCATION OF ALL OVERHEAD AND
UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL COORDINATE WITH CITY OFFICIALS AND UTILITY COMPANIES
IN LOCATING UTILITIES. CONTRACTOR SHALL BE HELD RESPONSIBLE
FOR LOSSES DUE TO DAMAGE TO UTILITIES. LOCATION FOR ALL
UTILITIES SHOWN ON PLANS ARE APPROXIMATE. CONTRACTOR
SHALL CALL TEXAS 811, 1-800-344-8377.
EROSION AND ESTABLISHMENT NOTES
THE LANDSCAPE CONTRACTOR SHALL REFER TO THE CONTRACT AND
SPECIFICATIONS FOR REQUIREMENTS NOT LISTED HEREIN
THE CONTRACTOR SHALL LOCATE AND VERIFY THE EXISTENCE OF ALL UTILITIES
PRIOR TO STARTING WORK
THE CONTRACTOR SHALL SUPPLY ALL MATERIALS NECESSARY TO PREVENT
EROSION AND SEDIMENTATION FROM THE CONSTRUCTION ACTIVITIES, AND TO
ESTABLISH NECESSARY VEGETATIVE COVER ADJACENT TO NEW CONSTRUCTION
PER TCEQ REQUIREMENTS
ANY SOD INSTALLED ADJACENT TO PAVEMENT TO ESTABLISH VEGETATIVE COVER
FOLLOWING CONSTRUCTION SHALL BE OF A WARM-SEASON TURF, NON-SEEDING
VARIETY
ALL PLANTS INSTALLED BY THE CONTRACTOR SHALL BE WATERED THOROUGHLY
TWICE DURING THE FIRST 24 HOUR PERIOD AFTER PLANTING, ALL PLANTS SHALL
THEN BE WATERED WEEKLY OR MORE OFTEN AS NEEDED DURING THE FIRST
GROWING SEASON
ALL TEMPORARY EROSION CONTROL MEASURES & SILT FENCING FOR THE
PROPOSED CONSTRUCTION SHALL BE REMOVED BY CONTRACTOR FOLLOWING THE
ESTABLISHMENT OF THE NEW CONSTRUCTION AND VEGETATIVE COVER
CONSTRUCTION NOTES
CONSTRUCTION SEQUENCE NOTES
NOTE: BELOW IS GENERAL SEQUENCE OF CONSTRUCTION. THE
ENGINEER OF RECORD SHALL UPDATE
BELOW WITH NOTES SPECIFIC TO THE PROJECT.
1. REACH OUT TO THE CITY FOR PRE-CONSTRUCTION MEETING
AND CONSTRUCTION PERMIT.
2. SET-UP E/S CONTROLS AND TREE PROTECTION AND REACH
OUT TO CITY FOR INSPECTION.
3. SET UP TEMPORARY TRAFFIC CONTROLS.
4. CONSTRUCT THE DRAINAGE PONDS AND STORM WATER
FEATURES.
5. START UTILITY, ROAD, GRADING, FRANCHISE UTILITY AND ALL
NECESSARY INFRASTRUCTURE CONSTRUCTION. [NOTE: PLEASE
UPDATE AS PER THE PROJECT]
6. REQUEST FINAL WALKTHROUGH AND CONDUCT
WALKTHROUGH WITH ENGINEER OF RECORD AND CITY
DEPARTMENT.
7. ENGINEER OF RECORD IS RESPONSIBLE TO PREPARE AND
SUBMIT CLOSEOUT DOCUMENTS FOR PROJECT CLOSEOUT.
EXAMINATION OF SITE OF WORK
BEFORE SUBMITTING A BID, EACH BIDDER SHALL CAREFULLY
EXAMINE THE SITE OF WORK. EACH BIDDER SHALL INFORM
HIMSELF/HERSELF PRIOR TO BIDDING AS TO THE EXISTING
CONDITIONS AND LIMITATIONS UNDER WHICH THE WORK IS TO
BE PERFORMED, AND SHALL INCLUDE IN HIS/HER BID A SUM TO
COVER ALL COSTS OF ALL ITEMS NECESSARY TO PERFORM THE
WORK AS SET FORTH IN THE CONTRACT DOCUMENTS. NO
ALLOWANCE WILL BE MADE TO ANY BIDDER BECAUSE OF LACK
OF SUCH EXAMINATION OR KNOWLEDGE. THE SUBMISSION OF A
BID SHALL BE CONSTRUED AS CONCLUSIVE EVIDENCE THAT
THE BIDDER IS SUFFICIENTLY FAMILIAR WITH ALL RELEVANT
CONDITIONS.
CONCRETE FORMWORK AND REINFORCEMENT
THE CONTRACTOR SHALL NOTIFY THE OWNER'S
REPRESENTATIVE A MINIMUM OF 48 HOURS PRIOR TO THE
PLANNED PLACEMENT OF CONCRETE. THE OWNER'S
REPRESENTATIVE MUST HAVE OBSERVED AND APPROVED THE
FORMWORK AND REINFORCEMENT PRIOR TO ANY PLACEMENT
OF CONCRETE
CONCRETE FINISH AND JOINTS
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ON THE SITE
SAMPLE PANELS OF PAVEMENT 4' X 4' IN SIZE FOR EACH FINISH
OF CONCRETE PAVEMENT. THE SURFACE FINISHES SHALL BE AS
APPROVED BY THE OWNER'S REPRESENTATIVE. ANY CONCRETE
PLACED WITH AN IMPROPER FINISH SHALL BE REMOVED AND
REPLACED AT THE CONTRACTOR'S EXPENSE. ALL
CONTRACTION JOINTS SHALL ADHERE TO SPECIFICATIONS. ANY
CONCRETE JOINTS THAT DO NOT ADHERE TO THE TIME FRAME
AND INSTRUCTION OF THE SPECIFICATIONS, AND IN THE
OPINION OF THE OWNER'S REPRESENTATIVE, HAS EXCESSIVE
SHRINKAGE CRACKS DUE TO FAILING TO ADHERE TO THE
SPECIFICATIONS FOR JOINTS, SHALL BE REMOVED AND
REPLACED AT THE CONTRACTOR'S EXPENSE.
ALIGNMENT AND TANGENCY OF PAVEMENTS
THE EDGES OF ALL FINISHED PAVING SHALL BE STRAIGHT OR
SMOOTH CURVES (AS DELINEATED ON THE PLANS) WITH NO
INTERRUPTIONS SUCH AS CHORDS, WAVES, JOGS, OR MISSED
TANGENTS. PAVEMENT WITH SUCH INTERRUPTION SHALL BE
REMOVED.
CITY STANDARDS
ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH
THE CITY STANDARD, TEXAS DEPARTMENT OF PUBLIC SAFETY
CAMPUS SPECIFICATIONS, AND THE STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION.
DIMENSIONS
DIMENSIONS ARE TO BACKS OF CURBS, TO CENTERLINES OF
FENCES, OR TO EDGES OF PAVEMENTS, UNLESS OTHERWISE
INDICATED. WRITTEN AND NUMBERED DIMENSIONS HOLD
PRECEDENCE OVER SCALED DIMENSIONS.
ADJUSTMENTS
IF THE CONTRACTOR BELIEVES IT IS NECESSARY TO MAKE AN
ADJUSTMENT IN THE LAYOUT OR GRADE OF PROPOSED
IMPROVEMENTS, SUCH AN ADJUSTMENT SHALL BE PROPOSED
TO THE OWNER'S REPRESENTATIVE. NO ADJUSTMENT WILL BE
PERMITTED UNTIL IT HAS FIRST BEEN APPROVED BY THE
OWNER'S REPRESENTATIVE.
GENERAL LAYOUT NOTES
1. REFER TO PLAN DRAWINGS FOR ANNOTATION AND LAYOUT OF
THE PROPOSED SITE DEMOLITION AND NEW CONSTRUCTION.
2. MAINTAIN A MIN. 5 FOOT WIDTH ON ALL SIDEWALKS FOR
HANDICAP ACCESSIBILITY.
3. ALL EXISTING AND PROPOSED SIDEWALKS, BARRIER FREE
RAMPS, HANDICAP PARKING, DRIVEWAY CROSSWALKS,
DRIVEWAYS, AND ACCESSIBLE ROUTES SHALL COMPLY WITH
A.D.A., T.A.S. AND CITY OF AUSTIN REQUIREMENTS. EXISTING
INFRASTRUCTURE WITHIN WORK AREA NOT COMPLYING
SHALL BE REMOVED AND REPLACED TO MEET STANDARDS.
ACCESSIBILITY NOTE
CONTRACTOR TO MAINTAIN ACCESSIBLE PATHS TO MAIN ENTRY OF
THE BUILDING AND TO ACTIVITY AREAS OF THE EXISTING SITE.
IF CONSTRUCTION POSES A POSSIBLE DISRUPTION TO ACCESSIBLE
PATHS, CONTRACTOR TO DEVELOP A PLAN FOR ACCESSIBLE
ROUTES TO BE MAINTAINED WHILE THE PROPOSED CONSTRUCTION
TAKES PLACE.
1. SLOPE OF THE PROPOSED FOR ACCESSIBLE ROUTES SHALL
COMPLY WITH TAS SECTION 402 INCLUDING A MAXIMUM CROSS
SLOPE 1:48 AND MAXIMUM RUNNING SLOPE 1:20.
2. ANY PROPOSED WALKING SURFACES THAT ARE A PART OF AN
ACCESSIBLE ROUTE SHALL COMPLY WITH TAS SECTION 403.
3. CONTRACTOR TO INSTALL PAVEMENT WITH SURFACE SLOPE OF
THE PROPOSED CONSTRUCTION PER CURRENT TEXAS
ACCESSIBILITY STANDARDS AND AMERICANS WITH DISABILITIES
ACT GUIDELINES, AND NOTIFY LANDSCAPE ARCHITECT IF THE
SITE CONDITIONS OF THE PROPOSED DO NOT ACHIEVE OR
POSE A CONFLICT WITH THESE STANDARDS.
Parkhill.com
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
2.
\0 3_
D
SG
N \0
1_ D
W G
\0
_L
AN
D \0
4_
SH
EE
TS
\G
1-
2.
D W
G , 2
/1 1/
1:
:5
AM
, g hu ffa ke r
Te xa s D ep ar tm en t o f P ub lic
Sa fe ty
PT
T ra ck a nd F ie ld
Texas Department of Public Safety 5805 N Lamar Boulevard Austin, Tx 78752
43502.24
- 02/24/2025 Issue For Bid
S
HIST
E C
CT
TE
SA
ET
TA
I
RE
G
OF ET
X
R
LDRE
CAANDS EP A
TY
F
OSTER SISCO
2 2 7 0
02/24/2025 http://www.parkhill.com/
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
WWWWWWW
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W W
W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWWWW
W W
W W
W
D E
N S
O N
D R
IV
E
BURNS
STREET
N LAMAR BLVD
W W
W W
W W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W
W W
W W
W W
W
W
W
W W
W W
W W
W W
W W
W
W W
W W
W
W
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
WWWWWWW
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W W
W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWWWW
W W
W W
W
D E
N S
O N
D R
IV
E
BURNS
STREET
N LAMAR BLVD
A
UGE UGE UGEOHE OHE
O H
Ex O
H Ex
O H
Ex O
H Ex
O H
Ex O
H Ex
O H
Ex O
H Ex
O H
Ex O
H Ex
O H
Ex O
H Ex
W W
W W
W W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W
W W
W W
W W
W
W
W
W W
W W
W W
W W
W W
W
W W
W W
W
W
W W
W W
W W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W
W W
W W
W W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W
W W
W
W
W W
W W
W
W
X
XXX
X X X X
696 697698
2 69
1:120
1:
1:
1:120
1: 2001: 200 1: 13.33
1:120
1:
1:
1:200 1:100
1:100
1:
1:
1:
1:25
1:75
1:
01:75
1:
1:120
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
WWWWWWW
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W W
W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWWWW
W W
W W
W
D E
N S
O N
D R
IV
E
BURNS
STREET
N LAMAR BLVD
TBM
#2
SURVEY CONTROL
POINT
N = 10093275.69 E = 3119831.89
ELEVATION=704.27'
BLDG C
BLDG C
NORTH
0 40' 80'
Project Control Plan
G002
N - 10093275.69 E - 3119831.89
ELEV. 704.27
SURVEY CONTROL
POINT
Parkhill.com
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
2.
\0 3_
D
SG
N \0
1_ D
W G
\0
_C
IV
IL
\0
0_
SH
EE
TS
\G
2-
2_
.D W
G , 2
/1 1/
0:
:0
AM
, g hu ffa ke r
Te xa s D ep ar tm en t o f P ub lic
Sa fe ty
PT
T ra ck a nd F ie ld
Texas Department of Public Safety 5805 N Lamar Boulevard Austin, Tx 78752
43502.24
- 02/24/2025 Issue For Bid
FOR
INFORMATIONAL
PURPOSES
ONLY
AutoCAD SHX Text C
X
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
WWWWW
BLDG C
D E
N S
O N
D R
IV
E
BURNS
STREET
X
X
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC LOC
LOC
LOC LOC
LOC LOC LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LOC
LOC
LOC
LOCLOCLOCLOC
LO
C
LO
C
LO
C
LO
C
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
X
XXX
X X X X
686 685
EXISTING TREES
TO BE
PROTECTED
DURING
CONSTRUCTION
EXISTING TREE
TO BE
PROTECTED
DURING
CONSTRUCTION
(LIVE OAK 35" - IN)
EXISTING TREE
TO BE
PROTECTED
DURING
CONSTRUCTION
(LIVE OAK 30" - IN)
PORTION OF TRACK
DEMOLISHED BY
OTHERS
PROPERTY LINE
Overall Existing Conditions & Demolition Plan
LX100
Parkhill.com
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
2.
\0 3_
D
SG
N \0
1_ D
W G
\0
_L
AN
D \0
4_
SH
EE
TS
\L X1
-4
.D W
G , 2
/5 /2
9:
:0
AM
, g hu ffa ke r
Te xa s D ep ar tm en t o f P ub lic
Sa fe ty
PT
T ra ck a nd F ie ld
Texas Department of Public Safety 5805 N Lamar Boulevard Austin, Tx 78752
43502.24
- 02/24/2025 Issue For Bid
S
HIST
E C
CT
TE
SA
ET
TA
I
RE
G
OF ET
X
R
LD
RE
CAANDS EP A
TY
F
OSTER SISCO
2 2 7 0
02/24/2025
EXISTING UTILITIES
CONTRACTOR MUST VERIFY LOCATION OF ALL OVERHEAD AND
UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL COORDINATE WITH CITY OFFICIALS AND UTILITY COMPANIES
IN LOCATING UTILITIES. CONTRACTOR SHALL BE HELD RESPONSIBLE
FOR LOSSES DUE TO DAMAGE TO UTILITIES. LOCATION FOR ALL
UTILITIES SHOWN ON PLANS ARE APPROXIMATE. CONTRACTOR
SHALL CALL TEXAS 811, 1-800-344-8377.
509 EXISTING 1' CONTOUR
LEGEND
NOTE:
DISPOSAL OF ALL EXCESS/WASTE MATERIALS IS TO BE MADE
AT A REGISTERED LANDFILL.
CONTRACTOR IS TO NOTIFY CITY OF AUSTIN IF DISPOSAL SITE
IS INSIDE THE CITY'S JURISDICTIONAL BOUNDARIES.
DEMOLITION
1. THE CONTRACTOR SHALL NOT ASSUME THAT UTILITIES ARE
PRECISELY LOCATED. UTILITIES ARE SHOWN TO HELP MAKE THE
CONTRACTOR AWARE OF THEIR EXISTENCE. THIS MEASURE IS
TAKEN TO HELP PROTECT THE INVESTMENTS AND SERVICES OF
THE OWNERS, OF THE UTILITIES AND THEIR CUSTOMERS. THE
CONTRACTOR SHALL CALL TEXAS 811 FOR HELP IN LOCATING
UTILITIES.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE AND
VERIFY THE EXACT LOCATION AND DEPTH OF ALL EXISTING
UTILITIES PRIOR TO PROCEEDING WITH CONSTRUCTION. THE
CONTRACTOR SHALL ASCERTAIN WHETHER ANY ADDITIONAL
UTILITIES OR FACILITIES, OTHER THAN THOSE SHOWN ON THE
PLANS, MAY BE PRESENT ON THE SITE OF THE WORK.
3. PRIOR TO PROCEEDING WITH CONSTRUCTION, THE CONTRACTOR
SHALL NOTIFY THE OWNER OR A/E IF CONFLICTS OR POTENTIAL
CONFLICTS OCCUR BETWEEN EXISTING UTILITIES AND THE
PROPOSED CONSTRUCTION.
4. PRIOR TO PROCEEDING WITH CONSTRUCTION, THE CONTRACTOR
SHALL COORDINATE THE AFFECTED PARTS OF THE UTILITIES. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO PRESERVE AND
PROTECT ALL UTILITIES.
5. THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE UTILITY OWNER
AND MAKE RESTITUTION FOR ANY UTILITY THAT IS DAMAGED BY
THE CONTRACTOR DURING THE COURSE OF THE WORK.
6. THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE OWNER AND
MAKE RESTITUTION FOR ANY DAMAGE TO THE EXISTING COMPLEX
BY THE CONTRACTOR DURING THE COURSE OF THE WORK.
7. COORDINATE DEMOLITION PHASING WITH CIVIL, LANDSCAPE,
ARCHITECTURAL/ STRUCTURAL, AND ELECTRICAL DISCIPLINES.
8. ALL TREES TO REMAIN UNLESS OTHERWISE NOTED.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MISCELLANEOUS
REPAIRS DUE TO DEMOLITION ACTIVITIES.
PROPERTY LINE
EXISTING TREE
TREE PROTECTION
CONTRACTOR IS RESPONSIBLE TO CONTACT UTILITIES
& ONE CALL SYSTEM 14 DAYS PRIOR TO DIGGING.
ALL SECTIONS DIGTESS @ 1-800-344-8377
HTTPS://TEXAS811.ORG
EXISTING 5' CONTOUR
TRACK SURFACE TO BE REMOVED
LOC LOC
LIMITS OF CONSTRUCTION -
3" MIN. PECAN SHELL MULCH WITHIN
TREE PROTECTION
AND PROPERLY DISPOSED OF
(FENCE LINE TO BE VERIFIED ON SITE)
NORTH
0 40' 80'
N - 10093275.69 E - 3119831.89
ELEV. 704.27
SURVEY CONTROL
POINT
TREE PROTECTION NOTE:
1. CONTRACTOR SHALL PROVIDE 3" OF
PECAN MULCH WITHIN THE CRITICAL
ROOT ZONE.
2. CONTRACTOR SHALL HIRE A LICENSED
ARBORIST TO TRIM ANY LIMBS, ROOTS,
OR TRUNK AT THE CONTRACTOR'S EXPENSE.
3. ANY BACKFILL REQUIRE PER PLANS WITHIN
THE TREES "DRIP LINE" SHALL CONSIST OF
NATIVE TOPSOIL FREE FROM ROCKS, TRASH,
DEBRIS, ECT.
X
X
X
X
X
X
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
WWWWWWWWWW
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC LOC LOC LOC
LOC LOC LOC
LOC LOC LOC LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
X
XXXXX
X
X
X X X X X
EXISTING SIGNAGE TO BE
REMOVED AND DISPOSED
OF BY CONTRACTOR
DURING CONSTRUCTION
EXISTING SIGNAGE TO BE
REMOVED AND
DISPOSED OF BY
CONTRACTOR DURING
CONSTRUCTION
EXISTING TREES TO
BE PROTECTED
DURING
CONSTRUCTION,
CONTRACTOR TO
FILL ROOT ZONE
WITHIN T.P. FENCE
WITH MAX. 3" PECAN
SHELL MULCH, REF.
SPECS
14,364 S.F. TOTAL OF
TRACK TO BE REMOVED
AND DISPOSED OF BY
CONTRACTOR DURING
CONSTRUCTION
EXISTING TREE TO
BE PROTECTED
DURING
CONSTRUCTION
(LIVE OAK 30"- IN)
EXISTING SITE
EQUIPMENT TO BE
REMOVED AND DISPOSED
OF BY CONTRACTOR
DURING CONSTRUCTION
EXISTING SITE
EQUIPMENT TO BE
REMOVED AND DISPOSED
OF BY CONTRACTOR
DURING CONSTRUCTION
EXISTING SITE
EQUIPMENT TO BE
REMOVED AND DISPOSED
OF BY CONTRACTOR
DURING CONSTRUCTION
EXISTING SIGNAGE TO BE
REMOVED AND DISPOSED
OF BY CONTRACTOR
DURING CONSTRUCTION
EXISTING TREE TO
BE PROTECTED
DURING
CONSTRUCTION
(LIVE OAK 35"-IN)
PORTION OF TRACK TO
BE DEMOLISHED BY
OTHERS
CONTRACTOR
TO FILL ROOT
ZONE WITHIN
T.P. FENCE WITH
MAX. 3" PECAN
SHELL MULCH,
REF. SPECS
CONTRACTOR TO LOCATE
EXISTING WATERLINE. REF
TO CIVIL CU101 AND SPECS
FOR PROPOSED
CONTRACTOR TO STRIP AND
PRESERVE 3" DEPTH OF
TOPSOIL FOR INSIDE TRACK.
STOCK PILE ON-SITE IN
ACCORDANCE WITH TCEQ,
AND DELIVER PER OWNER'S
INSTRUCTION TO NEW
DESTINATION.
PROPERTY LINE
Existing Conditions & Demolition Plan
LX101
Parkhill.com
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
2.
\0 3_
D
SG
N \0
1_ D
W G
\0
_L
AN
D \0
4_
SH
EE
TS
\L X1
-4
.D W
G , 2
/5 /2
9:
:4
AM
, g hu ffa ke r
Te xa s D ep ar tm en t o f P ub lic
Sa fe ty
PT
T ra ck a nd F ie ld
Texas Department of Public Safety 5805 N Lamar Boulevard Austin, Tx 78752
43502.24
- 02/24/2025 Issue For Bid
S
HIST
E C
CT
TE
SA
ET
TA
I
RE
G
OF ET
X
R
LD
RE
CAANDS EP A
TY
F
OSTER SISCO
2 2 7 0
02/24/2025
M
ATC
H
LIN
E - LX102
EXISTING UTILITIES
CONTRACTOR MUST VERIFY LOCATION OF ALL OVERHEAD AND
UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL COORDINATE WITH CITY OFFICIALS AND UTILITY COMPANIES
IN LOCATING UTILITIES. CONTRACTOR SHALL BE HELD RESPONSIBLE
FOR LOSSES DUE TO DAMAGE TO UTILITIES. LOCATION FOR ALL
UTILITIES SHOWN ON PLANS ARE APPROXIMATE. CONTRACTOR
SHALL CALL TEXAS 811, 1-800-344-8377.
509 EXISTING 1' CONTOUR
LEGEND
NOTE:
DISPOSAL OF ALL EXCESS/WASTE MATERIALS IS TO BE MADE
AT A REGISTERED LANDFILL.
CONTRACTOR IS TO NOTIFY CITY OF AUSTIN IF DISPOSAL SITE
IS INSIDE THE CITY'S JURISDICTIONAL BOUNDARIES.
DEMOLITION
1. THE CONTRACTOR SHALL NOT ASSUME THAT UTILITIES ARE
PRECISELY LOCATED. UTILITIES ARE SHOWN TO HELP MAKE THE
CONTRACTOR AWARE OF THEIR EXISTENCE. THIS MEASURE IS
TAKEN TO HELP PROTECT THE INVESTMENTS AND SERVICES OF
THE OWNERS, OF THE UTILITIES AND THEIR CUSTOMERS. THE
CONTRACTOR SHALL CALL TEXAS 811 FOR HELP IN LOCATING
UTILITIES.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE AND
VERIFY THE EXACT LOCATION AND DEPTH OF ALL EXISTING
UTILITIES PRIOR TO PROCEEDING WITH CONSTRUCTION. THE
CONTRACTOR SHALL ASCERTAIN WHETHER ANY ADDITIONAL
UTILITIES OR FACILITIES, OTHER THAN THOSE SHOWN ON THE
PLANS, MAY BE PRESENT ON THE SITE OF THE WORK.
3. PRIOR TO PROCEEDING WITH CONSTRUCTION, THE CONTRACTOR
SHALL NOTIFY THE OWNER OR A/E IF CONFLICTS OR POTENTIAL
CONFLICTS OCCUR BETWEEN EXISTING UTILITIES AND THE
PROPOSED CONSTRUCTION.
4. PRIOR TO PROCEEDING WITH CONSTRUCTION, THE CONTRACTOR
SHALL COORDINATE THE AFFECTED PARTS OF THE UTILITIES. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO PRESERVE AND
PROTECT ALL UTILITIES.
5. THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE UTILITY OWNER
AND MAKE RESTITUTION FOR ANY UTILITY THAT IS DAMAGED BY
THE CONTRACTOR DURING THE COURSE OF THE WORK.
6. THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE OWNER AND
MAKE RESTITUTION FOR ANY DAMAGE TO THE EXISTING COMPLEX
BY THE CONTRACTOR DURING THE COURSE OF THE WORK.
7. COORDINATE DEMOLITION PHASING WITH CIVIL, LANDSCAPE,
ARCHITECTURAL/ STRUCTURAL, AND ELECTRICAL DISCIPLINES.
8. ALL TREES TO REMAIN UNLESS OTHERWISE NOTED.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MISCELLANEOUS
REPAIRS DUE TO DEMOLITION ACTIVITIES.
PROPERTY LINE
EXISTING TREE
TREE PROTECTION
CONTRACTOR IS RESPONSIBLE TO CONTACT UTILITIES
& ONE CALL SYSTEM 14 DAYS PRIOR TO DIGGING.
ALL SECTIONS DIGTESS @ 1-800-344-8377
HTTPS://TEXAS811.ORG
EXISTING 5' CONTOUR
TRACK SURFACE TO BE REMOVED
LOC LOC
LIMITS OF CONSTRUCTION -
3" MIN. PECAN SHELL MULCH WITHIN
TREE PROTECTION
AND PROPERLY DISPOSED OF
(FENCE LINE TO BE VERIFIED ON SITE)
NORTH
0 20' 40'
N - 10093275.69 E - 3119831.89
ELEV. 704.27
SURVEY CONTROL
POINT
TREE PROTECTION NOTE:
1. CONTRACTOR SHALL PROVIDE 3" OF
PECAN MULCH WITHIN THE CRITICAL
ROOT ZONE.
2. CONTRACTOR SHALL HIRE A LICENSED
ARBORIST TO TRIM ANY LIMBS, ROOTS,
OR TRUNK AT THE CONTRACTOR'S EXPENSE.
3. ANY BACKFILL REQUIRE PER PLANS WITHIN
THE TREES "DRIP LINE" SHALL CONSIST OF
NATIVE TOPSOIL FREE FROM ROCKS, TRASH,
DEBRIS, ECT.
BLDG C
LOC
LO
C
LOC LOC LOC LOC LOC LOC LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOCLOCLOCLOCLOCLOC
LOC
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
X X
X
X X
X
686 685
EXISTING SIGNAGE TO
BE REMOVED AND
DISPOSED OF BY
CONTRACTOR DURING
CONSTRUCTION
14,364 S.F. TOTAL OF
TRACK TO BE REMOVED
AND DISPOSED OF BY
CONTRACTOR DURING
CONSTRUCTION
EXISTING TREE TO
BE PROTECTED
DURING
CONSTRUCTION
(LIVE OAK 35" - IN)
70 S.F. OF CONCRETE
TO BE REMOVED AND
DISPOSED OF BY
CONTRACTOR
DURING
CONSTRUCTION
16 L.F. OF CURB TO BE
REMOVED AND
DISPOSED OF BY
CONTRACTOR DURING
CONSTRUCTION
PORTION OF TRACK TO
BE DEMOLISHED BY
OTHERS
CONTRACTOR TO FILL
ROOT ZONE WITHIN
T.P. FENCE WITH MAX.
3" PECAN SHELL
MULCH, REF. SPECS
CONTRACTOR TO STRIP
AND PRESERVE 3"
DEPTH OF TOPSOIL
FOR INSIDE TRACK.
STOCK PILE ON-SITE IN
ACCORDANCE WITH
TCEQ, AND DELIVER
PER OWNER'S
INSTRUCTION TO NEW
DESTINATION.
EXISTING SITE
EQUIPMENT TO BE
REMOVED AND DISPOSED
OF BY CONTRACTOR
DURING CONSTRUCTION
CONTRACTOR TO
LOCATE EXISTING
WATERLINE. REF. TO
CIVIL CU101 AND
SPECS FOR PROPOSED
5 L.F. OF CURB TO BE
REMOVED
Existing Conditions & Demolition Plan
LX102
Parkhill.com
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
2.
\0 3_
D
SG
N \0
1_ D
W G
\0
_L
AN
D \0
4_
SH
EE
TS
\L X1
-4
.D W
G , 2
/1 0/
:3
0:
P M
, g hu ffa ke r
Te xa s D ep ar tm en t o f P ub lic
Sa fe ty
PT
T ra ck a nd F ie ld
Texas Department of Public Safety 5805 N Lamar Boulevard Austin, Tx 78752
43502.24
- 02/24/2025 Issue For Bid
S
HIST
E C
CT
TE
SA
ET
TA
I
RE
G
OF ET
X
R
LD
RE
CAANDS EP A
TY
F
OSTER SISCO
2 2 7 0
02/24/2025
EXISTING UTILITIES
CONTRACTOR MUST VERIFY LOCATION OF ALL OVERHEAD AND
UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL COORDINATE WITH CITY OFFICIALS AND UTILITY COMPANIES
IN LOCATING UTILITIES. CONTRACTOR SHALL BE HELD RESPONSIBLE
FOR LOSSES DUE TO DAMAGE TO UTILITIES. LOCATION FOR ALL
UTILITIES SHOWN ON PLANS ARE APPROXIMATE. CONTRACTOR
SHALL CALL TEXAS 811, 1-800-344-8377.
509 EXISTING 1' CONTOUR
LEGEND
NOTE:
DISPOSAL OF ALL EXCESS/WASTE MATERIALS IS TO BE MADE
AT A REGISTERED LANDFILL.
CONTRACTOR IS TO NOTIFY CITY OF AUSTIN IF DISPOSAL SITE
IS INSIDE THE CITY'S JURISDICTIONAL BOUNDARIES.
DEMOLITION
1. THE CONTRACTOR SHALL NOT ASSUME THAT UTILITIES ARE
PRECISELY LOCATED. UTILITIES ARE SHOWN TO HELP MAKE THE
CONTRACTOR AWARE OF THEIR EXISTENCE. THIS MEASURE IS
TAKEN TO HELP PROTECT THE INVESTMENTS AND SERVICES OF
THE OWNERS, OF THE UTILITIES AND THEIR CUSTOMERS. THE
CONTRACTOR SHALL CALL TEXAS 811 FOR HELP IN LOCATING
UTILITIES.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE AND
VERIFY THE EXACT LOCATION AND DEPTH OF ALL EXISTING
UTILITIES PRIOR TO PROCEEDING WITH CONSTRUCTION. THE
CONTRACTOR SHALL ASCERTAIN WHETHER ANY ADDITIONAL
UTILITIES OR FACILITIES, OTHER THAN THOSE SHOWN ON THE
PLANS, MAY BE PRESENT ON THE SITE OF THE WORK.
3. PRIOR TO PROCEEDING WITH CONSTRUCTION, THE CONTRACTOR
SHALL NOTIFY THE OWNER OR A/E IF CONFLICTS OR POTENTIAL
CONFLICTS OCCUR BETWEEN EXISTING UTILITIES AND THE
PROPOSED CONSTRUCTION.
4. PRIOR TO PROCEEDING WITH CONSTRUCTION, THE CONTRACTOR
SHALL COORDINATE THE AFFECTED PARTS OF THE UTILITIES. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO PRESERVE AND
PROTECT ALL UTILITIES.
5. THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE UTILITY OWNER
AND MAKE RESTITUTION FOR ANY UTILITY THAT IS DAMAGED BY
THE CONTRACTOR DURING THE COURSE OF THE WORK.
6. THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE OWNER AND
MAKE RESTITUTION FOR ANY DAMAGE TO THE EXISTING COMPLEX
BY THE CONTRACTOR DURING THE COURSE OF THE WORK.
7. COORDINATE DEMOLITION PHASING WITH CIVIL, LANDSCAPE,
ARCHITECTURAL/ STRUCTURAL, AND ELECTRICAL DISCIPLINES.
8. ALL TREES TO REMAIN UNLESS OTHERWISE NOTED.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MISCELLANEOUS
REPAIRS DUE TO DEMOLITION ACTIVITIES.
PROPERTY LINE
EXISTING TREE
TREE PROTECTION
CONTRACTOR IS RESPONSIBLE TO CONTACT UTILITIES
& ONE CALL SYSTEM 14 DAYS PRIOR TO DIGGING.
ALL SECTIONS DIGTESS @ 1-800-344-8377
HTTPS://TEXAS811.ORG
EXISTING 5' CONTOUR
TRACK SURFACE TO BE REMOVED
LOC LOC
LIMITS OF CONSTRUCTION -
3" MIN. PECAN SHELL MULCH WITHIN
TREE PROTECTION
AND PROPERLY DISPOSED OF
(FENCE LINE TO BE VERIFIED ON SITE)
NORTH
0 20' 40'
N - 10093275.69 E - 3119831.89
ELEV. 704.27
SURVEY CONTROL
POINT
TREE PROTECTION NOTE:
1. CONTRACTOR SHALL PROVIDE 3" OF
PECAN MULCH WITHIN THE CRITICAL
ROOT ZONE.
2. CONTRACTOR SHALL HIRE A LICENSED
ARBORIST TO TRIM ANY LIMBS, ROOTS,
OR TRUNK AT THE CONTRACTOR'S EXPENSE.
3. ANY BACKFILL REQUIRE PER PLANS WITHIN
THE TREES "DRIP LINE" SHALL CONSIST OF
NATIVE TOPSOIL FREE FROM ROCKS, TRASH,
DEBRIS, ECT.
M
AT
C H
L
IN
E
- L
X1
W W
W W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W
W W
W W
W W
W
W
W
W W
W W
W W
W W
W W
W
W W
W W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
WWWWW
BLDG C
D E
N S
O N
D R
IV
E
BURNS
STREET
X
XXX
X X X X
℄CURB
A
UGE UGE UGEOHE OHE
16' RADIUS
HALF-CRZ
(NO CONSTRUCTION WITHIN
THIS AREA)
CONTRACTOR TO AIR SPADE
OR HAND TROWEL FOR
MAJOR ROOTS, CONTRACTOR
TO DEFER TO ARBORIST'S
RECOMMENDATION FOR ANY
ROOT >1" DIA UNCOVERED
DURING EXCAVATION WITHIN
CIRCLE.
18' RADIUS
HALF-CRZ
(NO CUT/FILL >4")
CONTRACTOR TO AIR
SPADE OR HAND TROWEL
FOR MAJOR ROOTS,
CONTRACTOR TO DEFER
TO ARBORIST'S
RECOMMENDATION FOR
ANY ROOT >1" DIA
UNCOVERED DURING
EXCAVATION WITHIN
CIRCLE.
PROPOSED CONC
PAVEMENT ON SLOPE
WITH CONNECTION TO
RAMP.
100'
346'
8'26.38'
147.38' 174.62'
21'
TO CENTER
PROPOSED CONC
RETAINING WALL
6" CONCRETE SITE
PAVING WITH
THICKENED EDGE
ALTERNATE NO.4: SHADE
PAVILION AND CONCRETE
SLAB, REF STRUCTURAL
SHEETS, TYP
Overall Construction Layout
LC100
Parkhill.com
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
2.
\0 3_
D
SG
N \0
1_ D
W G
\0
_L
AN
D \0
4_
SH
EE
TS
\L C
0-
2.
D
W G
, 2 /1
7/
2:
:4
PM
, g hu ffa ke r
Te xa s D ep ar tm en t o f P ub lic
Sa fe ty
PT
T ra ck a nd F ie ld
Texas Department of Public Safety 5805 N Lamar Boulevard Austin, Tx 78752
43502.24
- 02/24/2025 Issue For Bid
S
HIST
E C
CT
TE
SA
ET
TA
I
RE
G
OF ET
X
R
LD
RE
CAANDS EP A
TY
F
OSTER SISCO
2 2 7 0
02/24/2025
EXISTING UTILITIES
CONTRACTOR MUST VERIFY LOCATION OF ALL OVERHEAD AND
UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL COORDINATE WITH CITY OFFICIALS AND UTILITY COMPANIES
IN LOCATING UTILITIES. CONTRACTOR SHALL BE HELD RESPONSIBLE
FOR LOSSES DUE TO DAMAGE TO UTILITIES. LOCATION FOR ALL
UTILITIES SHOWN ON PLANS ARE APPROXIMATE. CONTRACTOR
SHALL CALL TEXAS 811, 1-800-344-8377.
LEGEND
SYNTHETIC RUNNING TRACK
SURFACING AS SPEC'D
SYNTHETIC GRASS SURFACING -
RECREATIONAL/IMPACT PER DET. C2/LD501
LIMITS OF CONSTRUCTION - (FENCE
LINE TO BE VERIFIED ON SITE)
LOC
SYNTHETIC GRASS SURFACING -
LANDSCAPE PER DET. C1/LD501
TREE PROTECTION FENCE
6" CONCRETE PAD PER DET.
A1, A3, C1/LD500
LIGHT POLE, ADD ALT. #1, REF
ELECTRICAL
4"-6" CRUSHED GRANITE RIP RAP PER DET.
C2/LD500
NORTH
0 40' 80'
TREE PROTECTION NOTE:
1. CONTRACTOR SHALL PROVIDE 3" OF
PECAN MULCH WITHIN THE CRITICAL
ROOT ZONE.
2. CONTRACTOR SHALL HIRE A LICENSED
ARBORIST TO TRIM ANY LIMBS, ROOTS,
OR TRUNK AT THE CONTRACTOR'S EXPENSE.
3. ANY BACKFILL REQUIRE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .