Sol_140R2021Q0056.pdf
PDF 2 MB Posted
- Attached to
- Vegetation & Weed Abatement Services Federal contract opportunity
- Solicitation number
- 140R2021Q0056
About this file
This solicitation requests quotes for vegetation and weed abatement services at Folsom Dam and its facilities. The Bureau of Reclamation intends to award a firm-fixed price purchase order for a base period from June 2021 to May 2022, with four optional one-year extensions. Quotes are due by April 30, 2021. The scope of work involves chemical application of herbicides to remove specified weeds from roads, structures, dikes and other areas totaling approximately 507 acres. Contractors must hold a valid C-27 Landscaping License and have a past performance record for similar services. The solicitation will be set aside for small businesses and evaluated based on past performance, technical acceptability, and price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2021Q0056_Amd_0003.pdf | ||
| A0003 Revised Price Schedule and Statement of Work_0003.docx | DOCX document | |
| Sol_140R2021Q0056_Amd_0002.pdf | ||
| Request For Information Responses_0002.docx | DOCX document | |
| Attachment 2 - 2019 Invasive Species Monitoring Report_0002.pdf | ||
| Sol_140R2021Q0056_Amd_0001.pdf | ||
| Attachment 1 - Wage Determination 2015-5631.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
R20
Sacramento CA 95825-1898
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
CODE 16. ADMINISTERED BYCODE
X
X
X
561730
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORR20
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
04/30/2021 1200 PD
04/14/2021
916-978-5540Denard Fobbs (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140R2021Q0056
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 32 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
2800 Cottage Way, Room E-1815
TELEPHONE NO.
17a. CONTRACTOR/
15. DELIVER TO
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815 Division of Acquisition Services Regional Office Mid-Pacific Region
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$8.00
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
Bureau of Reclamation
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Legacy Doc #: BOR Period of Performance: 06/01/2021 to 05/31/2022
00010 Base Period: June 1, 2021 - May 31, 2022: Folsom Vegetation and Weed Abatement Services in accordance with the Performance Work Statement & Price Schedule
00020 Option Year #1 : June 1, 2022 - May 31,2023 Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Denard Fobbs
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Folsom: Vegetation and Weed Abatement Services in accordance with the Performance Work Statement
& Price Schedule
(Option Line Item)
05/31/2022
Period of Performance: 06/01/2022 to 05/31/2023
00030 Option Year #2: June 1, 2023 - May 31, 2024:
Folsom Vegetation and Weed Abatement Services in accordance with the Performance Work Statement &
Price Schedule
(Option Line Item)
05/31/2023
Period of Performance: 06/01/2023 to 05/31/2024
00040 Option Year #3: June 1, 2024 - May 31, 2025:
Folsom Vegetation and Weed Abatement Services in accordance with the Performance Work Statement &
Price Schedule
(Option Line Item)
05/31/2024
Period of Performance: 06/01/2024 to 05/31/2025
00050 Option Year #4: June 1, 2025 - May 31,2026:
Folsom Vegetation and Weed Abatement Services in accordance with the Performance Work Statement &
Price Schedule
(Option Line Item)
05/31/2025
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 32
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2021Q0056
Period of Performance: 06/01/2025 to 05/31/2026
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. The Bureau of Reclamation intends to award a Firm-Fixed Price Purchase Order for services represented in the Performance Work Statement. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-05.
This requirement is being solicited as a Small Business Set-Aside and will be awarded based on a comparative evaluation of price and past performance under FAR Part 13.
GENERAL INFORMATION
RFQ Number: 140R2021Q0056
Request for Quotation (RFQ) Request for Proposal (RFP) Invitation for Bid (IFB)
North American Industry Classification Code
(NAICS):
561730 Size Standard: $8.0M
QUOTES DUE: April 30, 2021 at 12:00 PM Pacific Time
EMAIL TO: dfobbs@usbr.gov
*** Site Visit Information *** Attending the Site Visit is Highly Recommended
Date: April 21, 2021 @ 8:00 PM Pacific Time
Location: 38.7072546571276, -121.16826573405464 ( Google Maps: Copy>Paste>Search)
Requirements: Vendor Must RSVP with Denard Fobbs at dfobbs@usbr.gov No Later Than 4/19/2021 @ 12:00 PM Pacific Time mailto:dfobbs@usbr.gov
SECTION B – CONTINUATION OF SF-1449
PRICE SCHEDULE
CLIN DESCRIPTION QUANT UNIT UNIT PRICE AMOUNT
Base Period: June 1, 2021 – May 31, 2022 Folsom Vegetation and Weed Abatement Services in accordance with the Performance Work Statement & Price Schedule
3 JOB
Option Year #1 : June 1, 2022 – May 31, 2023 Folsom Vegetation and Weed Abatement Services in accordance with the Performance Work Statement & Price Schedule
3 JOB
Option Year #2: June 1, 2023 – May 31, 2024 Folsom Vegetation and Weed Abatement Services in accordance with the Performance Work Statement & Price Schedule
3 JOB
Option Year #3: June 1, 2024 – May 31, 2025 Folsom Vegetation and Weed Abatement Services in accordance with the Performance Work Statement & Price Schedule
3 JOB
Option Year #4: June 1, 2025 – May 31,2026 Folsom: Vegetation and Weed Abatement Services in accordance with the Performance Work Statement & Price Schedule
3 JOB
Grand Total
Scope of Work Weed Abatement Program Central California Area Office – Safety of Dams
FY 2021 -2026
1.0 Scope
1.1 Objective – The objective of this contract is to acquire contractor services to perform weed abatement for Folsom Dam and its facilities. The goal is to have a weed free area for the Folsom Dam and its facilities.
1.2 Background
The Contractor shall provide the Central California Area Office of the Bureau of Reclamation, Great Basin Region 10 (Reclamation) with weed abatement services via the application of herbicides as part of its weed abatement program.
Reclamation maintenance personnel perform occasional mechanical control of weeds, however, additional work is needed.
Weed abatement services will allow the Central California Area Office to closeout environmental commitments for the Safety of Dams Project.
Weed abatement services will be carried out at Folsom Dam and its facilities including Dikes 1, 4, 5, 6, 7, 8, Left- and Right-Wing Dams, Mormon Island Auxiliary Dam, and Auxiliary Spillway. Figure 1 below illustrates these locations (note that the Auxiliary Spillway is within the Left-Wing Dam polygon).
Figure 1: Weed Abatement Service Locations
The contractor shall be responsible for all permitting, herbicide application, post-application reporting, and disposal of all empty containers. The contractor will also be responsible for the protection of all non-target plants, animals, and other species.
Protection of the environment and water quality is of the utmost importance. Work shall be performed when wind is at a minimum and all application activities shall be halted when wind gusts exceed 10 mph. All herbicide tank mixes shall include a surfactant to enhance chemical adhesion and retard drift.
The work shall involve chemical application of herbicides, approved by Reclamation prior to use, along the drainage slopes, waste ways, primary and secondary roadways and road edges, road drainage swales and ditches, fence lines, turnouts, kiosks, overlooks, parking lots, restrooms, trailheads, wildlife ponds, dams, dam works, spillways, penstocks, pipelines, valve structures, monitoring weirs, bridges, gates, boat ramps, equipment storage areas, office buildings and other structures or appurtenances.
2.0 References
The following document is required in the performance of this contract:
1. Reclamation Manual Integrated Pest Management Program - Reclamation Manual | Bureau of Reclamation (usbr.gov).
May 5th, 2020.
3.0 Tasks
The contractor shall perform the following tasks:
3.1 The Contractor will submit a Spray Management Work Plan (Work Plan) before the start of work. The Work Plan shall include recommendations of chemical use, and outlines proposed method and timing necessary to insure a weed-free treatment area from the first pre-emergence application through post-emergence application.
The Work Plan shall include a proposed timetable for weed abatement treatments along with the chemicals and their application rates.
3.2 The contractor will utilize herbicides to remove weeds from the Folsom Dam and its facilities. All weeds must be removed, however, the following species are to be targeted: Fox Tail grass Bromus rubens, Wild Oats Avena fatua, Rye Grasses Lolium perenne, Blue Grasses Poa secunda , Yellow Star Thistle Centaurea solstitialis, Italian Thistle Carduus pycnocephalus, Bull Thistle Cirsium vulgare, Filaree Erodium cicutarium, Skeleton weed Chondrilla juncea, Field Bindweed Convolvulus arvensis, Pampas Grass Cortaderia selloana, Stinkwort Dittrichia graveolens, French Broom Genista monspessulana, Perennial Pepperweed Lepidium latifolium, Medusa head Elymus caput-medusae, Mare’s Tail Hippuris vulgaris, and Tree of heaven Ailanthus altissima.
Contractor shall spray for all annual grasses and any woody vegetation as it appears. Special attention shall be paid to dams, dikes, canals, and structures.
3.3 Chemicals approved for use on Reclamation Lands include the following products:
Sulfometuron-methyl (Oust) Oxyfluorfen (Goal) Glyphosate (Rodeo, Roundup) Oryzalin (Surflan) Clopyralid (Transline) Tricloypr (Pathfinder, Garlon) Aminopyralidtriisopropanolammonium (Milestone VM) Sulfentrazone (Portfolio 4F CA)
3.4 All chemical treatments shall be band applied. No broadcast or blanket type of spray coverage shall be permitted. All chemical treatment shall be applied by ground driven or handheld equipment.
Contractor shall avoid driving over freshly sprayed areas. No aerial equipment will be permitted.
3.5 Chemical band treatments will be applied at the following widths;
(a) Fence lines – 10 feet (5 feet each side of fence)
(b) Primary (paved) roads – 5 feet on each shoulder (to include drainage ditch)
(c) Secondary (unpaved) roads – road width + 5 feet each shoulder (to include drainage ditch)
(d) Road edge w/ Bollards – Spray road edge and 3 feet beyond bollards
(g) Parking lots – 5 feet along lot edges (to include drainage ditch)
(h) Bridges/Gates – 5 feet along perimeter and road edge (including abutments)
(j) All Buildings – 5 feet band around perimeter of all buildings Exception: Landscaped areas around office buildings
(k) Pipelines – 30 feet each side and under pipelines
(l) Wing Dams/Dikes – crest road width + 5 feet each shoulder, access roads + 5 feet each shoulder, entire upstream and downstream face including groin areas, and woody and weedy vegetation on upstream face (when accessible)
(m) Monitoring Wells/Weirs – 5 feet radius around each well/weir plus instrumentation access roads + 5 feet each shoulder
3.6 Weed Abatement applications will be made at the following facilities per Figure 1;
https://www.usbr.gov/recman/
(a) All Primary roads
(b) Secondary roads
(c) Parking lots
(d) Fence lines
(e) Natomas & North Fork Pipeline Right-of-Way (including woody vegetation)
(g) Area buildings and shops
(h) Equipment storage areas
(i) Warehouse storage yard
(j) Secured storage
(k) Earthen Wing Dams and Dikes 1, 4, 5, 6, 7, & 8
(l) Mormon Island Auxiliary Dam (including the two benches on the downstream side)
(m) Monitoring weirs/wells including access roads
3.7 Contractor shall apply herbicide applications based upon the following schedule, weather permitting; (Actual times may be adjusted based on weather conditions and after mutual agreement between Reclamation and the Contractor).
3.7.1 Pre-emergence - October to December (annual grasses, biennials and perennials). Spray for annual grasses and woody vegetation within treatment areas, with special focus on Yellow Starthistle Centaurea solstitialis and Stinkwort Dittrichia graveolens. If possible, spray before rain events to allow the material to sink into the soil. Take proper precaution to avoid any chemicals from entering into any waterbodies.
3.7.2 Post-emergence - January to February (annual grasses, biennials and perennials). Spray for annual grasses and all woody vegetation growing within treatment areas.
3.7.3 Touch-up - March to May (late germination of annual grasses, biennials, and thistle). Treat problem areas and re-spray areas missed by initial post-emergence application. Touch-up spray for annual grasses and all woody vegetation growing within the treatment areas.
3.8 The Contractor must abide by all local, state and Federal regulations relative to the work being performed.
Contractor shall be responsible for all fees, fines and penalties assessed for failure to comply with pertinent laws and regulations.
3.9 The Contractor shall provide proof of insurance for the performance of the requested activities including but not limited to vehicle, workers compensation, and professional liability. Professional liability insurance shall have a minimum of one million dollars per occurrence. The Bureau of Reclamation, Central California Area Office shall be listed as additional insured on all professional liability insurance.
3.10 The Contractor shall provide Reclamation a hold harmless agreement for all actions resulting from their work activities.
3.11 A work performance evaluation period will commence after the end of the contract time period of June 2021 – May 2026. As part of the evaluation, the contractor will be assessed by its performance in effectively creating a weed-free treatment area for the time period covered in this contract. Mid-term evaluations will be carried out in May 2023 to assess contractor performance.
3.12 The Contractor shall include in the Work Plan steps to be taken to prevent the unauthorized release of any chemicals, steps to be taken for notification of an unauthorized chemical release, steps to be taken to remediate an unauthorized chemical release, including clean-up procedures to be undertaken allowing for the protection of the visiting public, workers, Reclamation employees, neighbors/adjoining property owners, and the environment.
3.13 The Contractor shall submit a hazard analysis prior to commencing work. Hazard analysis shall identify all possible hazards and provide actions for preventing or mitigating them should they occur. Hazard Analysis shall include location and route to nearest hospital, name and telephone number of company physician, telephone number for ambulance, police and fire departments having jurisdiction.
3.14 Prior to the submitting the Work Plan the contractor shall have a mandatory meeting at each project site to review and become familiar and knowledgeable about each area to be treated.
3.15 The Contractor shall include a surfactant in each tank mix to ensure that chemical drift is reduced to a minimum. All chemical applications will be discontinued when the wind gust speed reaches a minimum of 10 mph.
3.16 A non-toxic dye coloring to denote the areas treated shall be included in each tank mix. The dye coloring will be selected by Reclamation. Contractor shall inform Reclamation as to the colors available. Color dye will be detected for no longer than 30 days after chemical treatment.
3.17 The Contractor shall be responsible for the triple rinsing, crushing, and proper disposal of all pesticide, surfactant, and any other containers utilized on this project. Contractor shall be responsible for the proper removal and disposal of all trash, rubbish, or other waste created while performing work.
3.18 Signs shall be placed along road edges and within campgrounds or visitation sites at least 2 days prior to any herbicide applications. Signs shall be removed no later than noon the second day after treatment. The signs shall include wording informing visitors of herbicide application and the signs need to be approved by Reclamation prior to posting.
3.19 Should contractor fail to provide effective chemical treatment, contractor shall be responsible for providing mechanical abatement to protect buildings, campgrounds, pipelines, powerhouses, water treatment plants, and all other structures or appurtenances from a wildland fire threat.
3.20 Total estimated acreage to be treated for each 1st and 2nd application is approximately 507 acres. The total acreage for Folsom is 507 acres; 404 acres consists mainly of annual grasses and 103 acres of annual grasses with woody vegetation.
Special emphasis for treatments shall be placed upon road shoulders, dams, wing dams and monitoring weirs.
3.21 Pest Management Maintenance Record shall be prepared by the Contractor and include; name and address where pest control work was performed, name and address of pest control operator, type of pest control work performed, manufacturer and name of products used, EPA registration number of pesticide used, total product used, site treated, and acres treated.
3.22 Pest Management Maintenance Record shall be signed by the applicator and include applicator identification number/permit number and license number.
3.23 The Contractor shall produce and abide by a fire protection plan with measures to prevent and respond to potential fires. The fire protection plan shall be approved by Reclamation prior to abatement activities.
4.0 Performance Requirements Summary
Task No. Task Description Performance Indicator Performance Standard
Minimum Acceptable Quality Level
3.1 Submit Spray
Management Work Plan
Contractor shall have a work plan that achieves goal 3.2
Submit plan with chemical recommendatio ns, method, timing, chemical application rates
Submit completed plan by May 2021
3.2 The contractor will
utilize herbicides to remove weeds from the Folsom Dam and its facilities.
Existing weed populations are reduced
Weed free treatment area from first application through June
Achieve at a minimum a 80% reduction in all listed species or Control weed species such that populations stay at or below present levels
3.13 Hazard Analysis Plan Contractor shall
have sufficient analysis to be prepared for all potential hazards
Hazard analysis shall provide:
location and route to nearest hospital, name and telephone number of company physician, telephone number for ambulance, police and fire departments having jurisdiction.
Submit completed plan by May 2021
3.20 Treatment Acreage Identified
areas show signs of treatment
All 507 acres will be treated during the pre-emergence, post-emergence, and touch-up phases
All 507 acres will be treated during the pre-emergence, post-emergence, and touch-up phases
3.21 – 3.22
Pest Management Record
Contractor shall maintain proper records to allow for future improvements and provide evidence for work completed.
Pest Management Maintenance Record shall include; name and address where pest control work was performed, name and address of pest control operator, type of pest control work
Contractor shall continue the record throughout the duration of the contracted work.
The record may need to submitted at regular intervals to ensure compliance and at the end of work for proper records.
performed, manufacturer and name of products used, EPA registration number of pesticide used, total product used, site treated, and acres treated.
3.23 Fire Protection Plan Contractor
shall produce and abide by a reasonable plan to avoid and be able to respond to any fires.
The plan shall have measures to avoid and respond to potential fires effectively.
Submit completed plan by May 2021 and abide by the plan for the duration of the contracted work
5.0 Security
Reclamation has identified specific security sensitivity designations for information related to Government facilities. All Contractor produced and Government furnished information related to this contract is designated Public Information (Non Official-Use-Only), except for the Government furnished work products which are designated Official Use Only – SENSITIVE (FOUO/SENSITIVE). The Contractor shall be required to supply Reclamation with the legal names and other personal information of employees who will be working under this contract.
Reclamation reserves the right to perform security checks on Contractor employees. All contract personnel are required to identify themselves as contractors. Whether attending meetings, answering Government telephones, or working in other situations where their contractor status is not obvious to third parties, they must make their status known to avoid creating an impression that they are Government employees. Contractor employees will be accessing secure sites and security training and the use of a Central California Area Office badge will be necessary.
Additionally, the contractor must have at least one person on the crew obtain a PIV card if the work is to last less than 180 days. If longer than 180 days, all personnel will have to get a PIV card if it is a dedicated person/team. The tops of dikes 4, 5, and 6, the left-wing dam, the right-wing dam, and the JFP are all zone three. If this contract lasts for more than a year, one or more contractors would have to be designated as an escort and obtain an MBI background investigation for continued access. On the other hand, a zone three escort CCAO employee can escort them while they are spraying.
6.0 Government Furnished Materials
N/A
SECTION C – CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/
Clauses Title Date 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.212-4 Contract Terms and Conditions – Commercial Items OCT 2018 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.237-2 Protection of Government Buildings, Equipment, and Vegetation
APR 1984
52.242-15 Stop-Work Order AUG 1989 52.212-5 Contract Terms and Conditions Required to Implement
Statutes or Executive Orders -- Commercial Items
JAN 2021
_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.
109-282) (31 U.S.C. 6101 note).
_X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101note).
_X_ (18) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
_X_ (22) (i) 52.219-28, Post Award Small Business Program Representation (MAR 2020) (15 U.S.C. 632(a)(2)).
_X_ (27) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).
_X_ (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
_X_ (30) (i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).
_X_ (31) (i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
_X_ (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C.793).
_X_ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
_X_ (35) (i) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O. 13627).
_X_ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.
13513).
_X_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
http://www.acquisition.gov/far/ https://www.acquisition.gov/content/52204-10-reporting-executive-compensation-and-first-tier-subcontract-awards#i1064087 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/content/52209-6-protecting-government%E2%80%99s-interest-when-subcontracting-contractors-debarred-suspended-or-proposed-debarment#i1062590 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/content/52219-13-notice-set-aside-orders#i1057715 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/52219-28-post-award-small-business-program-rerepresentation#i1057874 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/52222-3-convict-labor#i1055332 https://www.acquisition.gov/content/52222-21-prohibition-segregated-facilities#i1055713 https://www.acquisition.gov/content/52222-26-equal-opportunity#i1055793 https://www.acquisition.gov/content/52222-35-equal-opportunity-veterans#i1056230 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/content/52222-36-equal-opportunity-workers-disabilities#i1056250 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/content/52222-37-employment-reports-veterans#i1056265 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/content/52222-50-combating-trafficking-persons#i1056535 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/52223-18-encouraging-contractor-policies-ban-text-messaging-while-driving#i1053316 https://www.acquisition.gov/content/52225-13-restrictions-certain-foreign-purchases#i1054249
_X_ (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) (31 U.S.C. 3332).
_X_ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
_X_ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
This Statement is for Information Only: It is not a Wage Determination
Employee Class Monetary Wage-Fringe Benefits Laborer Grounds Maintenance (WG-3) $17.06 to $19.89
_X_ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_X_ (7) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).
_X_ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
(End of Clause)
52.217-8 OPTION TO EXTEND SERVICES NOV 1999
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 Days
(End of clause)
52.217-9 OPTION TO EXTEND THE TERM OF THE
CONTRACT
MAR 2000
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 45 days before the contract expires. The preliminary notice does not commit the Government to an extension. If the Government exercises this option, the extended contract shall be considered to include this option clause.
(b) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.
(End of clause) https://www.acquisition.gov/content/52232-33-payment-electronic-funds-transfer-system-award-management#i1050674 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/content/52222-41-service-contract-labor-standards#i52_222_41 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/52222-42-statement-equivalent-rates-federal-hires#i1056410 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/52222-44-fair-labor-standards-act-and-service-contract-labor-standards-price-adjustment#i1056463 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/52222-55-minimum-wages-under-executive-order-13658#i1056818 https://www.acquisition.gov/content/52222-62-paid-sick-leave-under-executive-order-13706#i52_222_62
52.219-6 Notice of Total Small Business Set-Aside
(DEVIATION 2019-01)
JAN 2019
(a) Definition. Small business concern, as used in this clause, means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.
(b) Applicability. This clause applies only to—
(1) Contracts that have been totally set aside or reserved for small business concerns; and
(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) General.
(1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.
(2) Any award resulting from this solicitation will be made to a small business concern.
(d) Agreement.
(1) For a contract at or below the simplified acquisition threshold, a small business concern may provide the end item of any firm. For a contract exceeding the simplified acquisition threshold and the requirements of paragraphs (d)(1)(i) through (iii) of this clause have not been waived by SBA in accordance with 13 CFR 121.1204, a small business concern that provides an end item it did not manufacture, process, or produce, shall—
(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;
(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and
(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.
(2) Paragraph (d)(1) of this clause does not apply to construction or service contracts.
(End of Clause)
DOI-AAAP-0028 Electronic Invoicing And Payment Requirements – Invoice Processing Platform
APR 2013
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
The Contractor shall attach/upload an electronic copy of the invoice to the IPP invoice submittal.
The Contractor shall also submit an electronic copy of the IPP invoice to the attention of the Contracting Officer at supplyserviceinvoice@usbr.gov once the IPP invoice has been submitted.
Invoices must be submitted via IPP in order to be properly processed within the payment terms set forth under this contract.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date.
Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT
REPORTING SYSTEM
DEC 2015
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO).
https://www.ipp.gov/ mailto:supplyserviceinvoice@usbr.gov mailto:ippgroup@bos.frb.org
140R2021Q0056 Folsom Vegetation and Weed Abatement
Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for http://www.cpars.gov/ http://www.cpars.gov/ some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
DIAR 1452.201-70 Authorities and Delegation DEC 2009
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of Clause)
WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations
MAY 2018
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR’s authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract;
therefore, the COR does not have the authority to, and may not, issue any technical direction that
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor’s right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must –
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order. (f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
(End of Clause)
WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE
PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN
THE FEDERAL WORKPLACE -- BUREAU OF
RECLAMATION
DEC
In performing work under this contract, the contractor shall comply with the requirements of Executive Order 13058, dated August 9, 1997, which prohibits the smoking of tobacco products in all interior space owned, rented, or leased by the executive branch of the Federal Government, and in any outdoor areas under executive branch control in front of air intake ducts.
(a) In addition, pursuant to Federal Management Regulation (FMR) Bulletin 2009-B1, effective December 22, 2008, smoking is prohibited in courtyards and within 25 feet of doorways and air intake ducts on outdoor space under the jurisdiction, custody or control of GSA.
WBR 1452.237-80 Security Requirements--Bureau of Reclamation FEB 2017
(a) General Security Requirements:
(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, vessel exclusion barriers, and information technology security requirements. Within this clause, COR means Contracting Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.
(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the CO. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the CO will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.
(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or sensitive areas. The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.
(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.
(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. (Note: within the Department of the Interior this card is known as a DOI Access Card.) During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.
(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the Contractor employee. For those individuals that will be receiving a PIV Card, the Government may, at its discretion, issue a temporary identification card or visitor identification badge after the electronic background investigation forms have been received and the investigation is initiated.
(7) All Contractor employees shall access the facility via the facility’s entry screening system and visibly display the Government-issued PIV Card, temporary identification card, or visitor identification badge at all times. Contractor employees must visibly wear the Government-issued identification card at all times they are on Government facilities.
Contractor employees are responsible for the safekeeping of all Government-issued identification cards, whether on-site or off-site. Cards that have been lost, damaged, or stolen must be reported to the COR and DOI Access Sponsor within 24 hours. The Contractor shall return all identification cards and card keys and any other Government property and information upon completion of performance or when personnel depart permanently or for a period of 7 days or more. The Contractor may be required to turn in access control cards or identification cards on a daily basis.
(8) Misuse or loss of access control or identification cards, or failure to comply with required surrender of such cards may, at Government discretion, result in Contractor personnel being denied access to the work site, at no cost to Government.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .