This document is a Request for Proposal (RFP) for the Lahontan Basin Area Office (LBAO) Review of Data and Methods in Operating Criteria and Procedures (OCAP) for the Newlands Project. The solicitation (140R2025Q0077) is issued by the Bureau of Reclamation's Interior Region 10 in Sacramento, California, and is set aside exclusively for small businesses with a size standard of $19 million. The contract will run from the date of award to September 30, 2027, with an anticipated award date in September 2025.
The performance work statement requires a scientific review of data and methods used to determine reservoir storage targets, forecast reservoir inflows, and calculate Truckee River diversions for the Newlands Project in Nevada. The project includes mandatory tasks for project management, meetings, and recommending updates to Lahontan storage objectives, with optional tasks for updating Carson River inflow forecasting and Truckee River diversion calculations. Proposals are due by August 28, 2025, at 3:00 PM Pacific Time, to be submitted via email. The contractor must provide technical documentation, including a technical approach, project schedule, key personnel information, and relevant experience.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
R20
See Schedule
CODE 16. ADMINISTERED BYCODE
X
X
X
541620
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORR20
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
08/28/2025 1500 PD
08/04/2025
916-978-5445Sarah Rodrigues (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140R2025Q0077
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 96 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
15. DELIVER TO
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815 Division of Acquisition Services Regional Office Mid-Pacific Region
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$19
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
Bureau of Reclamation
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
ADMINISTERED BY:
Bureau of Reclamation Mid-Pacific Region Regional Office Division of Acquisition Services 2800 Cottage Way, Room E-1815 Sacramento CA 95825-1898 US
PLEASE DO NOT USE THIS FORM TO SUBMIT
QUOTES/PRICING
SEE ATTACHED COMBINED SYNOPSIS/SOLICITATION
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Sarah Rodrigues
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
PLEASE DIRECT ALL QUESTIONS TO SARAH RODRIGUES AT
SRODRIGUES@USBR.GOV
Period of Performance: 09/30/2025 to 09/30/2027
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
96 2 of
Combined Synopsis/Solicitation
BUREAU OF RECLAMATION, INTERIOR REGION 10
SACRAMENTO, CALIFORNIA
140R2025Q0077
COMBINED SYNOPSIS/SOLICITATION
Lahontan Basin Area Office (LBAO) Review Data and Methods in Operating Criteria and Procedures (OCAP)
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with FAR part 13 and additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Solicitation number 140R2025Q0077 is issued as a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-04.
GENERAL INFORMATION
RFQ Number: 140R2025Q0077
Request for Quotation (RFQ) Request for Proposal (RFP) Invitation for Bid (IFB)
North American Industry Classification Code (NAICS): 541620 Size Standard: $19 Million
This acquisition is set-aside 100 percent Small Business concerns only. (Large businesses may not submit a quote.)
Offer Due Date:
Offer Submission:
August 28, 2025 03:00 PM Pacific Time
By email to srodrigues@usbr.gov
Contact Information: Sarah Rodrigues Email: srodrigues@usbr.gov
OFFEROR INFORMATION
Offeror’s Business Information:
Business Name: _______________________________
Business Size (select one): Small Large
DUNS Number/Cage Code: ______________________
Tax ID Number: _______________________ mailto:srodrigues@usbr.gov mailto:srodrigues@usbr.gov
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
The contractor shall provide all necessary tools, materials, equipment, labor, travel, transportation, facilities, and per diem to perform a scientific review of the data and methods used to determine reservoir storage targets, to forecast reservoir inflows, and to calculate allowable Truckee River diversions in the 1997 OCAP for the Bureau of Reclamation’s Newlands Project in accordance with the attached Performance Work Statement.
00010 MANDATORY TASK 1 – Project management and administrative duties
Period of Performance (Date of award to 9/30/2027)
21 MO $ $
00020 MANDATORY TASK 2 – Meetings
Period of Performance (Date of award to 9/30/2027)
21 MO $ $
00030 MANDATORY TASK 3 – Recommend updates to Lahontan storage objectives
Period of Performance (Date of award to 9/30/2027)
21 MO $ $
TOTAL OF ALL MANDATORY TASKS $
00040 OPTIONAL TASK 4 – Recommend updates to Carson River inflow forecasting
Period of Performance (Date of award to 9/30/2027)
21 MO $ $
00050 OPTIONAL TASK 5 – Recommend updates to the Truckee River Diversion calculations
Period of Performance (Date of award to 9/30/2027)
21 MO $ $
TOTAL OF ALL OPTIONAL TASKS $
GRAND TOTAL INCLUDING ALL MANDATORY TASKS AND
OPTIONAL TASKS
QUOTE/PRICING SCHEDULE
If FAR 52.217-8 is exercised, the prices for the Option to Extend Service’s term will be calculated based on the prorated term and prices that are in effect at the time the option is exercised.
Quotes/offers shall be valid for 60 days from the offer due date.
Authorized Agent’s Signature/Date: __________________________________
Please see further instructions for quote submission under Addendum to Provision 52.212-1 starting on page 69 of this document.
Documents necessary for quote submission are as follows:
1. Completed Technical and Past Performance Documentation/Information to include, at a minimum, the following:
(i) Technical Approach: Describe in as much detail as possible, your technical approach/understanding of the proposed work to provide the services described in the Performance Work Statement (PWS).
(ii) Project Schedule: Provide a proposed project schedule for completing all tasks as listed in the PWS.
(iii) Organization & Key Personnel: Identify by name the key management and technical personnel including their proposed position on the project team and contribution toward accomplishing the work identified in the PWS. Include resumes of qualified personnel and provide all relevant experience relative to the work required in PWS.
(iv) Experience: Describe in as much detail as possible, your company’s experience in performing work similar in size, scope, complexity, and nature to what is proposed for this requirement. Provide up to three (3) project examples that are relevant and similar to the work proposed under this requirement.
2. Completed and signed Pages 4 through 6 of this document.
3. Completed FAR Clause 52.212-3, Offeror’s Representations and Certifications NOTE: The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification electronically via System for Award Management
(SAM).
QUOTE VALID DATE
PERFORMANCE WORK STATEMENT (PWS)
Review of Data and Methods used in the Operating Criteria and Procedures (OCAP) for the
Newlands Project, Nevada July 2025
1. SCOPE
This Performance Work Statement (PWS) outlines the tasks and deliverables for a Contractor to perform a scientific review of the data and methods used to determine reservoir storage targets, to forecast reservoir inflows, and to calculate allowable Truckee River diversions in the 1997 Operating Criteria and Procedures (OCAP) for the Bureau of Reclamation’s (Reclamation’s) Newlands Project, Nevada (Project).
1.1 OBJECTIVE
The overall objectives of this study are to:
• Assess the extent to which the 1997 OCAP incorporates the best available data, science, and technology to determine reservoir storage targets, forecast reservoir inflows, and calculate allowable Truckee River diversions.
• Develop recommendations to improve upon the use of the best data, science, and technology in the OCAP to determine reservoir storage targets, forecast reservoir inflows, and calculate allowable Truckee River diversions.
To accomplish these objectives, this PWS encompasses the following tasks:
• MANDATORY TASK 1 – Project management and administrative duties
• MANDATORY TASK 2 – Meetings
• MANDATORY TASK 3 – Recommend updates to Lahontan storage objectives
• OPTIONAL TASK 4 – Recommend updates to Carson River inflow forecasting
• OPTIONAL TASK 5 – Recommend updates to the Truckee River Diversion calculations The Contractor must consider the computational complexity of any recommended changes to OCAP calculations and parameters relative to the potential benefits in the accuracy and precision of calculations. Recommendations should not require an undue amount of time, data, or expertise.
Recommendations must be objective and not require Reclamation to apply discretion in administering the OCAP. Recommended updates must be capable of operating within the current Truckee-Carson modeling and decision-making environment with sufficient flexibility to operate under changing conditions. Within this requirement, the recommended updates must be capable of functioning in the Truckee River Operating Agreement (TROA) RiverWare models in a forward-looking daily time-step operation and backward-looking accounting mode.
The equations that govern the OCAP influence high-stakes decisions, necessitating a thorough evaluation and verification of any recommended updates. Any data used and methods applied will need to undergo rigorous review and thus should represent the state of the science, while also being operational and acceptable to stakeholders. The developed recommendations should also be easily communicated and understandable to a wide audience of stakeholders within the Truckee and Carson Basins. Clear graphics and reasonable explanations of the methods will aid in the communication effort and potential adoption within the OCAP, and within the TROA RiverWare models.
The Contractors should reference the 1997 OCAP and Preamble (Bureau of Reclamation, 1997) when developing their proposal.
1.2 BACKGROUND
The Project provides water from the Truckee and Carson Rivers for about 57,000 acres of cropland and wetlands in the Lahontan Valley and the towns of Fernley and Fallon, in western Nevada. Most of the Project water is diverted from Lahontan Reservoir on the Carson River to meet the demands of about 55,000 acres in the Carson Division. Derby Dam on the Truckee River diverts water through the Truckee Canal (Canal) to directly serve about 2,000 acres of land in the Truckee Division and, when needed, Truckee River water is diverted to Lahontan Reservoir to supplement supplies from the Carson River.
The decrease in Truckee River flows below Derby Dam, mostly from diversions to the Project, has lowered Pyramid Lake levels, contributing to the deterioration of endangered and threatened fish species in Pyramid Lake. The impacts of Project diversions on Pyramid Lake fisheries triggered protracted and repeated litigation by the Pyramid Lake Paiute Tribe and the federal government against the Truckee-Carson Irrigation District and other users of Truckee River Project water in both Nevada and California.
To better manage diversions from the Truckee River to the Project, the Secretary of the Interior adopted the initial OCAP in 1967, and several updates have occurred since then. Current operations follow the 1997 Adjustment to the 1988 OCAP, a federal rule published in the Code of Federal Regulations 418 (OCAP, 1997). The Supplemental Information for the 1997 OCAP identifies the following objectives of the OCAP:
• Provide the appropriate water supply to meet the entitled demand for water,
• Increase the reliance of the Project on water from the Carson River,
• Minimize the use of water from the Truckee River as a supplemental supply,
• Increase efficiency of water use in the Project, and
• Establish a regulatory scheme to manage deliveries to Project water users (OCAP, 1997).
To achieve these objectives, the OCAP establishes procedures to estimate the annual water demand of the Project and to regulate the diversion of water from the Truckee River to help meet that demand consistent with existing decrees.
Since the 1997 OCAP was implemented, numerous legal and operational changes have taken place in the Truckee-Carson Basin that require Reclamation to evaluate and potentially update the OCAP.
These changes include the establishment of the TROA as well as the reauthorization of the Project under Public Law 101-618 to allow the delivery of water for municipal and wildlife beneficial uses.
The passage of time has also revealed ambiguities and problems in the 1997 OCAP language that need to be clarified or resolved.
Reclamation started a scoping effort to update the 1997 OCAP, referred to as the OCAP revision.
Stakeholders at the scoping workshops identified several possible areas of study to investigate for the OCAP revision (U.S. Department of the Interior, 2021). This included the need to, “Incorporate the best available science and technology to support well-informed decision-making, allowing for adjustments to sources of scientific information and technology when more accurate, reliable and/or relevant information is available without requiring revision to the regulation.” Within this objective, this PWS addresses the needs identified by stakeholders to:
• Review the current models and methods used to estimate parameters used in the OCAP calculations, and
• Review the current forecasting methodology to identify potential improvements and provide the ability to build more informed forecasts (U.S. Department of the Interior, 2021).
Reclamation is undertaking a series of studies to review each of the parameters used to determine the Lahontan Reservoir Storage Objective for the Current Month (LSOCM) and the monthly Truckee River Diversions (TRD) (§ 418.20)1. This PWS focuses on tasks associated with reviewing the reservoir storage targets and forecasted reservoir inflows, as well as the overall calculation of LSOCM and TRD. Refer to the OCAP (1997) and subsequent text for further details on these calculations and parameters.
The following subsubsections provide direction to approach the PWS objective to perform a review of selected portions of the 1997 OCAP to ensure the best use of science and technology to support well-informed decision-making.
2. REFERENCES
The following list of documents are provided for reference in the performance of this contract. Many of these are available in the public domain, and the others will be provided to the Contractor after the contract award.
Bureau of Reclamation. (1997). Preamble to the Adjustments to 1988 Operating Criteria and Procedures (OCAP) for the Newlands Irrigation Project in Nevada (No. 43 CFR 418 RIN:
1006-AA37).
Operating Criteria and Procedures for the Newlands Reclamation Project, Nevada, Pub. L. No. 43 CFR Part 418, 43 Code of Federal Rules (1997). https://www.ecfr.gov/current/title-43/part-418
U.S. Department of the Interior. (2021). Plan Formulation Report for the Newlands Project Operating Criteria and Procedures (OCAP) Update.
1 Note, that all section numbers (§) refer to OCAP (1997).
3. TASKS
The contractor shall perform the following tasks to achieve the objective of this PWS.
3.1 MANDATORY TASK 1 – Project management and administrative duties
3.1.1 Develop Project Management Plan
(1) The Contractor shall develop a Project Management Plan (PMP) no later than one (1) month after contract award that includes the Contractor’s understanding and approach to the deliverables outlined in this PWS by sub-task, the Contractor’s approach to completing the Project within schedule, key staff, and contact information.
(2) The Contractor shall develop a schedule of activities by sub-task identified in the PWS for discussion no later than one (1) month after contract award, ensuring all appropriate tasks and milestones for each product are identified. The project schedule shall be in a Gantt chart format, use the Critical Path Method, and be delivered to Reclamation in Microsoft (MS) Project format and .pdf format. The schedule shall contain necessary predecessor/successor logic, clearly show the Project’s critical path, and show planned and actual durations. The schedule should also include project deliverables and milestones.
(3) The Contractor shall make any modifications required to the PMP and schedule of activities and obtain Government approval before initiating MANDATORY TASK 3 – Recommend updates to Lahontan storage objectives.
3.1.2 Develop Quality Control Plan
(1) The Contractor shall develop a Quality Control Plan (QCP) no later than one (1) month after contract award that demonstrates how they will ensure the quality of work performed by their staff or their subcontractors. In compliance with the contract clause, the Contractor shall provide the QCP to the Contracting Officer’s Representative (COR) and may include the QCP in the PMP. All quality control review forms shall be submitted with the deliverables to Reclamation.
(2) The Contractor shall make any modifications required to the QCP and obtain Government approval before initiating MANDATORY TASK 3 – Recommend updates to Lahontan storage objectives.
(3) The Contractor is responsible for subcontractor performance and quality. Reclamation shall be notified if the subcontractor is not performing or meeting the contract schedules. The Contractor shall communicate the objectives and scope for each task with any subcontractors. The Contractor shall ensure that the subcontractors are provided reasonable timeframes to complete and provide their work product including the technical and quality review cycles. The Contractor shall designate milestones at which time the subcontractor work is reviewed, and the COR is apprised of the effort.
(4) Records documenting quality shall be kept and made available to the Contracting Officer (CO) and COR (when requested) throughout the contract performance period and for the period after contract completion, until final settlement of any claims under this contract.
3.1.3 Develop Records and Data Control Plan
(1) The Contractor shall develop a Records and Data Control Plan no later than one (1) month after contract award that outlines how the records will be managed throughout the project and closed out at the end of the project. The Contractor may include the Records and Data Control Plan in the
PMP.
(2) The Contractor shall make any modifications required to the Records and Data Control Plan and obtain Government approval before initiating MANDATORY TASK 3 – Recommend updates to Lahontan storage objectives.
(3) All records, files, metadata, model runs, coding, models, documents, emails, notes, calculations, and data are the property of the Federal government. The Contractor shall be responsible for creating and maintaining required records specifically cited in Sections 1 and 6 or required by the provisions of a mandatory directive listed in Applicable Publications and Forms. If requested by Reclamation, the Contractor shall provide the original record or data files including any metadata, or a reproducible copy of any such records, within five (5) working days of receipt of the request.
3.1.4 Develop Risk Management Matrix
(1) The Contractor shall develop a Risk Management Matrix no later than one (1) month after contract award that demonstrates how they will manage risks that may impede goals, objectives, success, and schedule. The Contractor shall use the Risk Management Matrix for identifying, prioritizing, and tracking risks. The Contractor shall apprise the subcontractors of the risks and consequences associated with their tasks. The Contractor may include the Risk Management Matrix in the PMP.
(2) The Contractor shall make any modifications required to the Risk Management Matrix and obtain Government approval before initiating MANDATORY TASK 3 – Recommend updates to Lahontan storage objectives.
3.1.5 Closeout
(1) Contractor shall prepare and submit final invoice and written “Release of Claims.”
(2) Contractor shall close out all records and data as prescribed in the Records and Data Control Plan.
3.2 MANDATORY TASK 2 – Meetings
3.2.1 Kickoff meeting
Within one month of the contract award, the CO, COR, and LBAO’s Project Manager (PM) will schedule a Kickoff Meeting with the Contractor via webinar to discuss the project direction and schedule. Discussion topics at the meeting shall include but are not limited to, requirements and deliverables of the contract, roles of personnel assigned to this contract, and the project schedule.
3.2.2 Site visit (Optional)
If requested and determined necessary by Reclamation and the Contractor, the Contractor may conduct up to one site visit to the Project facilities and lands within 365 days after the award to get a better understanding of Project operations and to meet with Reclamation staff in person.
3.3 MANDATORY TASK 3 – Recommend updates to Lahontan storage objectives Diversion of Truckee River water to the Carson Division is governed in the 1997 OCAP by the end-of-month Lahontan storage objective, i.e., LSOCM. The LSOCM is intended to ensure sufficient supply is stored in Lahontan Reservoir to meet the seasonal Carson Division Demand Total (CDT, acre-feet).
This task requires reviewing the storage objectives in the 1997 OCAP, updating the table of storage targets in the 1997 OCAP, developing recommendations for updating and improving the LSOCM methodology, and documenting the process and results in a Technical Memorandum (TM). This task focuses on the following variables and calculations in the OCAP:
• Lahontan Reservoir Target Storage in May and June (TSM/J): Target storage for Lahontan Reservoir in May and in June (acre-feet) dependent on Carson Division demand and found in the Adjustments to Lahontan Reservoir Storage Targets lookup table (§ 418.22, excerpt provided in Table 1). The TSM/J is a parameter used to calculate the LSOCM from January to May.
• Lahontan Storage Objective January through May (LSOCM): Target storage for Lahontan Reservoir from January through May (acre-feet) calculated from expected Carson Division demand, losses from Lahontan Reservoir, and forecasted Carson River inflows from the current month through May and June.
• Lahontan Storage Objective June through December (LSOCM): End of month Lahontan Storage Objectives from June through December (acre-feet) dependent on CDT and found in the Adjustments to Lahontan Reservoir Storage Targets table (§ 418.22).
Table 1. Excerpt from the Adjustments to Lahontan Reservoir Storage Targets table in the 1997 OCAP showing the Lahontan storage targets (thousand acre-feet) each month based on Carson Division Demand (thousand acre-feet) (§ 418.22 OCAP, 1997).
3.3.1 Review reservoir storage targets
The Contractor shall complete a review of the Adjustments to Lahontan Reservoir Storage Targets table (§ 418.22), its application to determining the LSOCM throughout the year, and any supporting documentation or other references that provide background on the development of the table and issues/challenges in its application (supplied by Reclamation).
The Contractor shall complete a review of the state of the science used to ensure sufficient water is stored in reservoirs to meet seasonal irrigation demands in the West, particularly as it relates to inter-basin transfer. Relevant studies and methods applied outside the Truckee-Carson system may be included at the Contractor’s discretion, with approval from the LBAO Technical Team.
Presumably, these references will help identify appropriate updates to the method used to determine reservoir targets in the OCAP.
3.3.2 Update the Adjustments to Lahontan Reservoir Storage Targets table, as needed
(1) The Contractor shall update the values in the Adjustments to Lahontan Reservoir Storage Targets table (§ 418.22), as deemed necessary due to increased data availability, modeling improvements, and/or changes in demand and supply patterns since the 1997 OCAP was published.
(2) The scope of this task is limited to updating the storage target values and should not include any other updates to the methodology used to calculate the LSOCM throughout the year.
3.3.3 Develop recommendations for updating the LSOCM methodology Taking into consideration the advantages and shortfalls of the Adjustments to Lahontan Reservoir Storage Targets table alongside the state of the science in setting reservoir targets (Task 3.3.1), the Contractor shall develop a set of overarching recommendations for updating the Adjustments to Lahontan Reservoir Storage Targets table and its use in determining LSOCM throughout the year.
Based on the developed recommendations and as deemed necessary, the Contractor shall develop an updated methodology to ensure sufficient water is stored in Lahontan Reservoir to meet monthly Carson Division Demand (CDD) and seasonal CDT for consideration in an OCAP revision. Any recommended changes to the existing Adjustments to Lahontan Reservoir Storage Targets table and LSOCM methodology must:
a. Represent improvements over the current Adjustments to Lahontan Reservoir Storage Targets table and LSOCM methodology, evaluated in terms of the recommendation’s ability to support well-informed decision-making and ensure OCAP meets its objectives (outlined in Section 1.2).
b. Be scientifically defensible, objective, and repeatable.
c. Utilize only existing, easily accessible datasets, and easily estimated variables.
d. Function in the TROA RiverWare models in a forward-looking operation and backward-looking accounting mode.
e. Be flexible enough to account for additional data availability, modeling improvements, and/or changes in demand and supply patterns.
f. Include concise, straightforward language, free from ambiguity.
The Contractor shall consult with the US District Court Water Master to ensure that any updates protect Nevada and California water rights and are operable within the TROA RiverWare models and TROA planning process.
3.3.4 Document recommendations for updating Lahontan storage objectives in a TM
The Contractor shall document the recommendations for updating (or not updating) the Lahontan storage objectives and LSOCM methodology from Tasks 3.3.1, 3.3.2, and 3.3.3 in a TM that includes the following:
a. Executive summary.
b. Summary of the use of the Adjustments to Lahontan Reservoir Storage Targets table, monthly LSOCM, and TSM/J in the 1997 OCAP.
c. Advantages and shortfalls of the current Adjustments to Lahontan Reservoir Storage
Targets table and methodology used to calculate LSOCM in the 1997 OCAP.
d. Review of the state of the science used to ensure sufficient water is stored in reservoirs to meet seasonal irrigation demands in the West (~3-5 pages).
e. Advantages and shortfalls of external methods to ensure sufficient water is stored in reservoirs, in terms of their applicability to the Truckee-Carson system, with a focus on the operability within the Project and TROA RiverWare models.
f. Key takeaways for updating (or not updating) the Adjustments to Lahontan Reservoir Storage Targets table and methodology used to calculate LSOCM.
g. Recommended methodology to address current shortfalls, ensure sufficient, but not excess, water is stored in Lahontan Reservoir to meet Carson Division Demand throughout the irrigation season for consideration in an OCAP revision.
h. Evidence that the recommendations represent improvements over the current Adjustments to Lahontan Reservoir Storage Targets table and methodology used to calculate LSOCM, do not impact Nevada or California water rights, and are compatible with the TROA RiverWare models, or evidence in support of maintaining the 1997 OCAP Adjustments to Lahontan Reservoir Storage Targets table and LSOCM methodology in an OCAP revision.
i. Any other pertinent information.
The Contractor shall perform an internal quality control review of the TM. The Contractor shall have a Senior Hydrologist or Senior Hydrologic Engineer review and provide comments on the TM, before review by Reclamation.
The Contractor shall provide the TM as a draft for review by the LBAO’s Project Manager and LBAO’s Technical Team, as well as other basin stakeholders. The report will require the submission of a draft, draft-final, and final report, providing Reclamation and other stakeholders the opportunity to review each draft iteration and provide feedback. The Contractor will address each comment in a standard comment sheet, including comment disposition and back-check by Reclamation/other stakeholders to document whether the comment response was accepted.
The Contractor shall submit with each report version the accompanying models, files, datasets, and reviews, as listed in Section 5 Data and Reports.
The Contractor shall prepare and present the results of this task in a 1-2 hour presentation to Reclamation, including the recommendations for updating forecasting language and methodology and other pertinent information in the TM. The Contractor should also be prepared for the potential to present this information to other stakeholders in the basin on one occasion during a two (2) hour session.
3.3.5 Oversee activities, staff, and resources
(1) The Contractor shall conduct all managerial and administrative duties related to this task. This includes project management and oversight of contractor activities, staff, and resources.
3.3.6 LBAO meetings
(1) The Contractor’s Project Manager and pertinent project staff shall participate in twice-a-month meetings with LBAO’s Project Manager and LBAO’s Technical Team (i.e., Special Studies Division Manager and Special Studies Division Staff) to assess the status of the study and determine if additional direction or information is needed.
(2) The Contractor shall prepare an agenda, give progress updates, record meeting notes, and solicit feedback from LBAO’s Project Manager and LBAO’s Technical Team for each meeting. Draft meeting notes shall be delivered within five (5) days of the meeting. Final notes, incorporating comments and suggested changes, shall be provided within three (3) days of receipt of all comments.
(3) The Contractor shall participate in up to twenty-four (24) 1-hour teleconferences. Up to two (2) hours of pre-meeting preparation are anticipated per call.
3.3.7 Prepare monthly status reports and invoices
(1) The Contractor shall prepare and submit monthly status reports and invoices, that include the date, contract number, invoice number, CO, COR, contract amount, task number, percent complete, current invoice amount, and cumulative complete.
3.4 OPTIONAL TASK 4 – Recommend updates to Carson River inflow forecasting This task entails reviewing the forecasting methodology used in the 1997 OCAP, updating the forecast adjustment coefficients in the 1997 OCAP, developing recommendations for updating the forecasting methodology, and documenting the process and results in a Technical Memorandum (TM). This task focuses on the following variables and calculations in the OCAP:
• April through July runoff forecast (AJ): April through July runoff forecast for the Carson River at Fort Churchill (acre-feet). The 1997 OCAP directs that LSOCM from January to May “will be based, in part, on the monthly Natural Resources Conservation Services April through July runoff forecast” (§ 418.20).
• Forecast discretization coefficient (C1): An adjustment coefficient multiplied by the AJ to estimate the forecasted Carson River inflow from the current month through May or June. The C1 coefficient is used to calculate the LSOCM from January to May.
• Monthly Carson River Inflow (CRI): Anticipated Carson River inflow to Lahontan Reservoir for the current month (acre-feet). The CRI is used to calculate the current month
TRD.
3.4.1 Review forecasting methodology
The Contractor shall complete a review of the seasonal forecasted Carson River inflow used in the LSOCM calculations (AJ*C1) and the monthly forecasted Carson River inflow (CRI) used in the TRD calculation, along with any supporting documentation or other references that provide background on the development of the 1997 forecasting methodology and issues/challenges in its application (supplied by Reclamation).
The Contractor shall complete a review of the state of the science in forecasting methodology in water planning in the Truckee-Carson Basin (ex. forecasting used to administer the TROA) and decision-making in the West more generally. Relevant studies and methods applied outside the Truckee-Carson system may be included at the Contractor’s discretion, with approval from the LBAO Technical Team. Presumably, these references will help identify appropriate updates to the forecasting language and methodology used in the OCAP.
3.4.2 Update forecast adjustment coefficient (C1), as needed
(1) The Contractor shall update the C1/May and C1/June values (§ 418.20), as deemed necessary due to increased data availability, modeling and forecasting improvements, and/or changes in Carson River inflow patterns since the 1997 OCAP was published.
(2) The scope of this task is limited to updating the C1 values and should not include any other updates to the forecasting methodology or LSOCM calculation.
3.4.3 Develop recommendations for updating the forecasting methodology Taking into consideration the advantages and shortfalls of the 1997 OCAP forecasting methodology alongside the state of the science in forecasting methodology (Task 3.4.1) the Contractor shall develop a set of overarching recommendations for updating the forecasting methodology in OCAP.
Based on the developed recommendations and as deemed necessary, the Contractor shall develop an updated forecasting methodology for consideration in an OCAP revision. Any recommended changes to the existing forecasting language and methodology must:
a. Represent improvements over the current forecasting language and methodology, evaluated in terms of the recommendation’s ability to support well-informed decision-making and ensure OCAP meets its objectives (outlined in Section 1.2).
a. Be scientifically defensible, objective, and repeatable.
b. Utilize only existing, easily accessible datasets, and easily estimated variables.
c. Function in the TROA forecasting workbook and TROA RiverWare models in a forward-looking operation and backward-looking accounting mode.
d. Be flexible enough to account for improvements, or decreases, in forecasting skill and availability.
e. Eliminate any perception of discretion in forecast selection that could open Reclamation up to disputes and challenges.
f. Include concise, straightforward language, free from ambiguity.
The Contractor shall consult with the US District Court Water Master to ensure that any updates protect Nevada and California water rights and are operable within the TROA RiverWare models and TROA planning process.
3.4.4 Document recommendations for updating forecasting language and methodology in a
TM
The Contractor shall document the recommendations for updating (or not updating) the forecasting language and methodology from Task 3.4.1, 3.4.2, and 3.4.3 in a TM that includes the following:
a. Executive summary.
b. Summary of the use of forecasts in the 1997 OCAP.
c. Issues/challenges with the 1997 OCAP forecasting language and methodology.
d. Review of the state of the science in forecasting methodology in water management planning and decision-making in the West and use of forecasting methodology in the Truckee-Carson Basin (~3-5 pages).
e. Advantages and shortfalls of existing forecasting methodologies, in terms of their applicability to the Truckee-Carson system, with a focus on the operability within the Project, the US District Court Water Master’s forecasting workbook, and TROA RiverWare models.
f. Key takeaways for updating (or not updating) the OCAP forecasting methodology.
g. Recommended forecasting language and methodology for consideration in an OCAP revision.
h. Evidence that the recommendations and updated methodology represent improvements over the current methods and are compatible with the TROA RiverWare models, or evidence in support of maintaining the forecasting methodology in the 1997 OCAP in an OCAP revision.
i. Any other pertinent information.
The Contractor shall perform an internal quality control review of the TM. The Contractor shall have a Senior Hydrologist or Senior Hydrologic Engineer review and provide comments on the TM, before review by Reclamation.
The Contractor shall provide the TM as a draft for review by the LBAO’s Project Manager and LBAO’s Technical Team, as well as other basin stakeholders. The report will require the submission of a draft, draft-final, and final report, providing Reclamation and other stakeholders the opportunity to review each draft iteration and provide feedback. The Contractor will address each comment in a standard comment sheet, including comment disposition and back-check by Reclamation/other stakeholders to document whether the comment response was accepted.
The Contractor shall submit with each report version the accompanying models, files, datasets, and reviews, as listed in Section 5 Data and Reports.
The Contractor shall prepare and present the results of this task in a 1-2 hour presentation to Reclamation, including the recommendations for updating forecasting language and methodology and other pertinent information in the TM. The Contractor should also be prepared for the potential to present this information to other stakeholders in the basin on one occasion during a two (2) hour session.
3.4.5 Update project management documents
(1) No later than one (1) month after execution of Optional Task 4, the Contractor shall update the
Project Management Plan (PMP) and schedule to include the Contractor’s understanding and approach to the deliverables outlined in this task, the Contractor’s approach to completing the task within schedule, key staff, and contact information.
(2) The Contractor shall review and updated, as needed, the QCP, Records and Data Control Plan, and Risk Management Matrix
3.4.6 Oversee activities, staff, and resources
(1) The Contractor shall conduct all managerial and administrative duties related to this task. This includes project management and oversight of contractor activities, staff, and resources.
3.4.7 LBAO meetings
(1) The Contractor’s Project Manager and pertinent project staff shall participate in twice-a-month meetings with LBAO’s Project Manager and LBAO’s Technical Team to assess the status of the study and determine if additional direction or information is needed.
(2) The Contractor shall prepare an agenda, give progress updates, record meeting notes, and solicit feedback from LBAO’s Project Manager and LBAO’s Technical Team for each meeting. Draft meeting notes shall be delivered within five (5) days of the meeting. Final notes, incorporating comments and suggested changes, shall be provided within three (3) days of receipt of all comments.
(3) The Contractor shall participate in up to twenty-four (24) 1-hour teleconferences. Up to two (2) hours of pre-meeting preparation are anticipated per call.
3.4.8 Prepare monthly status reports and invoices
(1) The Contractor shall prepare and submit monthly status reports and invoices, that include the date, contract number, invoice number, CO, COR, contract amount, task number, percent complete, current invoice amount, and cumulative complete.
3.5 OPTIONAL TASK 5 – Recommend updates to the Truckee River Diversion calculations One of the objectives of the 1997 OCAP is to minimize diversions of Truckee River water to meet Project demands, as determined by the calculation of the LSOCM and allowable TRD each month (§ 418.20). The studies in this PWS and others undertaken by Reclamation examine each of the parameters in the calculation of LSOCM and TRD (§ 418.20); building off of the results and lessons learned from these studies, this task entails a holistic review of the TRD equation to develop potential recommendations for updates, considering the forthcoming recommendations for updating the individual parameters used to calculate LSOCM and TRD.
3.5.1 Conduct a literature review of methodologies to determine allowable diversions The Contractor shall review the LSOCM (§ 418.20 (b)) and TRD (§ 418.20 (d)) equations and overall methodology to determine allowable Truckee River Diversions to assess the extent to which these incorporate “the best available science and technology to support well-informed decision-making, allowing for adjustments to sources of scientific information and technology when more accurate, reliable and/or relevant information is available without requiring revision to the regulation” (U.S. Department of the Interior, 2021).
The Contractor shall identify 1-3 case study irrigation districts that provide applicable and useful examples of methods to determine the amount of water diverted from rivers to meet irrigation and other water demands/rights. It is expected that the most applicable case studies will derive from the arid western US and involve inter-basin transfers. Relevant studies and methods may be included at the Contractor’s discretion, with approval from the LBAO Technical Team. Presumably, these references will help to identify alternative methods for determining allowable diversions to meet water demands that can provide transferable lessons learned for updating, or not updating, the TRD calculation.
3.5.2 Develop recommendations for updating the TRD calculation Taking into consideration the advantages and shortfalls of different methods to determine allowable diversions (Task 3.5.1), the Contractor shall develop a set of overarching recommendations for updating (or not updating) the TRD calculation in the OCAP, including LSOCM and the TSM/J.
Based on the developed recommendations and as deemed necessary, the Contractor shall recommend a method to calculate TRD for consideration in an OCAP revision. Any recommended changes to the TRD calculation must:
a. Represent an improvement over the calculation of allowable TRD, evaluated in terms of the recommendation’s ability to support well-informed decision-making and ensure OCAP meets its objectives (outlined in Section 1.2).
b. Be scientifically defensible, objective, and repeatable.
c. Utilize only existing, easily accessible datasets, and easily estimated variables.
d. Function in the TROA RiverWare models in a forward-looking operation and backward-looking accounting mode.
e. Eliminate any perception of discretion in the calculations that could open Reclamation up to disputes and challenges.
f. Be flexible enough to account for improvements in efficiency and system operations.
g. Be flexible enough to account for climatic changes, ex. earlier peak runoff, warmer summers with increased evaporation, etc.
h. Be described in concise, straightforward language, free from ambiguity.
The Contractor shall consult with the US District Court Water Master to ensure that any updates protect Nevada and California water rights and are operable within the TROA RiverWare models and TROA planning process.
3.5.3 Document recommendations for updating the TRD and LSOCM calculations The Contractor shall document the recommendations for updating (or not updating) the Truckee River Diversions equation from Tasks 3.5.1 and 3.5.2 in a TM that includes the following:
a. Executive summary.
b. Summary of the use of the TRD and LSOCM equations in the 1997 OCAP.
c. Issues/challenges with the TRD and LSOCM equations in the 1997 OCAP.
d. Review of the state of the science in determining allowable diversions in water management planning and decision-making in the West, including examples from the relevant case studies (~5-10 pages).
e. Advantages and shortfalls of allowable diversion determination methodologies in terms of their applicability to the Truckee-Carson system, with a focus on the operability and flexibility within the Project and TROA RiverWare models.
f. Key takeaways for informing an update to the calculation of TRD.
g. Updated methodology to determine TRD, as deemed necessary.
h. Evidence that the updates to the TRD equations and recommendations represent improvements over the current methods and are compatible with the TROA RiverWare models, or evidence in support of maintaining the TRD equation in the 1997 OCAP in an OCAP revision.
i. Any other pertinent information.
The Contractor shall perform an internal quality control review of the TM. The Contractor shall have a Senior Hydrologist or Senior Hydrologic Engineer review and provide comments on the TM, before review by Reclamation.
The Contractor shall provide the TM as a draft for review by the LBAO’s Project Manager and LBAO’s Technical Team, as well as other basin stakeholders. The report will require the submission of a draft, draft-final, and final report, providing Reclamation and other stakeholders the opportunity to review each draft iteration and provide feedback. The Contractor will address each comment in a standard comment sheet, including comment disposition and back-check by Reclamation/other stakeholders to document whether the comment response was accepted.
The Contractor shall submit with each report version the accompanying models, files, datasets, and reviews, as listed in Section 5 Data and Reports.
The Contractor shall prepare and present the results of this task in a 1-2 hour presentation to Reclamation, including the recommendations for updating forecasting language and methodology and other pertinent information in the TM. The Contractor should also be prepared for the potential to present this information to other stakeholders in the basin on one occasion during a two (2) hour session.
3.5.4 Update project management documents
(3) The Contractor shall update the Project Management Plan (PMP) and schedule no later than one
(1) month after execution of the option to include the Contractor’s understanding and approach to the deliverables outlined in this task, the Contractor’s approach to completing the task within schedule, key staff, and contact information.
(4) The Contractor shall review and updated, as needed, the QCP, Records and Data Control Plan, and Risk Management Matrix
3.5.5 Oversee activities, staff, and resources
(2) The Contractor shall conduct all managerial and administrative duties related to this task. This includes project management and oversight of contractor activities, staff, and resources.
3.5.6 LBAO meetings
(1) The Contractor’s Project Manager and pertinent project staff shall participate in twice-a-month meetings with LBAO’s Project Manager and LBAO’s Technical Team to assess the status of the study and determine if additional direction or information is needed.
(2) The Contractor shall prepare an agenda, give progress updates, record meeting notes, and solicit feedback from LBAO’s Project Manager and LBAO’s Technical Team for each meeting. Draft meeting notes shall be delivered within five (5) days of the meeting. Final notes, incorporating comments and suggested changes, shall be provided within three (3) days of receipt of all comments.
(3) The Contractor shall participate in up to twelve (12) 1-hour teleconferences. Up to two (2) hours of pre-meeting preparation are anticipated per call.
3.5.7 Prepare monthly status reports and invoices
(1) The Contractor shall prepare and submit monthly status reports and invoices, that include the date, contract number, invoice number, CO, COR, contract amount, task number, percent complete, current invoice amount, and cumulative complete.
4. DATA AND REPORTS
The contractor shall provide the following data and reports as follows:
Item No.
Description Content Format Medium Delivery
1. Project Management Plan and Deliverables Schedule
See PWS Section 3.1.1
Tasks, Milestones
MS
Project or similar
No later than (NLT) 1 month after contract award
2. Quality Control Plan
See PWS Section 3.1.2
Contractor’s Choice
MS
Word
NLT 1 month after contract award
3. Records and Data Control Plan
See PWS Section 3.1.3
Contractor’s Choice
MS
Word
NLT 1 month after contract award
4. Risk Management Matrix
See PWS Section 3.1.4
Contractor’s Choice
MS
Excel
NLT 1 month after contract award
5. Draft TM – Recommendations for updating the Lahontan storage objectives
See PWS Section
3.3.4 and 6
Reclamation’s…