SOL_26_164_Attach 2_Cost Workbook.xlsx

XLSX spreadsheet 234 KB Posted

Attached to
Simulation-augmented, Real-time Platform Adaptive Seamless Trials (SURPASS)
Solicitation number
ARPA-H-SOL-26-164
Issued by

About this file

This is a Cost Workbook template (version 1.06.02) designed for proposers responding to the ARPA-H SURPASS (Simulation-augmented, Real-time Platform Adaptive Seamless Trials) Program solicitation ARPA-H-SOL-26-164. The workbook serves as a standardized cost proposal submission tool for both prime proposers and subproposers and is compatible with multiple business entity types including large businesses, small businesses, non-profits, academic institutions, and FFRDCs/labs.

The workbook contains comprehensive cost estimation sections organized by task (up to 16 tasks) and includes detailed labor rate tables with six fiscal year periods, allowing proposers to account for labor category escalation rates. Proposers must populate white/non-colored cells with direct labor hours and costs, fringe benefits, labor overhead, subcontract costs, consultant costs, other direct costs, material handling overhead, general and administrative costs, cost of money, and profit/fee calculations. The template accommodates multiple indirect rate structures including procurement overhead, facilities costs, and separate indirect rate categories for academia (including student fringe). Additional specialized worksheets address animal-related costs, human subjects research costs, and milestones/deliverables tracking. The workbook automatically calculates subtotals and grand totals across base periods and multiple options (up to five), with built-in error-checking mechanisms. Proposers are instructed not to delete rows or columns but may add rows as needed, and all costs must be included as ARPA-H does not maintain separate funding buckets for indirect costs.

View the file

Other files

File Type Posted
SOL_26_164_Attach 1_SOW Template.docx DOCX document
SOL_26_164_SURPASS ISO.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Change Notes

Version IDTabChanges from Previous
12-2019Original Version used for BTO BAA.
01-2020.1Base, all Options, TasksIn Base and all Option tabs and two TASK tabs, column Q in Labor Rates table, now refers to correct column (N) instead of (M). Incorrect column caused Fringe Benefit Rate to be used instead of Labor Overhead Rate in calculations. This was only incorrect for the second fiscal year (only column Q).
01-2020.1Base, all Options, TasksIn all of the same tabs described above, cell U72 was distributed with "10%" as the default value. This is changed to be 0%
01-2020.1Summary Cost TableRemoved the inclusion of row D (hours) in the Checksum value in the bottom row.
03-2020Base, all Options, TasksSummed the Hours for Consultants.
03-2020GeneralUpdated the General Instructions Word document.
03-2020BaseYellow highlights added to column B.
04-2020ConstantsThere were two "Program/Project Manager III" categories. Changed second one to be "Program/Project Manager II"
1.04.00GeneralTop, added CAGE codes and proposer's proposal ID.
1.04.00ConstantsAdded Fringe, Overhead (Labor), G&A (Labor) and F&A (Labor) to the Indirect Rates list.
1.04.00GeneralCells B18 & B19 instructions expanded.
1.04.00Labor RatesUpdated A7, B7 to include the word "Required".
1.04.00Offeror ConstantsReplaced out-year fiscal year dates with formulas that add 12 months to the prior FY date. Plus conditional formatting on FY Begin Dates.
1.04.00Summary Cost TableAdded checksums and Hour Totals by Proposer's FY
1.04.00Indirect RatesAdded Profit and Fee categories. Renamed tab to be Indirect Rates and Profit_Fee
1.04.00Labor RatesChanged Escalation Rate to be "N/A" when the prior year's labor rate is zero.
1.04.00Additional TabsCopied additional tabs from the "Multiple TAs" version of this spreadsheet.
1.05.00GeneralAdded the SBIR/STTR Phase selection
1.05.00Proposer ConstantsAdded the Small Business Size Estimate selection
1.05.00Indirect Rates and Profit_FeeUpdated instructions in cell B16
1.06.00ConstantsRemoved the (labor) and (non-labor) designations after G&A and F&A indirect rate categories
1.06.01ConstantsAdded Faculty/Professor to Research labor group for Academia business type
1.06.02ConstantsAdded new Fringe (Students) indirect category for academia
1.06.02InstructionsAdded new worksheet named Instructions
1.06.02TravelUpdated to accommodate first/last day of travel calculations
1.06.02Indirect Rates and Profit_FeeIncreased precision of percentages to seven decimal places, primarily for Cost of Money

Constants

Spreadsheet Version Number
1.06.02First digit change --> prior functions changes. Second digit change --> new function added. Third digit change --> change in spreadsheet that does not affect CPDB.
SpecificAnnouncementNumber
General, I2, Picklist of Offeror Business TypesCell Range Naming Conventions:
Large BusinessThisIsAName = internal constants such as pick-lists
Small BusinessThis.Is.a.Name = named ranges holding proposer data
Non-Profit
Academia
Lab/FFRDCLabor Collection --> Labor Group --> Labor Category
Labor Collection based on Offeror Business Type SelectionERROR:#REF!
ERROR:#REF!Valid values are Academia or GeneralAdd/Change Labor Collection requires Data Validation code change on Labor Rates tab, and new Labor Group list below.
No Business Type Selectedinstructional choice
First select a Business TypeNo Labor Collection is available
Academia Labor GroupsAdd/Change Labor Group requires changes below to Categories
Project Management
Research
Consultant
Administrative Support
General Labor Groups
Project Management
Science and Engineering
Software Development
Consultant
Support
Academia Project Management Categories
Principal Investigator
Co-Principal Investigator
Co-Investigator
Project Manager
Academia Research Categories
Faculty/Professor
Sr. Post-Doc
Post-Doc
Post-Doc Fellow
Research Scientist/Engineer
Research Associate
Research Assistant
Staff Scientist
Graduate Research Assistant
Graduate Student
Undergrad Student
Consultant
Academia Consultant Categories
Consultant
Academia Administrative Support Categories
Project Administrator
Systems Administrator
General Support Categories
Administrative
Security
Financial
Contracts
General Project Management Categories
Principal Pgm/Proj Mgr
Senior-level Pgm/Proj Mgr
Mid-level Prgm/Proj Mgr
Junior Pgm/Proj Mgr
General Science and Engineering Categories
Principal Scientist
Senior-level Scientist
Mid-level Scientist
Junior Scientist
General Software Development Categories
Principal Software Developer
Senior-level Software Developer
Mid-level Software Developer
Junior Software Developer
General Manufacturing Categories
Principal Manufacturer
Senior-level Manufacturer
Mid-level Manufacturer
Junior Manufacturer
Principal Quality Control
Senior-level Quality Control
Mid-level Quality Control
Junior Quality Control
General Consultant Categories
Consultant
Indirect Rate Categories
Fringe
Fringe (Students)
Overhead (Labor)
General and Administrative
Facilities and Administrative Cost Rate
Material Handling
Procurement Overhead
Subcontract Overhead
Business Operating Support Overhead
Information Technology Support Overhead
Other Direct Cost (ODC) Overhead
Facilities Cost of Money: Procurement COM
Facilities Cost of Money: G&A COM
Facilities Cost of Money: Labor/Engineering COM
Other Overhead/Cost Factors
Profit (Fixed Price Awards)
Fee (Cost Type Awards)
SBIR/STTR Phase Choices
Not Applicable
Phase I
Phase II
Phase III
Small Business Size Choices
Not Applicable
1-100
101-500
501-1,000
1,000+

Business

Instructions

ARPA-H WORKBOOK INSTRUCTIONS

• These instructions describe how to use this ARPA-H Cost Proposal Workbook. Proposers that do not contemplate Resource Sharing shall leave those cells blank. These instructions do not replace or supersede the cost proposal instructions given in the solicitation or announcement.
• This Workbook is to be used by both a Prime Proposer and its Subproposers. While each Proposer and Subproposer must complete the Workbook for its own organziation, the Prime may submit all Workbooks. Subproposers may submit theirs separately if they so choose.
• Fill out only non-colored/white cells. Only the Project Cost Tab is to be filled out. You may add tabs and spreadhseets to the Workbook to clarify a proposal.
• Do not delete rows or columns. You may add rows. Do not add columns.
• Note that, in addition to the instructions provided herein, each spreadsheet may have additional guidance and instructions on it.

General

GENERAL INFORMATION

Prime Proposer:NamePrime's CAGE Code
Solicitation No.Number
Proposer's Proposal ID:ID
Summary of Proposed Total Costs. This chart will automatically fill in.
YearARPA-H sharePerfomer shareTotal
Year 1$0.00$0.00$0.00
Year 2$0.00$0.00$0.00
Year 3$0.00$0.00$0.00
Year 4$0.00$0.00$0.00
Year 5$0.00$0.00$0.00
All years$0.00$0.00$0.00

Project costs

Instructions: • Insert the Subtasks that you listed in the SOW Template and number appropriately. Complete all cells that are unshaded/white. Do not change other cells.

• It is ideal is each subtask (or sub-subtask) is performed by a single organization. If >1 organization performs a subtask, please break it into sub-subtasks by organization, if possible.

• Ensure the Month start/end dates align with your inputs in the project Gantt chart/ Timeline. Subtotals and totals will automatically calculate.

• Add additional rows and columns if needed.

• All costs must be included because ARPA-H doesn't have a separate bucket of funds for indirects or other costs

Attribution of cost by year (best effort)
1122334455
SubTask NumberSubtask TitleOrganization performing subtaskStart Month (1 through 60)End Month (1 through 60)Calculation: Project year startCalculation: Project year endARPA-H sharePerformer cost shareTask SubtotalsTask TotalsY1 ARPA-H shareY1 Performer shareY2 ARPA-H shareY2 Performer shareY3 ARPA-H shareY3 Performer shareY4 ARPA-H shareY4 Performer shareY5 ARPA-H shareY5 Performer share
1.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
1.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
1.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
1.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
1.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
1.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
1.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 1$0$0$0$0
2.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
2.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
2.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
2.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
2.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
2.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
2.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 2$0$0$0$0
3.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
3.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
3.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
3.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
3.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
3.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
3.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 3$0$0$0$0
4.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
4.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
4.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
4.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
4.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
4.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
4.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 4$0$0$0$0
5.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
5.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
5.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
5.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
5.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
5.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
5.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 5$0$0$0$0
6.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
6.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
6.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
6.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
6.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
6.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
6.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 6$0$0$0$0
7.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
7.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
7.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
7.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
7.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
7.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
7.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 7$0$0$0$0
8.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
8.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
8.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
8.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
8.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
8.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
8.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 8$0$0$0$0
9.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
9.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
9.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
9.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
9.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
9.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
9.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 9$0$0$0$0
10.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
10.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
10.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
10.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
10.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
10.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
10.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 10$0$0$0$0
11.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
11.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
11.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
11.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
11.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
11.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
11.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 11$0$0$0$0
12.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
12.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
12.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
12.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
12.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
12.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
12.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 12$0$0$0$0
13.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
13.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
13.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
13.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
13.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
13.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
13.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 13$0$0$0$0
14.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
14.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
14.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
14.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
14.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
14.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
14.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 14$0$0$0$0
15.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
15.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
15.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
15.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
15.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
15.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
15.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 15$0$0$0$0
16.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
16.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
16.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
16.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
16.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
16.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
16.X.X00$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Costs for Task 16$0$0$0$0
Total Project Costs00$0$0$0
$0$0$0$0$0$0$0$0$0$0$0$0
$0$0$0$0$0
$0$0$0
$0

Summary Cost Table

Proposer Fiscal Year Labels:ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Hours Proposed in Each Fiscal Year:ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
BaseOp1Op2Op3Op4Op5Row Sum
Total Direct Labor Hourstdlc.hrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Direct Labor Coststdlc.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Fringe Benefit Coststfbc.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Labor Overhead Coststloc.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Subcontract Coststsc.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Consultant Coststcc.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Other Direct Coststodc.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Material Handling Coststmhc.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Subtotal Costssc.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total G&A Coststgac.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Cost of Moneytcm.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Fixed Feeff.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Estimated Costs Plus Fixed Feetecpff.dlrsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Column TotalsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Sum of Column Totals ($)ERROR:#REF!
Sum of Row Totals ($)ERROR:#REF!
COLUMN TOTALS - ROW TOTALSERROR:#REF!This should be $0. If not, research is needed.

Task 1

Cost Proposal by Task - Task 1Enter proposed PoP as "MM/YY to MM/YY"
ProposerERROR:#REF!
Prime ProposerName
(See Note 2)(See Note 2)(See Note 2)(See Note 2)(See Note 2)(See Note 2)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Direct Labor (DL)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Proposer's Labor Category (Note 1)Name (Last, First)HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead Cost
Milestone 1ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Milestone 2ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Milestone 3ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Direct Labor Hours/Costs46,080ERROR:#REF!46,080ERROR:#REF!36,480ERROR:#REF!36,480ERROR:#REF!36,480ERROR:#REF!36,480ERROR:#REF!
Fringe Benefit (FB) Cost from Direct Labor AboveERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Insert line(s) & title(s) for any other F/B ratesERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%
Total Fringe Benefit CostsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Labor Overhead from Direct Labor and FB AboveERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Insert line(s) & title(s) for any other O/H ratesERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%
Total Labor Overhead CostsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subproposer- #01Provide details in Subproposer Tab$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000
Subproposer- #02Provide details in Subproposer Tab$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000
Subproposer- #03Provide details in Subproposer Tab$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000
Insert line(s) for any additional SubproposersProvide details in Subproposer Tab$ -$ -$ -$ -$ -
Total Subcontract Costs$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000
ConsultantsHoursHourly RateHoursHourly RateHoursHourly RateHoursHourly RateHoursHourly RateHoursHourly Rate
Consultant Name - #01Provide details in Consultant Tab1,920$ 170.00$ 326,4001,920$ 170.00$ 326,4001,920$ 170.00$ 326,4001,920$ 170.00$ 326,4001,920$ 170.00$ 326,4001,920$ 170.00
Consultant Name - #02Provide details in Consultant Tab1,920$ 150.00$ 288,0001,920$ 150.00$ 288,0001,920$ 150.00$ 288,0001,920$ 150.00$ 288,0001,920$ 150.00$ 288,0001,920$ 150.00
Consultant Name - #03Provide details in Consultant Tab1,920$ 100.00$ 192,0001,920$ 100.00$ 192,0001,920$ 100.00$ 192,0001,920$ 100.00$ 192,0001,920$ 100.00$ 192,0001,920$ 100.00
Insert line(s) for any additional ConsultantsProvide details in Consultant Tab0$ - 0$ -0$ - 0$ -0$ - 0$ -0$ - 0$ -0$ - 0$ -0$ - 0
Total Consultant Costs$ 806,400$ 806,400$ 806,400$ 806,400$ 806,400
Other Direct Costs
Materials/SuppliesProvide details in Materials Tab$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000
EquipmentProvide details in Equip. Tab$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000
TravelProvide details in Travel Tab$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000
Insert line(s) for any other types of ODCsProvide details in ODC Tab$ -$ -$ -$ -$ -
Total Other Direct Costs$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000
Material Handling (M/H O/H) (See Indirect Rates Worksheet)BaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Insert M/H O/H rate title$ 1,500,000.0010.000%$ 150,000$ 1,500,000.0010.000%$ 150,000$ 1,500,000.0010.000%$ 150,000$ 1,500,000.0010.000%$ 150,000$ 1,500,000.0010.000%$ 150,000$ 1,500,000.0010.000%
Insert line(s) & title(s) for any other M/H O/H rates$00.000%$ -$ - 010.000%$ -$00.000%$ -$00.000%$ -0.000%$ -$ -0.000%
Total Material Handling Costs$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000
Subtotal CostsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
General and Administrative (G&A) (See Indirect Rates Worksheet)BaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
ERROR:#REF!ERROR:#REF!

Breen, David (contr-cmo):

Change this cell if Modified Total Direct Costs are needed for this calculation.10.000%ERROR:#REF!ERROR:#REF!10.000%ERROR:#REF!ERROR:#REF!10.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!
Insert line(s) & title(s) for any other G&A rates$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -ERROR:#REF!0.000%ERROR:#REF!ERROR:#REF!
Total G&A CostsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Subtotal CostsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Facilities Captial Cost of Money (FCCM) (See Indirect Rates Worksheet)BaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Insert COM rate title$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ -
Insert line(s) & title(s) for any other COM rates$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ - 00.000%$ -$ -
Total Cost of Money$ -$ -$ -$ -$ -$ -$ -
Total Estimated CostsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Fixed Fee (If proposing a CPFF award) or Profit(See Note 4)ERROR:#REF!6.000%ERROR:#REF!ERROR:#REF!6.000%ERROR:#REF!ERROR:#REF!6.000%ERROR:#REF!ERROR:#REF!6.000%ERROR:#REF!ERROR:#REF!6.000%ERROR:#REF!ERROR:#REF!6.000%ERROR:#REF!ERROR:#REF!
Total Estimated Costs Plus Fixed FeeERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

Instructions: • For PRIME submission - Subproposer Name: If there are subproposers, list all subpropsers names.

• In upper right last column, replace the “X” in X-Months with actual number of months.

• Add descriptions in Column B if costs are entered in the following areas: Fringe Benefits, Labor Overhead, Other Direct Costs (other types), Material Handling, General and Administrative, and Facilities Cost of Money.

• Subproposers/Interorganizational Transfers: If appropriate, place Subproposer name(s) or Interorganizational Name/Code in Column B.

Note 1:Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2:The Fiscal Years or time periods (Row 5) are defined on the Proposer Constants tab. The months during the period of performance that these rates apply (Row 6) are also defined on the Proposer Constants tab.
Note 3:The values under Total Direct Labor "Hours" column indicate the total level of effort for the project for each labor category. The Proposer must define the split of hours between initial and subsequent rate years based on its time periods defined on the Proposer Constants tab.
Note 4:Profit or fee is not allowed on direct costs for equipment, government entities, or cost/share arrangements

Task 2

Cost Proposal by Task - Task 2Enter proposed PoP as "MM/YY to MM/YY"
ProposerERROR:#REF!
Prime ProposerName
(See Note 2)(See Note 2)(See Note 2)(See Note 2)(See Note 2)(See Note 2)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Direct Labor (DL)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Proposer's Labor Category (Note 1)Name (Last, First)HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead CostTotal $HoursHourly Labor RateDirect Labor CostFringe Benefit RateFringe Benefit CostLabor Overhead RateLabor Overhead Cost
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1,920ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .