Sol_140R2025Q0028.pdf
PDF 580 KB Posted
- Attached to
- Bradbury Janitorial Services Federal contract opportunity
- Solicitation number
- 140R2025Q0028
About this file
This is a Request for Proposal (RFP) for janitorial services at the Bradbury Dam Field Office in Santa Barbara, California, issued by the Bureau of Reclamation's Interior Region 10. The solicitation (No. 140R2025Q0028) is set aside 100% for small businesses and seeks a contractor to provide comprehensive janitorial services from May 5, 2025, to May 4, 2030, with a base year and four option years. The services include daily, weekly, monthly, semi-annual, and annual cleaning tasks for a one-story building with two office rooms and one restroom, involving tasks such as emptying trash, cleaning restrooms, mopping floors, dusting surfaces, and maintaining various interior and exterior areas.
The quote is due by April 29, 2025, at 11:59 PM PST, with a site visit scheduled for April 22, 2025, at 8:30 AM PST. Evaluation will be based on three factors: price (with analysis for reasonableness), past performance (verified through CPARS and Contracting Officer's knowledge), and technical capabilities (including verification of California Department of Industrial Relations registration). The contractor must provide all necessary equipment, cleaning supplies, and follow specific safety and quality control requirements, including monthly safety meetings, material safety data sheets, and adherence to Bureau of Reclamation Safety and Health Standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2025Q0028_Amd_0002.pdf | ||
| Contractor_Compiled_Questions_0002.pdf | ||
| WD_2015-5647_Rev__23_Dated_12_23_24_0002.pdf | ||
| Bradbury_Dam_Office_Layout_Sq_Footage_4-29-2025_0002.pdf | ||
| Sol_140R2025Q0028_Amd_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
R20
See Schedule
0011285590 CODE 16. ADMINISTERED BYCODE
X
X
X
561720
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORR20
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
04/29/2025 2359 PD
04/17/2025
0000000000Derek Celedon (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140R2025Q0028
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 68 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
Santa Barbara CA 93105-0000 Bradbury Dam, Star Route Bradbury Dam Bureau of Reclamation-MP-SCCAO
15. DELIVER TO
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815 Division of Acquisition Services Regional Office Mid-Pacific Region
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$22
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
Bureau of Reclamation
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
ADMINISTERED BY:
Bureau of Reclamation Mid-Pacific Region Regional Office Division of Acquisition Services 2800 Cottage Way, Room E-1815 Sacramento CA 95825-1898 US Period of Performance: 05/05/2025 to 05/04/2030
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
DATED
Joe Molina
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
00010 SSB Bradbury Dam Janitorial Services - Base Year
Product/Service Code: S201
Product/Service Description: HOUSEKEEPING-
CUSTODIAL JANITORIAL
Delivery: 05/04/2026
Period of Performance: 05/05/2025 to 05/04/2026
00020 SSB Bradbury Dam Janitorial Services - Option
Year One
(Option Line Item)
Anticipated Exercise Date 05/01/2026
Product/Service Code: S201
Product/Service Description: HOUSEKEEPING-
CUSTODIAL JANITORIAL
Delivery: 05/04/2027
Period of Performance: 05/05/2026 to 05/04/2027
00030 SSB Bradbury Dam Janitorial Services - Option
Year Two
(Option Line Item)
Anticipated Exercise Date 05/01/2027
Product/Service Code: S201
Product/Service Description: HOUSEKEEPING-
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
68 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 68
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2025Q0028
CUSTODIAL JANITORIAL
Delivery: 05/04/2028
Period of Performance: 05/05/2027 to 05/04/2028
00040 SSB Bradbury Dam Janitorial Services - Option
Year Three
(Option Line Item)
Anticipated Exercise Date 05/01/2028
Product/Service Code: S201
Product/Service Description: HOUSEKEEPING-
CUSTODIAL JANITORIAL
Delivery: 05/04/2029
Period of Performance: 05/05/2028 to 05/04/2029
00050 SSB Bradbury Dam Janitorial Services - Option
Year Four
(Option Line Item)
Anticipated Exercise Date 05/01/2029
Product/Service Code: S201
Product/Service Description: HOUSEKEEPING-
CUSTODIAL JANITORIAL
Delivery: 05/04/2030
Period of Performance: 05/05/2029 to 05/04/2030
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Combined Synopsis/Solicitation
BUREAU OF RECLAMATION, INTERIOR REGION 10
SACRAMENTO, CALIFORNIA
140R2025Q0028
140R2025Q0028
COMBINED SYNOPSIS/SOLICITATION
Bradbury Dam Janitorial Services
SOUTH-CENTRAL CALIFORNIA AREA OFFICE (SCCAO)
SACRAMENTO, CALIFORNIA
140R2025Q0028
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with FAR part 13 and additional information included in this notice. The Bureau of Reclamation intends to award a Firm Fixed Price Purchase Order. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This requirement is being set aside 100% for Small Business. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03 as of 01/17/2025.
GENERAL INFORMATION
RFQ Number: 140R2025Q0028
Request for Quotation (RFQ) Request for Proposal (RFP) Invitation for Bid (IFB)
North American Industry Classification Code (NAICS): 561720 Size Standard: $22 Million
This acquisition is set-aside 100 percent Small Business concerns only. (Large businesses may not submit a quote.)
Offer Due Date:
Offer Submission:
April 29, 2025 11:59 PM Pacific Time
By email to dceledon@usbr.gov
Contact Information: Derek H Celedon Email: dceledon@usbr.gov
OFFEROR INFORMATION
Offeror’s Business Information:
Business Name: _______________________________
Business Size (select one): Small Large
DUNS Number/Cage Code: ______________________
Tax ID Number: _______________________ mailto:dceledon@usbr.gov
SACRAMENTO, CALIFORNIA
140R2025Q0028
Site Visit:
A site visit will be held Tuesday 4/22/2025 at 08:30 AM PST. Interested vendors shall register by email to dceledon@usbr.gov by 4/18/2025 12:00 PM PST. Vendors shall provide the names of attendees.
Note: Attendees will meet at the Bradbury Dam Field Office 1669 Highway 154, Santa Barbara CA 93105 (Bradbury Dam) mailto:dceledon@usbr.gov
SACRAMENTO, CALIFORNIA
140R2025Q0028
Line Items
Description Contractor shall furnish labor, material, supplies, tools, equipment, transportation and supervision necessary to perform the following janitorial services at the Bradbury Dam Field Office, Santa Barbara, CA, in accordance with the Performance Work Statement (PWS)
QTY Unit of Issue
Unit Price
Total Price
00010 Base Year: Period of Performance - 5/5/2025 to 5/4/2026 Daily Services (Monday, Wednesday, Friday) – Please see PWS for description of service.
52 EA $ $
Weekly Service – Please see PWS for description of service.
52 EA $ $
Monthly– Please see PWS for description of service. 12 EA $ $
Semi-Annual Service – – Please see PWS for description of service.
2 EA $ $
Annual – Please see PWS for description of service. 1 EA $ $
Total for Line Item 00010 Base Year $
00020 Option Year 1: Period of Performance 5/5/2026 to 5/4/2027 Daily Services (Monday, Wednesday, Friday) – Please see PWS for description of service.
52 EA $ $
Weekly Service – Please see PWS for description of service.
52 EA $ $
Monthly– Please see PWS for description of service. 12 EA $ $
Semi-Annual Service – – Please see PWS for description of service.
2 EA $ $
Annual – Please see PWS for description of service. 1 EA $ $
Total for Line Item 00020 - Option Year 1 $
00030 Option Year 2: Period of Performance 5/5/2027 to 5/4/2028 Daily Services (Monday, Wednesday, Friday) – Please see PWS for description of service.
52 EA $ $
Weekly Service – Please see PWS for description of 52 EA $ $
QUOTE/PRICING SCHEDULE
SACRAMENTO, CALIFORNIA
140R2025Q0028 service.
Monthly– Please see PWS for description of service. 12 EA $ $
Semi-Annual Service – – Please see PWS for description of service.
2 EA $ $
Annual – Please see PWS for description of service. 1 EA $ $
Total for Line Item 00030 - Option Year 2 $
00040 Option Year 3: Period of Performance 5/5/2028 to 5/4/2029 Daily Services (Monday, Wednesday, Friday) – Please see PWS for description of service.
52 EA $ $
Weekly Service – Please see PWS for description of service.
52 EA $ $
Monthly– Please see PWS for description of service. 12 EA $ $
Semi-Annual Service – – Please see PWS for description of service.
2 EA $ $
Annual – Please see PWS for description of service. 1 EA $ $
Total for Line Item 00040 - Option Year 3 $
00050 Option Year 4: Period of Performance 5/5/2029 to 5/4/2030 Daily Services (Monday, Wednesday, Friday) – Please see PWS for description of service.
52 EA $ $
Weekly Service – Please see PWS for description of service.
52 EA $ $
Monthly– Please see PWS for description of service. 12 EA $ $
Semi-Annual Service – – Please see PWS for description of service.
2 EA $ $
Annual – Please see PWS for description of service. 1 EA $ $
Total for Line Item 00050 - Option Year 4 $
Grand Total for Contract (Base Year & All Option Years) $
Notes: If FAR 52.217-8 is exercised, the prices for the Option to Extend Service’s terms will be calculated based on prorated term and prices that are in effect at the time the option is exercised.
SACRAMENTO, CALIFORNIA
140R2025Q0028
PERFORMANCE WORK STATEMENT
Janitorial Services – SCCAO – Bradbury Dam Field Office April 2025
PART A - GENERAL INFORMATION
1. Introduction: The purpose of this contract is to provide janitorial services to the SCCAO- Bradbury Dam Field Office 1699 HWY 154 Santa Barbara CA 93105, located in Santa Barbara County. The Contractor shall provide all labor, materials, equipment, cleaning supplies, transportation and supervision necessary to provide the janitorial services.
2. Point of Contact: Contract Specialist: Derek H Celedon, Contract Specialist, 916-978-5391.
3. Period of Performance: This contract shall be for a Base Year and four (4) Option Years. The Option Years will be exercised based on the performance of the Contractor and the existing need for the services by the Government. Base Year shall be from 05/05/25 – 05/04/26.
4. Contractor Submittals: The Contractor shall submit to the Contracting Officer (CO) and Contracting Officer’s Representative (COR) all items listed below. Unless otherwise specified these items shall be submitted within two
(2) weeks from Date of Award or at the Post Award Conference, whichever is sooner. If the contract is awarded less than 30 days prior to contract starting date, submittals shall be furnished on a schedule mutually agreed upon by the CO and the Contractor.
a. Safety Plan: The Contractor shall submit to the CO and the COR for approval a safety plan to the South- Central California Area Office’s Safety Manager that is in compliance with Reclamation Safety and Health Standards (RSHS), which can be found at the following web site: http://www.usbr.gov/ssle/safety/RSHS/rshs.html
b. Job Hazard Analysis: The Contractor shall submit to the CO and the COR for approval a Hazard Analysis which shall include a supplier’s “Material Safety Data Sheet” or “OSHA Form 20”, in accordance with FAR Clause 52.223-3 Alternate I. This plan shall include but shall not be limited to, use of the approved chemical compounds, protection of personnel and protection of areas during service, cleaning, etc., including using proper signage. The COR retains the right to reject any material that may create a safety or health hazard. See Appendix “A” for an example form.
c. Contractor’s Point of Contact: The Contractor shall provide the name, telephone numbers and addresses of the supervisor and an alternate supervisor in writing. Also, the Contractor shall furnish in writing, the names, and addresses of all personnel performing services prior to beginning work to the COR. This list of employees shall be maintained current during the entire contract period. The contractor shall provide a list of employee’s using privately owned vehicles (POV) and the license plate number of the vehicles used. Individuals that are not a party to this contract shall not be waiting in a POV, assist nor be in the immediate proximity of any employee performing work under the janitorial service contract, unless those individuals have been identified in writing by the Contractor as an employee.
d. Safety Exposure Report: The Contractor shall maintain records of the number of man hours worked at the SCCAO- Bradbury Dam Field Office each month. The Contractor shall hold monthly safety meetings with all employees working under the janitorial service contract. Minutes of the safety meeting shall be written on the monthly safety report form and turned into the CO and the COR on the last Monday of every month. See Appendix “B”.
http://www.usbr.gov/ssle/safety/RSHS/rshs.html
SACRAMENTO, CALIFORNIA
140R2025Q0028
e. Work Schedules: The Contractor shall provide in writing detailed work schedules and estimated times of service for each building. The Contractor shall submit this work schedule to the CO and the COR prior to beginning the janitorial service. An updated schedule shall be provided to the CO and the COR five (5) days prior to the beginning of each new month as applicable.
f. Quality Control Plan: The Contractor shall submit a Quality Control Plan to the CO and the COR prior to initiating work. This plan will be approved by the COR prior to initiating work. Refer to Part C. Number 18 for detailed information regarding this plan.
g. Quality Control Reports: The Contractor shall submit to the CO and the COR the Quality Control Reports in accordance with Part C. Number 19.
5. Meetings:
a. Post-Award Conference: Prior to work beginning under the contract, the Contractor and personnel shall meet with the COR, as specified by the CO, to discuss all elements of this contract. The Contractor shall contact the COR to determine the date, time, and location of this meeting. As determined by the CO, the post award conference may be repeated prior to each option period to discuss any changes.
b. Planning Meeting: The Contractor shall meet with the COR to coordinate and update the work schedule and to discuss quality control, Contractor performance, safety and other items pertinent to the contract. The time and location of these meetings will be determined by mutual agreement of the CO, or COR and the Contractor.
6. Area Closures: Areas are subject to reduced facilities, most often but not limited to partial to total closure of public areas depending on maintenance work and unplanned repairs in the building. During such closures, the contractor shall not service those facilities unless directed to do so by the COR. Payment shall only be for services provided, if area/facilities are closed, the service shall not be provided; therefore payment shall not be made on closed areas/facilities. The Government shall provide notification to the Contractor at a minimum of 3 days prior to closure, unless an emergency occurs.
7. Invoicing: All invoices must be submitted electronically through the Invoice Processing Platform (IPP) unless otherwise indicated in the solicitation. The contractor is required to register on IPP and follow the procedures for invoice submission.
8. Payment: Payment shall be made monthly in arrears at the contract unit price for services performed in accordance with the pricing schedule and as described herein. The Government shall pay the Contractor upon submission of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract in accordance with the Prompt Payment Act.
PART B – WORK TO BE PERFORMED:
1. General Information:
a. Bradbury Dam Office: One, one (1) story building with 2 office rooms, 1 restroom, with linoleum flooring. Walls are painted, textured concrete, and painted drywall.
2. Contractor Furnished Property and Supplies:
a. Property: The contractor shall be required to furnish all equipment necessary to provide the janitorial services.
SACRAMENTO, CALIFORNIA
140R2025Q0028
b. Supplies: The contractor shall provide all necessary supplies and equipment to provide the janitorial services specified in the contract. This shall include, but is not limited to, such things as; ladders, vacuum cleaners, mops and buckets, floor brushes, brooms, paper towels, garbage bags, toilet seat liners, toilet tissue, toilet deodorants, deodorant blocks for all urinals, etc., to satisfactorily perform the services specified herein.
(1) Cleaning Agents: The following are definitions and specifications for the major types of cleaning agents and supplies which shall include, but is not limited to, the materials necessary to comply with this contract.
The Contractor shall submit a list of all materials, and their Material Safety Data Sheets (MSDS), for approval before use. Soap, soap compounds and biodegradable detergents shall be used. If the Contractor uses a cleaning compound containing disinfectants or deodorant in lieu of applying these materials separately, the label shall state that the compound is biodegradable and contains disinfectants and/or deodorants. The manufacturer’s instructions shall be followed in mixing the proper strength solution of application. Different cleaning agents or compounds shall not be mixed together unless permitted by the manufacturer’s instruction and approved by the COR.
(2) Germicidal Disinfectants: Only standard commercial germicidal disinfectants shall be used. The manufacturer’s instructions shall be followed when mixing the proper strength solution for application use. The disinfectants may be mixed with the cleaning solution if the manufacturer’s instructions on the disinfectant’s label do not prohibit it.
(3) Deodorizer: Deodorant shall be a material packaged and marketed for use as a deodorizer. The manufacturer’s instructions shall be followed when mixing the proper strength solution for application use. The deodorant may be mixed with the cleaning solution if the manufacturer’s instructions on the deodorant’s label do not prohibit it.
(4) Toilet Tissue: Toilet tissue shall meet or exceed Federal Specification A-A-697 for paper, toilet tissue.
This is a white, two-ply, unglazed, soft, clean, roll paper of the quality normally used at Federal office buildings and military installations.
(5) Deodorant Cakes: Deodorant cakes for the urinals shall meet or exceed Federal Specification P-D- 215 for Deodorant, Toilet Cakes. Cake shall be 100% paradichlorobenzene and perfume firmly pressed into the hard cake. Minimum size is 3/4” thick, weighing 4 ounces. The cake can be furnished with or without a hanger.
(6) Trash Receptacle Liners: Trash receptacle liners for waste baskets shall be polyethylene of 0.25” minimum thickness or thicker, and the proper size to fit for existing trash receptacles.
(7) Hand Soap: Hand soap shall be manufactured for use in existing mechanical soap dispensers and shall be biodegradable, phosphate-free, and anti-bacterial.
(8) Paper Towels: Paper towels shall be strong, pliable and absorbent. Towels shall be the same size to fit and work in existing automatic dispensers.
(9) Equipment: All equipment not covered in other sections of this contract, shall be of commercial quality and in a condition to adequately and safely perform services for which intended.
3. Restroom Closure during Cleaning: Restrooms shall be closed to the public when cleaning services are in progress. The Contractor shall place their closed for cleaning sign in the front of the entry door.
SACRAMENTO, CALIFORNIA
140R2025Q0028
4. Work Schedule: All work shall be completed Monday, Wednesday and Friday between the hours of 3:00 p.m.
and 9:00 p.m.
a. Daily Services:
Tile/Linoleum/Laminated: Sweep and mop to remove including but not limited to any dust, debris, dirt, etc.
(2) Trash Receptacles: The Contractor shall remove trash from the buildings and deposit it in the designated containers. New polyethylene liners shall be reinstalled in cans and waste baskets, especially the feminine hygiene receptacles. Recycled paper products placed in separate containers by the Government work stations, shall be collected and placed in receptacles provided for such material.
(3) Restrooms: Thoroughly clean all restrooms and sinks to include: damp mopping of floors with a disinfectant deodorizing cleaning solution, cleaning and disinfecting all toilets, sinks, urinals. Thoroughly wash all walls, stall walls, stall doors and window ledges to remove all dirt, hand prints, smudges, or other foreign matter. A disinfectant cleaner shall be used to restore surface to a streak-free original condition. Clean all mirrors.
(4) Refill Consumables: To include, but not limited to: toilet paper, seat cover liners, paper towel/batteries in dispensers, soap dispensers, etc.
(5) Restroom Cleaning: Thoroughly clean to include: damp mopping of floors with a disinfectant deodorizing cleaning solution, cleaning and disinfecting all toilets, sinks, urinals. Thoroughly wash all walls to remove all dirt, hand prints, smudges, or other foreign matter. A disinfectant cleaner shall be used to restore surface to a streak-free original condition. Clean all mirrors.
(6) Kitchen: Clean and/or wash of all accumulations of dust, dirt, smudges, water stains, etc., The surfaces shall be kept clean and free of all streaks. The counters, microwave and refrigerator shall be kept clean and free of dust, dirt, bugs, etc.
b. Weekly Services:
(1) Mats: Clean mats at all entry doors and by reception area.
c. Monthly Services:
(1) Chairs: Vacuum all cloth chairs and wipe clean vinyl chairs of all accumulations of dust, dirt, smudges, etc., with a germicidal disinfectant. Water shall be changed as needed to ensure clean, odor and streak free surface.
(2) Dust: Fire extinguishers and defibrillator cabinets (exterior of cabinets only), ceiling surfaces including HVAC vents. To include, but not limited to: document production rooms, offices’ computer and equipment, pictures, plaques and other displays in offices, hallways and meeting rooms, door windows, etc.
SACRAMENTO, CALIFORNIA
140R2025Q0028
(3) Wall Surfaces and Fixtures: Clean to include but not limited to floorboards, fans, bulletin boards, etc., free of smudges and dirt.
(4) Cobwebs: Remove cobwebs with a treated dust mop, vacuum cleaner or other appropriate equipment used to leave area clean and free of all cobwebs and other foreign materials.
(5) Window Blinds: Remove all accumulations of dust, dirt, smudges, etc., with a germicidal disinfectant.
Water shall be changed as needed to ensure clean, odor and streak free surface.
(6) Floors: Clean and wax linoleum/tile/Laminated Flooring.
(7) Exterior Entryways: Clean entryways and landings.
f. Semi-Annual Services:
(1) Doors /Windows: Clean and/or wash of all accumulations of dust, dirt, smudges, water stains, etc., all interior and exterior windows and doors. The surfaces shall be kept clean and free of all streaks. The tracks shall be kept clean and free of dust, dirt, bugs, etc. Removal of interior or exterior door and/or window covering shall be made as necessary by the contractor. Must be scheduled in advance through the COR.
(2) Floors: Strip and wax linoleum/tile/Laminated flooring. Must be scheduled in advance through the
COR.
g. Annual Services:
(1) Doors /Windows: Clean and/or wash of all accumulations of dust, dirt, smudges, water stains, etc., all interior and exterior windows and doors. The surfaces shall be kept clean and free of all streaks. The tracks shall be kept clean and free of dust, dirt, bugs, etc. Removal of interior or exterior door and/or window covering shall be made as necessary by the contractor. Must be scheduled in advance through the COR.
(2) Floors: Strip and wax linoleum/tile/Laminated flooring. Must be scheduled in advance through the
COR.
PART C – CONTRACTOR’S RESPONSIBILITIES:
1. Commencement of Work: To ensure continuity of essential services, the successful bidder shall be prepared to fully commence work on the start date of this contract and should not assume that government or the previous contractor will be available to guide, direct, or specifically orientate the Contractor.
2. Contractor Work Responsibilities: The Contractor’s work shall include, but is not limited to, all job planning, programming, scheduling, administration, inspection, and management necessary to accomplish specified services.
The contractor is responsible for providing supervision and conducting a quality control inspection of the services that are being provided. The Contractor is responsible for making sure that all janitorial services have been performed in a timely manner and have met the standards of the contract for each type of service required. These standards may be found in Part B.
SACRAMENTO, CALIFORNIA
140R2025Q0028
3. Communication: SCCAO – Bradbury Dam Field Office phone numbers for maintenance and management shall be given to the Contractor for emergency calls. The Contractor shall provide a phone number or the phone numbers of Contractor employee(s) during hours of service for discussion of contractual matters. Phone message machine is an acceptable point of contact as long as the response to the phone call is initiated within two hours of the time of the message. Once COR has notified the contractor, this shall be considered official notification when called for service related issues.
4. Personnel: The Contractor shall provide a minimum of two (2) or an adequate number of fully qualified personnel to perform the work specified herein and promptly investigate complaints of poor performance. The Contractor shall comply with all Government regulations posted. If the Contractor chooses to accomplish the work by subcontract, sub-Contractor must still be able to provide the required service within the established time limits.
It shall be the Contractors responsibility to ensure that sub-Contractor’s personnel fulfill the requirements of the contract. All personnel employed under this contract shall be legal residents of the United States. All personnel shall be qualified to perform the tasks assigned in accordance with Government Regulations. The Contractor and personnel are directed to be safety conscious. A list of authorized personnel shall be provided to the COR before any work commences or as new employees are obtained. Failure to follow safety precautions will be considered unsatisfactory service and could result in a citation or a contractor caused work stoppage.
5. Conduct: The Contractor shall conform and require Contractor employees to conform to similar standards of conduct as Government personnel. Personal conditions such as being under the influence of intoxicating beverages, drugs, etc., which may interfere with the performance of the contract services or affect the safety of the employee or others will not be permitted. Misconduct of the kind set forth in this paragraph shall cause the Contractor to take disciplinary action against Contractor employees, which may result in the immediate removal of employee from Government property and removal from continued work under the contract. When it is necessary to remove Contractor personnel the Contractor shall immediately provide a qualified replacement to carry out the services performed.
6. Identification: The Contractor shall have identity badges or clothing with the company name to identify them as Contractor’s personnel.
7. Unsafe Conditions: Work shall be halted by the CO or the COR if an unsafe condition exists or will develop if work continues. The Contractor shall have no basis for compensation should such a work stoppage cost the Contractor damages. Work shall not resume until the condition is corrected. The Contractor shall immediately notify the COR of all cases of death, occupational disease or injury which occurs within the scope of this contract.
8. Safety and Health Codes: The Contractor shall comply with all pertinent provisions of the Bureau of Reclamation “Safety and Health Standards” manual and applicable state and local health and safety codes.
9. Safety Program: The Contractor shall formulate and furnish to the COR in writing a comprehensive program to implement the general policies and procedures for safe janitorial service. It shall include provisions for safe use of cleaning agents and proper use of equipment. The Contractor shall evaluate his cleaning equipment on a quarterly basis, equipment that is worn and in poor condition shall be replaced immediately. Equipment and materials used in the janitorial services of the facilities shall be kept in good serviceable conditions at all times. All cleaning agents shall be properly labeled and a material safety data sheet (MSDS) for each chemical used in cleaning under this contract shall be kept in a binder and given to the COR. The MSDS binder shall be updated on quarterly basis. Chemical data sheets no longer used shall be removed and new chemical data sheets shall be
SACRAMENTO, CALIFORNIA
140R2025Q0028 placed in the binder prior to the use of the new chemical. All personnel conducting the service shall be properly trained by the Contractor in the safe use and handling of these chemicals used. The Contractor is responsible for using any required safety equipment such as gloves and eye protection while conducting the janitorial service.
10. Equipment: The equipment used by the contractor for the specified services shall be in operating condition and shall be maintained in order to provide the services required in this contract. The Contractor’s equipment and vehicles shall meet all Federal, State and OSHA standards. All equipment shall be of commercial grade and quality.
11. MSDS: The Contractor shall submit a Material Safety Data Sheet (MSDS) and product information sheet or label for each chemical used. This information shall be given to the COR before work begins.
12. Hazard Analysis: The Contractor shall submit a Job Safety Hazard Analysis on all phases of the work to be performed prior to the start of service. A sample format is attached in Appendix A.
13. Safety Meetings: The Contractor shall submit a report containing the minutes of the Contractor’s monthly safety meetings as required in Reclamation Safety and Health Standard manual under Section 3.4. A report of each meeting shall be submitted to the COR on the last Monday of each month. A sample format is attached in Appendix B.
14. Accident Report Procedure: In the event of an accident involving the Contractor while in performance of the contract the Contractor shall submit a report to the COR, no later than two working days from the time of the event.
The report shall include the following: 1) the time and date of the occurrence, 2) the place of occurrence, 3) a list of personnel directly involved, 4) a narrative description of the accident that includes a chronological order of facts and circumstances leading to mishap, the results of the investigation and an analysis to include a discussion of all cause factors listed, findings, recommendation, and any corrective action taken and 5) the signature of the supervisor at the time of the accident. The Contractor shall maintain an accurate record of the event and shall report to the CO and the COR in the manner prescribed by the CO. All accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies, and equipment incidental to work performed under this contract shall be reported immediately.
15. Call-out Number: The Contractor shall maintain a telephone number from 7:30 AM to 4:30 PM seven (7) days per week. The contact may be a person or answering service or machine. Once the COR has notified this contact, the Contractor shall be considered officially notified when called for problems or other work related items.
16. Lost and Found: The Contractor shall report to the COR, all personal articles found by the Contractor or Contractor employees shall be turned in on the same day found. The Contractor shall report any and all loss, damage and/or theft of Contractor equipment and/or supplies and the cost for repair or replacement.
17. Quality Control: The Contractor is responsible for establishing and maintaining adequate quality control to ensure satisfactory performance of contract work in accordance with the specifications. This feature will be assured by a comprehensive Quality Control Plan developed by the Contractor and submitted to the CO and COR within two (2) weeks of contract award. The Government will monitor all work to ensure compliance with the Contractor’s Quality Control Plan and that the Contractor's performance meets contract specifications. The plan shall depict in detail, an inspection system covering all work performed under this contract. This Plan shall include the following: 1) Identifying inspector(s), contact information, their vehicle, and work schedule; 2) inspection schedule, minimum 4 times per year.
SACRAMENTO, CALIFORNIA
140R2025Q0028
18. Quality Control Reports: The quality control report shall be turned in to the CO and COR for review following each inspection. The quality control report shall be typed and shall be submitted as part of the Contractor Quality Control Program. These reports shall, at a minimum, include the following information: 1) inspector’s name, 2) date, 3) deficiencies encountered, 4) any corrective action taken, 5) safety violations, 6) questions/concerns from Government personnel, 7) temporarily area closures, and 8) additional comments or suggestions.
19. Performance Evaluation Meetings: The Contractor shall meet with the COR (or a designated, representative) monthly, or as determined necessary by the COR, to discuss performance. However, a meeting shall be held not later than one normal workday after a Contract Deficiency Report (CDR) is issued. Mutual effort will be made to resolve any and all problems identified. Written minutes of these meetings shall be prepared and signed by the COR, the Contractor, or their designated representatives.
PART E – GOVERNMENT RESPONSIBILITIES:
1. Inspections: The Government shall inspect the Contractor’s performance in all functional areas under this contract and shall reserve the right to use whatever additional surveillance procedures are deemed appropriate.
Contractor services shall be inspected using the random sampling method, the planned sampling method and/or 100% inspection method. The Government reserves the right to change or alter the type of inspection plan at its discretion at any time. As a checklist guide the COR may use at their discretion the Performance Summary attached in Appendix C.
2. Performance Based Plan:
a. Monitoring Performance: During the course of the evaluation period, the COR will track Contractor performance. Interim (mid-term) evaluations may be provided to identify strengths and weaknesses in the Contractor's performance during the period being evaluated. At the end of the period, the COR will assess the Contractor's performance in accordance with the Quality Assurance Surveillance Plan (QASP) and report to the Contracting Officer.
b. Contractor Self-Assessment: Following each evaluation period, the Contractor may provide a written self-assessment of its performance to the COR to be considered in its report to the CO. The self-assessment shall be submitted not later than 5 working days after the end of each evaluation period. The self-evaluation shall not exceed two (2) pages. The self-assessment shall address both the strengths and weaknesses of the Contractor's performance during the evaluation period. Where deficiencies in performance are noted, the Contractor shall describe the actions planned or taken to correct such deficiencies and avoid their recurrence. The self-assessment itself will NOT be the basis for the payment determination.
c. COR Recommendation: The COR will consider all evaluations and any other pertinent information, including Contractor self-assessment, and will prepare a report to the CO with findings and recommendations. The Contractor will be provided a copy of the draft findings and recommendations of the COR and will be afforded the opportunity to identify factual errors. The COR's draft recommendation is not subject to negotiation and the COR will not engage in discussions with the Contractor. Any errors identified by the Contractor will be addressed by the COR in its final report. The Contractor will be provided a copy of the final COR report at the same time the report is submitted to the CO.
d. Payment Determination: The CO may meet with the COR to discuss the COR's report. The CO will make a final determination in writing as to the percentage of work successfully completed, and the resulting payment to be made. A copy of the determination will be provided to the Contractor no later than 45 calendar days after the
SACRAMENTO, CALIFORNIA
140R2025Q0028 end of the period being evaluated. All CO decisions regarding payment calculations are unilateral decisions made solely at the discretion of the Government.
e. Deduction: Notwithstanding any other clause of this contract, payment calculations will be made after receipt of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract.
f. Quality Assurance Surveillance Plan: The Quality Assurance Surveillance Plan is one evaluation method the Government uses to perform surveillance to determine whether the Contractor meets the standards of performance as defined in the Performance Work Statement. The absence of a QASP for any contract requirement, however, shall not detract from its enforceability or limit the rights or remedies of the Government under any other provision of the contract in determining the quality of the Contractor performance.
QUALITY ASSURANCE SURVEILLANCE PLAN
PERFORMANCE
REQUIREMENT SUMMARY
ACCEPTABLE
QUALITY LEVEL
MEANS OF
MEASUREMENT
Contractor shall comply with the Performance Work Statement’s Part B - Work to be Performed.
1. Timeliness:
Required turnaround time met 98% of the time.
2. Quality:
Analyses are within required tolerances 95% of time.
COR Surveillance:
100% review or periodic (depending on tasks) using Performance Summary in Appendix C
SACRAMENTO, CALIFORNIA
140R2025Q0028
APPENDIX A
JOB HAZARD ANALYSIS
COMPANY:
CONTRACTOR
TYPE OF
SERVICE:
PRINCIPAL STEPS: POSSIBLE HAZARDS: PREVENTION OR CONTROL:
1.
2.
3.
4.
5.
6.
7.
8.
This hazard analysis has been reviewed by all partners and employees who shall be working on Government Property.
CONTRACTOR
: DATE:
(Signature)
SACRAMENTO, CALIFORNIA
140R2025Q0028
APPENDIX B:
MONTHLY SAFETY REPORT
CONTRACTOR
NAME:
CONTRACTOR
SIGNATURE: DATE:
TOPIC:
MEETING SUMMARY:
ACTION REQUIRED:
SACRAMENTO, CALIFORNIA
140R2025Q0028
APPENDIX C:
PERFORMANCE SUMMARY
PERFORMANCE OBJECTIVE LOCATION PERFORMANCE
STANDARD
PERFORMANCE
ASSESSMENT
METHOD
D A I L Y S E R V I C E S
Empty Office Trash Receptacles ALL Put in designated dumpster Random Inspection Customer Complaint
Remove Food and Other Organic Receptacles ALL Put in designated dumpster Random Inspection
Customer Complaint
Empty Recyclables Bins ALL Put in designated outside receptacles
Random Inspection Customer Complaint
Clean Restroom Fixtures ALL No spots, streaks or dust Random Inspection Customer Complaint
Clean Restroom panels and stall doors ALL No spots, streaks or dust on steel trimming Random Inspection Customer Complaint
Clean Sinks ALL No food, waste, cleaning residue or stains
Random Inspection Customer Complaint
Clean Toilets ALL No excrement / other objects or stains; sanitized odor
Random Inspection Customer Complaint
Clean Mirrors ALL No spots, streaks or cleaning residue
Random Inspection Customer Complaint
Clean Kitchen Counter Tops ALL No food, spots, spills or cleaning residue
Random Inspection Customer Complaint
Clean Kitchen, Lunchroom, Break Room Cabinets and Lockers ALL Clean exposed surfaces and hardware Random Inspection Customer Complaint
Clean Appliances ALL Clean exposed surfaces and hardware
Random Inspection Customer Complaint
Refill Consumables ALL Refill containers and designated loose items; ready for use
Random Inspection Customer Complaint
Sweep and Mop Linoleum/Tile/Laminated Floors ALL No visible dirt, particles, stains or smudges Random Inspection Customer Complaint
Clean ALL Tables: Meeting Rooms, Break Room, Offices, Duplicating Rooms
ALL No dust, spider webs, smudges or stains
Random Inspection Customer Complaint
W E E K L Y S E R V I C E S
Clean Mats at Entry Ways ALL No visible dirt, paper, other particles or stains
Random Inspection Customer Complaint
Clean Trash Receptacles Containers ALL No visible refuse, liquids, or stains or smells Random Inspection Customer Complaint
SACRAMENTO, CALIFORNIA
140R2025Q0028
PERFORMANCE OBJECTIVE LOCATION PERFORMANCE
STANDARD
PERFORMANCE
ASSESSMENT
METHOD
D A I L Y S E R V I C E S
Dust Office Computer, desks, Equipment, and Bookshelves ALL Clean exposed surfaces of dust, spider webs Random Inspection Customer Complaint
Dust Window Offices (Interior Side) ALL Clean exposed surfaces, frames of dust Random Inspection Customer Complaint
Clean Door Windows (Interior & Exterior) ALL Clean screens and accessible glass on doors Random Inspection Customer Complaint
M O N T H L Y S E R V I C E S
Clean/Sweep EXTERIOR Entryways, ALL No visible dirt, particles or recent stains Random Inspections Customer Complaint
Dust Window Blinds ALL No dust or spider webs Random Inspection Customer Complaint
Clean Walls Surface, Floor to 6-ft Height ALL No dust, smudges or spider webs, stains Random Inspection Customer Complaint
Dust Wall Surface, above 6-ft ALL No objectionable dust or spider webs
Random Inspection Customer Complaint
Clean/Dust Wall Fixtures ALL No dust, smudges or spider webs
Random Inspection Customer Complaint
Dust Wall Fixtures; Above 6-ft Spider webs ALL No objectionable dust or spider webs Random Inspection Customer Complaint
Dust Fire Extinguisher & Defibrillator Cabinets ALL
Clean door and window on
EXTERIOR OF CABINETS
ONLY
Random Inspection Customer Complaint
Dust Ceiling Surfaces no Spider webs ALL No objectionable dust, smudges or spider webs Random Inspection Customer Complaint
Dust Ceiling HVAC Vents ALL No objectionable dust, smudges or spider webs
Random Inspection Customer Complaint
Dust Ceiling Light Fixtures ALL No objectionable dust, smudges or spider webs
Random Inspection Customer Complaint
Dust Ceiling Other Fixtures ALL No objectionable dust, smudges or spider webs
Random Inspection Customer Complaint
Wax Linoleum/Tile/ Laminated Floors ALL No visible dirt, particles, stains or smudges Random Inspection Customer Complaint
Clean/Vacuum ALL Chairs:
Meeting Room, Break Room, Offices
ALL No dust, spider webs, smudges, debris or stains
Random Inspection Customer Complaint
S E M I - A N N U A L S E R V I C E S
Clean ALL Windows (Interior & Exterior) ALL Clean glass and frames, no dust, smudges or spider webs Random Inspection
SACRAMENTO, CALIFORNIA
140R2025Q0028
PERFORMANCE OBJECTIVE LOCATION PERFORMANCE
STANDARD
PERFORMANCE
ASSESSMENT
METHOD
D A I L Y S E R V I C E S
Strip & Wax ALL Tile, Linoleum, Laminated Floors ALL No visible dirt, particles, stains or smudges Random Inspection Customer Complaint
A N N U A L S E R V I C E S
Clean ALL Windows (Interior & Exterior) ALL Clean glass and frames, no dust, smudges or spider webs Random Inspection Customer Complaint
Strip & Wax ALL Tile, Linoleum, Laminated Floors ALL No visible dirt, particles, stains or smudges Random Inspection Customer Complaint
O T H E R S E R V I C E S
Supply Cleaning Equipment ALL Supply Random Inspection Customer Complaint
Supply Cleaning Supplies ALL Supply environmentally benign and hypo-allergenic
Random Inspection Customer Complaint
Store Equipment and Supplies ALL Store equipment and supplies in janitor closets ONLY
Random Inspection Customer Complaint
Dispose of Wastewater and Cleaning Products ALL
Dispose in janitor wash tub in Admin Building Dispose in washtub in O&M Building
Random Inspection
End of Performance Work Statement
SACRAMENTO, CALIFORNIA
140R2025Q0028
SOLICITATION CLAUSES
Clauses included in this combined solicitation/synopsis are not all inclusive. Clauses included on any ensuing award may include all or some of the below clauses. Contractors should assume that all of the below clauses are applicable to this acquisition. Additional clauses may also be added at the discretion of the contracting officer upon award
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar
(End of clause)
The clauses in the table below are incorporated by reference.
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS
(DEC 2014)
52.212-4 CONTRACT TERMS AND CONDITIONS-COMMERICAL PRODUCTS
AND COMMERCIAL SERVICES
(NOV 2023)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
52.228-5 INSURANCE-WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS
(MAR 2023)
52.233-1 DISPUTES (MAY 2014)
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND
VEGETATION
(APR 1984)
END OF CLAUSES INCORPORATED BY REFERENCE
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES
(Jan 2025)
(DEVIATION
FEB 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 http://www.acquisition.gov/far http://www.acquisition.gov/diar https://www.acquisition.gov/far/52.203-19#FAR_52_203_19
SACRAMENTO, CALIFORNIA
140R2025Q0028
(Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C.
3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) ( 31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) ( 41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4)52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community— see FAR 3.900(a).
_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L.
109-282) ( 31 U.S.C. 6101 note).
__ (6) [Reserved].
__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L.
111-117,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .