This is a Combined Synopsis/Solicitation for a Request for Quotation (RFQ) issued by the Bureau of Reclamation for the purchase, delivery, and offloading of bulk fencing materials at Navajo State Park in Arboles, Colorado.
The solicitation is a total small business set-aside under NAICS 332323 with a 500-employee size standard. The Government intends to award a single fixed-price purchase order to the responsible contractor whose quote represents the lowest price technically acceptable offer. Contractors must be capable of providing all required materials as specified in the Statement of Work, and all items must be new (not used or refurbished). Quotations must include a complete price schedule with all labor, materials, overhead, delivery fees, and applicable costs; partial quotes will not be considered. The delivery location is Navajo State Park at 1526 County Road 982, Arboles, Colorado 81121, and all materials must be delivered no later than September 30, 2026. Contractors must contact Jon Meats at (970) 883-2208 ext. 208 at least three business days prior to each delivery.
Quotations are due July 21, 2026, by 4:00 PM MDT, with all questions and inquiries submitted to Nayda Gonzalez at nayda_gonzalezsalgado@ios.doi.gov no later than July 13, 2026 at 4:00 PM MDT. Evaluation criteria include Technical Capability, Past Performance, and Lowest Price, with the two lowest-priced technically acceptable quotes evaluated first; award proceeds to the lowest-priced quote if both are technically acceptable. The contract incorporates standard FAR provisions and clauses including those for commercial items, small business programs, Buy American requirements, sustainable products, and electronic invoicing through the Invoice Processing Platform (IPP). The period of performance runs from the date of award through September 30, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS/SOLICITATION
140R4026Q0103
Navajo Bulk Fencing Materials
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in part 12, as supplemented with additional information included in this notice. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 effective 3/13/2026. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Solicitation number 140R4026Q0103 is issued as a request for quotation (RFQ). This combined synopsis & solicitation notice is a request for competitive quotations.
Therefore, all capability statements or quotations received prior to the RFQ close date will be considered.
1. This is a total small business set-aside under NAICS 332323 with an associated small business size standard of 500 Employees.
2. Description of Services:
The Bureau of Reclamation requires the purchase, delivery and offloading of fencing materials at Navajo State Park. These materials will support a separate fence installation effort to be performed either by Colorado Parks and Wildlife under a service agreement or through a Bureau of Reclamation service contract. This acquisition covers only the supply and delivery of the required fencing materials
3. The Government intends to award a single fixed-price purchase order resulting from this RFQ. to the responsible contractor whose quote represents the lowest price technically acceptable offer.
4. Submit the following documents in response to this RFQ:
a. Technical Capability Statement which indicates the items being supplied are in accordance with the Statement of Work.
b. Price Quote (Attachment 2-Price Schedule).
To be considered for award:
a. Contractors must be:
i. Capable of providing ALL the required materials. Materials furnished must match the specifications and quantities required in the Statement of Work.
ii. Capable of providing all new items, items cannot be used or refurbished.
b. Provide a Pricing Proposal
i. Provide a complete price schedule. Quotes will be considered for award as per the Price Schedule, but no quote will be considered for award on only a part of the Price Schedule. Quotes will be evaluated to determine a fair and reasonable price.
ii. Include all labor, materials, overhead, delivery fees, and all other applicable costs required to complete the work.
5. The delivery location is:
Navajo State Park at 1526 County Rd 982, Arboles, Colorado 81121.
Please Contact: Jon Meats, Navajo State Park Manager with Colorado Parks & Wildlife at
(970.883.2208 ext. 208) at least 3 (three) business days prior to each delivery.
6. Period of Performance:
Day of award – September 30,2026
Deliver all materials no later than September 30, 2026.
7. FAR Provisions and Clauses 52.212-1, 52.212-2, and 52.212-4 apply to this procurement. The full text of FAR provisions or clauses may be accessed electronically at:
https://www.acquisition.gov/.
The provision at 52.212-1, Instructions to Offerors–Commercial Products and Commercial Services applies to this acquisition. Addendum to 52.212-1 substitutes the term “quote” where the term “offer” appears in the provision.
As per provision 52.212-2, Evaluation-Commercial Products and Commercial Services, the following factors will be used to evaluate the quotes: Technical Capability, Past Performance, and Lowest Price. The Government will evaluate the offers to determine the following:
a. Contractor is:
i. Capable of providing ALL the required materials. Materials furnished must match the specifications and quantities required in the Statement of Work.
ii. Capable of providing all new items, items cannot be used or refurbished.
b. Contractor
i. Provided a complete price schedule. Quotes will be considered for award as per the Price Schedule, but no quote will be considered for award on only a part of the Price Schedule.
The Government will only consider offerors who meet the above criteria to be technically acceptable, The two lowest priced quotes will be evaluated and if they are considered technically acceptable, the quote with the lowest price represents the best value for the government and the evaluation process stops at this point. Award shall be made to the lowest priced quote without further consideration of any other quotes. If either of the two lowest priced quotes are not technically acceptable, the next lowest priced quote will be evaluated, and the process will continue (in order by price) until a total of two quotes are considered technically acceptable.
8. Quotes are due on July 21, 2026, by 4:00 PM MDT. All questions/inquiries must be submitted to the contract specialist via e-mail no later than 4:00 PM MDT July 13, 2026. Inquiries submitted via telephone calls or mail submission will not be accepted. Submit quotes or any questions to Nayda Gonzalez at nayda_gonzalezsalgado@ios.doi.gov. Offerors who fail to complete and submit the requirements as per this combined synopsis/solicitation may be considered non-responsive.
Clauses
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar
(End of clause)
Clause
Number Clause Title Clause Date
52.212-4 Terms and Conditions—Commercial Products and Commercial Services
RFO Deviation Mar
52.203-17 Contractor Employee Whistleblower Rights Nov 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements Jan 2017
52.204-13 System for Award Management Maintenance RFO Deviation Mar
52.204-19 Incorporation by Reference of Representations and Certifications Dec 2014 52.209-6 Protecting the Government's Interest When Subcontracting With
Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded
RFO Deviation May
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations RFO Deviation May
52.219-6 Notice of Total Small Business Set-Aside (15 U.S.C. 644) RFO Deviation Jan 2026 52.219-28 Post Award Small Business Program Representation (15 U.S.C.
632(a)(2)) RFO Deviation Jan 2026
52.222-3 Convict Labor RFO Deviation May
52.222-19 Child Labor-Cooperation with Authorities and Remedies RFO Deviation May
52.222-36 Equal Opportunity for Workers with Disabilities (29 U.S.C. 793) RFO Deviation May
52.222-50 Combating Trafficking in Persons (22 U.S.C. chapter 78 and E.O.
13627)
RFO Deviation May
52.222-90 Addressing DEI Discrimination by Federal Contractors RFO Deviation May
52.225-1 Buy American-Supplies (41 U.S.C. chapter 83) Oct 2022 52.225-13 Restrictions on Certain Foreign Purchases (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury)
Feb 2021 https://www.acquisition.gov/far https://www.acquisition.gov/diar
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (E.O. 13513)
Mar 2026
52.232-33 Payment by Electronic Funds Transfer-System for Award Management (31 U.S.C. 3332)
Oct 2018
52.240-91 Security Prohibitions and Exclusions RFO Deviation Mar
52.244-6 Subcontracts for Commercial Products and Commercial Services RFO Deviation May
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020).
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of clause)
52.223-23 Sustainable Products (RFO DEVIATION MAY 2026)
(a) Definitions. As used in this clause—Sustainable product means—
(1) A product that contains recovered material designated by the EPA under the Comprehensive Procurement Guidelines (42 U.S.C. 6962) (40 CFR part 247) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).
(2) An energy-efficient product or low standby power device (42 U.S.C. 8259b) (10 CFR part 436, subpart C) (https://www.energy.gov/eere/femp/search-energy-efficient-products, https://www.energystar.gov/products?s=mega, and https://www.energy.gov/femp/low-standby-power-product-list).
(3) A biobased product that meets the content requirements of the USDA under the BioPreferred® program (7 U.S.C. 8102) (7 CFR Part 4270) (https://www.biopreferred.gov/).
(4) A substance identified in the EPA’s Significant New Alternatives Policy (SNAP) program as a safe alternative to an ozone-depleting substance (42 U.S.C.
7671l) (40 CFR part 82, subpart G) (https://www.epa.gov/snap/unacceptable-and-acceptable-substitutes-tables).
(b) Requirements. The Government has identified in the statement of work or elsewhere in https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products https://www.energy.gov/eere/femp/search-energy-efficient-products https://www.energy.gov/eere/femp/search-energy-efficient-products https://www.energystar.gov/products?s=mega https://www.energy.gov/femp/low-standby-power-product-list https://www.energy.gov/femp/low-standby-power-product-list https://www.biopreferred.gov/ https://www.epa.gov/snap/unacceptable-and-acceptable-substitutes-tables https://www.epa.gov/snap/unacceptable-and-acceptable-substitutes-tables the contract the sustainable products that are required during the performance of this contract. The Contractor shall ensure that it provides sustainable products as required by this contract, when the products are—
(1) Delivered to the Government;
(2) Furnished for use by the Government;
(3) Incorporated into the construction of a public building or public work; or
(c) Furnished for use in performing services under this contract, where the cost of the products is a direct cost to this contract.
(End of clause)
DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT
REQUIREMENTS-INVOICE PROCESSING PLATFORM (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
FAR 32.905(b) outlines a Proper Invoices to include:
1. Name & address of the Contractor.
2. Invoice date & number.
3. Contract number, contract line-item number and, if applicable, the order number.
4. Description, quantity, unit of measure, unit price and extended price of the items delivered.
5. Shipping number and date of shipment including the bill of lading number and weight of shipment if shipped on Government bill of landing.
6. Terms of any discount for prompt payment offered.
7. Name and address of official to whom payment is to be sent.
8. Name, title, and phone number of persons to notify in event of defective invoice.
9. Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
10. Any other information or documentation required by the contract.
Prior to uploading your invoice, please submit an electronic copy of the invoice to the Contracting Officer Representative (COR) to sign and copy the Contracting Officer and https://www.ipp.gov/
Contract Specialist. Once the invoice is signed by the COR, then upload and submit signed invoice to the IPP System. Once the invoice has been submitted to IPP, the Contractor shall also provide an electronic signed copy of the IPP invoice to the following:
• Tyler Spencer, Contracting Officer at tyler_spencer@ios.doi.gov
• Nayda Gonzalez, Contract Specialist at nayda_gonzalezsalgado@ios.doi.gov
• Eric Creeden, Contracting Officer’s Representative at ecreeden@usbr.gov.
Failure to email the invoice may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.
Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment mailto:tyler_spencer@ios.doi.gov mailto:nayda_gonzalezsalgado@ios.doi.gov mailto:ecreeden@usbr.gov mailto:IPPCustomerSupport@fiscal.treasury.gov memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of Clause)
WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S
AUTHORITIES AND LIMITATIONS -- BUREAU OF RECLAMATION (MAY 2018)
a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term "technical direction" is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract;
therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled "Changes;"
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled "Disputes."
(End of clause)
Contract Documents, Exhibits, or Attachments
1. Attachment 1- Statement of Work
2. Attachment 2- Price Schedule
Provisions
52.252-1, SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar
(End of provision)
Clause Number
Clause Title Clause Date
52.204-7 System for Award Management RFO Deviation Mar 2026 52.203-18 Prohibition on Contracting with Entities that Require Certain
Internal Confidentiality Agreements or Statements Representation
Jan 2017
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations-Representation
RFO Deviation May 2026
52.212-1 Instructions to Offerors—Commercial Products and Commercial Services
RFO Deviation Mar 2026
52.219-1 Small Business Program Representations RFO Deviation May 2026 52.225-2 Buy American Certificate Oct 2022 52.240-90 Security Prohibitions and Exclusions Representations and
Certifications RFO Deviation Mar 2026
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
https://www.acquisition.gov/far https://www.acquisition.gov/diar
52.212-2 Evaluation—Commercial Products and Commercial Services (RFO DEVIATION
MAR 2026).
(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:
(i) Lowest Price (ii) Technical Capability (iii) Past Performance. Evaluation factors other than price when combined are approximately equal to price.
(b) Options (if applicable). The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).
(c) Notice of award. A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
DIAR 1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION --
DEPARTMENT OF THE INTERIOR (APR 1984)
(a) Definitions. For the purposes of this provision and the Freedom of Information Act (5 U.S.C. 552), the following terms shall have the meaning set forth below:
(1) "Trade Secret" means an unpatented, secret, commercially valuable plan, appliance, formula, or process, which is used for making, preparing, compounding, treating or processing articles or materials which are trade commodities.
(2) "Confidential commercial or financial information" means any business information (other than trade secrets) which is exempt from the mandatory disclosure requirement of the Freedom of Information Act, 5 U.S.C. 552. Exemptions from mandatory disclosure which may be applicable to business information contained in proposals include exemption (4), which covers "commercial and financial information obtained from a person and privileged or confidential," and exemption (9), which covers "geological and geophysical information, including maps, concerning wells."
(b) If the offeror, or its subcontractor(s), believes that the proposal contains trade secrets or confidential commercial or financial information exempt from disclosure under the Freedom of Information Act, (5 U.S.C. 552), the cover page of each copy of the proposal shall be marked with the following legend: "The information specifically identified on pages of this proposal constitutes trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act. The offeror requests that this information not be disclosed to the public, except as may be required by law. The offeror also requests that this information not be used in whole or part by the government for any purpose other than to evaluate the proposal, except that if a contract is awarded to the offeror as a result of or in connection with the submission of the proposal, the Government shall have the right to use the information to the extent provided in the contract."
(c) The offeror shall also specifically identify trade secret information and confidential commercial and financial information on the pages of the proposal on which it appears and shall mark each such page with the following legend:
"This page contains trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act and which is subject to the legend contained on the cover page of this proposal."
(d) Information in a proposal identified by an offeror as trade secret information or confidential commercial and financial information shall be used by the Government only for the purpose of evaluating the proposal, except that (i) if a contract is awarded to the offeror as a result of or in connection with submission of the proposal, the Government shall have the right to use the information as provided in the contract, and (ii) if the same information is obtained from another source without restriction it may be used without restriction.
(e) If a request under the Freedom of Information Act seeks access to information in a proposal identified as trade secret information or confidential commercial and financial information, full consideration will be given to the offeror's view that the information constitutes trade secrets or confidential commercial or financial information. The offeror will also be promptly notified of the request and given an opportunity to provide additional evidence and argument in support of its position, unless administratively unfeasible to do so.
If it is determined that information claimed by the offeror to be trade secret information or confidential commercial or financial information is not exempt from disclosure under the Freedom of Information Act, the offeror will be notified of this determination prior to disclosure of the information.
(f) The Government assumes no liability for the disclosure or use of information contained in a proposal if not marked in accordance with paragraphs (b) and (c) of this provision. If a request under the Freedom of Information Act is made for information in a proposal not marked in accordance with paragraphs (b) and (c) of this provision, the offeror concerned shall be promptly notified of the request and given an opportunity to provide its position to the Government. However, failure of an offeror to mark information contained in a proposal as trade secret information or confidential commercial or financial information will be treated by the Government as evidence that the information is not exempt from disclosure under the Freedom of Information Act, absent a showing that the failure to mark was due to unusual or extenuating circumstances, such as a showing that the offeror had intended to mark, but that markings were omitted from the offeror's proposal due to clerical error.
| Clauses |
| 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020). |
| DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE PROCESSING PLATFORM (IPP) (FEB 2021) |
| DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011) |
| WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND LIMITATIONS -- BUREAU OF RECLAMATION (MAY 2018) |
| 1. Attachment 1- Statement of Work |
| 2. Attachment 2- Price Schedule |
| Provisions |
| 52.252-1, SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) |
| 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) |