Sol_140P8621Q0004.pdf
PDF 524 KB Posted
- Attached to
- PAINT NHL EUREKA OVERHEAD DECKS at SAFR
- Solicitation number
- 140P8621Q0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B11 NHL Eureka Sign in Sheet_0002.pdf | ||
| Sol_140P8621Q0004_Amd_0002.pdf | ||
| Sol_140P8621Q0004_Amd_0001.pdf | ||
| B03 DB Wages 1-15-2021.pdf | ||
| A04 Scope of Work.pdf | ||
| B08 Eureka Paint Bid Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040515204
NPS, PWR - GOGA MABO
Building 201, Fort Mason
San Francisco CA 94123
PPG
Gary Kramer 805 370 2324
167044
02/01/2021
140P8621Q0004
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Preparation, routine painting, and finish work underside of the wooden passenger and hurricane deck overhangs on the Historic Ferry at San Francisco Maritime Historical
Park
San Francisco Maritime National Historic Park, San Francisco, CA
The Contract Base Work requires that contractor provide preparation, routine painting, and finish work underside of the wooden passenger and hurricane deck overhangs on the Historic Ferry at San Francisco Maritime National Historic Park.
Per FAR 36.204 the Estimated Magnitude of Construction is: $100,000.00 to $250,000.00
Per FAR 19.502-2, this solicitation is reserved for Total Small Business. Offers received from concerns that are not Total Small Business concerns shall be considered nonresponsive and will be rejected.
The North American Industry Classification System (NAICS) code is 238320 and a small business size standard is $16.5 Million in annual gross receipts for the past three years.
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 150 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F
02/26/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
DOI, NPS, PWR - GOGA MABO - SAMO
401 W. Hillcrest Drive
Thousand Oaks CA 91360
PG2
Gary Kramer
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 40
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P8621Q0004
The Government intends to award a single, Firm-fixed price contract. Award selection will be made to the selected contractor on the basis of "Lowest Price Technically Acceptable" that the
Government determines can best satisfy the objectives and requirements of this Request for
Quotations, in a manner most advantageous to the
Government. See Section M for the evaluation factors for award.
A SITE VISIT: Contact the Project Manager, Jeffery Morris at (415) 561-7046, email jeffery_morris@nps.gov. See Section L of the RFP for more information.
PROPOSALS MUST BE RECEIVED BY: 12:00 p.m. PT, Friday, February 26, 2021, and shall only be accepted through electronic mail addressed to gary_kramer@nps.gov.
Interested parties may explore the San Francisco
Maritime Historical Park website to acquaint themselves with the general area and to view park maps at http://www.nps.gov/safr
This is a Federal Construction Project and applicable wages apply. See Section J, Attachment
No. 03
For Project technical question please contact the
PM: Jeffery Morris, Phone: 415-859-6805, Email:
jeffrey_morris@nps.gov
Legacy Doc #: NPS
Delivery: 09/01/2021
Delivery Location Code: 0009060632
NPS, San Francisco Maritime NHP
Fort Mason Center, Building E
San Francisco CA 94123 US
Period of Performance: 04/01/2021 to 09/01/2021
00010 Paint NHL Eureka Overhead Decks
Product/Service Code: J020
Product/Service Description: MAINT/REPAIR/REBUILD
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 40
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P8621Q0004
OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
Paint and finish work underside of overhangs on the Historic Ferry Eureka
THE CONTRACTOR IS RESPONSIBLE FOR ALL MATERIAL,
LABOR, EQUIPMENT, TOOLS, AND EXPERTISE NEEDED TO
COMPLETE THIS PROJECT IN ACCORDANCEWITH THE
STATEMENT of WORK
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
San Francisco Maritime National Historical Park (SAFR)
Paint NHL Eureka Overhead Decks
Solicitation140P8621Q0004
This solicitation is set aside for Small Businesses only
TABLE OF CONTENTS
SECTION B – SUPPLIES OR SERVICES AND PRICES
B.1 – Contract Price Schedule
SECTION C – DESCRIPTIONS AND SPECIFICATIONS
C.1 – Specifications
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
E.1 – 52.252-2 Clauses Incorporated by Reference (Feb 1998)
SECTION F – DELIVERIES OR PERFORMANCE
F.1 – 52.252-2 Clauses Incorporated by Reference (Feb 1998)
F.2 – 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 – Contract Administration
G.2 – 1452.201-70 Authorities and Delegations (Sep 2011)
G.3 – Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)Vo 3 (Sept 11, 2017)
G.4 – Correspondence
G.5 – Appointment of Contractor Representative/Superintendent
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 – Interpretation of Contract – Notice of Ambiguities
H.2 – Workers Compensation
H.3 – Site Specific Safety and Health Plan
H.5 – Conduct of Operations
H.6 – Archeological Findings
H.7 -- Wage Rates………………………………………………………………………………………………………13
SECTION I – CONTRACT CLAUSES
I.1 – 52.252-2 Clauses Incorporated by Reference (Feb 1998)
I.2 –1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996)
I.3 – 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996)
I.4 – 1452.204-70 Release of Claims – Department of the Interior (Jul 1996)
I.5 1452.236-70 Prohibition Against Use of Lead-Based Paint – Department of the Interior (Jul 1996)
I.6 – 52.219-13 Notice of Set-Aside of Orders (Nov 2011)
I.7 – 52.225-9 Buy American—Construction Materials (May 2014)
I.8 – 52.228-13 Alternative Payment Protections (Jul 2000)
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
J.1 – Attachments
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
K.1 – 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
K.2 – 52.204-8 Annual Representations and Certifications (Jan 2017)
K.3 – 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or
Equipment (Oct 2020)
K.4 – 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020)……...………..29
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
L.1 – 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
L.2 – Magnitude of Construction Project
L.3 – 1452.215-71 Use and Disclosure of Proposal Information – Department of the Interior (Apr 1984)
L.4 – 52.216-1 Type of Contract (Apr 1984)
L.5 – 52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work (May 2014)
L.6 – 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for
Construction (Feb 1999)
L.7 – 52.225-10 Notice of Buy American Requirement – Construction Materials (May 2014)
L.8 – 52.236-27 Site Visit (Construction) – Alt I (Feb 1995)
L.9 – Inquires (Asking Questions)
L.10 – Quotation Package (What to Submit)
L.11 – Responsibility Determinatio
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 – Evaluation Factors for Award
Section B – Supplies or Services and Prices
B.1 – Contract Price Schedule
See Section J, Attachments 1 Entitled: Contract Bid Schedule, Euerka Overhead Paint Project.
Additionally, the contractor shall submit a single, lump sum, price on the SF-1442. The price will to include all labor, tools, equipment, materials, mobilization, demobilization, disposal fees, all overhead and profit (applicable to prime contractor and subcontractor) necessary for completing all work.
Section C – Descriptions and Specifications
C.1 – Specifications
The Contractor shall furnish the necessary personnel, materials, equipment, services, expertise and appurtenances as necessary to successfully complete the work in accordance with the attached Scope of Work and other related documents which will be incorporated into the award:
• Scope of Work (see Section J, Attachment 03).
Section D – Packaging and Marking
There are no clauses in this section.
Section E – Inspection and Acceptance
E.1 – 52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far
Clause Title Date
52.246-12 Inspection of Construction Aug 1996
Section F – Deliveries or Performance
F.1 – 52.252-2 Clauses Incorporated by Reference (Feb 1998) available. Also, the full text of a clause may be accessed electronically at this/these address:
Clause Title Date
52.242-14 Suspension of Work Apr 1984
F.2 – 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Section G – Contract Administration Data
G.1 – Contract Administration
The Contracting Officer's Representative (COR) for this contract will be:
Jeffrey Morris
San Francisco Maritime NHP
Fort Mason Center, Building E
San Francisco, CA 94123
Email: jeffrey_morris@nps.gov
Telephone: 415-859-6805
The Contracting Officer with overall responsibility for this contract will be:
Gary Kramer
Contract Officer
National Park Service
401 Hillcrest Drive
Thousand Oaks, CA, 91360
(805) 370-2324 gary_kramer@nps.gov
G.2 – 1452.201-70 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment mailto:jeffrey_morris@nps.gov mailto:gary_kramer@nps.gov memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction
(written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the
Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting
Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.3 – Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's
Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the
Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
• A hard copy company invoice that has been approved by the COR.
• Release of Claim (with last invoice only) https://www.ipp.gov/
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
G.4 – Correspondence
Copies of all correspondence and written notices between the Contracting Officer’s
Representative and the Contractor shall be sent to the cognizant Contract Specialist at the address below, or by email. All correspondence sent by email shall state the contract number in the subject line of the email.
Contract Specialist responsible for administering this contract:
Gary Kramer
Contract Officer
National Park Service
401 Hillcrest Drive
Thousand Oaks, CA, 91360
(805) 370-2324 gary_kramer@nps.gov
G.5 – Appointment of Contractor Representative/Superintendent
Prior to commencement of work on this contract, the contractor shall provide to the Contracting
Officer, the name and telephone number of at least one responsible individual who will serve to respond to operational problems and/or emergencies on a daily basis. The contractor agrees that notice to the designated representative shall constitute notice to the contractor and agrees to be bound by any commitments or representations made by the representative.
mailto:ippgroup@bos.frb.org mailto:gary_kramer@nps.gov
Section H – Special Contract Requirements
H.1 – Interpretation of Contract – Notice of Ambiguities
(a) This written contract and any and all identified writings or documents incorporated by reference herein or physically attached hereto constitute the parties' complete agreement and no other prior or contemporaneous agreements either written or oral shall be considered to change, modify or contradict it. Any ambiguity in the contract will not be strictly construed against the drafter of the contract language but shall be resolved by applying the most reasonable interpretation under the circumstances, giving full consideration to the intentions of the parties at the time of contracting.
(b) It shall be the obligation of the Contractor to exercise due diligence to discover and to bring to the attention of the Contracting Officer at the earliest possible time any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated. Failure to comply with such obligation shall be deemed a waiver and release of any and all claims for extra costs or delay arising out of such ambiguities, discrepancies, inconsistencies, and conflicts.
H.2 – Workers Compensation
The Contractor is required to be insured against liability for workmen's compensation or to undertake self-insurance in accordance with the provisions of Section 3700 of the Labor Code of the State of California. Evidence of coverage is required before commencement of project work.
H.3 – Site Specific Safety and Health Plan
A site specific safety and health plan shall be prepared covering on-site work to be performed by the contractor and all subcontractors. The prime contractor shall be responsible for development, implementation, and oversight of the site specific plan. The site specific safety and health plan shall establish in detail, the protocols necessary for recognition, evaluation, and control of hazards associated with each task performed. The plan shall address site specific safety and health requirements and procedures based upon site specific conditions. The level of detail provided in the site specific safety and health plan shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. The site specific safety and health plan shall address, in as much detail as possible, anticipated tasks, their related hazards, and anticipated control measures.
As work proceeds, the site specific safety and health plan shall be adapted to new situations and new conditions. Changes and modifications to the accepted site specific safety and health plan shall be made with the knowledge and concurrence of the safety office, site superintendent, and contracting office.
Should any unforeseen hazard become evident during the performance of work, the contractor shall bring such hazard to the attention of the safety office and COR, both verbally and in writing for resolution as soon as possible. In the interim, necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public, and the environment.
Prior to submittal to the COR, the site specific safety and health plan shall be signed and dated by the prime contractor's safety and health manager and site superintendent. The site specific safety and health plan shall be part of the contractor's safety and Health program. The contractor shall submit to the COR the contractor's site specific safety and health plan for review and approval by the safety office.
Work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulations. This includes, but is not limited to, Occupational
Safety and Health Administration (OSHA) standards, 29 CFR, Part 1910 and Part 1926. Where the requirements of applicable laws, criteria, ordinances, regulations, and referenced documents vary the most stringent requirements shall apply.
H.4 – Conduct of Operations
At all times the Contractor shall conduct his organization in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and with such appropriate regulations as the Superintendent may prescribe. Work on Saturdays, Sundays, Federal holidays or at night may be performed only with the prior consent of the Contracting
Officer. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park except with approval of the Contracting Officer.
H.5 – Archeological Findings
(a) Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify Contracting Officer immediately of the findings; and continue operations in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for Contractor, he will be compensated by an equitable adjustment under the General Provisions of the Contract.
H.6 – Wage Rates
Davis-Bacon Wage Rates apply for this project and are attached to this solicitation (See Section
J). The project is located in San Francisco County, CA.
Section I – Contract Clauses
I.1 – 52.252-2 Clauses Incorporated by Reference (Feb 1998) available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Clause
Title
Date
52.202-1 Definitions Nov 2013
52.203-3 Gratuities Apr 1984
52.203-5 Covenant Against Contingent Fees May 2014
52.203-19 Prohibition on Requiring Certain Internal
Confidentiality Agreements or Statements.
Jan 2017
52.204-4 Printed or Copied Double-Sided on Postconsumer
Fiber Content Paper
May 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
Oct 2018
52.204-13 System for Award Management Maintenance Oct 2018
52.204-16 Commercial and Government Entity Code Reporting Jul 2016
52.204-18 Commercial and Government Entity Code Maintenance Jul 2016
52.204-19 Incorporation by Reference of Representations and
Certifications
Dec 2014
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment Aug 2020
52.209-10 Prohibition on Contracting with Inverted Domestic
Corporations
Nov 2015
52.209-6 Protecting the Government’s Interest When
Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.
Oct 2015
52.215-8 Order of Precedence -- Uniform Contract Format Oct 1997
52.215-19 Notification of Ownership Changes Oct 1997
52.219-6 Notice of Total Small Business Set-Aside Nov 2011
52.219-28 Post-Award Small Business Program Representation Jul 2013
52.222-3 Convict Labor Jun 2003
52.222-6 Construction Wage Rate Requirements Aug 2018
52.222-7 Withholding of Funds May 2014
52.222-8 Payrolls and Basic Records Aug 2018
52.222-9 Apprentices and Trainees Jul 2005
52.222-10 Compliance with Copeland Act Requirements Feb 1988
52.222-11 Subcontracts (Labor Standards) May 2014
52.222-12 Contract Termination - Debarment May 2014
52.222-13 Compliance with Construction Wage Rate
Requirements and Related Regulations
May 2014
52.222-14 Disputes Concerning Labor Standards Feb 1988
52.222-15 Certification of Eligibility May 2014
52.222-21 Prohibition of Segregated Facilities Apr 2015
52.222-26 Equal Opportunity Sep 2016
52.222-27 Affirmative Action Compliance Requirements for
Construction
Apr 2015
52.222-36 Equal Opportunity for Workers With Disabilities June 2020
52.222-50 Combating Trafficking in Persons Oct 2020
52.222-55 Minimum Wages Under Executive Order 13658 Dec 2015
52.223-5 Pollution Prevention and Right-to-Know Information May 2011
52.223-6 Drug Free Workplace May 2001
52.223-18 Encouraging Contractor Policies to Ban Text
Messaging While Driving
Aug 2011
52.225-13 Restrictions on Certain Foreign Purchases Jun 2008
52.227-1 Authorization and Consent Dec 2007
52.227-2 Notice and Assistance Regarding Patent and Copyright
Infringement
Dec 2007
52.227-4 Patent Indemnity -- Construction Contracts Dec 2007
52.228-14 Irrevocable Letter of Credit Nov 2014
52.232-5 Payments under Fixed-Price Construction Contracts May 2014
52.232-16 Progress Payments Apr 2012
52.232-23 Assignment of Claims May 2014
52.232-27 Prompt Payment for Construction Contracts Jan 2017
52.232-33 Payment by Electronic Funds Transfer -- System for
Award Management
Oct 2018
52.232-39 Unenforceability of Unauthorized Obligations Jun 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
Dec 2013
52.233-1 Disputes May 2014
52.233-3 Protest After Award Aug 1996
52.233-4 Applicable Law For Breach Of Contract Claim Oct 2004
52.236-2 Differing Site Conditions Apr 1984
52.236-3 Site Investigation and Conditions Affecting the Work Apr 1984
52.236-5 Material and Workmanship Apr 1984
52.236-6 Superintendence by the Contractor Apr 1984
52.236-7 Permits and Responsibilities Nov 1991
52.236-8 Other Contracts Apr 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
Apr 1984
52.236-10 Operations and Storage Areas Apr 1984
52.236-12 Cleaning Up Apr 1984
52.236-13 Accident Prevention Nov 1991
52.236-14 Availability and Use of Utility Services Apr 1984
52.236-17 Layout of Work Apr 1984
52.236-26 Preconstruction Conference Feb 1995
52.243-5 Changes and Changed Conditions Apr 1984
52.244-6 Subcontracts for Commercial Items Dec 2015
52.246-21 Warranty of Construction Mar 1994
52.249-1 Termination for Convenience of the Government
(Fixed-Price)(Short Form)
Apr 1984
52.249-10 Default (Fixed-Price Construction) Apr 1984
52.253-1 Computer Generated Forms Jan 1991
I.2 –1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996)
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the
Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
I.3 – 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$500,000 each person
$1,500,000 each occurrence
$1,000,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the
Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
I.4 – 1452.204-70 Release of Claims – Department of the Interior (Jul 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting
Officer with a release of claims against the United States relating to this contract. The Release of
Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
I.5 1452.236-70 Prohibition Against Use of Lead-Based Paint – Department of the Interior
(Jul 1996)
Paint containing more than .06 percent by weight of lead in paint, or the equivalent measure of lead in the dried film of paint already applied, shall not be used in the construction or rehabilitation of residential structures under this contract or any resulting subcontracts.
(End of provision)
I.6 – 52.219-13 Notice of Set-Aside of Orders (Nov 2011)
The Contracting Officer will give notice of the order or orders, if any, to be set aside for small business concerns identified in 19.000(a)(3) and the applicable small business program. This notice, and its restrictions, will apply only to the specific orders that have been set aside for any of the small business concerns identified in 19.000(a)(3).
I.7 – 52.225-9 Buy American—Construction Materials (May 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR
2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United
States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a
COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
“NONE”
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy
American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the
United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the
Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy
American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description
Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
I.8 – 52.228-13 Alternative Payment Protections (Jul 2000)
(a) The Contractor shall submit one of the following payment protections:
(i) A payment bond.
(ii) An irrevocable letter of credit (ILC).
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
Section J – List of Documents, Exhibits and Other Attachments
J.1 – Attachments
The following attachments are furnished herein and form a part of the solicitation/contract:
Attachment Number List of Documents, Exhibits, and Other Attachments
01 Contract Bid Schedule
02 Wage Determination: CA20210018 of 01/15/2021
03 Scope of Work
Section K – Representations, Certifications and Other Statements of
Offerors
K.1 – 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
Provision Title Date
52.236-28 Preparation of Proposals -- Construction Oct 1997
K.2 – 52.204-8 Annual Representations and Certifications (Jan 2017)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238320.
(2) The small business size standard is $16.5.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the
System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
□ (i) Paragraph (d) applies.
□ (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.
This provision applies to solicitations expected to exceed $150,000.
https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137850 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137850 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137583 https://www.acquisition.gov/sites/default/files/current/far/html/FARTOCP13.html#wp271421 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137684
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality
Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.
(vii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony
Conviction under any Federal Law. This provision applies to all solicitations.
(ix) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the
Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xiv) 52.222-25, Affirmative Action Compliance.This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvi) 52.222-57, Representation Regarding Compliance with Labor Laws (Executive Order 13673). This provision applies to solicitations expected to exceed $50 million which are issued from October 25, 2016 through April 24, 2017, and solicitations expected to exceed $500,000, which are issued after April 24, 2017.
Note to paragraph (c)(1)(xvi): By a court order issued on October 24, 2016, 52.222-57 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, GSA, DoD and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative
Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1150648 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137777 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137850 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1149919 https://www.acquisition.gov/sites/default/files/current/far/html/52_207_211.html#wp1144766 https://www.acquisition.gov/sites/default/files/current/far/html/52_207_211.html#wp1144909 https://www.acquisition.gov/sites/default/files/current/far/html/52_207_211.html#wp1146404 https://www.acquisition.gov/sites/default/files/current/far/html/52_214.html#wp1129381 https://www.acquisition.gov/sites/default/files/current/far/html/52_215.html#wp1144523 https://www.acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1135900 https://www.acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1135943 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1147663 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1147711 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1147704 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1147711 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1148142 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1168958 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1168785 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1168786 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1168826
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals–Representation.
This provision applies to solicitation that include the clause at 52.204-7.
(xx)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .