About this file

This document contains responses to a Request for Information related to solicitation number 140R2021Q0056 for Vegetation and Weed Abatement Services from the Department of the Interior Bureau of Reclamation. The responses clarify that the goal of the contract is to have a weed free area for Folsom Dam and its facilities, and that pre-emergent herbicide applications are intended to only treat for noxious weeds. It is also confirmed that the roads, lots, fences and storage areas to be treated are those that were previously disturbed per the Safety of Dams program. While the total acreage stated in the solicitation is 507 acres, the actual acreage of invasive species is likely to be less. Finally, it is noted that the statement during the site visit that dikes 2 and 3 were not to be treated was incorrect, and that the contract specifies treatment of dikes 1, 4, 5, 6, 7 and 8.

View the file

Other files for this federal contract opportunity

Other files attached to Vegetation & Weed Abatement Services, newest first.
File Type Posted
Sol_140R2021Q0056_Amd_0003.pdf PDF
A0003 Revised Price Schedule and Statement of Work_0003.docx DOCX document
Sol_140R2021Q0056_Amd_0002.pdf PDF
Attachment 2 - 2019 Invasive Species Monitoring Report_0002.pdf PDF
Sol_140R2021Q0056_Amd_0001.pdf PDF
Attachment 1 - Wage Determination 2015-5631.pdf PDF
Sol_140R2021Q0056.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request For Information Responses (RFI) A0002

1) At the pre-bid we discussed applications targeted on noxious weeds and the desire to keep other vegetation. The performance and work statement talks about pre-emergent herbicide application and targeting annual grasses, item 3.7.1,2,3. Pre-emergent applications to control or eliminate grasses will not protect the desired vegetation. Also item

3.19 states one of the goals is wildland fire threat. What is the goal of the operation. Is your pre-emergent application intended to only treat for noxious weeds?

The goal of the operation is under 1.1 and at the beginning of the document - The goal is to have a weed free area for the Folsom Dam and its facilities. Any mention of a goal listed thereafter is secondary to this primary goal.

2) During the visit we discussed treatment areas focused on areas that had been disturbed. Item 3.6 lists treatment areas that do not seem to be consistent with what we saw. Are the roads to be treated only within the previously worked areas? Are there lots, fences, storage areas?

There were some lots that were within the areas we looked at, are these the only ones?

What treatment areas in 3.6 are not consistent with the site visit? Yes, there are lots, fences, and storage areas, and the roads to be treated are the roads that were disturbed per the Safety of Dams program.

As with #3, I will see if I can obtain the shapefiles that will delineate the areas that were disturbed per the Safety of Dams program.

3) Item 3.20 has total acreage of 507 acres. Trying to measure areas we visited I do not get to that total. I realize that the acreage will vary year to year but is the 507 a number I can use a treatment area to determine costs or is there a more accurate number?

I obtained the 507 acre figure from our Tessel GIS web service by combining the acreage of the areas in the contract. The issue is that within those 507 acres, there are areas that do not have any invasive species, thus the actual acreage of invasives is likely to be less. I decided to err on the side of caution and provide a higher acreage figure to account for year to year variability.

I will see if I can obtain an acreage estimate that is based upon the 2019 invasive report survey results/GIS shapefiles and polygons.

4) In the tour Dikes 2 and 3 were to be treated and not 4 and 5. Is this correct it is inconsistent with work statement?

During the tour we stated that dikes 2 and 3 were not to be treated. As per the contract, the dikes and dams to be treated are the earthen wing dams and dikes 1, 4, 5, 6, 7 and 8.